Thông tin tài liệu
BẢN VẼ THI CÔNG CONSTRUCTION DRAWING LEGEND THINK SAFETY - WORK SAFELY - Container 40'' for client / Consultant (2 storey) - Container 20'' for Main contractor & Sub contractor (2 storey) - Container 20'' for Storge - Guardhouse - Motorbike Parking Rev No Rev Description Rev Date Mặt định vị / Key plan: - Worker's toilet - Washing pooL 3m X 4m x1.5m(H) 8b 9b 10b 11b 12b 52200 - Corridor 4250 8400 D3 B3 1100 950 3700 4311 C3 Block D 800 4350 13b 14b 3552 7b 4984 6b 7237 7120 5b 17660 4b 21000 - Staff's toilet 3b 28000 1b 2b A3 1820 11 - Transformer 560KvA 12 - Existing Guardhouse SONKIM LAND CORPORATION 14 Gate (B=8m) 8465 14850 Địa / Address: 53-55 Nguyen Dinh Chieu Street, Ward 6, District 3, Ho Chi Minh City 7646 10019 13 -Local Security house KP1 Chủ đầu tư / Owner: 11476 6030 10 - Advertising Tư vấn / Consultant: 14 -Temp Road M1 L1 K1 J1 117165 Block A Địa / Address: Kiểm / Checked by: Ngày / Date: Duyệt / Approved by: Ngày / Date: H1 G1 Nhà thầu / Contractor: 77200 F1 E1 108 Cao Thang St.,Ward 4, Dist 3, HCMC, VN Dự Án / Project: SKL GATEWAY APARTMENTS PROJECT Block B D1 Thao Dien Ward, District 2, HCM city Dự án số / Project #: C1 Hạng Mục / Item: Block C B1 11 3972 6230 74400 8742 Tên vẽ / Drawing name: TEMPORARY SITE LAYOUT PLAN 10 3972 Gate (B=8m) 8720 4805 A1 12 13 Số hiệu vẽ / Sheet #: Tỉ lệ / Scale: As indicated 10 11 Vẽ / Drawn by: Author Ngày / Date: S_101 Sửa đổi / Rev.: 09/10/2015 Kiểm / Checked by: THAO PHAM Duyệt / Approved by: VIET NGO BẢN VẼ THI CÔNG CONSTRUCTION DRAWING THINK SAFETY - WORK SAFELY Rev No Rev Description Rev Date Mặt định vị / Key plan: Project Signboard k oc Bl Chủ đầu tư / Owner: D SONKIM LAND CORPORATION k oc Bl A Địa / Address: 53-55 Nguyen Dinh Chieu Street, Ward 6, District 3, Ho Chi Minh City Tư vấn / Consultant: Gate oc Bl kC Địa / Address: Kiểm / Checked by: Ngày / Date: Duyệt / Approved by: Ngày / Date: Gate Nhà thầu / Contractor: oc Bl kB 108 Cao Thang St.,Ward 4, Dist 3, HCMC, VN Dự Án / Project: SKL GATEWAY APARTMENTS PROJECT Thao Dien Ward, District 2, HCM city Dự án số / Project #: Hạng Mục / Item: Tên vẽ / Drawing name: TEMPORARY SITE LAYOUT_3D VIEW Số hiệu vẽ / Sheet #: Tỉ lệ / Scale: Ngày / Date: Vẽ / Drawn by: Author Kiểm / Checked by: THAO PHAM S_102 Sửa đổi / Rev.: 09/10/2015 3D- TEMPORARY SITE LAYOUT PLAN Duyệt / Approved by: VIET NGO BẢN VẼ THI CÔNG CONSTRUCTION DRAWING THINK SAFETY - WORK SAFELY Rev No Rev Description Rev Date 5960 Mặt định vị / Key plan: Temporary fence M1 L1 q=1T/m2 -0.200 m F1 600 EXISTING GROUND -200 K1 J1 Block A B1 -3300 Chủ đầu tư / Owner: SONKIM LAND CORPORATION H1 G1 Sheet piles L=12m F1 Địa / Address: 53-55 Nguyen Dinh Chieu Street, Ward 6, District 3, Ho Chi Minh City 87460 77200 Tư vấn / Consultant: E1 S2 S2 Sheet piles for TC3's foundation Top level = -0,200 L=6m Block B SECTION S2 : 100 Địa / Address: Kiểm / Checked by: Ngày / Date: Duyệt / Approved by: Ngày / Date: -0.200 m 3400 D1 8600 5200 8100 C1 Block C Nhà thầu / Contractor: Pile driver Sheet piles L=12m -0.200 m 9082 39300 36080 3050 B1 108 Cao Thang St.,Ward 4, Dist 3, HCMC, VN -0.200 m 4380 4379 4702 Thao Dien Ward, District 2, HCM city Sheet piles L=12m -0.200 m 4681 4300 A1 Dự Án / Project: SKL GATEWAY APARTMENTS PROJECT 15010 -0.200 m Sheet piles L=12m S2 Dự án số / Project #: Hạng Mục / Item: S2 Tên vẽ / Drawing name: 10 SHEET PILES LAYOUT PLAN FOR BASEMENT BLOCK A, B, C : 250 11 SHEET PILES LAYOUT PLAN FOR BASEMENT BLOCK A, B, C Số hiệu vẽ / Sheet #: Tỉ lệ / Scale: As indicated