1. Trang chủ
  2. » Giáo Dục - Đào Tạo

SD PLAN

17 44 0

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

THÔNG TIN TÀI LIỆU

Thông tin cơ bản

Định dạng
Số trang 17
Dung lượng 16,18 MB

Nội dung

8+480 218+360 218+340 Pipe - (252), D=800 L=28.50m, i=1.00% 8+420 Structure - (237) RIM:+109.26m SUMP:+102.62m 8+440 218+320 Structure - (236) RIM:+109.52m SUMP:+103.02m 8+400 8+380 8+360 8+340 Pipe - (251), D=800 L=28.50m, i=1.00% Pipe - (250), D=800 L=28.50m, i=1.00% Structure - (235) RIM:+109.70m SUMP:+103.42m Structure - (234) RIM:+109.79m SUMP:+103.82m 8+460 8+440 218+300 218+280 218+260 218+240 Structure - (232) RIM:+109.79m SUMP:+103.82m Pipe - (10), D=800 L=28.50m, i=1.00% Pipe - (9), D=800 L=28.50m, i=1.00% Pipe - (8), D=800 L=28.50m, i=1.00% Pipe - (249), D=800 L=28.50m, i=1.00% 8+320 8+260 8+280 8+300 Structure - (230) RIM:+109.72m SUMP:+103.75m 8+420 8+400 8+380 8+360 218+220 218+200 218+160 218+180 Structure - (223) RIM:+109.61m SUMP:+103.64m Structure - (9) RIM:+109.78m SUMP:+103.56m Pipe - (7), D=800 L=28.50m, i=1.00% Pipe - (247), D=800 Pipe - (248), D=800 L=7.19m, i=1.00% L=16.42m, i=1.00% Pipe - (240), D=800 L=28.51m, i=1.00% 8+240 Structure - (8) RIM:+110.08m SUMP:+103.96m Structure - (7) RIM:+110.34m SUMP:+104.36m Pipe - (6), D=800 L=28.50m, i=1.00% Structure - (224) RIM:+109.38m SUMP:+103.24m Structure - (225) RIM:+109.08m SUMP:+102.84m 8+340 8+320 Structure - (217) RIM:+110.42m SUMP:+104.45m Pipe - (229), D=800 L=28.44m, i=1.00% 218+140 Pipe - (241), D=800 L=28.49m, i=1.00% Pipe - (242), D=800 L=28.50m, i=1.00% 8+300 8+280 8+260 8+240 Pipe - (3), D=800 L=28.50m, i=1.00% 218+120 218+100 Structure - (3) RIM:+110.32m SUMP:+104.05m 8+220 8+140 8+120 Pipe - (4), D=800 L=28.49m, i=1.00% Structure - (226) RIM:+108.82m SUMP:+102.44m Structure - (227) RIM:+108.66m SUMP:+102.04m Structure - (4) RIM:+110.06m SUMP:+103.65m Structure - (12) RIM:+108.88m SUMP:+102.36 Structure - (11) RIM:+109.17m SUMP:+102.76m Structure - (10) RIM:+109.47m SUMP:+103.16m BxH=1500x1500 8+100 Structure - (5) RIM:+109.74m SUMP:+103.25m 8+200 Structure - (228) Structure - (221) RIM:+108.59m RIM:+108.59m SUMP:+101.71m SUMP:+102.62m 8+080 218+080 218+060 Pipe - (243), D=800 L=28.49m, i=1.00% Pipe - (244), D=800 L=21.24m, i=1.00% 8+160 Pipe - (239), D=800 Pipe - (245), D=800 L=12.86m, i=1.00% L=21.93m, i=1.00 % 218+040 Pipe - (2), D=800 Pipe - (228), D=800 Pipe - (5), D=800 L=22.49m, i=1.00% L=5.24m, i=1.00% L=28 52m, i=1.00% 218+020 218+000 Pipe - (1), D=800 L=28.50m, i=1.00% Structure - (6) RIM:+109.43m SUMP:+102.85m 8+180 Structure - (2) RIM:+109.11m SUMP:+102.49m Structure - (1) RIM:+108.87m SUMP:+102.89m 8+220 8+200 8+180 8+160 8+140 8+120 BxH=1500x1500 DRAINAGE PLAN OF EXPRESSWAY NAME VIEN VI CHIT CASSAVA PEACH PRODUCTS THANH DONG CONSTRUCTION INVESTMENT LAO PEOPLE'S DEMOCRATIC REPUBLIC TÊN PROCESSING ONE NUMBER CO.,LTD BO Y - PAKSE EXPRESSWAY & TRADING JOINT STOCK CORPORATION SIGNATURE PREPARED BY THỰC HIỆN Msc.CHUONG NGUYEN QUOC CHECKED BY KIỂM TRA APPROVED BY DUYỆT Msc.TAI LAM DUY Msc.LIEN NGUYEN VAN CHỮ KÝ DATE NGÀY 4/2018 4/2018 4/2018 DRAINAGE/ HỆ THỐNG THOÁT NƯỚC DRAINAGE PLAN BÌNH ĐỒ THỐT NƯỚC REV.NO LẦN DATE NGÀY DESCRIPTION DIỄN GIẢI 4/2018 APPROVAL DETAILED DESIGN SIZE/ KHỔ GIẤY: A3 SCALE/ TỶ LỆ:1/1000 DRAWING NO./ BẢN VẼ SỐ: 0010 PAK-P1-EP3- 8+840 8+820 8+800 218+720 218+700 Structure - (246) RIM:+112.39m SUMP:+105.99m Structure - (247) RIM:+112.04m SUMP:+105.59m 8+780 8+760 Pipe - (260), D=800 L=28.49m, i=1.00% Pipe - (261), D=800 L=28.51m, i=1.00% 8+800 218+680 218+660 Structure - (248) RIM:+111.59m SUMP:+105.19m Structure - (249) RIM:+111.13m SUMP:+104.79m 8+740 218+620 218+640 Pipe - (262), D=800 L=28.50m, i=1.00% 8+720 8+680 8+700 218+580 218+600 Structure - (250) RIM:+110.67m SUMP:+104.39m Pipe - (22), D=800 L=28.49m, i=1.00% Pipe - (23), D=800 L=28.50m, i=1.00% Pipe - (24), D=800 L=28.49m, i=1.00% Pipe - (263), D=800 L=28.50m, i=1.00% Structure - (23) RIM:+112.45m SUMP:+105.52m Structure - (24) RIM:+112.02m SUMP:+105.12m Structure - (25) RIM:+111.60m SUMP:+104.72m Pipe - (25), D=800 L=28.50m, i=1.00% Pipe - (264), D=800 L=28.50m, i=1.00% Structure - (251) RIM:+110.21m SUMP:+103.99m 8+780 8+760 8+740 Structure - (26) RIM:+111.17m SUMP:+104.32m Pipe - (26), D=800 L=28.50m, i=1.00% Pipe - (265), D=800 L=28.50m, i=1.00% 8+660 8+640 8+720 8+700 8+680 218+560 218+540 218+520 Structure - (252) RIM:+109.75m SUMP:+103.59m Structure - (253) RIM:+109.32m SUMP:+103.19m Structure - (27) RIM:+110.74m SUMP:+103.92m Pipe - (27), D=800 L=28.50m, i=1.00% Pipe - (266), D=800 L=28.48m, i=1.00% 8+620 8+580 Structure - (14) RIM:+110.32m SUMP:+103.62m Pipe - (14), D=800 L=28.50m, i=1.00% Pipe - (267), D=800 L=28.52m, i=1.00% 8+600 218+500 218+480 Structure - (254) RIM:+109.02m SUMP:+102.79m Structure - (255) RIM:+108.85m SUMP:+102.39m Structure - (15) RIM:+109.89m SUMP:+103.22m Pipe - (15), D=800 L=28.50m, i=1.00% Pipe - (268), D=800 L=28.47m, i=1.00% 8+660 8+640 8+620 8+600 8+580 218+460 218+440 8+520 8+500 Structure - (241) RIM:+108.80m SUMP:+102.01m Pipe - (16), D=800 L=28.50m, i=1.00% Pipe - (269), D=800 L=28.52m, i=1.00% 8+540 Structure - (242) RIM:+108.87m SUMP:+101.61m 8+480 8+460 Structure - (238) RIM:+108.99m SUMP:+102.22m Pipe - (270), D=800 L=25.58m, i=1.00% Structure - (16) RIM:+109.47m SUMP:+102.82m BxH=1500x1500 8+440 8+560 8+540 Pipe - (252), D=800Pipe - (256), D=800Pipe - (258), D=8 L=28.50m, i=1.00% L=7 00Pipe - (257), D=800 40m, i=1.00% L=10.52m, i=1 00%L=28.50m, i=1.00% Structure - (237) RIM:+109.26m SUMP:+102.62m Structure - (17) RIM:+109.06m SUMP:+102.42m Pipe - (13), D=800Pipe - (254), D=800 Pipe - (18), D=800 Pipe - (17), D=800 L=11.14m, i=1.00%L=19.27m, i=1.00% L=7.67m, i=1.00% L=28.49m, i=1.00% 218+380 218+360 Pipe - (11), D=800 L=28.50m, i=1.00% Structure - (18) RIM:+108.79m SUMP:+102.02m 218+420 Pipe - (10), D=800 L=28.50m, i=1.00% Structure - (13) Structure - (239) RIM:+108.72m RIM:+108.70m SUMP:+101.96m SUMP:+101.73m 8+560 Structure - (12) RIM:+108.88m SUMP:+102.36m 218+400 Structure - (11) RIM:+109.17m SUMP:+102.76m 8+520 8+500 8+480 BxH=1500x1500 DRAINAGE PLAN OF EXPRESSWAY NAME VIEN VI CHIT CASSAVA PEACH PRODUCTS THANH DONG CONSTRUCTION INVESTMENT LAO PEOPLE'S DEMOCRATIC REPUBLIC TÊN PROCESSING ONE NUMBER CO.,LTD BO Y - PAKSE EXPRESSWAY & TRADING JOINT STOCK CORPORATION SIGNATURE PREPARED BY THỰC HIỆN Msc.CHUONG NGUYEN QUOC CHECKED BY KIỂM TRA APPROVED BY DUYỆT Msc.TAI LAM DUY Msc.LIEN NGUYEN VAN CHỮ KÝ DATE NGÀY 4/2018 4/2018 4/2018 DRAINAGE/ HỆ THỐNG THỐT NƯỚC DRAINAGE PLAN BÌNH ĐỒ THỐT NƯỚC REV.NO LẦN DATE NGÀY DESCRIPTION DIỄN GIẢI 4/2018 APPROVAL DETAILED DESIGN SIZE/ KHỔ GIẤY: A3 SCALE/ TỶ LỆ:1/1000 DRAWING NO./ BẢN VẼ SỐ: 0011 PAK-P1-EP3- Pipe - (278), D=800 L=28.50m, i=2.63% 9+200 Pipe - (279), D=800 L=23.31m, i=2.02% Structure - (266) RIM:+107.98m SUMP:+101.09m 9+180 Structure - (264) RIM:+108.62m SUMP:+102.54m BxH=2500x2500 BxH=2500x2500 