Biện pháp thi công cửa nhôm kính dự án Feliz En Vista

49 42 1

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

THÔNG TIN TÀI LIỆU

Form FEV-RFI-V1.1 Project Address Package Employer Contractor RFA Ref No : : : : : : Feliz-En-Vista High-Rise Residential Development At Plot Y1, Thanh My Loi Ward, District 2, HCMC, VN Main Contract CapitaLand- Thien Duc Investment Co., Ltd CSCEC32 FEV-CSCEC32-ARCHI-MOS-RFA-010D - Method statement of aluminium and glazing works Feliz En Vista project REQUEST FOR APPROVAL (RFA) VINAQS CO., LTD ; : RSP ARCHITECTS PLANNERS & To From: CSCEC32 Main Contractor ENGINEERS (Vietnam) LTD Attention Descipline : Dang Thanh Sang; Le Dinh Luong : Finishing work Subject : Name: He Wei Date of Request : Method statement of aluminium and glazing works Feliz En Vista project CC: Date to Reply : 17-Mar-19 CL SCI  Project Manager 8-Mar-19 RSP T&W ATICHA VQS  JRP CIDECO  DESCRIPTION: Dear Sirs, We would like to submit Method statement of aluminium and glazing works Feliz En Vista project Please review and approve  Normal (07 days) Critical (03 days) Regard, Main Contractor CSCEC32- Project manager Date: 8-Mar-19 Signed: Name: He Wei REPLY: This review is for conformance with the general design concept and for general arrangement expressed in the documents.  Review shall not be construed to mean that the reviewer accepts the  detail calculations and dimensions shown in the shop drawings or any deviation from the requirements of the contract documents.  Contractor is responsible for errors or omissions in the shop  drawings; for meeting all requirements of the contract documents; for confirming and correlating job site dimensions; for information that pertains solely to fabrication process or to techniques of  construction, and for the coordination of the work of all trades. It is understood that the notation on the submittal is not to be construed as an authorization for additional work or additional cost RSP Reply 18 Mar 2019 Examined with comments, subject to site installation & test results (including field test) Resubmission is not required 1-Please clear T&W for comments to Annex Gondola if any 2-Comments in following page to be complied This reply shall not relieve contractor from their responsibilities stated in the Contract Signed: RSP TW JRP SCI ATICHA CDC CL Le Dinh Luong The Engineer: Approved Not Approved Date: Approved with comments but works can proceed on site METHOD STATEMENT OF ALUMINUM AND GLAZING WORKS FELIZ EN VISTA PROJECT Project: Vista En Feliz Page CONTENTS Introduction General Procedure Resources (Materials, Equipments & Human Resources) Principle of Work Procedure Method Statement Quality control Test Plan and check list for inspection Site water testing  Annex Method for grouting work  Annex Organization Chart  Annex Gondola Project: Vista En Feliz Page Introductions This method statement relates to the installation work for Aluminum window & door frames and glazing The project site is located in District 2, HCMC of Vietnam We recognize that safety, health and environment (SHE) are primary premise in all decisions, being made for successful construction and shall comply with the relevant local authorities of Ho Chi Minh City, Socialist Republic of Vietnam We will develop the construction method with the focus to avoid any harm to the health and safety of owner's personnel, contractor employees and the public and also to minimize adverse effect to the natural and around environment All necessary specifications, inspection and quality control will be complied with the contract documents, specification If there is any discrepancy in the descriptions below, it will be designated by consultant/Client SUMMARY OF WORK Content Project: Vista En Feliz Works Product Remark Page General Procedure The main scope of works are for Aluminum Windows and Doors installation Aluminum extrusions for the project produced locally in Vietnam The extrusions are specifically designed by TACHENG METAL DOORS & WINDOWS CO., LTD for the specific project, and are processed and fabricated at Tacheng's factory in Long An After processing, all frames are cleaned and protected with PVC tape They are packed into batches and then transport to site by trucks with various