Biện pháp thi công xây tường dự án Feliz En Vista

27 26 0
Biện pháp thi công xây tường dự án Feliz En Vista

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

Thông tin tài liệu

Form FEV-RFI-V1.1 Project Address Package Employer Contractor : : : : : Feliz-En-Vista High-Rise Residential Development At Plot Y1, Thanh My Loi Ward, District 2, HCMC, VN Main Contract CapitaLand- Thien Duc Investment Co., Ltd CSCEC32 RFA Ref No : FEV-CSCEC32-ARCHI-MOS-RFA-003E - Method statement for masonry REQUEST FOR APPROVAL (RFA) VINAQS CO., LTD ; : RSP ARCHITECTS PLANNERS & To From: CSCEC32 Main Contractor ENGINEERS (Vietnam) LTD Attention Descipline : Dang Thanh Sang; Mai Tran Bich Tram : Finishing work Subject : Method statement for masonry Name: Wang Shi Wei Date of Request : CC: Date to Reply : 11-Dec-17 CL SCI R Project Manager 6-Dec-17 RSP T&W JRP ATICHA VQS CIDECO R DESCRIPTION: Dear Sirs, We would like to submit Method statement for masonry Please review and approve R Critical (03 days) Normal (07 days) Regard, CSCEC32- Main Contractor Date: Signed: Name: Wang Shi Wei 6-Dec-17 REPLY: This review is for conformance with the general design concept and for general arrangement expressed in the documents Review shall not be construed to mean that the reviewer accepts the detail calculations and dimensions shown in the shop drawings or any deviation from the requirements of the contract documents Contractor is responsible for errors or omissions in the shop drawings; for meeting all requirements of the contract documents; for confirming and correlating job site dimensions; for information that pertains solely to fabrication process or to techniques of construction, and for the coordination of the work of all trades It is understood that the notation on the submittal is not to be construed as an authorization for additional work or additional cost RSP comments- Dec 2017: -Noted CSCEC32's adjustments clouded in red color from RFA-003D to RFA-003E -Decision "Approved with comments" given dated Dec 2017 for RFA-003D is still valid for RFA-003E with the following comments: MOS of masonry works shall be read in conjunction with relevant shop drawings and the approved Materials info Demonstration for masonry works shall be done at mock up unit, recorded in photos for every step of the work process and submitted to Architect for record Detail comments refer to following pages Le Dinh Luong Signed: RSP The Engineer: TW JRP SCI ATICHA CDC CL Approved Not Approved Date: Approved with comments but works can proceed on site MOS for Masonry PROJECT: ITEMS: FELIZ EN VISTA HIGH-RISE RESIDENTIAL DEVELOPMENT BLOCK A, BLOCK B, BLOCK C, BLOCK D & PODIUM PARTY APPROVAL OWNER Capitaland- Thien Duc Investment Co., Ltd CONTRACTOR CSCEC32 CONSULTANTS RSP, Tham&Wong VIETNAM CO.,LTD DATE Rev 06/12/2017 06 Content Chapter General Chapter Main construction method Section Operation condition Section Material Section Technology process and method statement Chapter Masonry Precautions 14 Chapter Masonry detail 16 Chương 1- Chapter 1: Tổng quan - General STT/No Vị trí/ Location Tường ngồi/ External wall Chiều dày tường/Wall Loại gạch/Type brick Tỉ lệ trộn/Mix ratio Gạch đất nung/ Vữa (1ximăng:3cát) Burnt brick Mortar (1cement:3sand) Gạch bê tông/ Vữa (1ximăng:3cát) Concrete block Mortar (1cement:3sand) THK(mm) 200 200 Vữa chuyên dụng Tường 100,200,300 Gạch AAC/ (6~7 lít nước: 1bao vữa 25kg) AAC brick Spectial mortar (6~7 litter : 1mortar bag 25kg) /Internal wall 100,200 100,200 Gạch đất nung/ Vữa (1ximăng:3cát) Burnt brick Mortar (1cement:3sand) Gạch bê tông/ Vữa (1ximăng:3cát) Concrete block Mortar (1cement:3sand) Chương - Chapter 2: Phương án thi cơng chính- Construction method Phần - Section 1: Điều kiện thi công - Operation condition Kết cấu khu vực triển khai xây tường nghiệm thu bàn giao cho công tác xây tường Structure for masonry location need inspecting and handover to masonry teams Vệ sinh sàn kết cấu, giữ cho sàn gọn gẽ phẳng để chuẩn bị cho công tác xây tường Clean clearly and keep flat Đánh dấu đường mực chuẩn lên cột, vách bê tông cao độ 1m, để sử dụng chung cho tất công việc công tác kiểm tra nghiệm thu sau Set out benchmarkon R.C walls and columns at level 1m, these marks will apply for checking and inspection Kiểm tra cao độ tiến hành xây lớp Check construction level for the first brick course Làm ướt bề mặt kết cấu vị trí có xây tường từ 1~2h trước tiến hành xây Make wet the structure surface masonry location before constructing 1-2 hours Phần 2- Section 2: Vật tư -Material Gạch đất nung/gạch bê tông, gạch AAC: - Vật liệu cho công tác xây tường, cường độ chịu lực phải đáp ứng yêu cầu thiết kế Sự phù hợp giấy chứng nhận báo cáo kiểm tra hiệu suất phải có sẵn Khi vật liệu tới công trường, nên kiểm tra hợp quy chuẩn chúng sau tiến hành lấy mẫu Khi kết thí nghiệm đạt yêu cầu, vật liệu sử dụng để xây dựng Không ném đổ gạch trình xếp dỡ - Sau vào công trường, gạch đất nung, gạch bê tông gạch AAC phải xếp chồng lên bảo vệ khỏi thời tiết khắc nghiệt, tránh vỡ bị hỏng Ngồi ra, gạch bê tơng gạch AAC chuyển đến công trường dỡ xuống khu vực khô phải bảo vệ khỏi bị ướt - Gạch bê tông gạch AAC bị ẩm ướt không sử dụng chúng khơ để giảm thiểu co ngót q trình khơ Chiều cao xếp chồng khơng vượt 2m Vật liệu phải phủ nhựa ngày mưa Burnt bricks – AAC bricks – Concrete bricks: - Masonry materials: tensile strength must meet the design requirements There are enough available conformity of certificates and test reports When materials come into site, we have to check their COCQ document and sampling When passing the test, materials can be used for construction Do not throw or dump Burnt bricks - AAC bricks – Concrete bricks in the loading and unloading process - After entering site, Burnt bricks - AAC bricks – Concrete bricksare arranged following types and dimension at dried area They have to keep away from inclement weather, chipping or damage - The wet AAC bricks and concrete bricks will not be used until havingbeen dried Arranging bricks height not exceed 2m Material must be covered by plastic sheets in rainy days 2 Vữa: - Vữa cho cơng trình vữa trộn sẵn máy trộn cường độ vữa nên đạt tối thiểu 7.5MPa - Vữa trộn khô gồm xi măng cát trộn máy trộn sau vận chuyển đến nơi cần sử dụng cho nước vào hỗn hợp vữa khô trộn kỹ lại trước thi công sử dụng vịng 1h tính từ thời điểm cho thêm nước vào hỗn hợp vữa khô Tỉ lệ nước phải tuân theo dẫn nhà sản xuất xi măng phê duyệt, trộn ướt tỉ lệ 1xi măng: cát: 1,03 nước - Vữa chuyên dụng cho xây gạch AAC nhà sản xuất trộn khô đóng bao sẵn, ta cần cho thêm nước vào trộn kỹ lại trước thi công Theo dẫn nhà sản xuất bao vữa 25kg ta phải trộn với khoảng từ 6~7 lít nước - Xi măng cát phải đong thùng tích cho loại vật liệu Nước phải nước lấy từ đường ống - Cát thơ phải sạch, lấy từ cát sông nước ngọt, không lẫn đất sét tạp chất khác Mortar: - The mortar for this project is ready-mixed mortar by machine and compressive strength should be minimum 7.5MPa - Mortar is a mixture include cement and sand, has to be mixed dried by machine It will be transported to the construction area and added water before using This mixture has to be used within 01 hour from adding water Water ratio should be followed instruction of approved cement’s manufacturer, if mixing wet the ratio will be cement: 3sand: 1.03 water - Special mortar for AAC brick is ready-mixed and packed, It will added water and mixed carefully before using Follow manufacturer’s instruction, bag 25 kilo mixes with 6~7 litter