9+140 9+120 9+100 Structure - (263) RIM:+109.50m SUMP:+103.43m Pipe - (296), D=800 Pipe - (282), D=800 L=15.08m, i=1.00% L=6.03m, i=1.00% 9+160 Structure - (262) RIM:+110.31m SUMP:+104.23m Pipe - (233), D=800 L=9.93m, i=1.00% 219+080 219+060 219+040 219+020 219+000 218+980 Pipe - (277), D=800 L=28.52m, i=2.34% Structure - (261) RIM:+111.00m SUMP:+104.79m 9+180 9+160 9+140 9+120 9+100 9+080 9+040 9+020 Structure - (260) RIM:+111.58m SUMP:+105.19m Pipe - (276), D=800 L=28.50m, i=1.52% 9+080 Structure - (259) RIM:+112.04m SUMP:+105.59m 9+000 218+960 Pipe - (275), D=800 L=28.50m, i=1.00% 9+060 Pipe - (274), D=800 L=28.50m, i=1.00% 8+980 8+960 Structure - (258) RIM:+112.39m SUMP:+105.99m 218+940 218+920 Pipe - (273), D=800 L=28.50m, i=1.00% Structure - (257) RIM:+112.63m SUMP:+106.39m 9+060 9+040 9+020 218+900 218+880 Pipe - (272), D=800 L=28.50m, i=1.00% 8+940 8+920 Structure - (256) RIM:+112.76m SUMP:+106.79m 8+900 218+860 218+840 218+800 Structure - (244) RIM:+112.76m SUMP:+106.79m 9+000 8+980 8+960 8+940 8+920 8+900 Structure - (245) RIM:+112.63m SUMP:+106.39m 8+880 8+820 Structure - (246) RIM:+112.39m SUMP:+105.99m Pipe - (271), D=800 L=28.50m, i=1.00% Pipe - (30), D=800 L=28.49m, i=1.00% Pipe - (29), D=800 L=28.29m, i=1.00% Pipe - (33), D=800 L=28.50m, i=1.67% Pipe - (32), D=800 L=28.51m, i=1.67% Pipe - (31), D=800 L=28.50m, i=1.27% Pipe - (232), D=800 L=29.07m, i=1.00% Pipe - (35), D=800 L=28.51m, i=1.00% Pipe - (34), D=800 L=28.49m, i=1.55% Structure - (218) RIM:+109.47m SUMP:+103.21m Structure - (36) RIM:+109.69m SUMP:+103.61m Structure - (35) RIM:+110.09m SUMP:+104.01m Structure - (34) RIM:+110.66m SUMP:+104.58m Structure - (33) RIM:+111.26m SUMP:+105.18m Structure - (32) RIM:+111.86m SUMP:+105.78m Structure - (31) RIM:+112.46m SUMP:+106.26m Structure - (30) RIM:+112.96m SUMP:+106.66m Structure - (29) RIM:+113.28m SUMP:+107.06m Pipe - (28), D=800 L=27.05m, i=1.00% Pipe - (259), D=800 L=28.50m, i=1.00% 8+840 Pipe - (260), D=800 L=28.49m, i=1.00% Structure - (28) RIM:+113.42m SUMP:+107.45m Pipe - (19), D=800 L=28.49m, i=1.00% 218+760 218+740 218+720 Pipe - (20), D=800 L=28.81m, i=1.00% 218+780 Pipe - (22), D=800 L=28.49m, i=1.00% Structure - (19) RIM:+113.41m SUMP:+107.44m Structure - (20) RIM:+113.23m SUMP:+107.04m 218+820 Structure - (22) Pipe L=0 - (21), RIM:+112.87m 34m DSUMP:+105.92m , i=1 =800 00% 8+860 Structure - (23) RIM:+112.45m SUMP:+105.52m 8+880 8+860 8+840 DRAINAGE PLAN OF EXPRESSWAY NAME VIEN VI CHIT CASSAVA PEACH PRODUCTS THANH DONG CONSTRUCTION INVESTMENT LAO PEOPLE'S DEMOCRATIC REPUBLIC TÊN PROCESSING ONE NUMBER CO.,LTD BO Y - PAKSE EXPRESSWAY & TRADING JOINT STOCK CORPORATION SIGNATURE PREPARED BY THỰC HIỆN Msc.CHUONG NGUYEN QUOC CHECKED BY KIỂM TRA APPROVED BY DUYỆT Msc.TAI LAM DUY Msc.LIEN NGUYEN VAN CHỮ KÝ DATE NGÀY 4/2018 4/2018 4/2018 DRAINAGE/ HỆ THỐNG THOÁT NƯỚC DRAINAGE PLAN BÌNH ĐỒ THỐT NƯỚC REV.NO LẦN DATE NGÀY DESCRIPTION DIỄN GIẢI 4/2018 APPROVAL DETAILED DESIGN SIZE/ KHỔ GIẤY: A3 SCALE/ TỶ LỆ:1/1000 DRAWING NO./ BẢN VẼ SỐ: 0012 PAK-P1-EP3- 4/2018 Msc.TAI LAM DUY Msc.LIEN NGUYEN VAN 4/2018 4/2018 DRAINAGE/ HỆ THỐNG THỐT NƯỚC DRAINAGE PLAN BÌNH ĐỒ THOÁT NƯỚC 9+580 Structure - (270) RIM:+111.88m SUMP:+105.36m Structure - (269) RIM:+112.16m SUMP:+106.03m REV.NO LẦN DATE NGÀY DESCRIPTION DIỄN GIẢI 4/2018 APPROVAL 219+460 219+440 Pipe - (284), D=800 L=20.39m, i=1.00% Pipe - (283), D=800 L=28.52m, i=1.27% Structure - (268) RIM:+112.43m SUMP:+106.35m 9+540 9+520 Pipe - (285), D=800 L=20.01m, i=2.68% 9+500 9+480 9+460 Structure - (271) RIM:+111.51m SUMP:+104.96m Pipe - (44), D=800 L=28.50m, i=1.00% 219+420 219+400 Pipe - (286), D=800 L=28.50m, i=1.00% Structure - (272) RIM:+111.13m SUMP:+104.56m 9+560 9+540 9+520 9+500 219+380 9+480 219+360 219+340 Pipe - (45), D=800 L=28.50m, i=1.00% Pipe - (46), D=800 L=28.50m, i=1.00% Structure - (44) RIM:+113.74m SUMP:+107.77m Structure - (45) RIM:+113.45m SUMP:+107.37m Structure - (46) RIM:+113.16m SUMP:+106.97m Structure - (47) RIM:+112.86m SUMP:+106.57m Pipe - (287), D=800 L=28.51m, i=1.00% 9+440 9+400 9+380 APPROVED BY DUYỆT 9+420 Structure - (273) RIM:+110.75m SUMP:+104.16m CHECKED BY KIỂM TRA CHỮ KÝ DATE NGÀY 9+460 9+440 219+320 219+300 219+280 9+360 9+340 NAME VIEN VI CHIT CASSAVA PEACH PRODUCTS THANH DONG CONSTRUCTION INVESTMENT LAO PEOPLE'S DEMOCRATIC REPUBLIC TÊN PROCESSING ONE NUMBER CO.,LTD BO Y - PAKSE EXPRESSWAY & TRADING JOINT STOCK CORPORATION SIGNATURE PREPARED BY THỰC HIỆN Msc.CHUONG NGUYEN QUOC Pipe - (288), D=800 L=28.50m, i=1.00% Structure - (274) RIM:+110.37m SUMP:+103.76m Structure - (275) RIM:+109.99m SUMP:+103.36m Structure - (276) RIM:+109.61m SUMP:+102.96m Pipe - (47), D=800 L=28.50m, i=1.00% Pipe - (48), D=800 L=28.50m, i=1.00% Pipe - (289), D=800 L=28.50m, i=1.00% Pipe - (290), D=800 L=28.49m, i=1.00% Structure - (48) RIM:+112.48m SUMP:+106.17m Structure - (49) RIM:+112.02m SUMP:+105.77m Pipe - (49), D=800 L=33.08m, i=1.37% 219+260 219+240 9+420 9+400 9+380 9+360 9+340 219+220 9+300 Structure - (37) RIM:+111.44m SUMP:+105.19m Pipe - (37), D=800 L=28.49m, i=1.00% Pipe - (291), D=800 L=28.52m, i=1.00% 9+320 9+300 9+320 219+200 Structure - (277) RIM:+109.23m SUMP:+102.56m Structure - (278) RIM:+108.86m SUMP:+102.16m Structure - (38) RIM:+110.93m SUMP:+104.80m Pipe - (38), D=800 L=28.51m, i=1.14% Pipe - (292), D=800 L=28.51m, i=1.00% Pipe - (293), D=800 L=28.49m, i=1.00% 9+280 9+240 9+220 Structure - (39) RIM:+110.43m SUMP:+104.35m Pipe - (39), D=800 L=28.50m, i=1.30% 219+180 219+160 219+140 Structure - (279) RIM:+108.48m SUMP:+101.76m Structure - (280) RIM:+108.10m SUMP:+101.36m Structure - (40) RIM:+109.94m SUMP:+103.86m Pipe - (40), D=800 L=28.50m, i=1.00% Pipe - (294), D=800 L=28.49m, i=1.00% Pipe - (295), D=800 L=28.51m, i=1.00% 9+200 9+180 Structure - (266) RIM:+107.98m SUMP:+101.09m Structure - (41) RIM:+109.60m SUMP:+103.46m Pipe - (41), D=800 L=28.49m, i=1.00% 219+120 219+100 Pipe - (233), D=800 Pipe - (42), D=800 L=9.93m, i=1.00% L=17.42m, i=1.00% Pipe - (296), D=800 Pipe - (282), D=800 L=15.08m, i=1.00% L=6.03m, i=1.00% 9+280 Structure - (42) RIM:+109.44m SUMP:+103.06m 9+260 Structure - (218) RIM:+109.47m SUMP:+103.21m 9+260 9+240 9+220 BxH=2500x2500 BxH=2500x2500 DRAINAGE PLAN OF EXPRESSWAY DETAILED DESIGN SIZE/ KHỔ GIẤY: A3 SCALE/ TỶ LỆ:1/1000 DRAWING NO./ BẢN VẼ SỐ: 0013 PAK-P1-EP3- 9+940 9+920 9+900 219+820 219+800 219+780 219+760 Pipe - (301), D=800 L=28.50m, i=1.00% Pipe - (302), D=800 L=28.49m, i=1.00% Structure - (283) RIM:+116.71m SUMP:+110.32m 9+880 9+860 Pipe - (52), D=800 L=28.50m, i=1.00% RIM:+116.95m SUMP:+110.72m 9+900 9+880 9+860 219+740 219+720 Structure - (53) RIM:+117.20m SUMP:+110.73m Pipe - (53), D=800 L=28.50m, i=1.00% Structure - (284) RIM:+116.38m SUMP:+109.92m Structure - (285) RIM:+116.01m SUMP:+109.52m 9+820 Msc.LIEN NGUYEN VAN Structure - (54) RIM:+116.90m SUMP:+110.33m Pipe - (54), D=800 L=28.50m, i=1.00% Pipe - (303), D=800 