Tài liệu tham khảo |
Loại |
Chi tiết |
[1] Thanapun Prasertrungruang and B. H. W. Hadikusumo, “Study of Factors Influencing the Efficient Management and Downtime Consequences of Highway Construction Equipment in Thailand”, J. Constr. Eng. Manage. 2009.135:2-11 |
Sách, tạp chí |
Tiêu đề: |
Study of Factors Influencing the Efficient Management and Downtime Consequences of Highway Construction Equipment in Thailand |
|
[2] A S Nugraha, L S Putranto, “The effect of heavy equipment management on the performance of the construction project and the construction company”,Tarumanagara University, Department of Civil Engineering Jakarta 11440, Indonesia |
Sách, tạp chí |
Tiêu đề: |
The effect of heavy equipment management on the performance of the construction project and the construction company |
|
[3] Tatari O & Skibniewski M 2006 “Integrated agent-based construction equipmentmanagement: Conceptual design” Journal of Civil Engineering&Management 12(3) 231–6 |
Sách, tạp chí |
Tiêu đề: |
Integrated agent-based construction equipmentmanagement: Conceptual design |
|
[4] Sri Nuwan Randunupura và Chandanie Hadiwattege “Plant and equipment management to minimize delays in road construction projects” Department of Building Economics, University of Moratuwa, Sri Lanka, 2013 |
Sách, tạp chí |
Tiêu đề: |
Plant and equipment management to minimize delays in road construction projects |
|
[5] Thanapun Prasertrungruang và .H.W. Hadikusumo, “Heavy equipment management practices and problems in Thai highway contractors”, Construction Engineering and Infrastructure Management, School of Engineering andTechnology, Asian Institute of Technology, Pathumthani, Thailand, 2007 |
Sách, tạp chí |
Tiêu đề: |
Heavy equipment "management practices and problems in Thai highway contractors |
|
[7] Douglas D. Gransberg, Calin M. Poescu, Richard C. Ryan, Editor Michael D. Meyer, Department of Civil and Environmental Engineering Georgia Institute of Technology Atlanta, Georgia, “Construction equipment management for engineers, estimators, and owners”, 2006 by Taylor & Francis Group, LLC |
Sách, tạp chí |
Tiêu đề: |
Construction equipment management for engineers, estimators, and owners |
|
[8] Chan, DWM, và Kumarawamy, M.M (1997), “A comparative study of causes of time overruns in Hong Kong construction projects”. International Journal of Project Management, 15(1), 55-63 |
Sách, tạp chí |
Tiêu đề: |
A comparative study of causes of time overruns in Hong Kong construction projects |
Tác giả: |
Chan, DWM, và Kumarawamy, M.M |
Năm: |
1997 |
|
[9] Alaghbari, W., Kadir, MRA, Salim, A. và Ernawati. (2007), “The significant factors causing delay of building construction projects in Malaysia”, Engineering,Construction and Architectural Management, 14(2), 192 – 206 |
Sách, tạp chí |
Tiêu đề: |
The significant factors causing delay of building construction projects in Malaysia |
Tác giả: |
Alaghbari, W., Kadir, MRA, Salim, A. và Ernawati |
Năm: |
2007 |
|