running water - Cement and sand have to be measured by the same bucket and used water is running water - Sand for masonry (take from river, not have clay and other impurities) shall be clean 3 Kích thước: - Gạch đất nung: 02 lỗ (40x80x180mm) 04 lỗ (80x80x180mm) - Gạch AAC: 600x200x200mm 600x200x100mm - Gạch bê tông: 390x190x190mm 390x190x90mm 180x80x40mm Dimension: - Burnt brick: 02 hole (40 × 80 × 180mm) & 04 hole (80 × 80 × 180mm) - AAC brick: 600×200×200mm&600×200×100mm - Concrete brick: 390×190×190mm&390×190×90mm&180x80x40mm Phần – section 03: Quy trình phương án thi cơng - Technology process and method statement Quy trình xây tường - Construction process: Chuẩn bị → Vệ sinh sàn → Định vị vị trí tường xây→ Gia cơng, lắp đặt cốt thép cho râu tường, bổ trụ, chân tường (khu vực ẩm ướt, hộp gen kỹ thuật) → Đổ bê tông chân tường (khu vực ẩm ướt khu hộp gen kỹ thuật), Cịn chân tường khu vực khơ trét 01 lớp vữa xi măng nguyên chất + 01 lớp vữa xây xây 01 hàng gạch chân → tiến hành xây tường theo tường lớptiếp theo → thi công cốt thép, bê tông lanh tô →xây tường cho lớp tường lại → thi công bê tông bổ trụ Prepare → Clean the floor → Set out for wall location → Set uptie rebar, stiffener, kicker wall (wet area & technical pipe box) → pourconcrete kickerwall (wet area&technical pipe box area) Atdry area, the kicker wall is plastered 01 cement layer + 01 mortar layer+ 01 brick line→masonry layer by layer →finish rebar work and pour concrete for lintel → construct the remain layer at above →pour concrete stiffener Phương án - Method: a Chuẩn bị vệ sinh sàn - Prepare and cleanthe floor: - Tất vật tư liên quan đến công tác xây tường (như gạch, xi măng, cát, nước, vữa chuyên dụng, cấp phối vữa ) phải thành phần liên quan phê duyệt tập kết đầy đủ công trường - Thợ xây phải chun nghiệp có đầy đủ dụng cụ cho cơng việc xây - Trước tiến hành công tác xây tường, phải vệ sinh sàn khu vực thi cơng, bề mặt kết cấu vị trí xây phải phẳng - Một ngày trước bắt đầu công tác xây gạch, vị trí xây gạch với gạch đất nung gạch bê tông cần tưới ẩm để trì hiệu liên kết kết cấu lớp gạch xây - Trong trường hợp có đường ống qua tường, cần xác nhận vị trí, kích thước để chừa lại lỗ mở rãnh - Đối với gạch đất nung phải tưới ẩm nước trước xây, cịn gạch AAC gạch bê tơng không để ướt hay tưới nước vệ sinh lớp bụi bẩn bề mặt gạch trước xây - All materials related to the masonry work (such as bricks, cement, sand, water, mortar, ration mortar ) must be approved by consultant and delivered enough into the site - The worker must be skill and well-equipped masonry tools - Before doing masonry, clean the floor and keep construction surface even - The day before beginning masonry work, masonry location for burnt and concrete brick should be moisture to increase effect of connection between brick and concrete slab - In case there is pipeline through the wall, locate position and dimension of opening holes - Before constructing burnt bricks, make wet And AAC bricks and concrete bricks shall not be wet and need cleaning the dirt on surface b Định vị - Setting out: - Công cụ: + Máy tồn đạt: dùng để dẫn mốc chuẩn cơng trình xác định đường trục (đã triển khai lúc thi công kết cấu) + Máy thông tầng: dùng để chuyển đường trục từ sàn lên sàn (đã triển khai lúc thi công kết cấu) + Máy kinh vĩ: dùng để xác định đường trục sàn (đã triển khai lúc thi cơng kết cấu) + Máy thủy bình: dùng để đo cao độ - Nhân viên trắc đạcdùng máy thủy bình để vạch đường mực chuẩn đứng tường/cột cao độ +1mso với hoàn thiện phịng khách để dễ dàng kiểm tra thi cơng nghiệm thu - Tiếp tục dựa vào đường mực chuẩn gửi sàn bê tông lúc thi cơng phần kết cấu vạch đường mực vị trí tường theo thiết kế lên sàn, vị trí tường đường song song chiều rộng tường, vị trí cửa