L=28.50m, i=1.00% Pipe - (304), D=800 L=28.49m, i=1.00% 9+800 Msc.TAI LAM DUY 9+780 9+760 APPROVED BY DUYỆT Structure - (220) RIM:+116.61m SUMP:+109.93m Pipe - (235), D=800 L=14.40m, i=1.00% Structure - (286) RIM:+115.63m SUMP:+109.12m Structure - (287) RIM:+115.25m SUMP:+108.72m CHECKED BY KIỂM TRA Structure - (56) RIM:+116.46m SUMP:+109.67m 9+840 9+820 9+840 Pipe - (55), D=800 L=28.50m, i=1.00% 219+700 219+680 219+660 Pipe - (305), D=800 L=28.51m, i=1.00% Pipe - (306), D=800 L=28.49m, i=1.00% 9+740 9+720 9+700 9+800 9+780 9+760 219+620 219+600 9+680 Structure - (57) RIM:+116.16m SUMP:+109.27m Pipe - (56), D=800 L=28.50m, i=1.00% Structure - (288) RIM:+114.87m SUMP:+108.32m Structure - (289) RIM:+114.50m SUMP:+107.92m Structure - (290) RIM:+114.20m SUMP:+107.58m Pipe - (57), D=800 L=28.49m, i=1.00% 219+640 9+720 9+700 9+660 9+640 Pipe - (307), D=800 L=28.51m, i=1.00% Pipe - (308), D=800 L=22.00m, i=1.00% Structure - (58) RIM:+115.87m SUMP:+108.87m Structure - (59) RIM:+115.58m SUMP:+108.47m Pipe - (58), D=800 L=28.50m, i=1.00% Pipe - (59), D=800 L=28.51m, i=1.00% 219+580 Pipe - (309), D=800 L=28.50m, i=1.00% Structure - (291) RIM:+113.82m SUMP:+107.18m Structure - (292) RIM:+113.44m SUMP:+106.78m 9+620 9+580 219+560 219+540 219+520 Pipe - (310), D=800 L=28.50m, i=1.00% Structure - (60) RIM:+115.29m SUMP:+108.07m BxH=1500x1500 9+560 Structure - (267) RIM:+112.81m SUMP:+106.83m Structure - (293) RIM:+113.07m SUMP:+106.38m Pipe - (60), D=800 L=28.50m, i=1.00% Pipe - (61), D=800 L=28.49m, i=1.00% - (312), D=800 Pipe - (311), D=800 D=800 Pipe - (298),Pipe L=6.02m, i=1.00% L=28.49m, i=1.00% L=12.14m, i=1.00% 9+600 Structure - (268) RIM:+112.43m SUMP:+106.35m 9+540 219+500 219+480 219+460 Pipe - (283), D=800 L=28.52m, i=1.27% 9+680 9+660 9+640 9+620 9+600 9+580 Pipe - (62), D=800 L=32.90m, i=1.00% Structure - (61) RIM:+115.00m SUMP:+107.67m Structure - (62) RIM:+114.70m SUMP:+107.27m Structure - (63) RIM:+114.41m SUMP:+106.87m Structure - (44) RIM:+113.74m SUMP:+107.77m 9+740 BxH=1500x1500 DRAINAGE PLAN OF EXPRESSWAY NAME VIEN VI CHIT CASSAVA PEACH PRODUCTS THANH DONG CONSTRUCTION INVESTMENT LAO PEOPLE'S DEMOCRATIC REPUBLIC TÊN PROCESSING ONE NUMBER CO.,LTD BO Y - PAKSE EXPRESSWAY & TRADING JOINT STOCK CORPORATION SIGNATURE PREPARED BY THỰC HIỆN Msc.CHUONG NGUYEN QUOC CHỮ KÝ DATE NGÀY 4/2018 4/2018 4/2018 DRAINAGE/ HỆ THỐNG THỐT NƯỚC DRAINAGE PLAN BÌNH ĐỒ THỐT NƯỚC REV.NO LẦN DATE NGÀY DESCRIPTION DIỄN GIẢI 4/2018 APPROVAL DETAILED DESIGN SIZE/ KHỔ GIẤY: A3 SCALE/ TỶ LỆ:1/1000 DRAWING NO./ BẢN VẼ SỐ: 0014 PAK-P1-EP3- 220+180 220+140 220+160 Pipe - (90), D=800 L=28.49m, i=1.00% Pipe - (344), D=800 L=21.41m, i=1.00% Structure - (305) RIM:+117.09m SUMP:+110.33m Pipe - (343), D=800 L=28.51m, i=1.00% 10+280 10+260 10+240 Structure - (327) RIM:+117.09m SUMP:+109.97m BxH=2000x2000 10+220 10+320 10+300 10+280 BxH=1500x1500 10+260 10+240 220+120 Structure - (88) RIM:+117.66m SUMP:+110.95m D=80-0(91), D=800 Pipe - (82), Pipe 91m, i=1.00% L=8.0% L=8.51m, i=1.0 Pipe - (322), D=800 L=16.43m, i=1.00% Structure - (304) RIM:+117.10m SUMP:+110.73m 10+200 Structure - (303) RIM:+117.11m SUMP:+111.13m Pipe - (321), D=800 L=28.50m, i=1.00% 10+180 10+160 Structure - (297) RIM:+117.11m SUMP:+111.14m Pipe - (70), D=800 L=28.50m, i=1.00% 220+100 Pipe - (320), D=800 L=28.50m, i=1.00% 10+140 10+120 Pipe - (69), D=800 L=28.50m, i=1.00% 220+080 220+060 220+040 Pipe - (315), D=800 L=28.50m, i=1.00% Structure - (73) RIM:+117.63m SUMP:+109.21m Structure - (72) RIM:+117.66m SUMP:+109.61m Structure - (71) RIM:+117.72m SUMP:+110.01m Pipe - (68), D=800 L=28.50m, i=1.00% Structure - (298) RIM:+117.12m SUMP:+110.74m 10+100 10+220 10+200 10+180 10+160 10+140 220+020 220+000 219+980 Structure - (299) RIM:+117.13m SUMP:+110.34m 10+080 10+020 Pipe - (67), D=800 L=28.50m, i=1.00% Pipe - (316), D=800 L=28.50m, i=1.00% Structure - (300) RIM:+117.13m SUMP:+109.94m Structure - (70) RIM:+117.78m SUMP:+110.41m BxH=1500x1500 10+040 Structure - (301) RIM:+117.14m SUMP:+109.54m Structure - (69) RIM:+117.84m SUMP:+110.81m Pipe - (66), D=800 L=28.50m, i=1.00% Pipe - (317), D=800 L=28.49m, i=1.00% 10+060 Pipe - (318), D=800 L=28.51m, i=1.00% Structure - (68) RIM:+117.90m SUMP:+111.21m Pipe - (65), D=800 L=28.49m, i=1.00% 219+960 219+940 Pipe - (236), BxH=1500x1500 L=32.55m, i=-2.85% 219+920 10+000 10+120 10+100 10+080 10+060 10+040 10+020 9+980 9+960 9+940 9+920 Pipe - (314), D=800Pipe - (319), D=800 L=12.60m, i=1.00%L=17.43m, i=1.00% Structure - (296) RIM:+117.15m SUMP:+110.77m Structure - (295) RIM:+117.14m SUMP:+111.17m Structure - (281) RIM:+117.09m SUMP:+111.12m Structure - (67) RIM:+117.96m SUMP:+111.61m Pipe - (64), D=800 L=28.51m, i=1.00% Pipe - (313), D=800 L=28.49m, i=1.00% Pipe - (300), D=800 L=28.50m, i=1.00% Structure - (282) RIM:+116.95m SUMP:+110.72m Structure - (66) RIM:+117.99m SUMP:+112.01m Pipe - (50), D=800 L=28.48m, i=1.00% 219+880 219+840 219+860 Pipe - (51), D=800 L=28.50m, i=1.00% Pipe - (52), D=800 L=28.50m, i=1.00% Structure - (50) RIM:+117.91m SUMP:+111.93m Structure - (51) RIM:+117.74m SUMP:+111.53m 219+900 9+980 9+960 Structure - (52) RIM:+117.49m SUMP:+111.13m Structure - (53) RIM:+117.20m SUMP:+110.73m 219+820 10+000 BxH=1500x1500 DRAINAGE PLAN OF EXPRESSWAY NAME VIEN VI CHIT CASSAVA PEACH PRODUCTS THANH DONG CONSTRUCTION INVESTMENT LAO PEOPLE'S DEMOCRATIC REPUBLIC TÊN PROCESSING ONE NUMBER CO.,LTD BO Y - PAKSE EXPRESSWAY & TRADING JOINT STOCK CORPORATION SIGNATURE PREPARED BY THỰC HIỆN Msc.CHUONG NGUYEN QUOC CHECKED BY KIỂM TRA APPROVED BY DUYỆT Msc.TAI LAM DUY Msc.LIEN NGUYEN VAN CHỮ KÝ DATE NGÀY 4/2018 4/2018 4/2018 DRAINAGE/ HỆ THỐNG THOÁT NƯỚC DRAINAGE PLAN BÌNH ĐỒ THỐT NƯỚC REV.NO LẦN DATE NGÀY DESCRIPTION DIỄN GIẢI 4/2018 APPROVAL DETAILED DESIGN SIZE/ KHỔ GIẤY: A3 SCALE/ TỶ LỆ:1/1000 DRAWING NO./ BẢN VẼ SỐ: 0015 PAK-P1-EP3- 4/2018 APPROVED BY DUYỆT Msc.TAI LAM DUY Msc.LIEN NGUYEN VAN 4/2018 4/2018 DATE NGÀY DESCRIPTION DIỄN GIẢI 4/2018 APPROVAL 10+680 220+560 Structure - (315) RIM:+123.89m SUMP:+117.81m 10+640 10+620 10+600 10+580 10+560 Pipe - (331), D=800 L=28.50m, i=2.42% Structure - (316) RIM:+123.06m SUMP:+116.98m REV.NO LẦN Pipe - (101), D=800 L=28.51m, i=1.89% 220+540 220+520 Pipe - (332), D=800 L=28.50m, i=2.43% Structure - (317) RIM:+122.23m SUMP:+116.15m DRAINAGE/ HỆ THỐNG THỐT NƯỚC DRAINAGE PLAN BÌNH ĐỒ THỐT NƯỚC Structure - (99) RIM:+124.03m SUMP:+117.95m Pipe - (102), D=800 L=28.50m, i=1.88% 220+500 220+480 Pipe - (333), D=800 L=28.50m, i=2.43% Structure - (318) RIM:+121.40m SUMP:+115.32m 10+660 10+640 10+620 10+600 10+580 220+460 Structure - (100) RIM:+123.36m SUMP:+117.29m Pipe - (103), D=800 L=28.50m, i=1.90% Pipe - (334), D=800 L=28.51m, i=2.43% 10+540 10+500 10+480 CHECKED BY KIỂM TRA 10+520 Structure - (319) RIM:+120.57m SUMP:+114.50m Structure - (101) RIM:+122.69m SUMP:+116.62m Pipe - (104), D=800 L=28.50m, i=1.89% 220+440 220+420 220+400 Pipe - (335), D=800 