Thông tin tài liệu
Form FEV-RFI-V1.1 Project Address Package Employer Contractor : : : : : Feliz-En-Vista High-Rise Residential Development At Plot Y1, Thanh My Loi Ward, District 2, HCMC, VN Main Contract CapitaLand- Thien Duc Investment Co., Ltd CSCEC32 RFA Ref No : FEV-CSCEC32-ARCHI-MOS-RFA-013A - Method statement for painting REQUEST FOR APPROVAL (RFA) VINAQS CO., LTD ; : RSP ARCHITECTS PLANNERS & To From: CSCEC32 Main Contractor ENGINEERS (Vietnam) LTD Attention Descipline : Dang Thanh Sang; Mai Tran Bich Tram : Finishing work Subject : Method statement for painting Name: Wang Shi Wei Date of Request : CC: Date to Reply : 4-Jan-18 CL R SCI Project Manager 30-Dec-17 RSP T&W ATICHA VQS R JRP CIDECO R 10 Jan 18 DESCRIPTION: Dear Sirs, We would like to submit Method statement for painting Please review and approve R Normal (07 days) X Critical (03 days) Regard, Main Contractor CSCEC32- Project manager Date: Signed: Name: Wang Shi Wei 30-Dec-17 REPLY: This review is for conformance with the general design concept and for general arrangement expressed in the documents Review shall not be construed to mean that the reviewer accepts the detail calculations and dimensions shown in the shop drawings or any deviation from the requirements of the contract documents Contractor is responsible for errors or omissions in the shop drawings; for meeting all requirements of the contract documents; for confirming and correlating job site dimensions; for information that pertains solely to fabrication process or to techniques of construction, and for the coordination of the work of all trades It is understood that the notation on the submittal is not to be construed as an authorization for additional work or additional cost RSP's reply on 21/03/2018: Approved with comments - To be read in conjunction with approved MA for paint - Contractor to follow supplier's recommendation for paint system They may require 4-5 coats (2skim +1 sealer + coats) - Final approval subject to mock-up's aprroval -This MOS only apply for external and internal wall painting It shall not be appy for other surface, example Metal, plasterboard, etc - 1st mixing to be 5-10mins or according to supplier's recommendation - All materials need to be stored ane kept in good condition according to supplier's recommendation - Surface humitidy to follow supplier's recommendation Signed: RSP The Engineer: TW JRP SCI ATICHA CDC CL Approved Not Approved Date: Approved with comments but works can proceed on site MOS for Painting PROJECT: ITEMS: FELIZ EN VISTA HIGH-RISE RESIDENTIAL DEVELOPMENT BLOCK A, BLOCK B, BLOCK C, BLOCK D & PODIUM PARTY APPROVAL OWNER Capitaland- Thien Duc Investment Co., Ltd CONTRACTOR CSCEC32 CONSULTANTS RSP, Tham&Wong VIETNAM CO.,LTD DATE Rev 30/12/2017 01 I、Chuẩn bị thi công/Construction preparation: 1、Điều kiện thi công/Operation condition: - Công việc trát nghiệm thu bàn giao cho công tác sơn nước - The plastering work was inspection and handed over for painting work and skimming work - Thợ sơn phải chuyên nghiệp có đầy đủ dụng cụ cho cơng việc - The worker must be skill and have a proper and essential tiling work tool - Tất vật tư liên quan đến công tác sơn nước phải thành phần liên quan phê duyệt tập kết đầy đủ công trường - All materials related to the paintting work must be approved by the concerned parties and fully assembled on the site 2、Yêu cầu vật liệu/Material requirements: - Vật liệu cho