1. Trang chủ
  2. » Kỹ Thuật - Công Nghệ

RFI 1564 to 1662

198 5 0

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

THÔNG TIN TÀI LIỆU

EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY SHIMIZU CORPORATION CONTROL PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT Date: 24 Aug 2007 WEIP/D/QC02/1564 RFI No.: ECSI/L3/PC/3.2/028 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC TO THE ENGINEER’S Name: KO SHIMOKAZE Position: Resident REPRESENTATIVE Engineer Description of Activities: Inspection for Location of Works: Line (Tran dimension and surface of concrete belt from Binh Trong St) M23 to M24 after removed formwork WILL BE READY FOR INSPECTION ON RELEVANT INSPECTION AND TEST PLANS ATTACHED: OTHER DOCUMENTS 25 Aug 2007 at 10:00 AM MS- 009- 01 ECSI AND SIS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION WE REQUEST ELEMENTS: THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Signed by Signed and Accepted Copy to The Engineer’s SC - Site Engineer The Employer Representative Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY SHIMIZU CORPORATION CONTROL PLAN Signed: Signed: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY SHIMIZU CORPORATION CONTROL PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT Date: 24 Aug 2007 WEIP/D/QC02/1565 RFI No.: ECSI/L4/PC/3.2/160 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC TO THE ENGINEER’S Name: KO SHIMOKAZE Position: Resident REPRESENTATIVE Engineer Description of Activities: Inspection for sampling Location of Works: Line (An compaction test (FDT) of sand backfilling of Duong Vuong St) trenches from M39 - M12 WILL BE READY FOR INSPECTION ON RELEVANT INSPECTION AND TEST PLANS ATTACHED: OTHER DOCUMENTS 25 Aug 2007 at 9:30 AM MS- 009- 01 ECSI AND SIS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION WE REQUEST ELEMENTS: THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Signed by Signed and Accepted Copy to The Engineer’s SC - Site Engineer The Employer Representative Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY SHIMIZU CORPORATION CONTROL PLAN Signed: Signed: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY SHIMIZU CORPORATION CONTROL PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC02 (OVERTIME WORKS ) IMPROVEMENT Works Section / Location: EXISTING COMBINED SEWER Date: 24 Aug 2007 WEIP/D/QC02/1566 RFI No.: ECSI/L4/PC/3.2/161 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC TO THE ENGINEER’S Name: KO SHIMOKAZE Position: Resident REPRESENTATIVE Engineer Description of Activities: Inspection for sampling Location of Works: Line (An compaction test (FDT) of sand backfilling of Duong Vuong St) trenches from M39 - M12 WILL BE READY FOR INSPECTION ON RELEVANT INSPECTION AND TEST PLANS ATTACHED: OTHER DOCUMENTS 25 Aug 2007 at 3:00 PM MS- 009- 01 ECSI AND SIS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION WE REQUEST ELEMENTS: THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Signed by Signed and Accepted Copy to The Engineer’s SC - Site Engineer The Employer Representative Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY SHIMIZU CORPORATION CONTROL PLAN Signed: Signed: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY SHIMIZU CORPORATION CONTROL PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT Date: 24 Aug 2007 WEIP/D/QC02/1567 RFI No.: ECSI/L4/PC/3.2/162 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC TO THE ENGINEER’S Name: KO SHIMOKAZE Position: Resident REPRESENTATIVE Engineer Description of Activities: Inspection for sampling Location of Works: Line (An compaction test (FDT) of sand backfilling and Duong Vuong St) compaction of trenches from M37-M38 WILL BE READY FOR INSPECTION ON RELEVANT INSPECTION AND TEST PLANS ATTACHED: OTHER DOCUMENTS 25 Aug 2007 at 10:00 AM MS- 009- 01 ECSI AND SIS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION WE REQUEST ELEMENTS: THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Signed by Signed and Accepted Copy to The Engineer’s SC - Site Engineer The Employer Representative Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY SHIMIZU CORPORATION CONTROL PLAN Signed: Signed: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY SHIMIZU CORPORATION