L=28.50m, i=2.43% Pipe - (336), D=800 L=28.50m, i=2.42% CHỮ KÝ DATE NGÀY 10+560 10+540 10+520 10+500 220+380 220+360 10+440 PREPARED BY THỰC HIỆN Msc.CHUONG NGUYEN QUOC Structure - (102) RIM:+122.03m SUMP:+115.95m Pipe - (105), D=800 L=28.50m, i=1.88% Structure - (320) RIM:+119.74m SUMP:+113.67m Structure - (321) RIM:+118.92m SUMP:+112.84m NAME VIEN VI CHIT CASSAVA PEACH PRODUCTS THANH DONG CONSTRUCTION INVESTMENT LAO PEOPLE'S DEMOCRATIC REPUBLIC TÊN PROCESSING ONE NUMBER CO.,LTD BO Y - PAKSE EXPRESSWAY & TRADING JOINT STOCK CORPORATION SIGNATURE Structure - (103) RIM:+121.36m SUMP:+115.29m Pipe - (106), D=800 L=28.50m, i=1.89% Pipe - (337), D=800 L=28.50m, i=2.43% Pipe - (338), D=800 L=28.50m, i=2.08% 10+420 10+400 Structure - (104) RIM:+120.70m SUMP:+114.62m Pipe - (107), D=800 L=28.50m, i=1.86% 220+340 220+320 Pipe - (108), D=800 L=28.50m, i=1.71% Structure - (322) RIM:+118.19m SUMP:+112.12m Structure - (323) RIM:+117.65m SUMP:+111.57m 10+380 Structure - (105) RIM:+120.04m SUMP:+113.96m 10+460 10+460 10+440 Pipe - (339), D=800 L=28.50m, i=1.48% Pipe - (340), D=800 L=28.50m, i=1.00% 10+360 10+340 Pipe - (109), D=800 L=30.46m, i=1.42% 220+300 220+280 Pipe - (114), D=800 L=13.04m, i=1.00% Structure - (324) RIM:+117.28m SUMP:+111.17m Structure - (325) RIM:+117.10m SUMP:+110.77m Structure - (326) RIM:+117.08m SUMP:+110.37m 10+420 10+400 220+260 Pipe - (341), D=800 L=28.48m, i=1.00% Pipe - (342), D=800 L=28.53m, i=1.00% 10+300 10+280 Structure - (327) RIM:+117.09m SUMP:+109.97m Pipe - (87), D=800 L=28.50m, i=1.46% Pipe - (88), D=800 L=28.50m, i=1.00% 220+240 220+200 Pipe - (343), D=800 L=28.51m, i=1.00% 220+220 Pipe - (89), D=800 L=28.49m, i=1.00% Pipe - (90), D=800 L=28.49m, i=1.00% 10+380 10+360 Structure - (87) RIM:+117.77m SUMP:+111.35m 10+320 10+320 10+340 Structure - (86) RIM:+117.98m SUMP:+111.75m Structure - (106) RIM:+119.42m SUMP:+113.35m Structure - (84) RIM:+118.66m SUMP:+112.69m Structure - (85) RIM:+118.28m SUMP:+112.15m 10+480 BxH=2000x2000 DRAINAGE PLAN OF EXPRESSWAY DETAILED DESIGN SIZE/ KHỔ GIẤY: A3 SCALE/ TỶ LỆ:1/1000 DRAWING NO./ BẢN VẼ SỐ: 0016 PAK-P1-EP3- 4/2018 Msc.TAI LAM DUY Msc.LIEN NGUYEN VAN 4/2018 11+040 11+020 11+000 DRAINAGE/ HỆ THỐNG THỐT NƯỚC DRAINAGE PLAN BÌNH ĐỒ THỐT NƯỚC 220+900 220+880 Pipe - (347), D=800 L=28.50m, i=1.00% Pipe - (348), D= 80 L=28.50m, i=1.00 % 10+980 10+960 Structure - (331) RIM:+129.25m SUMP:+122.94m REV.NO LẦN DATE NGÀY DESCRIPTION DIỄN GIẢI 4/2018 APPROVAL Structure - (332) RIM:+128.82m SUMP:+122.54m 11+000 220+860 10+940 Structure - (330) RIM:+129.57m SUMP:+123.34m 220+920 10+980 10+960 220+840 Pipe - (346), D=800 L=28.50m, i=1.00% Structure - (329) RIM:+129.71m SUMP:+123.74m 10+920 10+900 10+880 10+860 APPROVED BY DUYỆT 4/2018 220+820 220+800 220+780 220+760 10+840 CHECKED BY KIỂM TRA CHỮ KÝ DATE NGÀY 10+940 10+920 10+900 10+880 10+860 10+820 10+800 10+780 10+760 NAME VIEN VI CHIT CASSAVA PEACH PRODUCTS THANH DONG CONSTRUCTION INVESTMENT LAO PEOPLE'S DEMOCRATIC REPUBLIC TÊN PROCESSING ONE NUMBER CO.,LTD BO Y - PAKSE EXPRESSWAY & TRADING JOINT STOCK CORPORATION SIGNATURE PREPARED BY THỰC HIỆN Msc.CHUONG NGUYEN QUOC Structure - (306) RIM:+129.72m SUMP:+123.74m Structure - (307) RIM:+129.56m SUMP:+123.34m Structure - (308) RIM:+129.22m SUMP:+122.94m Structure - (309) RIM:+128.71m SUMP:+122.54m Structure - (310) RIM:+128.02m SUMP:+121.94m Pipe - (345), D=800 L=28.50m, i=1.00% Pipe - (323), D=800 L=28.50m, i=1.00% Pipe - (324), D=800 L=28.51m, i=1.00% Pipe - (116), D=800 L=28.51m, i=1.00% Pipe - (115), D=800 L=28.49m, i=1.00% Pipe - (92), D=800 L=28.49m, i=1.00% Structure - (110) RIM:+129.27m SUMP:+122.94m Structure - (109) RIM:+129.56m SUMP:+123.34m Structure - (108) RIM:+129.72m SUMP:+123.74m Structure - (89) RIM:+129.71m SUMP:+123.74m Structure - (90) RIM:+129.55m SUMP:+123.34m Pipe - (93), D=800 L=28.51m, i=1.00% Pipe - (94), D=800 L=28.47m, i=1.00% 220+740 220+720 220+700 Pipe - (325), D=800 L=28.49m, i=1.00% Pipe - (326), D=800 L=28.50m, i=1.67% Structure - (91) RIM:+129.21m SUMP:+122.94m Structure - (92) RIM:+128.68m SUMP:+122.54m Pipe - (95), D=800 L=28.52m, i=1.64% Pipe - (96), D=800 L=28.50m, i=1.88% 220+680 220+660 10+840 10+820 10+800 10+780 10+760 220+640 Structure - (311) RIM:+127.19m SUMP:+121.12m Structure - (312) RIM:+126.37m SUMP:+120.29m 10+720 Structure - (313) RIM:+125.54m SUMP:+119.46m Pipe - (327), D=800 L=28.50m, i=2.41% Pipe - (328), D=800 L=28.51m, i=2.42% Structure - (93) RIM:+128.02m SUMP:+121.95m Structure - (94) RIM:+127.36m SUMP:+121.28m Pipe - (97), D=800 L=28.50m, i=1.88% Pipe - (98), D=800 L=28.50m, i=1.89% 220+620 Pipe - (329), D=800 L=28.50m, i=2.42% Structure - (314) RIM:+124.71m SUMP:+118.64m 10+660 Pipe - (99), D=800 L=28.50m, i=1.89% 220+600 220+580 Pipe - (330), D=800 L=28.50m, i=2.42% Structure - (95) RIM:+126.69m SUMP:+120.62m Structure - (96) RIM:+126.03m SUMP:+119.95m 10+740 Pipe - (100), D=800 L=28.49m, i=1.89% 220+560 10+640 SUMP:+117.81m Structure - (97) RIM:+125.36m SUMP:+119.29m 10+700 Pipe - (101), D=800 L=28.51m, i=1.89% Pipe - (331), D=800 L=28.50m, i=2.42% 10+740 Structure - (98) RIM:+124.70m SUMP:+118.62m 10+680 Structure - (99) RIM:+124.03m SUMP:+117.95m 10+720 10+700 10+680 DRAINAGE PLAN OF EXPRESSWAY DETAILED DESIGN SIZE/ KHỔ GIẤY: A3 SCALE/ TỶ LỆ:1/1000 DRAWING NO./ BẢN VẼ SỐ: 0017 PAK-P1-EP3- NAME VIEN VI CHIT CASSAVA PEACH PRODUCTS THANH DONG CONSTRUCTION INVESTMENT LAO PEOPLE'S DEMOCRATIC REPUBLIC TÊN PROCESSING ONE NUMBER CO.,LTD BO Y - PAKSE EXPRESSWAY & TRADING JOINT STOCK CORPORATION SIGNATURE PREPARED BY THỰC HIỆN Msc.CHUONG NGUYEN QUOC CHECKED BY KIỂM TRA APPROVED BY DUYỆT Msc.TAI LAM DUY Msc.LIEN NGUYEN VAN CHỮ KÝ DATE NGÀY 4/2018 4/2018 4/2018 DRAINAGE/ HỆ THỐNG THỐT NƯỚC DRAINAGE PLAN BÌNH ĐỒ THỐT NƯỚC 11+42 REV.NO LẦN DATE NGÀY DESCRIPTION DIỄN GIẢI 4/2018 APPROVAL 00 221+3 221+28 Pipe L=28.5 (131), D= 0m, i= 800 1.00% Pipe - (35 L=28.58m ), D=800 , i=1.00% Structure - (337) RIM:+127.93m SUMP:+121.95m 11+380 11+360 Structure - (338) RIM:+127.83m SUMP:+121.55m 11+340 11+320 11+40 221+26 Pipe - (354 ), L=28.50m, D=800 i=1.00% Structure - (339) RIM:+127.68m SUMP:+121.15m 11+300 11+280 Structure - (340) RIM:+127.54m SUMP:+120.75m Structure - (124) RIM:+128.28m SUMP:+119.14m Pipe L=28.5 (130), D=80 0m, i= 1.00% 221+240 Pipe - (355), D= L=28.50m, i=1 800 00% Structure - (341) RIM:+127.39m SUMP:+120.35m Structure - (123) RIM:+128.30m SUMP:+119.54m Pipe - (1 L=28.50 29), D=800 m, i=1.0 0% 221+220 221+200 11+380 11+360 11+340 Structure - (122) RIM:+128.30m SUMP:+119.94m Pipe - (12 L=28.50m ), D=800 , i=1.00% Pipe - (356), D=80 L=28.50m, i=1.00% 11+260 11+240 11+220 11+320 221+180 Pipe - (357), D=800 L=28.51m, i=1.00% Structure - (342) RIM:+127.25m SUMP:+119.95m Structure - (121) RIM:+128.30m SUMP:+120.34m Pipe - (127), D=8 L=28.52m, i= 00 1.00% 221+160 221+140 Structure - (343) RIM:+127.10m SUMP:+119.55m 11+200 11+300 11+280 11+260 Pipe - (358), D=800 