Vẽ / Drawn by: Author Ngày / Date: S_103 Sửa đổi / Rev.: 09/10/2015 Kiểm / Checked by: THAO PHAM Duyệt / Approved by: VIET NGO BẢN VẼ THI CÔNG CONSTRUCTION DRAWING THINK SAFETY - WORK SAFELY Rev No Rev Description Rev Date Mặt định vị / Key plan: Chủ đầu tư / Owner: Pile driver SONKIM LAND CORPORATION Sheet piles for Block A, B, C Top level = -0,200 L=12m Sheet piles for Block A, B, C Top level = -0,200 L=12m Sheet piles for TC3's foundation Top level = -0,200 L=6m Địa / Address: 53-55 Nguyen Dinh Chieu Street, Ward 6, District 3, Ho Chi Minh City Tư vấn / Consultant: Địa / Address: Kiểm / Checked by: Ngày / Date: Duyệt / Approved by: Ngày / Date: Nhà thầu / Contractor: 108 Cao Thang St.,Ward 4, Dist 3, HCMC, VN Dự Án / Project: SKL GATEWAY APARTMENTS PROJECT Thao Dien Ward, District 2, HCM city Dự án số / Project #: Hạng Mục / Item: Tên vẽ / Drawing name: 3D_VIEW DRIVE SHEET PILES FOR BLOCK A, B, C Số hiệu vẽ / Sheet #: 3D_VIEW DRIVE SHEET PILES FOR BLOCK A, B, C Tỉ lệ / Scale: Ngày / Date: Vẽ / Drawn by: Author Kiểm / Checked by: THAO PHAM S_104 Sửa đổi / Rev.: 09/10/2015 Duyệt / Approved by: VIET NGO BẢN VẼ THI CÔNG CONSTRUCTION DRAWING THINK SAFETY - WORK SAFELY Rev No Rev Description Rev Date Mặt định vị / Key plan: 1640 73108 1292 3000 910 M1 L1 3000 8390 Safety Railling 7200 K1 J1 Chủ đầu tư / Owner: Block A SONKIM LAND CORPORATION H1 Địa / Address: 53-55 Nguyen Dinh Chieu Street, Ward 6, District 3, Ho Chi Minh City B ck Bl o G1 Tư vấn / Consultant: F1 57663 C ck Bl o E1 Địa / Address: Kiểm / Checked by: Ngày / Date: Duyệt / Approved by: Ngày / Date: A ck Bl o Safety Railling Block B Nhà thầu / Contractor: 6250 D1 C1 Block C 7643 B1 3D_VIEW TEMPORARY SITE LAYOUT PLAN 108 Cao Thang St.,Ward 4, Dist 3, HCMC, VN Dự Án / Project: SKL GATEWAY APARTMENTS PROJECT Thao Dien Ward, District 2, HCM city Dự án số / Project #: A1 Hạng Mục / Item: Tên vẽ / Drawing name: 10 11 TEMPORARY SITE LAYOUT FOR EXCAVATION STAGE CDM WORKING TEMPORARY SITE LAYOUT FOR STAGE EXCAVATION WORKING : 250 Số hiệu vẽ / Sheet #: Tỉ lệ / Scale: : 250 Vẽ / Drawn by: Author Ngày / Date: S_105 Sửa đổi / Rev.: 09/10/2015 Kiểm / Checked by: THAO PHAM Duyệt / Approved by: VIET NGO BẢN VẼ THI CÔNG CONSTRUCTION DRAWING Remark : THINK SAFETY - WORK SAFELY Rev No 6100 1200 1800 Safety Way L1 -4.400 m 3650 WH4.5m_B2.2m_L7m 700 3200 5700 1200 Mặt định vị / Key plan: WH3.8m_B3.2m_L6m 2100 2790 1200 M1 -4.400 m 2100 -4.400 m -0.700 m 3200 1100 3200 1800 3200 5700 -0.700 m 4200 -0.700 m -0.700 m Safety Way 1200 WH5.2m_B4.2m_L8m -0.200 m 2400 3200 CDM driver WH5.7m_B3.2m_L9m -4.400 m Block A -0.200 m 2200 4700 SONKIM LAND CORPORATION H1 1450 2200 14850 WH7.9m_B6.2m_L15m 700 3200 Địa / Address: 53-55 Nguyen Dinh Chieu Street, Ward 6, District 3, Ho Chi Minh City 850 1050 3700 G1 Chủ đầu tư / Owner: WH9.4m_B7.2m_L14.5m 11500 K1 J1 Rev Date WH2.2m_B1.2m_L4m 8900 5200 Rev Description WH8.2m_B6.2m_L15m -5.900 m 2700 -0.200 m -1.700 m Tư vấn / Consultant: 11150 F1 -0.200 m -5.900 m 3003200 2700 5700 Địa / Address: Kiểm / Checked by: Ngày / Date: Duyệt / Approved by: Ngày / Date: -4.200 m -1.800 m 250 Top level=-1,800 L= 9m 3200 Block B -4.200 m 3790 6000 D1 7200 4000 2700 -0.200 m 700 1540 4010 6200 Safety Way E1 Nhà thầu / Contractor: 3300 2900 D1 C1 Sheet piles L=12m -2.400 m -3.700 m Top level=-4,200 L= 9m Top level=-1,800; L= 9m 5650 Dự Án / Project: SKL GATEWAY APARTMENTS PROJECT 700 3200 11 3200 850 3600 3200 1650 -0.200 m 108 Cao Thang St.,Ward 4, Dist 3, HCMC, VN Sheet piles L=12m A1 5000 1750 