Đang tải... (xem toàn văn)
Biện pháp thi công ốp lát gạch chi tiết công trình 50 tầng.
PROJECT: CONDOMINIUM BLOCKS WARD 22 – BINH THANH DISTRICT - HCMC METHOD STATEMENT FOR TILING WORK (FOR INTERIOR AND EXTERIOR AREA) BIỆN PHÁP ỐP, LÁT GẠCH (CHO KHU VỰC NỘI THẤT VÀ NGOẠI THẤT) Dự án: KHU CHUNG CƯ PHƯỜNG 22 – QUẬN BÌNH THẠNH Project: CONDOMINIUM BLOCKS OF WARD 22, BINH THANH DISTRICT Địa điểm /Addrees: Đường Nguyễn Hữu Cảnh, Phường 22, Quận Bình Thạnh, Thành phố Hồ Chí Minh JUNE- 2019 中国建筑(东南亚)有限公司 CHINA CONSTRUCTION (S.E.A.) CO., LTD PROJECT: CONDOMINIUM BLOCKS WARD 22 – BINH THANH DISTRICT - HCMC METHOD STATEMENT FOR TILING WORK (FOR INTERIOR AND EXTERIOR AREA) BIỆN PHÁP ỐP, LÁT GẠCH (CHO KHU VỰC NỘI THẤT VÀ NGOẠI THẤT) EDIT BY: NGUYỄN TẤN VIỆT CHECKED BY: NGUYỄN ANH VŨ SITE MANAGER: BÙI CÔNG THẠCH Dự án: KHU CHUNG CƯ PHƯỜNG 22 – QUẬN BÌNH THẠNH Project: CONDOMINIUM BLOCKS OF WARD 22, BINH THANH DISTRICT Địa điểm /Addrees: Đường Nguyễn Hữu Cảnh, Phường 22, Quận Bình Thạnh, Thành phố Hồ Chí Minh 中国建筑(东南亚)有限公司 CHINA CONSTRUCTION (S.E.A.) CO., LTD PROJECT: CONDOMINIUM BLOCKS WARD 22 – BINH THANH DISTRICT - HCMC CONTENTS / NỘI DUNG Purpose / Mục đích Reference documents / Tài liệu tham khảo Resources (Materials, Equipment Resources) / Tài nguyên (Vật liệu, thiết bị) Sequence of Work / Trình tự cơng việc Work Method / Biện pháp thi công Quality control process / Quy trình kiểm sốt chất lượng Inspection and test / Quy trình kiểm tra nghiệm thu Power and Lighting / Điện chiếu sáng Safety and health / An toàn sức khỏe: APPENDIX / PHỤ LỤC Inspection and test / Quy trình kiểm tra nghiệm thu Plan layout supplying material by Hoist / Mặt bố trí vật liệu chuyển từ vận thăng vào tầng Equipment Location & Lifting Loading Chart / Vị trí thiết bị & Biểu đồ tải nâng tải Detailed tile construction drawings / Các vẽ ốp, lát gạch chi tiết Technical instruction of tile adhesive supplier / Chỉ dẫn kỹ thuật sử dụng keo dán gạch keo chà ron nhà cung cấp 中国建筑(东南亚)有限公司 CHINA CONSTRUCTION (S.E.A.) CO., LTD PROJECT: CONDOMINIUM BLOCKS WARD 22 – BINH THANH DISTRICT - HCMC Purpose / Mục đích The purpose of this measure is to provide a detailed description of the construction tiling work of the Sunwah Pearl Project Mục đích biện pháp nhằm cung cấp mô tả chi tiết công tác thi công ốp, lát gạch dự án Sunwah Pearl Reference documents / Tài liệu tham khảo The project specification / Tiêu chuẩn kỹ thuật dự án Vietnamese standard / Tiêu chuẩn Việt Nam 01 TCVN 9377-1:2012: “Cơng tác hồn thiện xây dựng - Thi công nghiệm thu - Phần 1: công tác lát láng xây dựng” 02 TCVN 9377-2:2012: “Cơng tác hồn thiện xây dựng - Thi công nghiệm thu - Phần 2: công tác trát xây dựng” 03 TCVN 9377-3:2012: “Công tác hồn thiện xây dựng -Thi cơng nghiệm thu - Phần 3: công tác ốp xây dựng” 04 TCVN 4314:2003: “Vữa xây dựng Yêu cầu kỹ thuật” 05 TCVN 3121:2003: “Vữa xây dựng - Phương pháp thử.” 06 TCVN 6414:1998: “Gạch gốm ốp lát - Yêu cầu kỹ thuật.” 