L=18.71m, i=1.00% Structure - (344) RIM:+127.05m SUMP:+119.33m 11+180 11+160 11+140 Structure - (345) RIM:+127.05m SUMP:+118.96m Pipe - (126), D=800 L=28.52m, i=1.00% 221+120 221+100 221+080 221+060 221+040 11+240 11+200 11+180 11+160 Structure - (335) RIM:+127.55m SUMP:+121.34m 11+120 11+060 11+040 11+020 Structure - (346) RIM:+127.21m SUMP:+118.56m Pipe - (360), D=800 Pipe - (359), D=800 L=26.03m, i=1.00% L=10.51m, i=1.00% Structure - (120) RIM:+128.30m SUMP:+120.74m BxH=1500x1500 Structure - (334) RIM:+127.98m SUMP:+121.74m Pipe - (362), D=800Pipe - (361), D=80 Pipe - (351), D=800 0% L=28.55m, i=1.00% i=1.0 , 38m L=7 % 00 L=19.48m, i=1 11+100 D=800 Pipe - (349), 00% L=28.50m, i= Structure - (333) RIM:+128.40m SUMP:+122.14m Structure - (332) RIM:+128.82m SUMP:+122.54m 221+020 800 Pipe - (350), D= % L=28.50m, i=1.00 11+080 220+960 220+94 ), D=800 Pipe - (348 1.00% i= , 0m 28 L= 11+000 220+980 800 18), D= Pipe - (1 m, i=1.00% L=28.5 D=800 (117), Pipe - 1m, i=1.00% L=28.5 220+92 9), D=80 Pipe - (11 , i=1.00% m L=28 Structure - (119) RIM:+128.30m SUMP:+121.14m Pipe - (125), D=800 L=28.50m, i=1.00% Pipe - (124), D=800 L=28.50m, i=1.00% Pipe - (123), D=800 L=28.48m, i=1.00% D=800 Pipe - (120), 00% i= , 6m 26 L= 221+000 Structure - (110) RIM:+129.27m SUMP:+122.94m 11+140 11+120 11+100 11+08 11+06 Structure - (111) RIM:+128.98m SUMP:+122.54m Structure - (118) RIM:+128.30m SUMP:+121.54m Structure - (117) RIM:+128.30m SUMP:+121.94m Structure - (116) RIM:+128.32m SUMP:+122.34m Structure - (113) RIM:+128.48m SUMP:+121.74m Structure - (112) RIM:+128.70m SUMP:+122.14m 11+220 BxH=1500x150 DRAINAGE PLAN OF EXPRESSWAY DETAILED DESIGN SIZE/ KHỔ GIẤY: A3 SCALE/ TỶ LỆ:1/1000 DRAWING NO./ BẢN VẼ SỐ: 0018 PAK-P1-EP3- 4/2018 4/2018 11+800 221+660 221+620 11+680 11+700 11+720 221+600 221+580 221+560 11+780 11+760 11+740 11+720 11+700 11+680 221+540 221+640 Pipe - (373), D=800 L=28.50m, i=1.16% Structure - (357) RIM:+123.79m SUMP:+117.71m Structure - (356) RIM:+124.24m SUMP:+118.16m Structure - (355) RIM:+124.68m SUMP:+118.61m DRAINAGE/ HỆ THỐNG THỐT NƯỚC DRAINAGE PLAN BÌNH ĐỒ THỐT NƯỚC Pipe - (372), D=800 L=28.50m, i=1.17% Pipe - (371), D=800 L=28.50m, i=1.16% 11+660 Msc.LIEN NGUYEN VAN Structure - (354) RIM:+125.13m SUMP:+119.05m 11+640 Msc.TAI LAM DUY 4/2018 Pipe - (370), D=800 L=28.50m, i=1.15% 11+620 APPROVED BY DUYỆT 11+600 CHECKED BY KIỂM TRA CHỮ KÝ DATE NGÀY Pipe - (369), D=800 L=28.50m, i=1.14% Structure - (353) RIM:+125.59m SUMP:+119.49m 11+580 PREPARED BY THỰC HIỆN Msc.CHUONG NGUYEN QUOC Structure - (352) RIM:+126.04m SUMP:+119.89m 11+560 11+540 NAME VIEN VI CHIT CASSAVA PEACH PRODUCTS THANH DONG CONSTRUCTION INVESTMENT LAO PEOPLE'S DEMOCRATIC REPUBLIC TÊN PROCESSING ONE NUMBER CO.,LTD BO Y - PAKSE EXPRESSWAY & TRADING JOINT STOCK CORPORATION SIGNATURE 11+660 11+640 221+500 Pipe - (368), D=800 L=28.50m, i=1.00% Structure - (351) RIM:+126.50m SUMP:+120.29m 11+520 11+500 Structure - (350) RIM:+126.95m SUMP:+120.69m Pipe - (367), D=800 L=28.50m, i=1.00% 221+520 221+460 Pipe - (366), D=800 L=28.50m, i=1.00% ), D=800 Pipe - (143 1.00% i= , 2m L=27.5 800 Pipe - (142), D=00% i= , 2m L=28 Pipe - (141), D=80 % L=28.48m, i=1.00 Pipe - (140), D=800 L=28.51m, i=1.00% Pipe - (139), D=800 L=28.49m, i=1.00% Pipe - (138), D=800 L=28.57m, i=1.00% Structure - (136) RIM:+123.67m SUMP:+114.34m Structure - (135) RIM:+123.92m SUMP:+114.74m Structure - (134) RIM:+124.35m SUMP:+115.14m Structure - (133) RIM:+124.85m SUMP:+115.54m Structure - (132) RIM:+125.35m SUMP:+115.94m Structure - (131) RIM:+125.86m SUMP:+116.34m Pipe - (137), D=800 L=28.50m, i=1.00% 221+440 221+420 Pipe - (136), D=800 L=28.45m, i=1.00% Pipe - (365), D=800 L=28.50m, i=1.00% 11+620 Structure - (130) RIM:+126.36m SUMP:+116.74m 221+480 Pipe - (135), D=800 L=28.52m, i=1.00% 221+400 11+460 11+600 11+580 11+560 11+540 11+520 221+380 Structure - (129) RIM:+126.86m SUMP:+117.14m Structure - (349) RIM:+127.38m SUMP:+121.09m Structure - (348) RIM:+127.70m SUMP:+121.49m 11+440 Structure - (347) RIM:+127.87m SUMP:+121.90m 11+400 11+380 11+360 Pipe - (364), D=800 L=28.50m, i=1.00% Pipe - (363), D=800 L=28.84m, i=1.00% Structure - (337) RIM:+127.93m SUMP:+121.95m Structure - (128) RIM:+127.32m SUMP:+117.54m Pipe - (134), D=800 L=28.49m, i=1.00% 221+360 221+340 221+320 Pipe - (133), D=800 L=28.51m, i=1.00% 800 Pipe - (353), D= 0% L=28.58m, i=1.0 Structure - (338) RIM:+127.83m SUMP:+121.55m Structure - (127) RIM:+127.70m SUMP:+117.94m 11+480 Structure - (126) RIM:+127.98m SUMP:+118.34m Pipe - (132), D=800 L=28.50m, i=1.00% 221+300 Pipe - (131), D=800 L=28.50m, i=1.00% 11+500 11+480 Structure - (125) RIM:+128.17m SUMP:+118.74m 11+420 Structure - (124) RIM:+128.28m SUMP:+119.14m 11+460 11+440 2500 BxH=3000x 2500 0x 00 BxH=3 DRAINAGE PLAN OF EXPRESSWAY REV.NO LẦN DATE NGÀY DESCRIPTION DIỄN GIẢI 4/2018 APPROVAL DETAILED DESIGN SIZE/ KHỔ GIẤY: A3 SCALE/ TỶ LỆ:1/1000 DRAWING NO./ BẢN VẼ SỐ: 0019 PAK-P1-EP3- 12+160 222+020 222+000 12+100 Structure - (392) RIM:+128.91m SUMP:+122.67m Structure - (393) RIM:+128.27m SUMP:+122.19m 12+080 12+040 12+020 12+000 Pipe - (409), D=800 L=28.50m, i=1.00% Pipe - (410), D=800 L=28.50m, i=1.26% 12+060 Structure - (394) RIM:+127.62m SUMP:+121.54m Structure - (395) RIM:+126.97m SUMP:+120.89m 12+140 12+120 221+980 221+960 Pipe - (411), D=800 L=28.50m, i=1.83% Pipe - (412), D=800 L=28.50m, i=1.82% Structure - (396) RIM:+126.64m SUMP:+120.54m 11+980 12+100 12+080 221+940 221+920 221+900 11+960 12+060 12+040 12+020 221+880 11+940 11+920 Pipe - (413), D=800 L=13.96m, i=1.52% Structure - (397) RIM:+125.99m SUMP:+119.63m Structure - (398) RIM:+125.34m SUMP:+119.23m Structure - (399) RIM:+124.69m SUMP:+118.61m Structure - (400) RIM:+124.04m SUMP:+117.96m Pipe - (414), D=800 L=28.53m, i=2.70% Pipe - (415), D=800 L=28.50m, i=1.00% Pipe - (416), D=800 L=28.51m, i=1.72% 11+900 Structure - (401) RIM:+123.43m SUMP:+117.36m 221+860 221+840 221+820 221+800 Pipe - (417), D=800 L=28.50m, i=1.83% Pipe - (418), D=800 L=28.51m, i=1.69% 12+000 11+980 11+960 11+940 11+920 221+780 221+760 Structure - (402) RIM:+123.09m SUMP:+116.96m 11+800 11+900 11+880 Pipe - (419), D=800 L=28.51m, i=1.00% T2 T1 M1 M2 T5 T4 T3 Pipe - (156), D=800 L=28.49m, i=1.91% Pipe - (157), D=800 L=28.52m, i=1.93% Pipe - (158), D=800 L=28.50m, i=1.91% Pipe - (159), D=800 L=28.49m, i=1.91% Pipe - (160), D=800 L=30.62m, i=1.91% Pipe - (161), D=800 L=22.19m, i=3.52% BxH=3000x2500 BxH=3000x2500 11+780 11+760 11+740 Structure - (359) RIM:+123.06m SUMP:+116.86m Pipe - (164), D=800 L=28.47m, i=1.02% Pipe - (162), D=800 L=28.50m, i=1.00% Pipe - (163), D=800 L=28.51m, i=1.00% 11+880 Pipe - (374), D L=28.50m, i= =800 Pipe - (377), D=800 1.00% L=5 Pipe - (420), D=800 86m, i=1.00% L=20.05m, i=1.00% Structure - (358) RIM:+123.34m SUMP:+117.26m Pipe - (165), D=800 L=28.48m, i=1.19% 221+740 221+720 221+700 Pipe - (166), D=800 L=28.48m, i=1.00% Structure - (151) RIM:+129.40m