6950 9000 -3.700 m Block C 3200 1150 2200 2700 4450 1200 B1 -5.900 m 1200 -2.400 m 6350 -1.700 m Thao Dien Ward, District 2, HCM city Sheet piles L=12m Dự án số / Project #: -2.400 m 2900 Hạng Mục / Item: 3150 Tên vẽ / Drawing name: 10 11 CMD LOCATION LAYOUT PLAN CMD PILES LAYOUT PLAN : 250 Số hiệu vẽ / Sheet #: Tỉ lệ / Scale: As indicated Vẽ / Drawn by: Author Ngày / Date: S_106 Sửa đổi / Rev.: 09/10/2015 Kiểm / Checked by: THAO PHAM Duyệt / Approved by: VIET NGO BẢN VẼ THI CÔNG CONSTRUCTION DRAWING THINK SAFETY - WORK SAFELY Rev No Rev Description Rev Date Mặt định vị / Key plan: -0.200 m -1.700 m -0.200 m -3.700 m -0.200 m -2.400 m Chủ đầu tư / Owner: -1.700 m SONKIM LAND CORPORATION -0.200 m -0.200 m Địa / Address: 53-55 Nguyen Dinh Chieu Street, Ward 6, District 3, Ho Chi Minh City -5.900 m -4.400 m -3.700 m Tư vấn / Consultant: -4.200 m -5.900 m -0.700 m -0.200 m CDM Driver Địa / Address: Kiểm / Checked by: Ngày / Date: Duyệt / Approved by: Ngày / Date: Nhà thầu / Contractor: 108 Cao Thang St.,Ward 4, Dist 3, HCMC, VN Dự Án / Project: SKL GATEWAY APARTMENTS PROJECT Thao Dien Ward, District 2, HCM city Dự án số / Project #: Hạng Mục / Item: Tên vẽ / Drawing name: 3D_VIEW DRIVE CDM PILES FOR BLOCK A, B, C 3D_VIEW CONSTRUCT CDM PILES FOR BLOCK A, B, C Số hiệu vẽ / Sheet #: Tỉ lệ / Scale: Ngày / Date: Vẽ / Drawn by: Author Kiểm / Checked by: THAO PHAM S_107 Sửa đổi / Rev.: 09/10/2015 Duyệt / Approved by: VIET NGO BẢN VẼ THI CÔNG CONSTRUCTION DRAWING CDM Piles 2600 2100 3950 800 2400 1750 THINK SAFETY - WORK SAFELY 800 Rev No 3500 TC1's foundation M1 TC1's foundation 50 3950 4000 L1 Rev Date Mặt định vị / Key plan: 500 800 M1 Bored pile driver Rev Description 4000 2090 2400 1410 800 S_108 2100 L1 K1 J1 Block A SHEET PILES for TC1 's FOUNDATION : 100 Chủ đầu tư / Owner: 2900 H1 400 4000 2400 TC3's foundation SONKIM LAND CORPORATION 800 1410 800 Địa / Address: 53-55 Nguyen Dinh Chieu Street, Ward 6, District 3, Ho Chi Minh City 4000 Bored piles of TC3's foundation L=32m Tư vấn / Consultant: 140 D1 E1 2600 800 F1 2400 800 G1 CDM piles Sheet piles L=6m TC3's foundation Bored piles of TC3's foundation Block B S1 S1 Địa / Address: Kiểm / Checked by: Ngày / Date: Duyệt / Approved by: Ngày / Date: S_108 D1 Sheet piles L=6m 11 C1 Block C SHEET PILES for TC3 's FOUNDATION Nhà thầu / Contractor: : 100 -0.200 m B1 -0.200 m 108 Cao Thang St.,Ward 4, Dist 3, HCMC, VN Dự Án / Project: SKL GATEWAY APARTMENTS PROJECT A1 Thao Dien Ward, District 2, HCM city Dự án số / Project #: Hạng Mục / Item: 10 Tên vẽ / Drawing name: 11 CONSTRUCT BORED PILES FOR TC1 & TC3 's FOUNDATION CONSTRUCT SHEET PILES FOR TC1 & TC3 's FOUNDATION : 250 Số hiệu vẽ / Sheet #: Tỉ lệ / Scale: SECTION S1 - TC3 's FOUNDATION : 100 As indicated Vẽ / Drawn by: Author Ngày / Date: S_108 Sửa đổi / Rev.: 09/10/2015 Kiểm / Checked by: THAO PHAM Duyệt / Approved by: VIET NGO BẢN VẼ THI CÔNG CONSTRUCTION DRAWING THINK SAFETY - WORK SAFELY Rev No Rev Description Rev Date Mặt định vị / Key plan: Chủ đầu tư / Owner: SONKIM LAND CORPORATION B ck Blo Địa / Address: 53-55 Nguyen Dinh Chieu Street, Ward 6, District 3, Ho Chi Minh City Tư vấn / Consultant: C ck Blo A ck Blo Pile driver Địa / Address: Kiểm / Checked by: Ngày / Date: Duyệt / Approved by: Ngày / Date: Nhà thầu / Contractor: Bored piles for TC3 's foundation L=32m 108 Cao Thang St.,Ward 4, Dist 3, HCMC, VN Bored piles for TC3 's foundation L=32m Dự Án / Project: SKL GATEWAY APARTMENTS PROJECT Thao Dien Ward, District 2, HCM city Dự án số / Project #: Hạng Mục / Item: Tên vẽ / Drawing name: 3D VIEW_CONSTRUCT BORED PILES FOR TC1 & TC3 's FOUNDATION 3D VIEW_CONSTRUCT SHEET PILES FOR TC1 & TC3 's FOUNDATION Số hiệu vẽ / Sheet #: Tỉ lệ / Scale: Ngày / Date: Vẽ / Drawn by: Author Kiểm / Checked by: THAO PHAM S_109 Sửa đổi / Rev.: 09/10/2015 Duyệt / Approved by: VIET NGO BẢN VẼ THI CÔNG CONSTRUCTION DRAWING THINK SAFETY - WORK SAFELY Rev No Rev Description Rev Date 20957 9082 E3 11875 E1 -0.700 m -0.700 m -0.700 m Mặt định vị / Key plan: M1 12090 15990 -0.200 m [No Slope] TC1's foundation -4.400 m -4.400 m -0.200 m 3900 L1 -0.200 m -0.200 m Raft foundation of Block A K1 J1 -4.900 m Chủ đầu tư / Owner: -0.200 m SONKIM LAND CORPORATION Excavator -0.200 m H1 -1.700 m Địa / Address: 53-55 Nguyen Dinh Chieu Street, Ward 6, District 3, Ho Chi Minh City Sump Pit G1 Tư vấn / Consultant: Sump Pit -1.700 m F1 -1.700 m -4.900 m E2 E2 E1 -0.200 m Địa / Address: Kiểm / Checked by: Ngày / Date: Duyệt / Approved by: Ngày / Date: -4.200 m -0.200 m Raft foundation of Block B TC3's foundation -0.200 m D1 Nhà thầu / Contractor: -4.900 m -1.700 m Excavator 21° C1 -0.200 m -1.700 m 40° -2.400 m -3.700 m 108 Cao Thang St.,Ward 4, Dist 3, HCMC, VN Dự Án / Project: SKL GATEWAY APARTMENTS PROJECT -0.200 m 18927 -2.400 m Thao Dien Ward, District 2, HCM city Dự án số / Project #: Sheet piles L=12m 20242 15° 21 ° A1 17777 B1 1150 -0.200 m 16450 Hạng Mục / Item: 36692 -2.400 m -2.400 m Excavator to level -4,900 Volume : 18875 (m3) -0.200 m Tên vẽ / Drawing name: E3 E1 EXCAVATION METHOD DRAWING - STAGE 1 : 250 10 11 STAGE EXCAVATOR TO -4,900m & CONSTRUCT TC1, TC3 's FOUNDATIONS Số hiệu vẽ / Sheet #: Tỉ lệ / Scale: : 250 Vẽ / Drawn by: Author Ngày / Date: S_110 Sửa đổi / Rev.: 09/10/2015 Kiểm / Checked by: THAO PHAM Duyệt / Approved by: VIET NGO BẢN VẼ THI CÔNG CONSTRUCTION DRAWING THINK SAFETY - WORK SAFELY Rev No Rev Description Rev Date Mặt định vị / Key plan: Gate Temporary fence Safety Railling CDM Piles -0,200 -0,200 -0,200 Excavator -4,900 Chủ đầu tư / Owner: SONKIM LAND CORPORATION SECTION E1 - EXCAVATION METHOD - STAGE Gate Địa / Address: 53-55 Nguyen Dinh Chieu Street, Ward 6, District 3, Ho Chi Minh City Tư vấn / Consultant: Safety Railling CDM Piles -0,700 -0,200 Địa / Address: Kiểm / Checked by: Ngày / Date: Duyệt / Approved by: Ngày / Date: Excavator -4,900 Nhà thầu / Contractor: SECTION E2 - EXCAVATION METHOD - STAGE Gate 108 Cao Thang St.,Ward 4, Dist 3, HCMC, VN Dự Án / Project: SKL GATEWAY APARTMENTS PROJECT Temporary fence CDM Piles -0,200 -0,200 Safety Railling -0,200 Thao Dien Ward, District 2, HCM city Dự án số / Project #: Hạng Mục / Item: Excavator -4,900 Tên vẽ / Drawing name: STAGE - SECTION E1, E2 & E3 SECTION E3 - EXCAVATION METHOD - STAGE Số hiệu vẽ / Sheet #: Tỉ lệ / Scale: Ngày / Date: Vẽ / Drawn by: Author Kiểm / Checked by: THAO PHAM S_111 Sửa đổi / Rev.: 09/10/2015 Duyệt / Approved by: VIET NGO BẢN VẼ THI CÔNG CONSTRUCTION DRAWING THINK SAFETY - WORK SAFELY Rev No Rev Description Rev Date Mặt định vị / Key plan: -1.700 m -3.700 m -0.200 m -2.400 m Ra ft f o un da tio n of -4.900 m Chủ đầu tư / Owner: Blo ck B SONKIM LAND CORPORATION -1.700 m -0.200 m Excavator -0.200 m Địa / Address: 53-55 Nguyen Dinh Chieu Street, Ward 6, District 3, Ho Chi Minh City Sump Pit Tư vấn / Consultant: -0.200 m -4.900 m -4.200 m Excavator to level -4,900 Volume : 18875 (m3) -0.200 m TC3's foundation -0.200 m -4.900 m Địa / Address: Kiểm / Checked by: Ngày / Date: Duyệt / Approved by: Ngày / Date: Sump Pit TC1's foundation