có thêm đường chiều rộng cửa đường chéo nhau, vị trí bổ trụ có thêm đường chiều rộng bổ trụ 1đường chéo - Kiểm tra, nghiệm thu công việc trắc đạc, vạch mực vị trí tường, cửa đi, cửa sổ, bổ trụ, lỗ chờ, lỗ mở tường trước xây - Tools: + Total station: use fordefine benchmark and determine axis line (set up in the structural period) + Laser instrument: use for transfer axis line from the lower floor to the upper floor (set up in the structural period) + Theodolite: use forlocate axis line on the floor (set up in the structural period) + Automatic level: use forlocate level - The surveyor uses the automatic level to locate the mark line on the wall / column at level + 1m from FFL of living room to check within inspection period - Base on the mark line to locate wall position, the wall position is 02 parallel lines be the same width with wall At door position, there are 02 lines be the same width with wall and 02 diagonals And the position of stiffener, there are 02 lines be the same width with stiffener and 01 diagonal - Check and inspect surveying work, marking the position of walls, doors, windows, stiffener, holes, opening of walls before construction c Bổ trụ thép râu tường -Stiffener, plant rebar for tie bar: - Bổ trụ cần lắp đặt hai bên gạch hai bên cửa sổ / cửa đitới cột, vách bê tơng viên gạch đầy đủ Cần tăng cường bổ trụ cho hai bên cánh cửa kép vị trí kết nối loại gạch khác - Trường hợp khối xây gạch vượt 5000mm chiều dài / 4000mm chiều cao, phải cung cấp bổ trụ thẳng đứng / ngang gắn chặt vào kết cấu - Các nút giao gạch với cột/vách bê tông phải neo với râu tường thép có đường kính 6mm, dài trung bình 460mm, cách tối đa 400mm Một đầu râu tường buộc phải khoan nối vào bê tông cốt thép đầu râu dài khoảng 400mm xây nhét mạch vữa khối xây gạch Sau 24 khoan cấy xong, tiến hành bước - Stiffener should be installed at both sides if bricks wall near by window / door less than one full brick Stiffener should be installed from both sides of double door and connection of different bricks - If masonry brick exceeds 5000mm length and/ or 4000mm height, provide vertical and/or horizontal stiffener to connect structure part - The junctions of concrete column and wall will be anchored tie rebar with 6mm diameter, 460mm length and distance from each tie rebar is 400mm One side of tie rebar will be embedded into the concrete wall with 60mm length and tie rebar need putting into mortar joint After embedding 24 hours, we can proceed the next step d Đổ bê tông chân tường - Pouring concrete kicker wall: - Bê tơng chân tường có chiều rộng với tườngđược đúc khu vực ẩm ướt khu hộp gen kỹ thuật, bao gồm nhà vệ sinh, phòng tắm phòng kỹ thuật điện, nước Phần bê tông chân tườngnày phải cao bề mặt kết cấu sàn 150mm Mác bê tông tương tự với mác bê tông sàn - Chân tường khu vực khô trét 01 lớp vữa xi măng nguyên chất + 01 lớp vữa xây xây 01 hàng gạch chân - Kickerwall concrete is the same width with wall at wet area (toilet, bathroom…), Technical pipe shaft andpowder room It should be 150mm higher than structure surface Concrete grade is the same with slab concrete - Kicker wall at dry area is plastered 01 cement layer + 01 mortar layer +masonry 01 brick line lớp xây, tốt phải bố trí viên gạch lớp xây bên phải đảm bảo vị trí so le không nhỏ 25% chiều dài viên gạch - Masonry one by one The vertical mortar joint shall alternate between two layers, set out at the middle of below bricks and be sure the alternate location is not less than 25% of brick length - Phải đảm bảo mạch vữa đầy vữa - Makes sure joint be always full mortar - Khi xây gần đến cao độ đáy dầm, đáy sàn phải chừa lại khe cao khoảng 20mm dọc theo tường xây Sẽ tiến hành chèn khe ngày sau cơng tác xây hồn thành Khe phải chèn cách bơm Polyfoam