07 TCVN 6883:2001: “Gạch granít - Yêu cầu kỹ thuật ” 08 TCVN 6065:1995: “Gạch xi măng lát nền” 09 TCVN 6074:1995: “Gạch lát granito” 中国建筑(东南亚)有限公司 CHINA CONSTRUCTION (S.E.A.) CO., LTD PROJECT: CONDOMINIUM BLOCKS WARD 22 – BINH THANH DISTRICT - HCMC Resources (Materials, Equipment Resources) / Tài nguyên (Vật liệu, thiết bị): 3.1 Resources for tiling work - Material / Tài nguyên công tác lát, ốp gạch – Vật liệu: Notes No Material name Type Tile As submit Sand As submit Cement Adhesive Acotile 20 Tile grouting Acotile TG1 As submit As submit (For interior, exterior – “SWP-CSC-ARC-MAADOM-041) 3.2 Resources for tiling work - Equipment / Tài nguyên cho công tác ốp, lát gạch – Thiết bị: No Equipment name Trowel Rubber-hammer Spirit level Saw Spool of theard / Plumb 中国建筑(东南亚)有限公司 CHINA CONSTRUCTION (S.E.A.) CO., LTD Unit PROJECT: CONDOMINIUM BLOCKS WARD 22 – BINH THANH DISTRICT - HCMC Knife Electric wire Rough-trowel 10 Little mechanical mixer 10 Corner square-ruler 11 Measuring tape 12 Kitbag 13 Kitbox 14 Laser device 中国建筑(东南亚)有限公司 CHINA CONSTRUCTION (S.E.A.) CO., LTD PROJECT: CONDOMINIUM BLOCKS WARD 22 – BINH THANH DISTRICT - HCMC 3.3 Plan of Vertical supplying material by Hoist / Kế hoạch cung cấp vật liệu theo phương đứng vận thăng: HOIST HOIST MATERIAL HOIST SECTION 中国建筑(东南亚)有限公司 CHINA CONSTRUCTION (S.E.A.) CO., LTD PROJECT: CONDOMINIUM BLOCKS WARD 22 – BINH THANH DISTRICT - HCMC 3.4 Plan layout supplying material by Hoist / Mặt bố trí vật liệu chuyển từ vận thăng vào tầng: (Xem vẽ phần phụ lục / See the appendix drawing) 3.5 Equipment Location & Lifting Loading Chart / Vị trí thiết bị & Biểu đồ tải nâng tải: a) Temporary road layout / Mặt bố trí đường tạm: (Xem vẽ phần phụ lục / See the appendix drawing) b) Tiles Lifting: (Xem vẽ phần phụ lục / See the appendix drawing) 中国建筑(东南亚)有限公司 CHINA CONSTRUCTION (S.E.A.) CO., LTD Sequence of Work / Trình tự cơng việc: 4.1 Tile work sequence chart / Sơ đồ trình tự thi cơng ốp, lát gạch: BẮT ĐẦU Xem hồ sơ thiết kế Trình mẫu vật tư Không đồng ý Duyệt Đồng ý Lập biện pháp thi công, vẽ shop drawing Không đồng ý Duyệt Đồng ý Chuẩn bị bề mặt ốp Nghiệm thu bộp tường (Không đạt) Nhập vật tư Kiểm tra Không đạt Đạt Tiến hành ốp Không đạt Kiểm tra Đạt Vệ sinh Bảo dưỡng Nghiệm thu Đạt Vệ sinh Chà ron gạch Vệ sinh, bảo vệ KẾT THÚC * Trong khu vực có ốp gạch tường sàn phải ốp gạch tường trước lát gạch sàn PROJECT: CONDOMINIUM BLOCKS WARD 22 – BINH THANH DISTRICT - HCMC 4.2 Preparation of works / Chuẩn bị công việc: a) Material handling, storage and delivery / Xử lý vật liệu, bảo quản vận chuyển: Vật liệu đến công trường phải nghiệm thu trước đưa vào sử dụng Transportation of materials shall be by lorry or trailer and unloading by tower crane, fork lift and/or by manual as appropriate / Vận chuyển vật liệu xe tải, xe