size Tacheng Project Manager will be responsible to manage and supervise the installation at site, to ensure the workmanship, site safety, and installation progress Raw Materials Purchasing Process in Factory Transport to Site Installation at Site Inspection Cleaning Site water testing Hand Over Project: Vista En Feliz Page Resources ( Material – Equipment – Human Resource ) 3.1 List of Materials No Material Name Description Fixing Screw Pan head Fixing plug Galvazine steel Anchor Plastic Plastic Sika Latex Water Proof Silicone Weather Sealant Alcohol Cleaning Project: Vista En Feliz Picture Remarks Page 3.2 List of Tools Description Photo Units Lazer machine Concrete drilling machine Thrilling machine 10 Cutting machine Aluminum cutting saw Hammer 12 Glass pump Gondola 12 10 Safety net 11 Water mark 12 Silicone gun 13 Hoisting 14 Welding machine 15 Scaffolding 20 16 Inox Chair Project: Vista En Feliz Remarks Page 3.3 Human Resource – Deployment of Manpower ( Tacheng ) No Material Name Position Deputy Phone email Kevin Chen Mr Hà Minh Sang Nguyễn Văn Đệ Mr.Trương Quốc Cường Shang Zhi Hong Mr Phạm Minh Hùng Site Manager 0949 641 260 phamhung1712@gmail.com Mr Lê Văn Ngọc Site Manager 0979 552 988 ngocth.info@gmail.com Lưu Văn Dũng QA/QC Nguyễn Công Diện Site supervisor 10 Đinh Văn Ngọc Site Supervisor 11 Mr.Nguyễn Văn Thành Site Supervisor 12 Lê Hoàng Nhật Site supervisor 13 Bùi Thị Diễm My Site Secretary Project: Vista En Feliz Director Project Director 0912 955 988 chenkev@gmail.com 0939 86 33 38 sang.hm@tacheng.com.vn Technical tacheng.tech@gmail.com Manager Factory cuongtacheng@gmail.com Manager QA-QC Manager Page Principle of Work Procedure 4.1 Coordination at the Site - Before starting the installation, it is necessary to prepare the site organization, delegating workers, and the required tools and utilities - Communicating with Main contractor about site office preparation and permission for transporting overweighted equipments - Find out the equipments and utilities that will be provided by the Main contractor (CSCEC 3) at the site, such as hoist, tower crane, electricity, water, and etc - Survey and understand the current progress of the main structure and the site regulations on safety, cleaning, fire prevention, and etc - Make entry identification card for all technical officers, supervisors and workers working at site - Communicating with the Main Contractor to find out the storage area at the site, and the storage size and condition for future inventory management at site - Find out the transporting area at the site for product delivery, as well as the preferred delivery time 4.2 Site Work Execution a) Site measurements and marking Since the actual site dimensions might different from the approved shop drawings, Tacheng will perform the site measurement on each item before fabricating In case of any discrepancy, we shall coordinate with the Employer/Client and the Main Contractor (CSCEC3) to come out with a reasonable solution and must be informed to Architect for approval After confirmed with the Main Contractor (CSCEC3) and architect for the actual measurements on site, these figures will form the basis of the production dimensions Equipment : Rolling Ruler - 50mm in length, Leveling ruler Preparation : All technical documents of dimensions, measurements, and coordinates on site b) Scaffold Usage: Understand the safety requirements of the site scaffold, such as maximum load, allowed work, conditions, and etc Confirm with the Main Contractor (CSCEC3) with the dates that the scaffold will be installed and taken down Negotiate with the Main Contractor (CSCEC3) to finish all the scope of work that requires scaffolding before it is taken down Installation progress a) Before material delivery to Site After being fabricated at the factory, the aluminum products will be transferred to the Q/A Project: Vista En Feliz Page department for quality control in areas such as finished dimension against the drawing, workmanship, color, damage, and etc After that, they will be wrapped with PVC tapes which will prevent surface scratch and minor damage The tape can be easily removed on site and will not remain on the surface even under high temperature to ensure that the surface of