phải đảm bảo Polyfoam bơm vào đầy khe cách lúc bơm nhìn thấy foam tràn ngồi khe - As constructing near the beam bottom, leave a joint with 20mm width along the wall This space will be filled within 07 days after finishing masonry work This joint must be filled by pumping Polyfoam into until overflowing - Trong trình xây, mạch vữa cào sâu so với bề mặt viên gạch 10mm để tạo mối liên kết trát - The mortar joints will be raked into 10mm depth compare with brick surface to make connection * Gạch bê tông - Concrete block: - Xây cho lớp phẳng với vữa xi măng có chiều dày khoảng 10mm - Construct the first course with 10mm thickness mortar - Tiến hành xây cao lên cho lớp một, mạch vữa đứng phải luân chuyển so le lớp xây, tốt phải bố trí viên gạch lớp xây bên phải đảm bảo vị trí so le khơng nhỏ 25% chiều dài viên gạch - Masonry one by one The vertical mortar joint shall alternate between two layers, set out at the middle of below bricks and be sure the alternate location is not less than 25% of brick length - Phải đảm bảo mạch vữa đầy vữa 10 - Make sure joins be always full mortar - Khi xây gần đến cao độ đáy dầm, đáy sàn phải chừa lại khoảng trống khoảng 200mm dọc theo tường xây Sẽ tiến hành xây chèn khoảng trống ngày sau cơng tác xây hồn thành Viên gạch xây chèn khoảng trống có kích thước 40x80x180mm làm gạch đặc loại vật liệulà gạch bê tông quay đứng từ 45°~60° phải chèn đầy đủ vữa - As constructing near the bottom of the beam, leave a space with 200mm height along the wall This space will be filled within 07 days after finishing masonry work The concrete brick fill this space has dimension 40x80x180mm and is arranged 45o~60o in vertical direction have to be filled with enough mortar - Trong trình xây, mạch vữa cào sâu so với bề mặt viên gạch 10mm để tạo mối liên kết trát - The joints in works will be raked out to 10mm depth with external surfaces of brick to provide a key for plaster - Trong trình xây, mạch vữa ngang gia cố lưới thép với khoảng cách bố trí lớp gạch xây vị trí gia cố lớp gạch thứ 2, lưới thép có chiều rộng 65mm áp dụng cho tường dày 100mm rộng 165mm áp dụng cho tường dày 200mm - In construction process, the horizontal mortar joint will be reinforced by wire mesh with every courses of brick wall and start from second course Wire mesh 65mm is used for brick wall 100mm and wire mesh 165mm is used for brick wall 200mm - Vị trí sử dụng cắt gạch bê tơng lỗ cắt bơm vữa để tăng cường liên kết với viên gạch liền kề - The holes of concrete brick cut pieces where applicable will be infilled with motar to enhance its bonding to the adjacent brick f Lanh tô/Lintel construction : 11 12 g Lưới thép, lưới thủy tinh tường - Wire mesh, fiber mesh: - Lưới thép lưới thủy tinh sử dụng để đóng hay dán tường gạch vị trí tường gạch tiếp giáp với cột/vách bê tơng vị trí tiếp giáp loại vật liệu cấu tạo tường khác Chiều rộng lưới 200mm, bố trí dài theo vị trí tiếp nối - Wire mesh and fiber mesh close on the brick at connection area of column and concrete wall or two different types of wall Mesh with 200mm width will be arranged along connection - Lưới thép sử dụng cho tường gạch đất nung tường gạch bê tơng, cịn lưới thủy tinh sử dụng cho tường gạch AAC - Wire mesh is used for burnt brick wall and concrete block wall, and fiber mesh is used for AAC block wall - Quy trình lắp đặt - Installation process: + Vệ sinh chất bôi trơn ván khuôn, dầu, mỡ dư lượng ván khuôn tường bê tông bàn chải dây, làm bụi, vữa xi măng vữa dự phòng tường +Clear concrete wall surface by wire brush to clean dust, oil, remain formwork, mortar, grease and laitance + Cố định lưới thép tườngbằng bát chất kết dính đặc biệt đinh long đền đóng giữ lưới vô tường với khoảng cách tối đa 1m +Fasten mesh on the wall by patch and