Excavator -0.200 m ft Ra f no tio da n fou A ck Blo -0.700 m Nhà thầu / Contractor: 108 Cao Thang St.,Ward 4, Dist 3, HCMC, VN Dự Án / Project: SKL GATEWAY APARTMENTS PROJECT Thao Dien Ward, District 2, HCM city Dự án số / Project #: Hạng Mục / Item: 3D_VIEW - EXCAVATION METHOD - STAGE Tên vẽ / Drawing name: 3D_VIEW - S1 EXCAVATOR TO -4,900m & CONSTRUCT TC1, TC3 's FOUNDATIONS Số hiệu vẽ / Sheet #: Tỉ lệ / Scale: Ngày / Date: Vẽ / Drawn by: Author Kiểm / Checked by: THAO PHAM S_112 Sửa đổi / Rev.: 09/10/2015 Duyệt / Approved by: VIET NGO BẢN VẼ THI CÔNG CONSTRUCTION DRAWING THINK SAFETY - WORK SAFELY Rev No Rev Description Rev Date -4,900 E3 E1 -0.700 m Existing Piles Mặt định vị / Key plan: Piles head cutting [No Slope] M1 L1 -5,900 -4.400 m -4.400 m -4.400 m EXCAVATOR & PILE HEAD CUTTIONG SECTION -0.200 m -0.200 m Raft foundation of Block A -5.900 m K1 J1 Chủ đầu tư / Owner: -0.200 m Excavator Owner -0.200 m -0.200 m H1 -1.700 m Địa / Address: Piles head cutting G1 Tư vấn / Consultant: -1.700 m F1 Existing Piles -5.900 m -1.700 m E2 E2 -5.900 m E1 -5.900 m Địa / Address: Kiểm / Checked by: Ngày / Date: Duyệt / Approved by: Ngày / Date: -0.200 m -0.200 m Raft foundation of Block B -5.900 m Excavator D1 -4.200 m Nhà thầu / Contractor: -1.700 m 21° C1 -0.200 m -0.200 m B1 108 Cao Thang St.,Ward 4, Dist 3, HCMC, VN -1.700 m Dự Án / Project: SKL GATEWAY APARTMENTS PROJECT 40° -3.700 m -0.200 m Thao Dien Ward, District 2, HCM city A1 Hạng Mục / Item: 15° 21 ° Dự án số / Project #: Sheet piles L=12m -2.400 m Excavator to level -5,900 Volume : 6053 (m3) -0.200 m E3 E1 10 11 Tên vẽ / Drawing name: STAGE - EXCAVATOR TO -5,900m & BREAK PILES HEAD EXCAVATION METHOD DRAWING - STAGE : 250 Số hiệu vẽ / Sheet #: Tỉ lệ / Scale: : 250 Vẽ / Drawn by: Author Ngày / Date: S_113 Sửa đổi / Rev.: 10/06/15 Kiểm / Checked by: THAO PHAM Duyệt / Approved by: VIET NGO BẢN VẼ THI CÔNG CONSTRUCTION DRAWING THINK SAFETY - WORK SAFELY Rev No Rev Description Rev Date Gate Safety Railling CDM piles -0,200 Existing piles Mặt định vị / Key plan: Break piles head machine -0,200 -5,900 Chủ đầu tư / Owner: SECTION E1 - EXCAVATION METHOD - STAGE SONKIM LAND CORPORATION Địa / Address: 53-55 Nguyen Dinh Chieu Street, Ward 6, District 3, Ho Chi Minh City Gate Tư vấn / Consultant: Safety Railling CDM Piles -0,700 -0,200 Địa / Address: Kiểm / Checked by: Ngày / Date: Duyệt / Approved by: Ngày / Date: Pile head cutting Existing piles -5,900 Nhà thầu / Contractor: -5,900 SECTION E2 - EXCAVATION METHOD - STAGE 108 Cao Thang St.,Ward 4, Dist 3, HCMC, VN Gate Dự Án / Project: SKL GATEWAY APARTMENTS PROJECT Thao Dien Ward, District 2, HCM city Temporary fence CDM Piles -0,200 Safety Railling -0,200 Dự án số / Project #: Hạng Mục / Item: -0,200 -5,900 Piles head cutting Tên vẽ / Drawing name: STAGE - SECTION E1, E2 & E3 Số hiệu vẽ / Sheet #: SECTION E3 - EXCAVATION METHOD - STAGE Tỉ lệ / Scale: Ngày / Date: Vẽ / Drawn by: Author Kiểm / Checked by: THAO PHAM S_114 Sửa đổi / Rev.: 09/10/2015 Duyệt / Approved by: VIET NGO BẢN VẼ THI CÔNG CONSTRUCTION DRAWING THINK SAFETY - WORK SAFELY Rev No Rev Description Rev Date Mặt định vị / Key plan: -1.700 m -3.700 m -0.200 m -2.400 m Ra Chủ đầu tư / Owner: ft f o un da tio n of Owner Blo ck B -5.900 m -0.200 m Địa / Address: Tư vấn / Consultant: Sump Pit Excavator Piles head cutting -5.900 m -0.200 m Excavator -4.200 m ing es Pil Excavator to level -5,900 Volume : 6053 (m3) ist Ex -0.200 m Sump Pit ft Ra fo B of on ati d un kA loc -0.700 m Địa / Address: Kiểm / Checked