1. Trang chủ
  2. » Ngoại Ngữ

VIE: GMS Ben Luc-Long Thanh Expressway Project

248 119 0

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

THÔNG TIN TÀI LIỆU

Ngày đăng: 02/09/2018, 20:44

Xem thêm:

TỪ KHÓA LIÊN QUAN

Mục lục

    C. Intersections, bridges and viaducts in Phase 1

    II. LAND ACQUISITION AND RESETTLEMENT IMPACTS

    B. Land acquisition scale and resettlement impacts

    C. Affected HHs and vulnerable groups

    H. Affected Crops and Plants

    A. Period of survey, sampling method and sample size

    B. The purpose of the survey

    C. Family size of affected HHs

    D. The education of Hh members

    E. The working age structure of affected HHs

TÀI LIỆU CÙNG NGƯỜI DÙNG

TÀI LIỆU LIÊN QUAN

w