CONTROL PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT Date: 24 Aug 2007 WEIP/D/QC02/1568 RFI No.: ECSI/L4/PC/3.2/163 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC TO THE ENGINEER’S Name: KO SHIMOKAZE Position: Resident REPRESENTATIVE Engineer Description of Activities: Inspection for sampling Location of Works: Line (An compaction test (FDT) of sand backfilling and Duong Vuong St) compaction of trenches from M38-M39 WILL BE READY FOR INSPECTION ON RELEVANT INSPECTION AND TEST PLANS ATTACHED: OTHER DOCUMENTS 25 Aug 2007 at 10:30 AM MS- 009- 01 ECSI AND SIS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION WE REQUEST ELEMENTS: THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Signed by Signed and Accepted Copy to The Engineer’s SC - Site Engineer The Employer Representative Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY SHIMIZU CORPORATION CONTROL PLAN Signed: Signed: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY SHIMIZU CORPORATION CONTROL PLAN Signed: Signed: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY SHIMIZU CORPORATION CONTROL PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT Date: 28 Aug 2007 WEIP/D/QC02/1656 RFI No.: ECSI/L6/PC/3.2/129 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC TO THE ENGINEER’S Name: KO SHIMOKAZE Position: Resident REPRESENTATIVE Engineer Description of Activities: Inspection compaction Location of Works: Line (Chau test (FDT) of sand backfilling of trenches from Van Liem St) M58 - M59 WILL BE READY FOR INSPECTION ON RELEVANT INSPECTION AND TEST PLANS ATTACHED: OTHER DOCUMENTS 29 Aug 2007 at 4:00 PM MS- 009- 01 ECSI AND SIS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION WE REQUEST ELEMENTS: THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Signed by Signed and Accepted Copy to The Engineer’s SC - Site Engineer The Employer Representative Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY SHIMIZU CORPORATION CONTROL PLAN Signed: Signed: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY SHIMIZU CORPORATION CONTROL PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT Date: 28 Aug 2007 WEIP/D/QC02/1657 RFI No.: ECSI/L6/MC/3.2/174 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC TO THE ENGINEER’S Name: KO SHIMOKAZE Position: Resident REPRESENTATIVE Engineer Description of Activities: Inspection compaction Location of Works: Line (Chau test (FDT) of sand backfilling of manhole from Van Liem St) M56 WILL BE READY FOR INSPECTION ON RELEVANT INSPECTION AND TEST PLANS ATTACHED: OTHER DOCUMENTS 29 Aug 2007 at 10:45 AM MS- 009- 01 ECSI AND SIS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION WE REQUEST ELEMENTS: THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Signed by Signed and Accepted Copy to The Engineer’s SC - Site Engineer The Employer Representative Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY SHIMIZU CORPORATION CONTROL PLAN Signed: Signed: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY SHIMIZU CORPORATION CONTROL PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT Date: 28 Aug 2007 WEIP/D/QC02/1658 RFI No.: ECSI/L6/MC/3.2/175 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC TO THE ENGINEER’S Name: KO SHIMOKAZE Position: Resident REPRESENTATIVE Engineer Description of Activities: Inspection compaction Location of Works: Line (Chau test (FDT) of sand backfilling of manhole from Van Liem St) M56 WILL BE READY FOR INSPECTION ON RELEVANT INSPECTION AND TEST PLANS ATTACHED: OTHER DOCUMENTS 29 Aug 2007 at 3:00 PM MS- 009- 01 ECSI AND SIS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION WE REQUEST ELEMENTS: THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Signed by Signed and Accepted Copy to The Engineer’s SC - Site Engineer The Employer Representative Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY SHIMIZU CORPORATION CONTROL PLAN Signed: Signed: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY SHIMIZU CORPORATION CONTROL PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT Date: 28 Aug 2007 WEIP/D/QC02/1659 RFI No.: CSC/CM18-CM25/2.3/053 From: SHIMIZU CORPORATION R EPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC TO THE ENGINEER’S Name: KO