THÔNG TIN TÀI LIỆU
Thông tin cơ bản
Định dạng | |
---|---|
Số trang | 121 |
Dung lượng | 6,1 MB |
Nội dung
Ngày đăng: 25/01/2021, 22:49
Nguồn tham khảo
Tài liệu tham khảo | Loại | Chi tiết | ||||||
---|---|---|---|---|---|---|---|---|
[14]. Nida Azhar (2008), ‘Cost overrun factors in construction Industry of Pakistan’, First International on Construction in Developing Countries, 2008 Karachi, Pakistan | Sách, tạp chí |
|
||||||
[1]. Akintola Akintoye (1994), ‘Design and build: a survey of construction contractors’view’, Construction Management and Economics (1994) 12, 155-163 | Khác | |||||||
[3]. Adnan Enshassi (2009), ‘Factors affecting the performance of construction projects in the Gaza trip’, Journal of Civil Engineering and Management, 15:3, 269-280 | Khác | |||||||
[4]. Albert P. C. Chan (2001), ‘Design and build project success factors: Multivariate Analysis’, Journal of construction engineering and management, 2001.127:93-100 | Khác | |||||||
[6]. Edwin H. W. Chan (2005), ‘Contract strategy for design management in Design and Build system’, International Journal of Project Management 23 (2005) 630- 639 | Khác | |||||||
[7]. Hamimah Adnan, Fauziah Bachik (2011), ‘Success factor of Design and Build Projects in public university’, Asia Pacific International Conference on Environment – Behaviour Studies, 7-9 Dec 2011 | Khác | |||||||
[8]. Hoàng Trọng, Chu Nguyễn Mộng Ngọc (2008), ‘Thống kê ứng dụng trong kinh tế & kinh doanh’, Nhà xuất bản Hồng Đức, 2008 | Khác | |||||||
[9]. Hoàng Trọng, Chu Nguyễn Mộng Ngọc (2008), ‘Phân tích dữ liệu nghiên cứu với SPSS, tập 1+2’, Nhà xuất bản Hồng Đức, 2008 | Khác | |||||||
[10]. James J. Ernzen, Cliff Schexnayder (2000), ‘One company’s experience with Design/Build: Labor cost risk and profit potential’, Journal of construction engineering and management 2000.126: 10-14 | Khác | |||||||
[12]. Oko John Ameh, Aliu Adebayo Soyingbe (2010), ‘Significant factors causing cost overruns in Telecommunication projects in Nigeria’, Journal of Construction in Developing Countries, Vol. 15(2), 49-67,2010 | Khác | |||||||
[13]. Long Le-Hoai (2008), ‘Delay and Cost overrruns in Viet Nam Large Construction project: A comparison with other selected countries’, KSCE Journal of Civil Engineering (2008) 12(6): 367-377 | Khác | |||||||
[15]. Peter F. Kaming (1996), ‘Factors influencing construction time and cost overruns on high-rise projects in Indonesia’, Construction Management and Economics (1997) 15, 83-84 | Khác | |||||||
[16]. T. Subramani, P. S Sruthi (2014), ‘Causes of cost overrun in construction’, IOSR Journal of Engineering, vol. 04, Issue June, 2014 | Khác | |||||||
[17]. S. Shanmugapirya, Dr. K Subramanian (2013), ‘Investigation of significant factors influencing time and cost overruns in Indian construction projects’, International Journal of Emerging Technology and Advanced Engineering, Volume 3, issue 10, October 2013 | Khác | |||||||
[18]. Yogini K. Patil (2016), ‘Investigation of factors influencing cost overrun in high-rise building constructions’, International of Latest Trends in Engineering and Technology, Vol. 6 Issue 3, Jan 2016 | Khác |