SUMP:+123.33m Structure - (152) RIM:+128.73m SUMP:+122.65m Structure - (153) RIM:+128.05m SUMP:+121.98m Structure - (154) RIM:+127.38m SUMP:+121.30m Structure - (155) RIM:+126.67m SUMP:+120.48m Structure - (156) RIM:+126.17m SUMP:+119.55m Structure - (157) RIM:+125.58m SUMP:+119.15m Structure - (158) RIM:+125.00m SUMP:+118.75m Structure - (159) RIM:+124.42m SUMP:+118.34m 11+860 Pipe - (37 L=28.50m ), D=800 , i=1.16% Pipe - (169), D=800 L=21.82m, i=1.00% 221+680 221+660 Pipe - (143), D= 80 L=27.52m, i=1.00 % Structure - (160) RIM:+123.96m SUMP:+117.89m 11+840 Structure - (161) RIM:+123.69m SUMP:+117.49m 11+820 Structure - (136) RIM:+123.67m SUMP:+114.34m 11+860 11+840 11+820 11+800 BxH=3000x250 BxH=3000x250 DRAINAGE PLAN OF EXPRESSWAY NAME VIEN VI CHIT CASSAVA PEACH PRODUCTS THANH DONG CONSTRUCTION INVESTMENT LAO PEOPLE'S DEMOCRATIC REPUBLIC TÊN PROCESSING ONE NUMBER CO.,LTD BO Y - PAKSE EXPRESSWAY & TRADING JOINT STOCK CORPORATION SIGNATURE PREPARED BY THỰC HIỆN Msc.CHUONG NGUYEN QUOC CHECKED BY KIỂM TRA APPROVED BY DUYỆT Msc.TAI LAM DUY Msc.LIEN NGUYEN VAN CHỮ KÝ DATE NGÀY 4/2018 4/2018 4/2018 DRAINAGE/ HỆ THỐNG THỐT NƯỚC DRAINAGE PLAN BÌNH ĐỒ THỐT NƯỚC REV.NO LẦN DATE NGÀY DESCRIPTION DIỄN GIẢI 4/2018 APPROVAL DETAILED DESIGN SIZE/ KHỔ GIẤY: A3 SCALE/ TỶ LỆ:1/1000 DRAWING NO./ BẢN VẼ SỐ: 0020 PAK-P1-EP3- PREPARED BY THỰC HIỆN Msc.CHUONG NGUYEN QUOC 4/2018 APPROVED BY DUYỆT Msc.TAI LAM DUY Msc.LIEN NGUYEN VAN 4/2018 4/2018 12+520 12+500 12+480 12+460 12+440 DATE NGÀY DESCRIPTION DIỄN GIẢI 4/2018 APPROVAL 12+460 Structure - (380) RIM:+136.55m SUMP:+127.47m 12+440 12+420 REV.NO LẦN 222+400 222+380 222+340 222+320 222+360 Pipe - (397), D=800 L=28.50m, i=1.00% Structure - (381) RIM:+136.05m SUMP:+127.07m 12+400 12+380 DRAINAGE/ HỆ THỐNG THOÁT NƯỚC DRAINAGE PLAN BÌNH ĐỒ THỐT NƯỚC Structure - (162) RIM:+137.34m SUMP:+131.36m Pipe - (170), D=800 L=28.51m, i=1.00% Pipe - (398), D=800 L=28.50m, i=1.00% Structure - (382) RIM:+135.41m SUMP:+126.67m Structure - (383) RIM:+134.76m SUMP:+126.27m Structure - (139) RIM:+137.23m SUMP:+131.25m Pipe - (145), D=800 L=28.49m, i=1.41% Pipe - (399), D=800 L=28.50m, i=1.00% Pipe - (400), D=800 L=28.50m, i=1.00% 12+360 12+340 Structure - (140) RIM:+136.81m SUMP:+130.73m Pipe - (146), D=800 L=28.50m, i=1.85% 222+300 222+280 222+260 Structure - (384) RIM:+134.11m SUMP:+125.87m CHECKED BY KIỂM TRA 12+420 12+400 12+380 222+240 Structure - (385) RIM:+133.46m SUMP:+125.47m Structure - (141) RIM:+136.15m SUMP:+130.08m Pipe - (147), D=800 L=28.50m, i=1.91% Pipe - (401), D=800 L=28.50m, i=1.00% Pipe - (402), D=800 L=28.50m, i=1.00% CHỮ KÝ DATE NGÀY Structure - (142) RIM:+135.48m SUMP:+129.40m Pipe - (148), D=800 L=28.50m, i=1.92% 12+320 12+280 12+260 NAME VIEN VI CHIT CASSAVA PEACH PRODUCTS THANH DONG CONSTRUCTION INVESTMENT LAO PEOPLE'S DEMOCRATIC REPUBLIC TÊN PROCESSING ONE NUMBER CO.,LTD BO Y - PAKSE EXPRESSWAY & TRADING JOINT STOCK CORPORATION SIGNATURE Pipe - (149), D=800 L=28.51m, i=1.92% 12+300 Structure - (386) RIM:+132.81m SUMP:+125.07m Structure - (387) RIM:+132.16m SUMP:+124.67m Structure - (143) RIM:+134.80m SUMP:+128.73m 222+220 222+200 Pipe - (403), D=800 L=28.50m, i=1.00% Pipe - (404), D=800 L=28.50m, i=1.00% 12+360 12+340 12+320 Structure - (144) RIM:+134.13m SUMP:+128.05m Pipe - (150), D=800 L=28.49m, i=1.92% 222+180 222+160 12+220 Structure - (388) RIM:+131.51m SUMP:+124.27m Structure - (389) RIM:+130.86m SUMP:+123.87m 12+300 12+280 222+140 Pipe - (405), D=800 L=28.50m, i=1.00% Pipe - (406), D=800 L=28.50m, i=1.00% Structure - (145) RIM:+133.45m SUMP:+127.37m Pipe - (151), D=800 L=28.50m, i=1.91% 12+240 12+240 12+260 Structure - (146) RIM:+132.78m SUMP:+126.70m Pipe - (152), D=800 L=28.54m, i=1.92% 12+200 12+160 Structure - (390) RIM:+130.21m SUMP:+123.47m Structure - (391) RIM:+129.56m SUMP:+123.07m Structure - (147) RIM:+132.10m SUMP:+126.02m Pipe - (153), D=800 L=28.46m, i=1.92% 222+100 222+080 222+060 Pipe - (407), D=800 L=28.50m, i=1.00% 12+140 12+100 Structure - (392) RIM:+128.91m SUMP:+122.67m Pipe - (154), D=800 L=28.50m, i=1.91% Pipe - (408), D=800 L=28.50m, i=1.00% 12+120 Pipe - (409), D=800 L=28.50m, i=1.00% Structure - (148) RIM:+131.43m SUMP:+125.35m 222+120 Pipe - (155), D=800 L=28.50m, i=1.92% 222+040 Pipe - (156), D=800 L=28.49m, i=1.91% Structure - (149) RIM:+130.75m SUMP:+124.68m 12+180 Structure - (150) RIM:+130.08m SUMP:+124.00m 12+220 12+200 12+180 12+160 DRAINAGE PLAN OF EXPRESSWAY DETAILED DESIGN SIZE/ KHỔ GIẤY: A3 SCALE/ TỶ LỆ:1/1000 DRAWING NO./ BẢN VẼ SỐ: 0021 PAK-P1-EP3- APPROVED BY DUYỆT Msc.TAI LAM DUY Msc.LIEN NGUYEN VAN CHỮ KÝ DATE NGÀY 4/2018 4/2018 4/2018 222+760 222+740 DESCRIPTION DIỄN GIẢI 4/2018 APPROVAL 12+820 12+800 DATE NGÀY 12+840 222+720 12+780 12+760 12+880 12+860 12+840 222+700 222+680 222+660 DRAINAGE/ HỆ THỐNG THOÁT NƯỚC DRAINAGE PLAN BÌNH ĐỒ THỐT NƯỚC REV.NO LẦN Pipe - (384), D=800 L=28.50m, i=1.60% Structure - (367) RIM:+139.22m SUMP:+133.15m Structure - (368) RIM:+138.64m SUMP:+132.56m Structure - (369) RIM:+138.05m SUMP:+131.98m Structure - (370) RIM:+137.49m SUMP:+131.42m 12+740 12+720 12+820 12+800 12+780 222+640 CHECKED BY KIỂM TRA Pipe - (385), D=800 L=28.50m, i=1.61% Pipe - (386), D=800 L=28.50m, i=1.62% Pipe - (387), D=800 L=28.50m, i=1.53% Pipe - (388), D=800 L=28.50m, i=1.02% Structure - (371) RIM:+137.09m SUMP:+131.01m Structure - (372) RIM:+136.87m SUMP:+130.61m 12+680 12+660 PREPARED BY THỰC HIỆN Msc.CHUONG NGUYEN QUOC 12+760 Pipe - (389), D=800 L=28.50m, i=1.00% Structure - (373) RIM:+136.80m SUMP:+130.27m 12+640 NAME VIEN VI CHIT CASSAVA PEACH PRODUCTS THANH DONG CONSTRUCTION INVESTMENT LAO PEOPLE'S DEMOCRATIC REPUBLIC TÊN PROCESSING ONE NUMBER CO.,LTD BO Y - PAKSE EXPRESSWAY & TRADING JOINT STOCK CORPORATION SIGNATURE Pipe - (390), D=800 L=22.88m, i=1.00% 12+700 Structure - (374) RIM:+136.85m SUMP:+129.87m 222+620 222+600 222+580 Pipe - (391), D=800 L=28.50m, i=1.00% Pipe - (181), D=800 L=28.49m, i=1.00% Pipe - (182), D=800 L=28.53m, i=1.00% Pipe - (183), D=800 L=28.47m, i=2.26% Pipe - (184), D=800 L=28.50m, i=2.26% Structure - (173) RIM:+140.07m SUMP:+133.59m Structure - (174) RIM:+139.29m SUMP:+133.19m Structure - (175) RIM:+138.49m SUMP:+132.41m Structure - (176) RIM:+137.71m SUMP:+131.63m Pipe - (185), D=800 L=28.51m, i=1.74% Pipe - (186), D=800 L=28.49m, i=1.14% Pipe - (187), D=800 L=28.51m, i=1.00% 222+560 Structure - (375) RIM:+136.89m SUMP:+129.47m 12+740 12+720 12+700 12+680 Pipe - (392), D=800 L=28.50m, i=1.00% 12+620 Structure - (376) RIM:+136.94m SUMP:+129.07m 222+540 222+520 222+500 Pipe - (393), D=800 L=28.50m, i=1.00% 12+600 Structure - (377) RIM:+136.99m SUMP:+128.67m 12+660 12+640 12+620 222+480 222+460 Pipe - (394), D=800 L=28.50m, i=1.00% Structure - (177) RIM:+137.09m SUMP:+131.01m Structure - (178) RIM:+136.65m SUMP:+130.57m Structure - (179) RIM:+136.39m SUMP:+130.17m Pipe - (174), D=800 Pipe - (176), D=800 Pipe - (188), D=800 