1. Trang chủ
  2. » Ngoại Ngữ

VIE: GMS Ben Luc-Long Thanh Expressway Project

220 154 0

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

THÔNG TIN TÀI LIỆU

Ngày đăng: 02/09/2018, 20:44

Xem thêm:

TỪ KHÓA LIÊN QUAN

Mục lục

    C. Intersections, bridges and viaducts in Phase 1

    II. LAND ACQUISITION AND RESETTLEMENT IMPACTS

    B. Land acquisition scale and resettlement impacts

    C. Affected households and vulnerable groups

    H. Affected Crops and Plants

    A. Period of survey, sampling method and sample size

    B. The purpose of the survey

    C. Family size of affected households

    D. The education of Hh members

    E. The working age structure of affected households

TÀI LIỆU CÙNG NGƯỜI DÙNG

  • Đang cập nhật ...

TÀI LIỆU LIÊN QUAN

w