chở hàng, cần cẩu di động, cần cẩu tháp, xe nâng pallet thủ công cần thiết, an toàn Store materials at designated location and adequately protected / Vật liệu phải lưu trữ địa điểm quy định bảo vệ đầy đủ Prevent flood by providing perimeter surface drainage if necessary / Nơi cất giữ phải ngăn nước, bố trí nước cần thiết Boarded platform at least 75 mm off the ground and undercover are recommended to protect contact from water and construction debris / Nơi để gạch cao mặt đất 75mm che đậy cần thiết để bảo vệ gạch không bị nước bùn, đất mảnh vụn xây dựng dính vào Materials shall be hoist up by tower crane and/or hoist / Vật liệu vận chuyển lên tầng vận thăng b) Checking the Floor Substrate surface (screeding) & Wall plaster surface / Kiểm tra bề mặt bề mặt tường: Vệ sinh bề nền, tường làm khô bề mặt nền, tường trước tiến hành ốp, lát gạch Wall render, Floor substrate should be free from crack lines & hollowness, evenness & any harmful material or water at the location where the finishing material is to be installed, cleaning works shall be carried out / Bề mặt nền, tường khơng có vết nứt, không hốc, lõm, ghồ ghề, bề mặt phải phẳng, độ ghồ ghề >= 15mm cần trát phẳng vữa Độ ghồ ghề ốp keo ≤ ∓ 3mm có vật liệu lạ, nguy hại đọng nước nơi chuẩn bị lát, ốp gạch tiến hành dọn dẹp trước thi cơng Check & confirm that waterproofing works done & make sure that repair works for crack lines, hollowness or unevenness not effected waterproofing layers below / Kiểm tra xác nhận công tác chống thấm hoàn thành đảm bảo việc sửa chữa vết nứt, lỗi hốc, lõm, ghồ ghề không làm ảnh hưởng đến lớp chống thấm bên c) Checking lines marking / Kiểm tra đường mực đánh dấu: Level and lines marking shall be checked in advance / Đường mực đánh dấu kiểm tra trước Laser level to be used for the accuracy / Dùng máy laser kiểm tra bảo đảm độ xác cao Grid line marking on wall, and slab by certified 3rd party surveyors shall be used as base line and the finishing contractor shall mark the detail ceiling level, wall line, etc / Kiểm tra đường mực đánh dấu tường sàn thiết bị kiểm tra bên thứ ba Kết 中国建筑(东南亚)有限公司 CHINA CONSTRUCTION (S.E.A.) CO., LTD OWNER MSB & GENERATOR CÔNG TY TNHH BAY WATER WATER TANK & PUMPS LAB 50 m2 20 m3 R= MAINHOLE 800 x 800 x 600 CP MATERIAL ALU-FORM YARD BLOCK MIXING STATION RAILING 35000 RAILING CLEAN SAND TRAY 10M3 MIXING STATION 60m2 MAINHOLE 800x800x600 3.1 32 01 -R= Công ty Cổ phần Hữu hạn xây dựng Trung Quốc 100m2 REBAR YARD 150m2 35000 MAINHOLE 800x800x600 CLAY BRICK KERB BLOCK CP 32 BLOCK TEMPORARY ALU-FORM YARD 200m2 MSB & GENERATOR 26524 SAFETY SIGHTS MAINHOLE 800 x 800 x 600 R.C PIPE DRAINAGE D=400 M =55 R 02 TC BÙI CÔNG THẠCH CHECKED BY: MAINHOLE 800x800x600 NGUYỄN ANH VŨ CONCRETE 100 THK HOIST SF+0.880 Hs=300 10000 CP RAILING MIXING STATION 60m2 P.14 FISHING MATERIAL YARD 01 -R= 32 HOIST 3.2 TEMPORARY ALU-FORM YARD 