L=28.50m, i=1.00% L=8.74m, i=1.00% L=23.41m, i=1.00% 12+580 12+520 Structure - (378) RIM:+137.01m SUMP:+128.27m 12+500 12+480 Structure - (379) RIM:+136.87m SUMP:+127.87m Pipe - (395), D=800 L=28.50m, i=1.00% Structure - (167) RIM:+136.31m SUMP:+129.36m Structure - (166) RIM:+136.43m SUMP:+129.76m Pipe - (173), D=800 L=28.50m, i=1.00% 12+560 Pipe - (396), D=800 L=28.50m, i=1.00% Structure - (165) RIM:+136.71m SUMP:+130.16m Pipe - (172), D=800 L=28.50m, i=1.00% 222+440 222+420 Pipe - (397), D=800 L=28.50m, i=1.00% Structure - (164) RIM:+137.00m SUMP:+130.56m Pipe - (171), D=800 L=28.48m, i=1.00% 222+400 Pipe - (170), D=800 L=28.51m, i=1.00% 12+600 12+580 Structure - (163) RIM:+137.28m SUMP:+130.96m 12+540 Structure - (162) RIM:+137.34m SUMP:+131.36m 12+560 12+540 12+520 BxH=1500x1500 DRAINAGE PLAN OF EXPRESSWAY DETAILED DESIGN SIZE/ KHỔ GIẤY: A3 SCALE/ TỶ LỆ:1/1000 DRAWING NO./ BẢN VẼ SỐ: 0022 PAK-P1-EP3- APPROVED BY DUYỆT Msc.TAI LAM DUY Msc.LIEN NGUYEN VAN CHỮ KÝ DATE NGÀY 4/2018 4/2018 4/2018 223+120 223+100 13+200 13+180 REV.NO LẦN DATE NGÀY DESCRIPTION DIỄN GIẢI 4/2018 APPROVAL Pipe - (425), D=800 L=28.50m, i=1.00% Structure - (407) RIM:+140.99m SUMP:+134.72m Structure - (406) RIM:+141.50m SUMP:+135.12m 13+160 13+140 13+260 13+240 13+220 223+080 223+060 223+040 DRAINAGE/ HỆ THỐNG THỐT NƯỚC DRAINAGE PLAN BÌNH ĐỒ THỐT NƯỚC Pipe - (195), D=800 L=28.50m, i=1.00% Pipe - (424), D=800 L=28.50m, i=1.00% Structure - (405) RIM:+141.89m SUMP:+135.52m Structure - (187) RIM:+140.75m SUMP:+132.81m Structure - (186) RIM:+141.11m SUMP:+133.21m Pipe - (194), D=800 L=28.51m, i=1.00% Pipe - (423), D=800 L=28.49m, i=1.00% 13+120 Structure - (404) RIM:+142.16m SUMP:+135.92m 13+100 13+080 13+200 13+180 13+160 223+020 223+000 222+980 13+060 CHECKED BY KIỂM TRA Pipe - (193), D=800 L=28.50m, i=1.00% Pipe - (422), D=800 L=28.50m, i=1.00% Structure - (403) RIM:+142.29m SUMP:+136.32m Structure - (360) RIM:+142.29m SUMP:+136.32m 13+040 13+000 Structure - (361) RIM:+142.15m SUMP:+135.92m NAME VIEN VI CHIT CASSAVA PEACH PRODUCTS THANH DONG CONSTRUCTION INVESTMENT LAO PEOPLE'S DEMOCRATIC REPUBLIC TÊN PROCESSING ONE NUMBER CO.,LTD BO Y - PAKSE EXPRESSWAY & TRADING JOINT STOCK CORPORATION SIGNATURE 13+140 13+100 222+960 Pipe - (421), D=800 L=28.52m, i=1.00% Structure - (185) RIM:+141.39m SUMP:+133.61m Structure - (184) RIM:+141.58m SUMP:+134.01m Pipe - (192), D=800 L=28.97m, i=1.00% Pipe - (191), D=800 L=28.51m, i=1.00% Pipe - (378), D=800 L=28.50m, i=1.00% PREPARED BY THỰC HIỆN Msc.CHUONG NGUYEN QUOC Structure - (183) RIM:+141.67m SUMP:+134.42m Structure - (182) RIM:+141.68m SUMP:+134.82m Pipe - (190), D=800 L=28.48m, i=1.00% 222+940 Structure - (362) RIM:+141.88m SUMP:+135.52m 13+120 13+060 Pipe - (379), D=800 L=28.50m, i=1.00% 12+980 12+960 Structure - (181) RIM:+141.64m SUMP:+135.22m 13+020 Pipe - (380), D=800 L=28.50m, i=1.00% 222+920 222+900 222+880 222+860 13+080 13+020 13+000 12+980 13+040 Structure - (180) RIM:+141.59m SUMP:+135.62m Pipe - (189), D=800 L=28.50m, i=1.00% Structure - (363) RIM:+141.49m SUMP:+135.11m 12+940 222+820 222+800 222+840 Structure - (364) RIM:+140.97m SUMP:+134.71m 12+920 12+860 Structure - (168) RIM:+141.56m SUMP:+135.59m Pipe - (177), D=800 L=28.50m, i=1.00% Pipe - (381), D=800 L=28.50m, i=1.00% Structure - (365) RIM:+140.38m SUMP:+134.31m Structure - (366) RIM:+139.80m SUMP:+133.73m Structure - (169) RIM:+141.52m SUMP:+135.19m Pipe - (178), D=800 L=28.50m, i=1.00% Pipe - (382), D=800 L=28.50m, i=1.02% 12+900 Structure - (367) RIM:+139.22m SUMP:+133.15m Structure - (170) RIM:+141.43m SUMP:+134.79m Pipe - (179), D=800 L=28.50m, i=1.00% Pipe - (383), D=800 L=28.50m, i=1.61% Pipe - (384), D=800 L=28.50m, i=1.60% 12+960 Structure - (171) RIM:+141.15m SUMP:+134.39m Pipe - (180), D=800 L=28.51m, i=1.00% 222+780 222+760 Pipe - (181), D=800 L=28.49m, i=1.00% 12+840 12+940 Structure - (172) RIM:+140.70m SUMP:+133.99m 12+880 Structure - (173) RIM:+140.07m SUMP:+133.59m 12+920 12+900 DRAINAGE PLAN OF EXPRESSWAY DETAILED DESIGN SIZE/ KHỔ GIẤY: A3 SCALE/ TỶ LỆ:1/1000 DRAWING NO./ BẢN VẼ SỐ: 0023 PAK-P1-EP3- 223+500 Pipe - (223), D=800 L=28.51m, i=1.67% 223+480 Pipe - (464), D=800 L=28.50m, i=2.53% BxH=1500x1500 13+560 13+540 Pipe - (463), D=800 L=28.50m, i=2.67% Structure - (445) RIM:+137.23m SUMP:+131.15m Structure - (446) RIM:+136.38m SUMP:+130.29m Structure - (447) RIM:+135.91m SUMP:+129.82m 13+520 13+500 13+620 13+600 Pipe - (224), D=800 L=28.49m, i=1.06% 223+460 223+440 223+420 223+400 Pipe - (225), D=800 L=28.50m, i=1.00% Structure - (417) RIM:+135.85m SUMP:+129.23m 13+480 Structure - (416) RIM:+136.05m SUMP:+129.63m Structure - (214) RIM:+138.05m SUMP:+131.97m Structure - (215) RIM:+137.63m SUMP:+131.55m Pipe - (434), D=800 Pipe - (446), - (466), D=800 Pipe - (465), D=800 PipeD=800 L=28.50m, i=1.00% L=4.02m,L=8.51m, i=1.00% i=1.00% L=28.50m, i=1.25% Structure - (415) RIM:+136.58m SUMP:+130.03m 13+440 13+580 13+560 13+540 13+520 223+380 Pipe - (433), D=800 L=28.51m, i=1.00% 13+460 13+400 13+380 Structure - (414) RIM:+137.13m SUMP:+130.43m Structure - (216) RIM:+137.39m SUMP:+131.15m Pipe - (204), D=800Pipe - (206), D=800 Pipe - (226), D=800 L=28.50m, i=1.00%L=2.49m, i=1.00%L=24.63m, i=1.00% 223+360 223+340 223+320 Pipe - (432), D=800 L=28.50m, i=1.00% Structure - (413) RIM:+137.68m SUMP:+130.83m 13+500 13+480 13+460 Pipe - (203), D=800 L=28.50m, i=1.00% 13+420 Structure - (412) RIM:+138.23m SUMP:+131.23m Pipe - (431), D=800 L=28.50m, i=1.00% Structure - (196) RIM:+137.33m SUMP:+129.21m Structure - (195) RIM:+137.45m SUMP:+129.61m Structure - (194) RIM:+137.75m SUMP:+130.01m Pipe - (202), D=800 L=28.50m, i=1.00% 223+300 223+280 Pipe - (430), D=800 L=28.51m, i=1.00% Structure - (411) RIM:+138.78m SUMP:+131.63m 13+440 13+420 13+400 223+260 Pipe - (429), D=800 L=28.49m, i=1.00% Structure - (193) RIM:+138.17m SUMP:+130.41m Pipe - (201), D=800 L=28.51m, i=1.00% 13+360 Structure - (410) RIM:+139.33m SUMP:+133.26m Pipe - (200), D=800 L=28.49m, i=1.00% 13+340 Structure - (409) RIM:+139.88m SUMP:+133.81m 13+380 13+360 13+340 223+220 223+180 223+200 Pipe - (428), D=800 L=28.51m, i=5.10% 13+300 13+240 13+220 Structure - (408) RIM:+140.44m SUMP:+134.32m Pipe - (427), D=800 L=28.49m, i=1.50% 13+260 Pipe - (426), D=800 L=28.50m, i=1.37% Structure - (407) RIM:+140.99m SUMP:+134.72m 13+200 223+160 223+140 Pipe - (425), D=800 L=28.50m, i=1.00% Pipe - (199), D=800 L=28.50m, i=1.00% Pipe - (198), D=800 L=28.50m, i=1.00% 223+240 Pipe - (197), D=800 L=28.50m, i=1.00% Pipe - (196), D=800 L=28.49m, i=1.00% Structure - (192) RIM:+138.60m SUMP:+130.82m Structure - (191) RIM:+139.03m SUMP:+131.21m Structure - (190) RIM:+139.46m SUMP:+131.61m Structure - (189) RIM:+139.89m SUMP:+132.01m 13+320 Structure - (188) RIM:+140.32m SUMP:+132.41m 13+280 Structure - (187) RIM:+140.75m SUMP:+132.81m 13+320 13+300 13+280 13+260 BxH=2000x2000 DRAINAGE PLAN OF EXPRESSWAY NAME VIEN VI CHIT CASSAVA PEACH PRODUCTS