by: Ngày / Date: Duyệt / Approved by: Ngày / Date: -5.900 m Nhà thầu / Contractor: 108 Cao Thang St.,Ward 4, Dist 3, HCMC, VN Dự Án / Project: SKL GATEWAY APARTMENTS PROJECT Thao Dien Ward, District 2, HCM city Dự án số / Project #: Hạng Mục / Item: 3D_VIEW - EXCAVATION METHOD - STAGE Tên vẽ / Drawing name: 3D_VIEW - S2 - EXCAVATOR TO -5,900m & BREAK PILES HEAD Số hiệu vẽ / Sheet #: Tỉ lệ / Scale: Ngày / Date: Vẽ / Drawn by: Author Kiểm / Checked by: THAO PHAM S_115 Sửa đổi / Rev.: 10/06/15 Duyệt / Approved by: VIET NGO BẢN VẼ THI CÔNG CONSTRUCTION DRAWING THINK SAFETY - WORK SAFELY Rev No E3 Rev Description Rev Date E1 -0.700 m Mặt định vị / Key plan: [No Slope] M1 -0.200 m -4.400 m -4.400 m -0.200 m L1 -0.200 m Block A -5.900 m K1 J1 6520 Chủ đầu tư / Owner: -0.200 m H1 SONKIM LAND CORPORATION Timper driver 10001000 450 930 -0.200 m 8600 14900 3850 Địa / Address: 53-55 Nguyen Dinh Chieu Street, Ward 6, District 3, Ho Chi Minh City -1.700 m 6800 -1.700 m 6800 1000 F1 -1.700 m 2050 Tư vấn / Consultant: Timper Piles (25 piles/m2) 1000 -5.900 m 1400 G1 -5.900 m E1 E2 7051 Block B 11700 1000 -5.900 m 400 E2 4000 Ngày / Date: Nhà thầu / Contractor: 3750 -1.700 m 1000 1250 8200 Duyệt / Approved by: -4.200 m -5.900 m Timper driver D1 Ngày / Date: -0.200 m 900 -0.200 m Địa / Address: Kiểm / Checked by: 21° 1000 2100 13275 C1 -0.200 m -0.200 m 108 Cao Thang St.,Ward 4, Dist 3, HCMC, VN B1 -1.700 m Dự Án / Project: SKL GATEWAY APARTMENTS PROJECT 40° -0.200 m -3.700 m Thao Dien Ward, District 2, HCM city A1 21 ° Dự án số / Project #: 15° Hạng Mục / Item: -2.400 m -0.200 m Tên vẽ / Drawing name: E3 STAGE - CONSTRUC TIMPER PILES E1 10 11 EXCAVATION METHOD DRAWING - STAGE : 250 Số hiệu vẽ / Sheet #: Tỉ lệ / Scale: : 250 Vẽ / Drawn by: Author Ngày / Date: S_116 Sửa đổi / Rev.: 09/10/2015 Kiểm / Checked by: THAO PHAM Duyệt / Approved by: VIET NGO BẢN VẼ THI CÔNG CONSTRUCTION DRAWING THINK SAFETY - WORK SAFELY Rev No Rev Description Rev Date Gate Mặt định vị / Key plan: CDM Piles Satety Railling -0,200 Timper piles (L=6m) -5,900 Excavator Chủ đầu tư / Owner: SONKIM LAND CORPORATION SECTION E1 - EXCAVATION METHOD - STAGE Địa / Address: 53-55 Nguyen Dinh Chieu Street, Ward 6, District 3, Ho Chi Minh City Gate Tư vấn / Consultant: Safety Railling CDM Piles -0,700 -0,200 Địa / Address: Kiểm / Checked by: Ngày / Date: Duyệt / Approved by: Ngày / Date: Excavator -4,900 Timper piles -5,900 -5,900 Nhà thầu / Contractor: SECTION E2 - EXCAVATION METHOD - STAGE 108 Cao Thang St.,Ward 4, Dist 3, HCMC, VN Gate Dự Án / Project: SKL GATEWAY APARTMENTS PROJECT Thao Dien Ward, District 2, HCM city Temporary fence Dự án số / Project #: CDM Piles -0,200 Safety Railling -0,200 Hạng Mục / Item: -0,200 -5,900 Timper driver Tên vẽ / Drawing name: STAGE - SECTION E1, E2 & E3 SECTION E3 - EXCAVATION METHOD - STAGE Số hiệu vẽ / Sheet #: Tỉ lệ / Scale: Ngày / Date: Vẽ / Drawn by: Author Kiểm / Checked by: THAO PHAM S_117 Sửa đổi / Rev.: 09/10/2015 Duyệt / Approved by: VIET NGO BẢN VẼ THI CÔNG CONSTRUCTION DRAWING THINK SAFETY - WORK SAFELY Rev No Rev Description Rev Date Mặt định vị / Key plan: -1.700 m -3.700 m -2.400 m -0.200 m Chủ đầu tư / Owner: SONKIM LAND CORPORATION -1.700 m -5.900 m -0.200 m Địa / Address: 53-55 Nguyen Dinh Chieu Street, Ward 6, District 3, Ho Chi Minh City Tư vấn / Consultant: -0.200 m Excavator -0.200 m Timper Piles L=6m -4.200 m -5.900 m Địa / Address: Kiểm / Checked by: Ngày / Date: Duyệt / Approved by: Ngày / Date: -5.900 m Excavator -0.700 m Nhà thầu / Contractor: -0.200 m 108 Cao Thang St.,Ward 4, Dist 3, HCMC, VN Dự Án / Project: SKL GATEWAY APARTMENTS PROJECT Thao Dien Ward, District 2, HCM city Dự án số / Project #: Hạng Mục / Item: Tên vẽ / Drawing name: 3D_VIEW - EXCAVATION METHOD - STAGE 3D_VIEW - S3 CONSTRUC TIMPER PILES Số hiệu vẽ / Sheet #: Tỉ lệ / Scale: Ngày / Date: Vẽ / Drawn by: Author Kiểm / Checked by: THAO PHAM S_118 Sửa đổi / Rev.: 09/10/2015 Duyệt / Approved by: VIET NGO BẢN VẼ THI CÔNG CONSTRUCTION DRAWING THINK SAFETY - WORK SAFELY Rev No E3 Rev Description Rev Date E1 -0.700 m -0.700 m -0.700 m Mặt định vị / Key plan: -4.400 m -0.200 m L1 3300 21450 -4.400 m 8850 5500 6800 M1 6000 -5.900 m 3000 20450 4800 Raft foundation of Block A Chủ đầu tư / Owner: 19249 -6.900 m 7519 1500 1750 10450 K1 J1 -0.200 m SONKIM LAND CORPORATION 1150 -0.200 m 2050 F1 2800 -1.700 m 1700 2500 G1 8800 5400 1500 3000 2200 -8.100 m 1850 -8.200 m -5.900 m 5800 1750 -5.900 m 2350 1850 1850 H1 Tank Bottom Block A & Block B 1800 Địa / Address: 53-55 Nguyen Dinh Chieu Street, Ward 6, District 3, Ho Chi Minh City Tư vấn / Consultant: -5.900 m -8.100 m -5.900 m E2 398 5600 E2 6450 8149 -8.200 m -0.200 m 500 C1 4000 13500 2500 2500 2000 -4.200 m -8.100 m 4100 1700 4200 3099 1750 275 -3.700 m Duyệt / Approved by: Ngày / Date: 11500 -9.600 m -0.200 m -3.700 m -1.700 m Ngày / Date: -8.200 m -5.900 m B1 Địa / Address: Kiểm / Checked by: Nhà thầu / Contractor: -0.200 m 12400 13700 1750 D1 4000 Tank of Block B 3750 1250 15000 -7.200 m -0.200 m 6250 Raft foundation of Block B -6.900 m -8.400 m -0.200 m 13550 E1 108 Cao Thang St.,Ward 4, Dist 3, HCMC, VN -8.100 m -5.900 m -2.400 m -3.700 m -0.200 m Dự Án / Project: SKL GATEWAY APARTMENTS PROJECT -0.200 m A1 Thao Dien Ward, District 2, HCM city Dự án số / Project #: -2.400 m -0.200 m Excavator to level -8,100 Volume : 1098 (m3) Hạng Mục / Item: Tên vẽ / Drawing name: E3 E1 EXCAVATION METHOD DRAWING - STAGE 10 11 STAGE EXCAVATOR TO -8,100m : 250 Số hiệu vẽ / Sheet #: Tỉ lệ / Scale: : 250 Vẽ / Drawn by: Author Ngày / Date: S_119 Sửa đổi / Rev.: 09/10/2015 Kiểm / Checked by: THAO PHAM Duyệt / Approved by: VIET NGO BẢN VẼ THI CÔNG CONSTRUCTION DRAWING THINK SAFETY - WORK SAFELY Rev No Gate Temp fence Rev Description Rev Date Safety Railling -0,200 Mặt định vị / Key plan: -5,900 -5,900 -8,100 -8,100 Timper piles Timper piles Timper piles SECTION E1 - EXCAVATION METHOD - STAGE Chủ đầu tư / Owner: SONKIM LAND CORPORATION Gate Địa / Address: 53-55 Nguyen Dinh Chieu Street, Ward 6, District 3, Ho Chi Minh City Tư vấn / Consultant: Safety Railling CDM Piles -0,700 -0,200 Excavator -4,900 -5,900 Địa / Address: Kiểm / Checked by: Ngày / Date: Duyệt / Approved by: Ngày / Date: -5,900 Timper piles -8,100 Nhà thầu / Contractor: SECTION E2 - EXCAVATION METHOD - STAGE 108 Cao Thang St.,Ward 4, Dist 3, HCMC, VN Gate Dự Án / Project: SKL GATEWAY APARTMENTS PROJECT Thao Dien Ward, District 2, HCM city Temporary fence CDM Piles -0,200 Safety Railling -0,200 -0,200 Dự án số / Project #: Hạng Mục / Item: -5,900 -5,900 Timper piles -8,100 -8,100 Tên vẽ / Drawing name: STAGE - SECTION E1, E2 & E3 SECTION E3 - EXCAVATION METHOD - STAGE Số hiệu vẽ / Sheet #: Tỉ lệ / Scale: Ngày / Date: Vẽ / Drawn by: Author Kiểm / Checked by: THAO PHAM S_120 Sửa đổi / Rev.: 09/10/2015 Duyệt / Approved by: VIET NGO BẢN VẼ THI CÔNG CONSTRUCTION DRAWING THINK SAFETY - WORK SAFELY Rev No Rev Description Rev Date Mặt định vị / Key plan: -1.700 m -3.700 m -0.200 m -2.400 m -5.900 m -1.700 m Chủ đầu tư / Owner: -0.200 m SONKIM