powder coating protected b) Aluminum Windows and Doors Installation: Aluminum products and components will first be transferred to the designated areas through site equipments such as tower crane, hoist, winch, and etc Installation process will be from floors to floors, depending on the schedule of the Main Contractor, Aluminum Frame Installation With the proper finish of its surrounding structure and the area handed over, frames will be installed on to the designated spot Experienced engineers will manage and check each connection of the frame into structure, and ensure the stability of the whole frame c) Q/A of the Aluminum Frame To set up plan and prepare documents for checking the installation of frames After finishing the installation of the frame, quality control department will check the technical requirements Any error will be fixed or replaced on the timely basis (See the chapter VI & VII) 4.4 Installation of glass and sashes a) Material: Must first confirm the type of glass that is used on the approved shop drawings The thickness, color, type, and characteristics Measurement: for glass that are fixed into frames or other anchoring devices, the actual measurements from the site is required For sashes, the engineers at the fabrication plant will calculate the dimensions that can be fitted into the sash b) Technical requirement: Glass and sashes will be protected by PVC tapes and thick paper cushions at the edges/corners during transportation and storage Confirm the backer rod, gasket system, and sealant application with the approved shop drawings before proceeding Make sure the direction of the glass is installed correctly (which side faces in or out) It might be necessary to signal marking on the glass to prevent accidentally walking on to glass 4.5 Anti- absorbency a) Material: Sealants that are approved by the Architects to be applied to different areas for different functioning b) Equipment § Sealant injection gun § Plastic knife with round side Project: Vista En Feliz Page Site water testing: The site water testing for windows directly with the environment, without roof will be randomly selected according to the Owner, TVGS, Main Contractor (CSCEC 3) With the probability of selecting 10% submit The site water testing was performed immediately after the top-of-the-line waterproof silicon injection was finished Equipment for site water testing include: High pressure water pump, water pipe, pressure gauge, container system installed by the contractor aluminum glass supply The procedures and standards of site water testing are applied in accordance with AAMA 50194 According to AAMA 501-94, the test pressure is 30psi ~ 35psi, the distance from the nozzle to the test surface is 305 mm and the test time for each position is minutes 10% of the total external window of the development upon selection by Architect & Client PERCENTAGE FOR FIELD WATER TEST No Items Sliding door & Window % of 1st Test % of 2nd Test (if not 100% water tight at the 1st test) % of 3rd Test (if not 100% water tight at the 2nd test) 10 20 40 If third test still have any case fail, the next test should be 100% external windows of FEV 10% of the total external window of the development upon selection by Architect & Client Project: Vista En Feliz Page 34 Project: Vista En Feliz Page 35 The sketch of test method Project: Vista En Feliz Page 36 1.2 AAMA 501.2.94 Test Standard Project: Vista En Feliz Page 37 1.3 The Test Record List ANNEX METHOD FOR GROUTING WORK Steps Preparation a) Preparation the tools and materials for grouting work( Sika latex, cement and sand) Project: Vista En Feliz Page 38 b) Inspection frame of location need to grouting c) Read and understand the standards required for grouting work The Construstion Steps Checking the gap follow shop drawing before cleaning Use the pump machine for cleaning the gap before Spray the water Project: Vista En Feliz Page 39 Spray the water to gap for sure cement eat the wall Put the mixture cement and Sika Latex to concrete for sure grouting eat with concrete Project: Vista En Feliz Page 40 Mix the Sika Latex and water follow the rate sika Latex + water Put the Admixture to cement and sand follow the rate cement+ sand then put in the grouting gun