THANH DONG CONSTRUCTION INVESTMENT LAO PEOPLE'S DEMOCRATIC REPUBLIC TÊN PROCESSING ONE NUMBER CO.,LTD BO Y - PAKSE EXPRESSWAY & TRADING JOINT STOCK CORPORATION SIGNATURE PREPARED BY THỰC HIỆN Msc.CHUONG NGUYEN QUOC CHECKED BY KIỂM TRA APPROVED BY DUYỆT Msc.TAI LAM DUY Msc.LIEN NGUYEN VAN CHỮ KÝ DATE NGÀY 4/2018 4/2018 4/2018 DRAINAGE/ HỆ THỐNG THOÁT NƯỚC DRAINAGE PLAN BÌNH ĐỒ THỐT NƯỚC REV.NO LẦN DATE NGÀY DESCRIPTION DIỄN GIẢI 4/2018 APPROVAL DETAILED DESIGN SIZE/ KHỔ GIẤY: A3 SCALE/ TỶ LỆ:1/1000 DRAWING NO./ BẢN VẼ SỐ: 0024 PAK-P1-EP3- Msc.TAI LAM DUY Msc.LIEN NGUYEN VAN DATE NGÀY 4/2018 4/2018 4/2018 REV.NO LẦN DATE NGÀY DESCRIPTION DIỄN GIẢI 4/2018 APPROVAL Pipe - (211), D=800 L=28.50m, i=1.00% 223+860 223+840 Structure - (434) RIM:+145.61m SUMP:+139.53m Pipe - (451), D=800 L=28.51m, i=1.15% Structure - (433) RIM:+146.05m SUMP:+139.98m 13+940 13+900 13+880 Pipe - (452), D=800 L=28.49m, i=1.16% 13+920 Structure - (435) RIM:+145.16m SUMP:+139.08m DRAINAGE/ HỆ THỐNG THỐT NƯỚC DRAINAGE PLAN BÌNH ĐỒ THỐT NƯỚC 13+980 13+960 Pipe - (453), D=800 L=28.52m, i=1.15% 13+860 13+840 223+820 223+800 Pipe - (454), D=800 L=28.48m, i=1.16% Structure - (436) RIM:+144.71m SUMP:+138.64m Pipe - (212), D=800 L=28.50m, i=1.00% Pipe - (213), D=800 L=28.50m, i=1.00% 223+780 223+760 13+940 13+920 13+900 13+880 13+820 13+800 13+780 APPROVED BY DUYỆT CHỮ KÝ Pipe - (455), D=800 L=28.50m, i=1.45% Structure - (437) RIM:+144.18m SUMP:+138.10m CHECKED BY KIỂM TRA Pipe - (214), D=800 L=28.48m, i=1.02% Pipe - (215), D=800 L=28.52m, i=2.89% 223+740 223+720 Pipe - (456), D=800 L=28.50m, i=1.94% Structure - (438) RIM:+143.49m SUMP:+137.42m 13+760 13+740 NAME VIEN VI CHIT CASSAVA PEACH PRODUCTS THANH DONG CONSTRUCTION INVESTMENT LAO PEOPLE'S DEMOCRATIC REPUBLIC TÊN PROCESSING ONE NUMBER CO.,LTD BO Y - PAKSE EXPRESSWAY & TRADING JOINT STOCK CORPORATION SIGNATURE PREPARED BY THỰC HIỆN Msc.CHUONG NGUYEN QUOC 13+860 13+840 223+700 Pipe - (457), D=800 L=28.50m, i=2.47% Structure - (439) RIM:+142.65m SUMP:+136.58m Structure - (440) RIM:+141.75m SUMP:+135.67m 13+720 13+700 13+820 223+660 Pipe - (458), D=800 L=28.51m, i=2.68% Pipe - (459), D=800 L=28.48m, i=2.68% Pipe - (216), D=800 L=28.50m, i=3.04% Pipe - (217), D=800 L=28.50m, i=3.04% Structure - (202) RIM:+148.27m SUMP:+141.53m Structure - (203) RIM:+147.83m SUMP:+141.13m Structure - (204) RIM:+147.21m SUMP:+140.73m Structure - (205) RIM:+146.41m SUMP:+140.33m Structure - (206) RIM:+145.44m SUMP:+139.36m Structure - (207) RIM:+144.43m SUMP:+138.35m 223+680 Pipe - (218), D=800 L=28.50m, i=3.04% 223+640 223+620 223+600 13+800 13+780 13+760 13+740 13+720 13+700 223+580 Structure - (208) RIM:+143.41m SUMP:+137.34m Structure - (209) RIM:+142.40m SUMP:+136.32m Pipe - (219), D=800 L=28.50m, i=3.03% Structure - (441) RIM:+140.84m SUMP:+134.77m Structure - (442) RIM:+139.94m SUMP:+133.87m 13+680 13+620 13+600 13+580 Structure - (445) RIM:+137.23m SUMP:+131.15m Pipe - (460), D=800 L=28.50m, i=2.68% Pipe - (461), D=800 L=28.51m, i=2.70% Structure - (443) RIM:+139.03m SUMP:+132.95m Structure - (444) RIM:+138.13m SUMP:+132.05m Structure - (210) RIM:+141.39m SUMP:+135.32m Pipe - (220), D=800 L=28.50m, i=3.04% 13+660 Pipe - (462), D=800 L=28.50m, i=2.67% Pipe - (463), D=800 L=28.50m, i=2.67% Pipe - (221), D=800 L=28.49m, i=2.85% 223+560 223+540 Pipe - (222), D=800 L=28.50m, i=2.26% 223+520 223+500 Pipe - (223), D=800 L=28.51m, i=1.67% Structure - (211) RIM:+140.38m SUMP:+134.30m Structure - (212) RIM:+139.43m SUMP:+133.35m Structure - (213) RIM:+138.65m SUMP:+132.57m 13+640 Structure - (214) RIM:+138.05m SUMP:+131.97m 13+680 13+660 13+640 13+620 DRAINAGE PLAN OF EXPRESSWAY DETAILED DESIGN SIZE/ KHỔ GIẤY: A3 SCALE/ TỶ LỆ:1/1000 DRAWING NO./ BẢN VẼ SỐ: 0025 PAK-P1-EP3- NAME VIEN VI CHIT CASSAVA PEACH PRODUCTS THANH DONG CONSTRUCTION INVESTMENT LAO PEOPLE'S DEMOCRATIC REPUBLIC TÊN PROCESSING ONE NUMBER CO.,LTD BO Y - PAKSE EXPRESSWAY & TRADING JOINT STOCK CORPORATION SIGNATURE PREPARED BY THỰC HIỆN Msc.CHUONG NGUYEN QUOC DATE NGÀY 4/2018 14+040 14+020 CHECKED BY KIỂM TRA APPROVED BY DUYỆT Msc.TAI LAM DUY Msc.LIEN NGUYEN VAN 4/2018 4/2018 14+140 224+000 Structure - (428) RIM:+148.64m SUMP:+142.66m 14+080 Structure - (429) RIM:+147.91m SUMP:+141.75m Structure - (430) RIM:+147.39m SUMP:+141.31m CHỮ KÝ Pipe - (447), D=800 L=28.50m, i=2.70% 14+060 Structure - (431) RIM:+146.95m SUMP:+140.87m Structure - (197) RIM:+149.57m SUMP:+143.60m Pipe - (207), D=800 L=28.50m, i=1.21% 223+980 223+960 223+940 Pipe - (448), D=800 L=28.49m, i=1.12% 14+000 13+960 Structure - (432) RIM:+146.50m SUMP:+140.42m 14+100 14+080 14+060 223+920 223+900 223+880 Pipe - (450), D=800 L=28.50m, i=1.15% Structure - (433) RIM:+146.05m SUMP:+139.98m 13+940 14+040 14+020 14+000 Pipe - (451), D=800 L=28.51m, i=1.15% Pipe - (208), D=800 L=28.50m, i=1.00% Pipe - (209), D=800 L=28.50m, i=1.00% 13+980 Structure - (434) RIM:+145.61m SUMP:+139.53m Pipe - (210), D=800 L=28.50m, i=1.00% Pipe - (211), D=800 L=28.50m, i=1.00% 223+860 223+840 223+820 Pipe - (452), D=800 L=28.49m, i=1.16% 13+920 13+880 13+860 Structure - (435) RIM:+145.16m SUMP:+139.08m 13+980 13+960 13+940 Pipe - (453), D=800 L=28.52m, i=1.15% 13+900 Structure - (436) RIM:+144.71m SUMP:+138.64m 13+840 13+820 Pipe - (454), D=800 L=28.48m, i=1.16% Pipe - (212), D=800 L=28.50m, i=1.00% Pipe - (213), D=800 L=28.50m, i=1.00% 223+800 223+780 223+760 223+740 Pipe - (455), D=800 L=28.50m, i=1.45% Structure - (437) RIM:+144.18m SUMP:+138.10m 13+920 13+900 13+880 Pipe - (214), D=800 L=28.48m, i=1.02% Pipe - (215), D=800 L=28.52m, i=2.89% Structure - (198) RIM:+149.25m SUMP:+143.13m Structure - (199) RIM:+149.01m SUMP:+142.73m Structure - (200) RIM:+148.77m SUMP:+142.33m Structure - (201) RIM:+148.54m SUMP:+141.93m Structure - (202) RIM:+148.27m SUMP:+141.53m Structure - (203) RIM:+147.83m SUMP:+141.13m Structure - (204) RIM:+147.21m SUMP:+140.73m Structure - (205) RIM:+146.41m SUMP:+140.33m Structure - (206) RIM:+145.44m SUMP:+139.36m 14+120 DRAINAGE PLAN OF EXPRESSWAY DRAINAGE/ HỆ THỐNG THỐT NƯỚC DRAINAGE PLAN BÌNH ĐỒ THỐT NƯỚC REV.NO LẦN DATE NGÀY DESCRIPTION DIỄN GIẢI 4/2018 APPROVAL DETAILED DESIGN SIZE/ KHỔ GIẤY: A3 SCALE/ TỶ LỆ:1/1000 DRAWING NO./ BẢN VẼ SỐ: 0026 PAK-P1-EP3- ... SUMP:+140.33m Structure - (206) RIM:+145.44m SUMP:+139.36m 14+120 DRAINAGE PLAN OF EXPRESSWAY DRAINAGE/ HỆ THỐNG THỐT NƯỚC DRAINAGE PLAN BÌNH ĐỒ THỐT NƯỚC REV.NO LẦN DATE NGÀY DESCRIPTION DIỄN GIẢI 4/2018... Msc.LIEN NGUYEN VAN CHỮ KÝ DATE NGÀY 4/2018 4/2018 4/2018 DRAINAGE/ HỆ THỐNG THỐT NƯỚC DRAINAGE PLAN BÌNH ĐỒ THỐT NƯỚC REV.NO LẦN DATE NGÀY DESCRIPTION DIỄN GIẢI 4/2018 APPROVAL DETAILED DESIGN... DSUMP:+105.92m , i=1 =800 00% 8+860 Structure - (23) RIM:+112.45m SUMP:+105.52m 8+880 8+860 8+840 DRAINAGE PLAN OF EXPRESSWAY NAME VIEN VI CHIT CASSAVA PEACH PRODUCTS THANH DONG CONSTRUCTION INVESTMENT LAO

Ngày đăng: 03/11/2019, 09:11

TÀI LIỆU CÙNG NGƯỜI DÙNG

TÀI LIỆU LIÊN QUAN

w