adhesive or nail and washer, maximum distance from two meshes is 1m 13 Chương - Chapter 3: Lưu ý công tác xây gạch- Masonry Precautions Chiều dài trải vữa cho lần không vượt 750 mm Đặt gạch sau trải vữa Mảnh cắt gạch AAC/ gạch bê tơng khơng dài 150mm - Mortar length does not exceed 750 mm for onetime masonry and we set bricks after putting mortar Cut pieces of brick/ concrete block should not be less than 150mm in length Mạch vữa phải đường thẳng, nhỏ gọn không trùng mạch Gạch bê tông, gạch AAC, gạch đất nung phải hình dáng, kích thước khơng bị vỡ Tất mạch vữa nằm ngang phẳng mạch vữađứng phải thẳng hàng suốt q trình thi cơng Vệ sinh làm sau tường xây phải theo đợt đợt khơng cao hồn thành khu vực thi công 1m so với đợt trước cho tường - Concrete bricks, AAC bricks and burnt bricks have tobe right shape and dimension All horizontal and vertical mortar joints shall be evenand straight during construction, clean clearly after finishing masonry work Brickwork shall be built in even stages and no Vị trí râu tường phù hợp với số lượng củaoflớp tường nên than part thegạch workRâu is to be carried outđặt more one meter higher than adjoining sections of the khớp chiều dài phù hợp với yêu cầu báo cáo phương pháp same wall or walls bonded thereto - Tie rebar position meets the number of brick/block course Tie rebar should be located at joints and its length shall conform to this method requirement Sau xây xong tường gạch đất nung gạch bêtông, tưới nướcđể bảo dưỡng, kéo dài ngày để tránh biến động vữa gây nhiệt độ cao After finishing burnt brick and concrete brickmasonry, water for maintainance which should last at least days to avoid any problem caused by high temperature Bảo vệ - Protection: - Gạch đất nung, gạch bê tông gạch AAC phải xếp chồng lên bảo vệ khỏi thời tiết khắc nghiệt, vỡ bị hỏng - Burnt bricks, concrete bricks and AAC bricks shall be arranged overlay and protected from inclement weather, chipping or damage 14 - Trong q trình thi cơng, tường bảo vệ khỏi mưa to vải bạt lớp phủ phù hợp Gạch xây dựng bảo vệ chống lại thời tiết khắc nghiệt để ngăn ngừa việc vữa khỏi bị rửa trôi khỏi khớp mưa Các đỉnh tường bao phủ bao bì, bạt, vật liệu phù hợp khác - During construction, walls and top of wall shall be protected from heavy rain by canavas or suitable coverings - Các khối gạch bê tông khối gạch AAC chuyển đến công trường dỡ xuống khu vực khô phải bảo vệ khỏi bị ướt Khối gạch bê tông trở nên ẩm ướt không sử dụng chúng khô để giảm co ngót gạch q trình làm khơ - Concrete bricks and AAC bricks delivered to site shall be arranged in dry area and protected from becoming wet Wet concrete bricks shall not be used until being dried Dụng cụ đặc biệt cho công tác xây gạch AAC Special tools for AAC bricks masonry 15 Chương - Chapter 4: Chi tiết điển hình cơng tác xây tường - Masonry detail Gạch đất nung - Burnt brick wall: 16 Corner of brick wall 17 Gạch AAC/AAC block wall: 18 19 Corner of AAC block wall Corner of AAC block wall 20 21 22 Gạch bê tông/ Concrete block wall: 23 Corner of concrete block wall 24 ... vữa xây xây 01 hàng gạch chân → tiến hành xây tường theo tường lớptiếp theo → thi công cốt thép, bê tơng lanh tơ ? ?xây tường cho lớp tường cịn lại → thi công bê tông bổ trụ Prepare → Clean the floor... kết đầy đủ công trường - Thợ xây phải chuyên nghiệp có đầy đủ dụng cụ cho công việc xây - Trước tiến hành công tác xây tường, phải vệ sinh sàn khu vực thi công, bề mặt kết cấu vị trí xây phải phẳng... phương án thi cơng - Technology process and method statement Quy trình xây tường - Construction process: Chuẩn bị → Vệ sinh sàn → Định vị vị trí tường xây? ?? Gia công, lắp đặt cốt thép cho râu tường,

Ngày đăng: 18/08/2021, 11:34

Từ khóa liên quan

Tài liệu cùng người dùng

Tài liệu liên quan