SHIMOKAZE Position: Resident REPRESENTATIVE Engineer Location of Works: CSC (CM18Description of Activities: Inspection for spun pile CM25) after delivery to site WILL BE READY FOR INSPECTION ON RELEVANT INSPECTION AND TEST PLANS ATTACHED: OTHER DOCUMENTS 29 Aug 2007 at 8:30 AM MS- 009- 01 ECSI AND SIS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION WE REQUEST ELEMENTS: THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Signed by Signed and Accepted Copy to The Engineer’s SC - Site Engineer The Employer Representative Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY SHIMIZU CORPORATION CONTROL PLAN Signed: Signed: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY SHIMIZU CORPORATION CONTROL PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT Date: 28 Aug 2007 WEIP/D/QC02/1660 RFI No.: ECSI/L3/PC/3.2/029 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC TO THE ENGINEER’S Name: KO SHIMOKAZE Position: Resident REPRESENTATIVE Engineer Description of Activities: Inspection for 28 days Location of Works: At (Thanh Tan compressive test of slipper concrete from M23 An Lab) to M24, Dated sampling: 01 Aug, 2007; Class: F WILL BE READY FOR INSPECTION ON RELEVANT INSPECTION AND TEST PLANS ATTACHED: OTHER DOCUMENTS 29 Aug 2007 at 2:30 PM MS- 009- 01 ECSI AND SIS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION WE REQUEST ELEMENTS: THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Signed by Signed and Accepted Copy to The Engineer’s SC - Site Engineer The Employer Representative Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY SHIMIZU CORPORATION CONTROL PLAN Signed: Signed: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY SHIMIZU CORPORATION CONTROL PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT Date: 28 Aug 2007 WEIP/D/QC02/1661 RFI No.: ECSI/L3/PC/3.2/030 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC TO THE ENGINEER’S Name: KO SHIMOKAZE Position: Resident REPRESENTATIVE Engineer Description of Activities: Inspection for days Location of Works: At (Thanh Tan compressive test of belt concrete for joint An Lab) connection from Manhole M23 to M24; Dated sampling: 22/08/2007; Class: F WILL BE READY FOR INSPECTION ON 29 Aug 2007 at 2:30 PM RELEVANT INSPECTION AND TEST PLANS ATTACHED: OTHER DOCUMENTS MS- 009- 01 ECSI AND SIS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION WE REQUEST ELEMENTS: THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Signed by Signed and Accepted Copy to The Engineer’s SC - Site Engineer The Employer Representative Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY SHIMIZU CORPORATION CONTROL PLAN Signed: Signed: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY SHIMIZU CORPORATION CONTROL PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT Date: 28 Aug 2007 WEIP/D/QC02/1662 RFI No.: ECSI/L3/PC/3.2/031 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC TO THE ENGINEER’S Name: KO SHIMOKAZE Position: Resident REPRESENTATIVE Engineer Description of Activities: Inspection for days Location of Works: At (Thanh Tan compressive test of slipper concrete from An Lab) Manhole M25 to M26; Dated sampling: 22/08/2007; Class: F WILL BE READY FOR INSPECTION ON 29 Aug 2007 at 2:30 PM RELEVANT INSPECTION AND TEST PLANS ATTACHED: OTHER DOCUMENTS MS- 009- 01 ECSI AND SIS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION WE REQUEST ELEMENTS: THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Signed by Signed and Accepted Copy to The Engineer’s SC - Site Engineer The Employer Representative Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY SHIMIZU CORPORATION CONTROL PLAN Signed: Signed: Name: Name: Date: Date: Date: Appendix No ... PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT Date: 24 Aug 2007 WEIP/D/QC02/1565 RFI No.: ECSI/L4/PC/3.2/160... ECSI/L4/PC/3.2/160 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC TO THE ENGINEER’S Name: KO SHIMOKAZE Position: Resident REPRESENTATIVE Engineer... REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC02 (OVERTIME WORKS ) IMPROVEMENT Works Section / Location: EXISTING COMBINED SEWER Date: 24 Aug 2007 WEIP/D/QC02/1566 RFI No.: ECSI/L4/PC/3.2/161

Ngày đăng: 04/09/2021, 02:25

Xem thêm:

w