300m2 P.A DRAFTER: R.C PIPE DRAINAGE D=400 NGUYỄN TẤN VIỆT TEMPORARY ROAD SECTION 3.15 PROJECT CONDOMINIUM BLOCKS WARD 22, BINH THANH DISTRICT KHU DÂN CƯ PHƯỜNG 22, QUẬN BÌNH THẠNH 150m2 MATERIAL SIDE WALK WASTAGE REBAR YARD 90m2 MATERIAL 90m2 FINISHING MATERIAL 180m2 REBAR YARD 200m2 FIXED LOCATION PUMPER RAILING 60m2 FINISHING MATERIAL FISHING MATERIAL YARD MIXING STATION FORM WORK 60m2 100m2 CLAY BRICK 90 Nguyễn Hữu Cảnh street, 22 ward, Binh Thanh district 03 TC R.C PIPE FIXED LOCATION PUMPER -R= Method Statement M 60 REBAR STORE WASHING BAY GROUND FLOOR MAINHOLE 800x800x600 TEMPORARY ALU-FORM YARD 200m2 GATE LI DUN AN - R.C SLAB 100 - 120 THK - D10 @ 300 - COMPENSATING SAND LAYER COMPACTS - K= 0.85-0.9 CLAY BRICK - PUMPING SAND LAYER SF+1.070 Hs=300 SIDE WALK SIDE WALK OUT & IN PROJECT MANAGER: DOWNSPOUT D90 @ 10M SITE MANAGER SF+1.070 Hs=300 R.C PILE D = 300 MAINHOLE 800 x 800 x 600 GROUND FLOOR i = 2% RIAL PT MATE 100m2 SF+1.070 Hs=300 MSB & GENERATOR OUT&IN CONTRACTOR R.C PIPE DRAINAGE D=400 BARRIER 01 -R = MAINHOLE 800 x 800 x 600 □ APPROVED BY: CHECKED BY: M 55 HOIST WATER TANK & PUMPS MIXING STATION HOIST 3.1 WASHING BAY STORE □ □ MIXING STATION 60m2 -R= TEMPORARY ALU-FORM YARD 200m2 MOTAR OUTPUT TEMPORARY ALU-FORM YARD SF+1.070 200m2 Hs=300 FINISHING MATERIAL SIDE WALK 80m2 General director: Ton That Tung Streer , District Dong Da, Ha Noi City, Vietnam Tel No : (+84 - 24) 38523706 Fax No : (+84 - 24) 35741231 Website : www.conincohn@coninco.com.vn 04 PARKING MOTAR TRAY 350L TC TEST ROOM CÔNG TY CP TV-CN,TB & KD XÂY DỰNG-CONINCO IN&OUT UNFIXED LOCATION SEPTIC TANK 15 m3 CP SF+1.070 Hs=300 SUPER VISION CONSULTANT OPENING DRAINAGE 300 x 300 5M R=5 01TC MAINHOLE 800 x 800 x 600 WATER BARREL 1M3 MIXER 350L HOIST SIDE WALK M&E STORE □ BOB CAT BULLDOZER R.C PIPE DRAINAGE 300 x 300 FINISHING MATERIAL PT MATERIAL □ □ MAINHOLE 800 x 800 x 600 FINISHED MATERIAL SIDE WALK 32 REBAR FABRICATION 110m2 BRICK KERB H=400 MIXER 350L FISHING MATERIAL YARD ALU-FORM 100m2 01 - FABRICATION YARD EXISTING SITE OFFICE OPENING DRAINAGE 300 x 300 UNFIXED LOCATION P.1 OFFICE W2 xL5 m2 FINISHED MATERIAL CATEGORIES OPENING DRAINAGE MAINHOLE P.A 800 x 800 x 600 General director: JOHNSON CHOI SUN WAH TOWER 115 Nguyen Hue Street Ben Nghe Ward, District 1, HCM City, Vietnam Tel No : 084.8.39219190 Fax No : 084.8.38219181 Website : www.sunwahpearl.com MATERIAL INPUT REBAR STORE TEMPORARY ALU-FORM YARD 150m2 □ Architecture 350 m2 20 m3 WATER TANK & PUMPS PARKING REBAR YARD STORE 260 m2 SEPTIC TANK 35 m3 300 m3 □ Structure MAINHOLE SECTION WC CONCRETE 100 THK REBAR YARD 300 m3 SEPTIC TANK M&E STORE 200 m3 □ M&E DRAWING TITLE METHOD STATEMENT FOR TILING WORKS DWG NO EQUIPMENT LOCATION & LIFTING LOADING CHART / VỊ TRÍ CỦA THIẾT BỊ & BIỂU ĐỒ TẢI NÂNG TẢI TEMPORARY ROAD LAYOUT / MẶT BẰNG BỐ TRÍ ĐƯỜNG TẠM MOS-ARC-TIL-03 rev issue date 06 