công tác bả bột sử dụng bột bả trộn khơ đóng bao sẵn cung cấp nhà sản xuất, trộn với nước theo tỉ lệ cung cấp nhà sản xuất để tạo hỗn hợp mềm dẻo - Materials for putty work use pre-packed dry powder provided by the manufacturer’s, mix with water clean follow manufacturer’s instruction shall be added to provide a pliable mix - Vật liệu cho công tác sơn nước sử dụng sơn pha đóng thùng sẵn cung cấp nhà sản xuất, trộn với nước theo tỉ lệ cung cấp nhà sản xuất để tạo dung dịch sơn thích hợp - Materials for painting work use pre-packed panit provided by the manufacturer’s, mix with water clean follow manufacturer’s instruction shall be added to provide a suitable paint solution - Vật liệu bột bả sơn nước phân chia sử dụng rõ ràng cho tường nhà nhà, phải sử dụng vật liệu với vị trí mà ứng dụng - Putty powder and painting are clearly used for internal and external, and must be used in the materialt location where it is used 3、Công cụ/Tools: - Bàn chà thép: dùng để đựng vữa skimcoat trát lên tường - Trowel steel: used to put skimcoat mortar and plaster on the wall - Tấm nhựa: dùng để trát vữa lên tường - Plastic plates: used to plaster on the wall - Giấy nhám máy chà nhám: Công dụng giấy nhám/máy chà nhám để làm mịn bề mặt không phẳng Khi sơn tường, bề mặt tường cần có độ nhẵn mịn định, khơng lớp sơn bị gồ ghề, lõm hay trũng gây thẫm mỹ tường Chính thế, trước thực cơng đoạn sơn tường, dùng giấy nhám để làm nhẵn bóng bề mặt gồ ghề tường Đối với khu vực có diện tích lớn lựa chọn cách dùng máy chà nhám tường để tiết kiệm thời gian hiệu cao - Abrasive paper or sanding machine: The use of sandpaper / sanding machine is to smooth the uneven surfaces When painting walls, the surface of the wall should be smooth smooth, if not, the paint will be rough, hollow or sunken wall loss of aesthetics Therefore, before painting, use sandpaper to smooth the rough surface on the wall For large areas, it is also possible to use a sanding machine to save time and efficiency Abrasive paper or sanding machine/Xả nhám tay máy xả nhám - Băng dính: Băng dính dùng để dán kín lên cơng tắc đèn, ổ cắm khu vực mà sơn dây bẩn vào Khi sơn tường, dùng đoạn băng dính dán bên rìa đường sơn để giữ cho đường sơn thẳng mịn Khi sơn khơ hồn tồn, gỡ băng dính - Adhesive tape: Adhesive tape is used to seal the light switch, socket, or areas where the paint may stain When painting the walls, use a sticky patch of paint on the edge of the paint line to keep the paint line straight and smooth When the paint is completely dry, remove the adhesive tape - Dụng cụ che chắn: Để bảo vệ sàn nội thất khu vực sơn, sử dụng nhựa to để trải lên sàn phủ lên vật dụng để tránh sơn dính vào - Shielding tools: To protect floors and furniture in the paint area, use large plastic sheets to spread on the floor and cover the items to avoid sticking paint - Dụng cụ cạo sơn: Dùng để loại bỏ mảng sơn cũ bị bong tróc khỏi bề mặt, sử dụng để lấp vết nứt lỗ hổng tường - Paint tools: Used to remove old paint peeling off the surface, or can also be used to cover cracks or holes in the wall - Khăn sạch: Sơn khơng dính tốt bề mặt xù xì, nhiều bụi bẩn dính để lại tường gồ ghề, không đẹp mắt Dùng chổi lông gà khăn ẩm để lau tường trước sơn nhằm có nước sơn đẹp tăng độ bám dính sơn Ngồi ra, khăn cịn giúp dễ dàng lau tường lau vệt sơn tràn - Clean towels: The paint will not stick well on rough surfaces, dirt and even adhesion will leave the wall rough, not