LAND CORPORATION -8.200 m Ta nk -0.200 m -8.400 m -6.900 m of Bl o ck B -5.900 m -7.200 m Địa / Address: 53-55 Nguyen Dinh Chieu Street, Ward 6, District 3, Ho Chi Minh City -8.100 m -0.200 m -8.200 m Tư vấn / Consultant: -0.200 m -4.200 m -8.100 m -5.900 m B nk -5.900 m Ta om ott Blo A ck lo &B ck Excavator to level -8,100 Volume : 1098 (m3) B -5.900 m -8.200 m -6.900 m -0.700 m Địa / Address: Kiểm / Checked by: Ngày / Date: Duyệt / Approved by: Ngày / Date: Nhà thầu / Contractor: -0.200 m -5.900 m 108 Cao Thang St.,Ward 4, Dist 3, HCMC, VN Dự Án / Project: SKL GATEWAY APARTMENTS PROJECT Thao Dien Ward, District 2, HCM city Dự án số / Project #: Hạng Mục / Item: 3D_VIEW - EXCAVATION METHOD - STAGE Tên vẽ / Drawing name: 3D_VIEW - S4 EXCAVATOR TO -8,100m Số hiệu vẽ / Sheet #: Tỉ lệ / Scale: Ngày / Date: Vẽ / Drawn by: Author Kiểm / Checked by: THAO PHAM S_121 Sửa đổi / Rev.: 09/10/2015 Duyệt / Approved by: VIET NGO BẢN VẼ THI CÔNG CONSTRUCTION DRAWING THINK SAFETY - WORK SAFELY Rev No Rev Description Rev Date Mặt định vị / Key plan: Chủ đầu tư / Owner: SONKIM LAND CORPORATION Địa / Address: 53-55 Nguyen Dinh Chieu Street, Ward 6, District 3, Ho Chi Minh City Tư vấn / Consultant: Tank Block B Concrete volumn : 166 (m3) Tank Bottom Block A & Block B Concrete volumn : 325 (m3) Total Excavated Volume : 26027 (m3) Địa / Address: Kiểm / Checked by: Ngày / Date: Duyệt / Approved by: Ngày / Date: Nhà thầu / Contractor: 108 Cao Thang St.,Ward 4, Dist 3, HCMC, VN Dự Án / Project: SKL GATEWAY APARTMENTS PROJECT Thao Dien Ward, District 2, HCM city Dự án số / Project #: Hạng Mục / Item: Tên vẽ / Drawing name: CONSTRUCT TANKS & RAFT FOUNDATIONS OF BLOCK A, B STAGE CONSTRUCT TANK BOTTOM BLOCK A & BLOCK B Số hiệu vẽ / Sheet #: Tỉ lệ / Scale: Ngày / Date: Vẽ / Drawn by: Author Kiểm / Checked by: THAO PHAM S_122 Sửa đổi / Rev.: 09/10/2015 Duyệt / Approved by: VIET NGO BẢN VẼ THI CÔNG CONSTRUCTION DRAWING THINK SAFETY - WORK SAFELY Rev No Rev Description Rev Date Mặt định vị / Key plan: Chủ đầu tư / Owner: SONKIM LAND CORPORATION Tank Block B Raft foundation of Block B Concrete volumn : 3228 (m3) Địa / Address: 53-55 Nguyen Dinh Chieu Street, Ward 6, District 3, Ho Chi Minh City Tư vấn / Consultant: Tank bottom Block A& B Địa / Address: Kiểm / Checked by: Ngày / Date: Duyệt / Approved by: Ngày / Date: Raft foundation of Block A Concrete volumn : 3526 (m3) Nhà thầu / Contractor: 108 Cao Thang St.,Ward 4, Dist 3, HCMC, VN Dự Án / Project: SKL GATEWAY APARTMENTS PROJECT Thao Dien Ward, District 2, HCM city Dự án số / Project #: Hạng Mục / Item: Tên vẽ / Drawing name: STAGE CONSTRUCT RAFT FOUNDATIONS OF BLOCK A, B CONSTRUCT TANKS & RAFT FOUNDATIONS OF BLOCK A, B Số hiệu vẽ / Sheet #: S_123 Tỉ lệ / Scale: Ngày / Date: Sửa đổi / Rev.: 09/10/2015 Vẽ / Drawn by: Author Kiểm / Checked by: THAO PHAM Duyệt / Approved by: VIET NGO ... city Dự án số / Project #: Hạng Mục / Item: 10 Tên vẽ / Drawing name: 11 CONSTRUCT BORED PILES FOR TC1 & TC3 's FOUNDATION CONSTRUCT SHEET PILES FOR TC1 & TC3 's FOUNDATION : 250 Số hiệu vẽ / Sheet... án số / Project #: Hạng Mục / Item: Tên vẽ / Drawing name: 3D VIEW_CONSTRUCT BORED PILES FOR TC1 & TC3 's FOUNDATION 3D VIEW_CONSTRUCT SHEET PILES FOR TC1 & TC3 's FOUNDATION Số hiệu vẽ / Sheet... HCM city Dự án số / Project #: Hạng Mục / Item: Tên vẽ / Drawing name: CONSTRUCT TANKS & RAFT FOUNDATIONS OF BLOCK A, B STAGE CONSTRUCT TANK BOTTOM BLOCK A & BLOCK B Số hiệu vẽ / Sheet #: Tỉ lệ
Ngày đăng: 03/11/2019, 18:05
Xem thêm: GWTD CONS XX BPDD r05 latuan