08/01/2019 drawing scale OWNER CÔNG TY TNHH BAY WATER General director: JOHNSON CHOI SUN WAH TOWER 115 Nguyen Hue Street Ben Nghe Ward, District 1, HCM City, Vietnam Tel No : 084.8.39219190 Fax No : 084.8.38219181 Website : www.sunwahpearl.com P.A P.1 TẢI TRỌNG LỚN NHẤT 3.5 TẤN / M □ □ □ SUPER VISION CONSULTANT HOIST CÔNG TY CP TV-CN,TB & KD XÂY DỰNG-CONINCO BLOCK IN&OUT SF+1.070 Hs=300 General director: Ton That Tung Streer , District Dong Da, Ha Noi City, Vietnam Tel No : (+84 - 24) 38523706 Fax No : (+84 - 24) 35741231 Website : www.conincohn@coninco.com.vn 3.1 □ □ HOIST 3.1 TC 5M R=5 01- TC SF+1.070 Hs=300 □ APPROVED BY: CHECKED BY: M 55 -R= 04 CONTRACTOR Công ty Cổ phần Hữu hạn xây dựng Trung Quốc SF+1.070 Hs=300 BLOCK BLOCK PROJECT MANAGER: LI DUN AN M 55 -R= C02 T SITE MANAGER BÙI CÔNG THẠCH SF+1.070 Hs=300 SF+1.070 Hs=300 HOIST CHECKED BY: NGUYỄN ANH VŨ SIDE WALK DRAFTER: SF+0.880 Hs=300 NGUYỄN TẤN VIỆT HOIST 3.2 3.15 PROJECT P.14 CONDOMINIUM BLOCKS WARD 22, BINH THANH DISTRICT KHU DÂN CƯ PHƯỜNG 22, QUẬN BÌNH THẠNH P.A 90 Nguyễn Hữu Cảnh street, 22 ward, Binh Thanh district GATE M 60 -R= 03 TC OUT & IN Method Statement □ Architecture □ Structure □ M&E DRAWING TITLE METHOD FOR CLAY BRICK & PLASTERING WORKS DWG NO EQUIPMENT LOCATION & LIFTING LOADING CHART / VỊ TRÍ CỦA THIẾT BỊ & BIỂU ĐỒ TẢI NÂNG TẢI TILES LIFTING / MẶT BẰNG NÂNG TẢI MOS-ARC-TIL-04 rev issue date 06 08/01/2019 drawing scale OWNER CÔNG TY TNHH BAY WATER General director: JOHNSON CHOI SUN WAH TOWER 115 Nguyen Hue Street Ben Nghe Ward, District 1, HCM City, Vietnam Tel No : 084.8.39219190 Fax No : 084.8.38219181 Website : www.sunwahpearl.com □ □ F LO L AL SUPER VISION CONSULTANT ES L I T CÔNG TY CP TV-CN,TB & KD XÂY DỰNG-CONINCO General director: Ton That Tung Streer , District Dong Da, Ha Noi City, Vietnam Tel No : (+84 - 24) 38523706 Fax No : (+84 - 24) 35741231 Website : www.conincohn@coninco.com.vn W E EV L H □ APPROVED BY: O EF L AL F □ □ S INI F R LIN □ D 2N E TIL R OW 2 CHECKED BY: CONTRACTOR Công ty Cổ phần Hữu hạn xây dựng Trung Quốc W O EL EV L R PROJECT MANAGER: O EF LIN LI DUN AN SITE MANAGER BÙI CÔNG THẠCH CHECKED BY: NGUYỄN ANH VŨ DRAFTER: NGUYỄN TẤN VIỆT PROJECT CONDOMINIUM BLOCKS WARD 22, BINH THANH DISTRICT KHU DÂN CƯ PHƯỜNG 22, QUẬN BÌNH THẠNH 90 Nguyễn Hữu Cảnh street, 22 ward, Binh Thanh district Method Statement □ Architecture □ Structure □ M&E DRAWING TITLE METHOD STATEMENT FOR TILING WORK LINES MARKING FOR STARTING ROW OF WALL & FLOOR TILES DWG NO MOS-ARC-TIL-05 rev issue date 06 08/01/2019 drawing scale OWNER CÔNG TY TNHH BAY WATER General director: JOHNSON CHOI SUN WAH TOWER 115 Nguyen Hue Street Ben Nghe Ward, District 1, HCM City, Vietnam Tel No : 084.8.39219190 Fax No : 084.8.38219181 Website : www.sunwahpearl.com □ □ □ SUPER VISION CONSULTANT CÔNG TY CP TV-CN,TB & KD XÂY DỰNG-CONINCO Tile adhesive General director: Ton