Project: Vista En Feliz Page 41 Use the grouting gun pump the mixture to the gap After finish grouting work, use the broom/wooden bar to checking the gap for must sure grouting full Use the broom /wooden bar to knock to aluminum frame and hear the sound from that we can clear the grouting inside full fill or not Project: Vista En Feliz Page 42 After checking grouting full, use the broom to cleaning the frame Cleaning the frame On the time finish grouting work, supervise need to inspection the frame to must sure the frame not move and take the picture for document inspection Project: Vista En Feliz Page 43 ANNEX ORGANIZATION CHART Project: Vista En Feliz Page 44 ANNEX SPECIFICATION GONDOLA The suspension mechanism is the heavy-duty steel frame structure fixed on the top of the building as the supporting equipment It is mobile, adaptable and easy to erect and dismantle The suspension mechanism (see figure as below) consists of front beam (1), middle beam (4), rear beam (5), front base (2), rear base (6), upper column (8), tommy bar (3), counter weight (7) and reinforce steel rope (9) etc The tommy bar is mounted on the front and rear base; the front and rear beams will be fixed through the tommy bar, the middle beam is fixed between the front and rear beam The upper column is mounted on the tommy bar for fixing the reinforced steel rope and counter weight will be placed on the rear base For details of structure, see attached figure 1: suspension mechanism on page 23 Project: Vista En Feliz Page 45 Figure 2: Suspension Mechanism Front beam Front base Tommy bar Middle beam Rear beam Rear base Counter weight Reinforcing stee rope Upper column 10 Turnbuckle 3.1.2 The configuration of the suspension mechanism shall meet the following formula: G *b n Safety coefficient against overturning G Weight of counter weight in kg a Front beam overhang in m; F Total weight in Kg of the platform, hoists, electric control system, safety lock, steel rope and rated load, plus wind pressure; b Distance in m between the front base and rear base The Relation between Permissible Load and the variables as Working Height, Front Beam Overhang, Distance between the Front Base and Rear Base Project: Vista En Feliz Page 46 Model Counter Working weight Height 50 m 100 m ZLP500 750 kg 120 m 150 m Model 1.3 m 1.5 m 1.7 m 1.3 m 1.5 m 1.7 m 1.3 m 1.5 m 1.7 m 1.3 m 1.5 m 1.7 m Front beam overhang Distance between front and rear base 4.6 m 4.6 m 4.4 m 4.6 m 4.6 m 4.4 m 4.6 m 4.6 m 4.4 m 4.6 m 4.6 m 4.4 m Permissible load 500 kg 500 kg 400 kg 500 kg 500 kg 350 kg 500 kg 500 kg 300 kg 500 kg 450 kg 250 kg Distance between front and rear base Permissible load 1.3 m 1.5 m 1.7 m 1.3 m 1.5 m 1.7 m 4.6 m 4.6 m 4.4 m 4.6 m 4.6 m 4.4 m 630 kg 630 kg 550 kg 630 kg 630 kg 500 kg 120 m 1.3 m 1.5 m 4.6 m 4.6 m 630 kg 630 kg 150 m 1.7 m 1.3 m 1.5 m 4.4 m 4.6 m 4.6 m 450 kg 630 kg 630 kg 1.7 m 4.4 m 400 kg Counter Working weight Height 50 m 100 m ZLP630 Front beam overhang 900 kg The Relation between Permissible Load and the variables as Working Height, Front Beam Overhang, Distance between the Front Base and Rear Base Model ZLP800 Counter Working weight Height 1000 kg 50 m 100 m Project: Vista En Feliz Front beam overhang 1.3 m 1.5 m 1.7 m 1.3 m Distance between front and rear base 4.6 m 4.6 m 4.4 m 4.6 m Permissible load 800 kg 800 kg 550 kg 800 kg Page 47 120 m 150 m 1.5 m 1.7 m 1.3 m 4.6 m 4.4 m 4.6 m 700 kg 460 kg 800 kg 1.5 m 1.7 m 1.3 m 1.5 m 1.7 m 4.6 m 4.4 m 4.6 m 4.6 m 4.4 m 680 kg 440 kg 800 kg 630 kg 400 kg Prepare by TACCHENG METAL DOOR & WINDOW Project: Vista En Feliz Page 48 ... Client Project: Vista En Feliz Page 34 Project: Vista En Feliz Page 35 The sketch of test method Project: Vista En Feliz Page 36 1.2 AAMA 501.2.94 Test Standard Project: Vista En Feliz Page 37 1.3...METHOD STATEMENT OF ALUMINUM AND GLAZING WORKS FELIZ EN VISTA PROJECT Project: Vista En Feliz Page CONTENTS Introduction General Procedure Resources (Materials, Equipments & Human Resources)... kính, cánh cửa 1) Check opening of aluminum frame to ensure the required (with tolerance+/2mm) / Kiểm tra lỗ mở khung bao đảm bảo yêu cầu, (Dung sai kích thước cửa +/-2mm) Project: Vista En Feliz

Ngày đăng: 18/08/2021, 18:01

Xem thêm:

TỪ KHÓA LIÊN QUAN

w