beautiful Use a chicken feather brush and a damp cloth to wipe the wall before painting for a nice paint finish and increased adhesion In addition, clean towels also help to easily clean the walls and wipe the paint spills - Cọ quét sơn lăn sơn: Có nhiều loại kích thước cho cọ lăn sơn để dùng với bề mặt mục đích khác Đối với bề mặt có diện tích nhỏ, hẹp nhiều góc cạnh cọ sơn dụng cụ tốt để xử ĺ công việc Con lăn sơn có lợi giúp hồn thành cơng việc nhanh hơn, tạo nên đường sơn sắc sảo dùng cọ sơn, cạnh ống lăn mềm - Paint brush and roller: There are various sizes for brushes and paint rollers for use with different surfaces and brush purposes For surfaces that are small, narrow, and angular, paint is the best tool for handling work The paint roller has the advantage of helping to get things done faster, but can not create sharp lines as if using paint brushes, as the edges of the rollers are very soft - Khay đựng lăn sơn: Dùng để đựng sơn làm lăn sơn Khay đựng sơn phải ráo, không bị vỡ, nứt; lăn sơn phải sáo, không sứt vải Trước đổ sơn vào khay, nên bọc túi nilon vào khay đựng sơn để tiết kiêm thời gian vệ sinh sau - Paint roller tray: Use for paint and dry paint roller Tray must be dry, not broken, cracked; The roller must be flute, not the fabric Prior to pouring the paint, a plastic bag should be applied to the paint tray for subsequent cleaning - Thùng: Để đựng sơn ngâm cọ quét sơn, lăn sơn, dụng cụ khác - Bin: To use for paint and soak paint brushes, paint rollers, other tools - Máy trộn: Để trộn hỗn hợp nước bột bả - Mixer machine: To mix well the mixture of water and putty powder - Cây sào dài: Dùng để đặt lăn vào đầu sào để sơn khu vực cao - Long pole: Used to place the roller at the top of the pole to paint the high areas - Thang chữ A, giàn giáo: Dùng để sơn nhà, dùng sơn nhà trời khu vực cao - A ladder, scaffolding: Use for indoor painting, or for outdoor painting in high areas - Đồ bảo hộ: Quần áo dài, nón, mặt nạ găng tay sử dụng để bảo vệ khơng bị dính sơn - Safety helmet: Long clothes, hats, masks and gloves are used to protect from paint Con lăn sơn, cọ quét sơn khay đựng/ Roller, paint brush and tray Máy trộn/mixer machine Băng dính/ adhesive tape Cây sào dài/ Long pole Dụng cụ che chắn, đồ bảo hộ, thang chữ A/ shielding, safety, A ladder II、Quy trình thi công/Workmanship procedure: Chuẩn bị bề mặt → kiểm tra độ ẩm → bả matic → tiến hành sơn → nghiệm thu → bảo vệ Prepairation surface → check humidity → putty → painting → inspection → protection III、Quá trình thực hiện/Operation sequence: 1、Chuẩn bị bề mặt/Prepairation surface : - Vệ sinh bề mặt sẽ, khơng có rong rêu, nấm mốc, dầu mỡ, nấm mốc, gỗ, đinh, - Clean surface, no moss, oil, wood, nails, - Với bề mặt tường trát, phải đảm bảo đủ thời gian bảo dưỡng khơ hồn tồn (tối thiểu 28 ngày trở tiến hành thi cơng sơn bả) - With freshly plastered wall/concrete surface, must ensure enough time for curing and dry time (minimum 28 days onwards can carry out painting) - Nếu tường khô, dùng rulô nhúng nước làm ẩm tường trước trét bột, (Lưu ́: Chỉ cần lăn nước mỏng, không nên lăn nhiều nước) - If the wall is too dry, moisten the walls surface with a wet roller before putty work, (Note: Just roll a thin water, not roll too much water) 2、Kiểm tra độ ẩm bề mặt/check humidity surface: - Độ ẩm bề mặt trước sơn bả phải đạt độ ẩm cho phép
Ngày đăng: 18/08/2021, 11:23
Xem thêm: Biện pháp thi công sơn dự án Feliz En Vista