That Tung Streer , District Dong Da, Ha Noi City, Vietnam Tel No : (+84 - 24) 38523706 Fax No : (+84 - 24) 35741231 Website : www.conincohn@coninco.com.vn □ □ □ APPROVED BY: CHECKED BY: Tile attaching sequence CONTRACTOR Công ty Cổ phần Hữu hạn xây dựng Trung Quốc PROJECT MANAGER: LI DUN AN Rubber hammer Start from second row of wall tiles SITE MANAGER BÙI CÔNG THẠCH CHECKED BY: NGUYỄN ANH VŨ DRAFTER: NGUYỄN TẤN VIỆT Fix level PROJECT Joint spacer CONDOMINIUM BLOCKS WARD 22, BINH THANH DISTRICT KHU DÂN CƯ PHƯỜNG 22, QUẬN BÌNH THẠNH 90 Nguyễn Hữu Cảnh street, 22 ward, Binh Thanh district Method Statement □ Architecture □ Structure □ M&E DRAWING TITLE METHOD STATEMENT FOR TILING WORK DWG NO MOS-ARC-TIL-06 rev issue date 06 08/01/2019 drawing scale OWNER CÔNG TY TNHH BAY WATER General director: JOHNSON CHOI SUN WAH TOWER 115 Nguyen Hue Street Ben Nghe Ward, District 1, HCM City, Vietnam Tel No : 084.8.39219190 Fax No : 084.8.38219181 Website : www.sunwahpearl.com □ □ □ SUPER VISION CONSULTANT CÔNG TY CP TV-CN,TB & KD XÂY DỰNG-CONINCO General director: Ton That Tung Streer , District Dong Da, Ha Noi City, Vietnam Tel No : (+84 - 24) 38523706 Fax No : (+84 - 24) 35741231 Website : www.conincohn@coninco.com.vn □ □ □ APPROVED BY: CHECKED BY: CONTRACTOR Công ty Cổ phần Hữu hạn xây dựng Trung Quốc PROJECT MANAGER: LI DUN AN SITE MANAGER BÙI CÔNG THẠCH 2650 CHECKED BY: NGUYỄN ANH VŨ DRAFTER: NGUYỄN TẤN VIỆT PROJECT CONDOMINIUM BLOCKS WARD 22, BINH THANH DISTRICT KHU DÂN CƯ PHƯỜNG 22, QUẬN BÌNH THẠNH 90 Nguyễn Hữu Cảnh street, 22 ward, Binh Thanh district Method Statement □ Architecture 450 □ Structure □ M&E DRAWING TITLE METHOD STATEMENT FOR TILING WORK DWG NO 1st STAGE: PONDING TEST (24H) MOS-ARC-TIL-07 rev issue date 06 08/01/2019 drawing scale OWNER CÔNG TY TNHH BAY WATER General director: JOHNSON CHOI SUN WAH TOWER 115 Nguyen Hue Street Ben Nghe Ward, District 1, HCM City, Vietnam Tel No : 084.8.39219190 Fax No : 084.8.38219181 Website : www.sunwahpearl.com □ □ □ SUPER VISION CONSULTANT CÔNG TY CP TV-CN,TB & KD XÂY DỰNG-CONINCO General director: Ton That Tung Streer , District Dong Da, Ha Noi City, Vietnam Tel No : (+84 - 24) 38523706 Fax No : (+84 - 24) 35741231 Website : www.conincohn@coninco.com.vn □ □ □ APPROVED BY: CHECKED BY: CONTRACTOR Công ty Cổ phần Hữu hạn xây dựng Trung Quốc PROJECT MANAGER: LI DUN AN SITE MANAGER 2650 BÙI CÔNG THẠCH CHECKED BY: NGUYỄN ANH VŨ DRAFTER: NGUYỄN TẤN VIỆT PROJECT CONDOMINIUM BLOCKS WARD 22, BINH THANH DISTRICT KHU DÂN CƯ PHƯỜNG 22, QUẬN BÌNH THẠNH 90 Nguyễn Hữu Cảnh street, 22 ward, Binh Thanh district Method Statement 450 □ Architecture □ Structure □ M&E DRAWING TITLE METHOD STATEMENT FOR TILING WORK DWG NO MOS-ARC-TIL-08 rev issue date 06 08/01/2019 drawing scale OWNER CÔNG TY TNHH BAY WATER General director: JOHNSON CHOI SUN WAH TOWER 115 Nguyen Hue Street Ben Nghe Ward, District 1, HCM City, Vietnam Tel No : 084.8.39219190 Fax No : 084.8.38219181 Website : www.sunwahpearl.com □ □ □ SUPER VISION CONSULTANT CÔNG TY CP TV-CN,TB & KD XÂY DỰNG-CONINCO General director: Ton That Tung Streer , District Dong Da, Ha Noi City, Vietnam Tel No : (+84 - 24) 38523706 Fax No : (+84 - 24) 35741231 Website : www.conincohn@coninco.com.vn □ □ □ APPROVED BY: CHECKED BY: CONTRACTOR Công ty Cổ phần Hữu hạn xây dựng Trung Quốc PROJECT MANAGER: LI DUN AN SITE MANAGER Refer shop drawing 2650 BÙI CÔNG THẠCH CHECKED BY: NGUYỄN ANH VŨ DRAFTER: NGUYỄN TẤN VIỆT PROJECT CONDOMINIUM BLOCKS WARD 22, BINH THANH DISTRICT KHU DÂN CƯ PHƯỜNG 22, QUẬN BÌNH THẠNH 90 Nguyễn Hữu Cảnh street, 22 ward, Binh Thanh district Method Statement □ Architecture □ Structure □ M&E DRAWING TITLE METHOD STATEMENT FOR TILING WORK DWG NO MOS-ARC-TIL-09 rev issue date 06 08/01/2019 drawing scale OWNER CÔNG TY TNHH BAY WATER General director: JOHNSON CHOI SUN WAH TOWER 115 Nguyen Hue Street Ben Nghe Ward, District 1, HCM City, Vietnam Tel No : 084.8.39219190 Fax No : 084.8.38219181 Website : www.sunwahpearl.com □ □ □ SUPER VISION CONSULTANT CÔNG TY CP TV-CN,TB & KD XÂY DỰNG-CONINCO General director: Ton That Tung Streer , District Dong Da, Ha Noi City, Vietnam Tel No : (+84 - 24) 38523706 Fax No : (+84 - 24) 35741231 Website : www.conincohn@coninco.com.vn □ □ □ APPROVED BY: CHECKED BY: CONTRACTOR Công ty Cổ phần Hữu hạn xây dựng Trung Quốc PROJECT MANAGER: LI DUN AN SITE MANAGER Refer shop drawing 2650 BÙI CÔNG THẠCH CHECKED BY: NGUYỄN ANH VŨ DRAFTER: NGUYỄN TẤN VIỆT PROJECT CONDOMINIUM BLOCKS WARD 22, BINH THANH DISTRICT KHU DÂN CƯ PHƯỜNG 22, QUẬN BÌNH THẠNH 90 Nguyễn Hữu Cảnh street, 22 ward, Binh Thanh district Method Statement □ Architecture □ Structure □ M&E DRAWING TITLE METHOD STATEMENT FOR TILING WORK DWG NO MOS-ARC-TIL-10 rev issue date 06 08/01/2019 drawing scale OWNER CÔNG TY TNHH BAY WATER General director: JOHNSON CHOI SUN WAH TOWER 115 Nguyen Hue Street Ben Nghe Ward, District 1, HCM City, Vietnam Tel No : 084.8.39219190 Fax No : 084.8.38219181 Website : www.sunwahpearl.com □ □ □ SUPER VISION CONSULTANT CÔNG TY CP TV-CN,TB & KD XÂY DỰNG-CONINCO General director: Ton That Tung Streer , District Dong Da, Ha Noi City, Vietnam Tel No : (+84 - 24) 38523706 Fax No : (+84 - 24) 35741231 Website : www.conincohn@coninco.com.vn □ □ □ APPROVED BY: CHECKED BY: CONTRACTOR Công ty Cổ phần Hữu hạn xây dựng Trung Quốc PROJECT MANAGER: LI DUN AN SITE MANAGER BÙI CÔNG THẠCH Refer shop drawing 2650 CHECKED BY: NGUYỄN ANH VŨ DRAFTER: NGUYỄN TẤN VIỆT PROJECT CONDOMINIUM BLOCKS WARD 22, BINH THANH DISTRICT KHU DÂN CƯ PHƯỜNG 22, QUẬN BÌNH THẠNH 90 Nguyễn Hữu Cảnh street, 22 ward, Binh Thanh district Method Statement □ Architecture □ Structure □ M&E DRAWING TITLE METHOD STATEMENT FOR TILING WORK DWG NO MOS-ARC-TIL-11 rev issue date 06 08/01/2019 drawing scale OWNER CÔNG TY TNHH BAY WATER General director: JOHNSON CHOI SUN WAH TOWER 115 Nguyen Hue Street Ben Nghe Ward, District 1, HCM City, Vietnam Tel No : 084.8.39219190 Fax No : 084.8.38219181 Website : www.sunwahpearl.com □ □ □ SUPER VISION CONSULTANT CÔNG TY CP TV-CN,TB & KD XÂY DỰNG-CONINCO General director: Ton That Tung Streer , District Dong Da, Ha Noi City, Vietnam Tel No : (+84 - 24) 38523706 Fax No : (+84 - 24) 35741231 Website : www.conincohn@coninco.com.vn □ □ □ APPROVED BY: CHECKED BY: CONTRACTOR Công ty Cổ phần Hữu hạn xây dựng Trung Quốc PROJECT MANAGER: LI DUN AN SITE MANAGER BÙI CÔNG THẠCH Refer shop drawing 2650 CHECKED BY: NGUYỄN ANH VŨ DRAFTER: NGUYỄN TẤN VIỆT PROJECT CONDOMINIUM BLOCKS WARD 22, BINH THANH DISTRICT KHU DÂN CƯ PHƯỜNG 22, QUẬN BÌNH THẠNH 90 Nguyễn Hữu Cảnh street, 22 ward, Binh Thanh district Method Statement □ Architecture □ Structure □ M&E DRAWING TITLE METHOD STATEMENT FOR TILING WORK DWG NO MOS-ARC-TIL-12 rev issue date 06 08/01/2019 drawing scale OWNER WALL WIDTH General director: JOHNSON CHOI SUN WAH TOWER 115 Nguyen Hue Street Ben Nghe Ward, District 1, HCM City, Vietnam Tel No : 084.8.39219190 Fax No : 084.8.38219181 Website : www.sunwahpearl.com WALL WIDTH SUPER VISION CONSULTANT TILE GLUE KEO DÁN GẠCH WOOD SKIRTING GỖ ỐP LEN CHÂN TƯỜNG TILE SKIRTING GẠCH ỐP LEN CHÂN TƯỜNG TILE FLOOR GẠCH LÁT SÀN TILE GLUE KEO DÁN GẠCH General director: Ton That Tung Streer , District Dong Da, Ha Noi City, Vietnam Tel No : (+84 - 24) 38523706 Fax No : (+84 - 24) 35741231 Website : www.conincohn@coninco.com.vn JOINT CEMENT COLOUR TILE WALL GẠCH ỐP TƯỜNG TILE FLOOR GẠCH LÁT SÀN APPROVED BY: FFL CHECKED BY: CONTRACTOR JOINT DETAIL Width of jointing according to "ARCHITECTURAL SPECIFICATION": Joints in external tiles shall be 10mm wide; flush with tile face Use uniform joint widths of 2mm for homogeneous tiles in wet area for both walls and floors unless otherwise shown on drawings PROJECT MANAGER: LI DUN AN DETAIL TILE, WOOD SKIRTING WALL & FLOOR TILE DETAIL SITE MANAGER CHECKED BY: DRAFTER: PROJECT CONDOMINIUM BLOCKS WARD 22, BINH THANH DISTRICT Method Statement Architecture Structure M&E DRAWING TITLE METHOD STATEMENT FOR TILING WORK DWG NO MOS-ARC-TIL-13 rev issue date 06 08/01/2019 drawing scale ... of the construction tiling work of the Sunwah Pearl Project Mục đích biện pháp nhằm cung cấp mô tả chi tiết công tác thi công ốp, lát gạch dự án Sunwah Pearl Reference documents / Tài liệu tham... Tiến hành ốp Không đạt Kiểm tra Đạt Vệ sinh Bảo dưỡng Nghiệm thu Đạt Vệ sinh Chà ron gạch Vệ sinh, bảo vệ KẾT THÚC * Trong khu vực có ốp gạch tường sàn phải ốp gạch tường trước lát gạch sàn PROJECT:... 4314:2003: “Vữa xây dựng Yêu cầu kỹ thuật” 05 TCVN 3121:2003: “Vữa xây dựng - Phương pháp thử.” 06 TCVN 6414:1998: Gạch gốm ốp lát - Yêu cầu kỹ thuật.” 07 TCVN 6883:2001: Gạch granít - Yêu cầu