1. Trang chủ
  2. » Kỹ Thuật - Công Nghệ

RFI 1994 to 2026

41 4 0

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

THÔNG TIN TÀI LIỆU

EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: CONVEYANCE SEWER CONSTRUCTION Date: 15-Sep- 07 WEIP/D/QC - 02/1994 SHIMIZU CORPORATION REPRESENTATIVE RFI No.: CSC/CM18-CM25/2.3/232 From: Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Location of Works: CSC (CM18-CM25) Name: KO SHIMOKAZE Position: Resident Engineer Description of Activities: Inspection for spun pile after delivery to site WILL BE READY FOR INSPECTION ON 17-Sep-07 at 2:00 PM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: Date: 17-Sep- CONVEYANCE SEWER CONSTRUCTION 07 WEIP/D/QC - 02/1983 SHIMIZU CORPORATION REPRESENTATIVE RFI No.: CSC/CM18-CM25/2.2/010 From: Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Location of Works: CSC (CM18-CM25) Name: KO SHIMOKAZE Position: Resident Engineer Description of Activities: Inspection Elevation & Dimensions for sand bedding of segment S15 & S16 WILL BE READY FOR INSPECTION ON 18-Sep-07 at 8:30 AM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: Date: 17-Sep- CONVEYANCE SEWER CONSTRUCTION 07 WEIP/D/QC - 02/1995 SHIMIZU CORPORATION REPRESENTATIVE RFI No.: CSC/CM18-CM25/2.2/011 From: Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Location of Works: CSC (CM18-CM25) Name: KO SHIMOKAZE Position: Resident Engineer Description of Activities: Inspection Placing & Sampling for Leveling concrete of segment S16 WILL BE READY FOR INSPECTION ON 18-Sep-07 at 10:00 AM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/1996 Date: 17-Sep-07 RFI No.: ECSI/L3/MC/3.2/108 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Location of Works: At (Thanh Tan An Lab) Name: KO SHIMOKAZE Position: Resident Engineer Description of Activities: Inspection 07 days compression test concrete of closure box-culvert from M23 to M24, sampling date 11/9/2007, class E WILL BE READY FOR INSPECTION ON 18-Sep-07 at 2:30 PM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/1997 Date: 17-Sep-07 RFI No.: ECSI/L3/MC/3.2/109 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Location of Works: At (Thanh Tan An Lab) Name: KO SHIMOKAZE Position: Resident Engineer Description of Activities: Inspection 07 days compression test concrete for wall of Manhole M24 (Hole driver water), sampling date 11/9/2007, class E WILL BE READY FOR INSPECTION ON 18-Sep-07 at 2:30 PM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/1998 Date: 17-Sep-07 RFI No.: ECSI/L5/MC/3.2/168 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Location of Works: At (Thanh Tan An Lab) Name: KO SHIMOKAZE Position: Resident Engineer Description of Activities: Inspection 07 days compression test concrete of wall and top of Manhole M"51, sampling date 11/9/2007, class E WILL BE READY FOR INSPECTION ON 18-Sep-07 at 2:30 PM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/1999 Date: 17-Sep-07 RFI No.: ECSI/L6/MC/3.2/171 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Location of Works: At (Thanh Tan An Lab) Name: KO SHIMOKAZE Position: Resident Engineer Description of Activities: Inspection 07 days compression test concrete for Bottom slab of Manhole I"59, sampling date 11/9/2007, class E WILL BE READY FOR INSPECTION ON 18-Sep-07 at 2:30 PM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/2000 Date: 17-Sep-07 RFI No.: ECSI/L6/PC/3.2/173 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Location of Works: At (Thanh Tan An Lab) Name: KO SHIMOKAZE Position: Resident Engineer Description of Activities: Inspection 07 days compression test concrete for slipper from M56 to M57, sampling date 11/9/2007, class F WILL BE READY FOR INSPECTION ON 18-Sep-07 at 2:30 PM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/2001 Date: 17-Sep-07 RFI No.: ECSI/L3/PC/3.2/49 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Name: KO SHIMOKAZE Position: Resident Engineer Location of Works: Line (Tran Binh Trong St) Description of Activities: Inspection for compaction test WILL BE READY FOR INSPECTION ON 18-Sep-07 at 10:00 AM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS (FDT) of sand backfilling of trenches from M23 - M24 OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION Ho Quang Trinh / WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/2002 Date: 17-Sep-07 RFI No.: ECSI/L3/PC/3.2/50 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Name: KO SHIMOKAZE Position: Resident Engineer Location of Works: Line (Tran Binh Trong St) Description of Activities: Inspection for compaction test WILL BE READY FOR INSPECTION ON 18-Sep-07 at 3:00 PM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS (FDT) of sand backfilling of trenches from M23 - M24 OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION Ho Quang Trinh / WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/2018 Date: 17-Sep-07 RFI No.: ECSI/L5/MC/3.2/169 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Name: KO SHIMOKAZE Position: Resident Engineer Location of Works: Line (Huynh Man Dat St) Description of Activities: Inspection for compaction test WILL BE READY FOR INSPECTION ON 18-Sep-07 at 10:30 AM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS (FDT) of sand backfilling of Manhole M53 OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION Nguyen Tan Hoa / WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/2019 Date: 17-Sep-07 RFI No.: ECSI/L5/MC/3.2/170 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Name: KO SHIMOKAZE Position: Resident Engineer Location of Works: Line (Huynh Man Dat St) Description of Activities: Inspection for compaction test WILL BE READY FOR INSPECTION ON 18-Sep-07 at 3:30 PM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS (FDT) of sand backfilling of Manhole M53 OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION Nguyen Tan Hoa / WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/2020 Date: 17-Sep-07 RFI No.: ECSI/L6/PC/3.2/174 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Name: KO SHIMOKAZE Position: Resident Engineer Location of Works: Line (Chau Van Liem St) Description of Activities: Inspection Invert elevation & WILL BE READY FOR INSPECTION ON 18-Sep-07 at 9:00 AM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS center line of Box culvert from M56 - M57 OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION Tran Minh Tri / WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/1977 Date: 17-Sep-07 RFI No.: ECSI/L6/PC/3.2/171 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Name: KO SHIMOKAZE Position: Resident Engineer Location of Works: Line (Chau Van Liem St) Description of Activities: Inspection formwork for Belt joint WILL BE READY FOR INSPECTION ON 18-Sep-07 at 3:00 PM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS connection of Box culvert from M56 - M57 OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION Tran Minh Tri / WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 (OVERTIME WORKS) Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/1978 Date: 17-Sep-07 RFI No.: ECSI/L6/PC/3.2/172 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Location of Works: Line (Chau Van Liem St) Name: KO SHIMOKAZE Position: Resident Engineer Description of Activities: Inspection Placing & sampling Concrete for Belt joint connection of Box culvert from M56 - M57 WILL BE READY FOR INSPECTION ON 18-Sep-07 at 10:00 PM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION Tran Minh Tri / WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/2021 Date: 17-Sep-07 RFI No.: ECSI/L6/PC/3.2/175 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Name: KO SHIMOKAZE Position: Resident Engineer Location of Works: Line (Chau Van Liem St) Description of Activities: Inspection Rebar & formwork of WILL BE READY FOR INSPECTION ON 18-Sep-07 at 3:00 PM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS Closure Box culvert from M56 - M57 OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION Tran Minh Tri / WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 (OVERTIME WORKS) Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/2022 Date: 17-Sep-07 RFI No.: ECSI/L6/PC/3.2/176 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Name: KO SHIMOKAZE Position: Resident Engineer Location of Works: Line (Chau Van Liem St) Description of Activities: Inspection Placing & sampling WILL BE READY FOR INSPECTION ON 18-Sep-07 at 10:00 PM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS Concrete of Closure Box culvert from M56 - M57 OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION Tran Minh Tri / WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/2023 Date: 17-Sep-07 RFI No.: ECSI/L6/PC/3.2/177 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Name: KO SHIMOKAZE Position: Resident Engineer Location of Works: Line (Chau Van Liem St) Description of Activities: Inspection for compaction test WILL BE READY FOR INSPECTION ON 18-Sep-07 at 9:30 AM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS (FDT) of sand backfilling of trenches from M58 - M59 OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION Tran Minh Tri / WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/2024 Date: 17-Sep-07 RFI No.: ECSI/L6/PC/3.2/178 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Name: KO SHIMOKAZE Position: Resident Engineer Location of Works: Line (Chau Van Liem St) Description of Activities: Inspection for compaction test WILL BE READY FOR INSPECTION ON 18-Sep-07 at 3:15 PM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS (FDT) of sand backfilling of trenches from M58 - M59 OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION Tran Minh Tri / WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/2025 Date: 17-Sep-07 RFI No.: ECSI/L6/MC/3.2/172 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Name: KO SHIMOKAZE Position: Resident Engineer Location of Works: Line (Chau Van Liem St) Description of Activities: Inspection Elevation & WILL BE READY FOR INSPECTION ON 18-Sep-07 at 3:00 PM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS Dimensions fof Leveling concrete of Manhole I"59 OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION Tran Minh Tri / WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and 0Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: CONVEYANCE SEWER CONSTRUCTION Date: 17-Sep- 07 WEIP/D/QC - 02/2026 SHIMIZU CORPORATION REPRESENTATIVE RFI No.: CSC/CM18-CM25/2.3/234 From: Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Location of Works: CSC (CM18-CM25) Name: KO SHIMOKAZE Position: Resident Engineer Description of Activities: Inspection for spun pile after delivery to site WILL BE READY FOR INSPECTION ON 18-Sep-07 at 8:00 PM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/1952 Date: 17-Sep-07 RFI No.: ECSI/L4/MC/3.2/273 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Name: KO SHIMOKAZE Position: Resident Engineer Location of Works: Line (An Duong Vuong St) Description of Activities: Inspection Rebar & Inner WILL BE READY FOR INSPECTION ON 18-Sep-07 at 9:00 AM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS formwork for Wall & Top of Manhole M34 OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION Truong Hoang Phuc / WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/1970 Date: 17-Sep-07 RFI No.: ECSI/L4/MC/3.2/276 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Name: KO SHIMOKAZE Position: Resident Engineer Location of Works: Line (An Duong Vuong St) Description of Activities: Inspection outer formwork for WILL BE READY FOR INSPECTION ON 18-Sep-07 at 3:00 PM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS Wall & Top of Manhole M34 OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION Truong Hoang Phuc / WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 (OVERTIME WORKS) Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/1971 Date: 17-Sep-07 RFI No.: ECSI/L4/MC/3.2/277 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Name: KO SHIMOKAZE Position: Resident Engineer Location of Works: Line (An Duong Vuong St) Description of Activities: 'Inspection Placing & Sampling WILL BE READY FOR INSPECTION ON 18-Sep-07 at 10:00 PM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS Concrete for Wall & Top of Manhole M34 OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION Truong Hoang Phuc / WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No ... INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: CONVEYANCE SEWER CONSTRUCTION Date: 17-Sep- 07 WEIP/D/QC - 02 /2026 SHIMIZU CORPORATION REPRESENTATIVE RFI No.: CSC/CM18-CM25/2.3/234... WEIP/D/QC - 02/1970 Date: 17-Sep-07 RFI No.: ECSI/L4/MC/3.2/276 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE... WEIP/D/QC - 02/1971 Date: 17-Sep-07 RFI No.: ECSI/L4/MC/3.2/277 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE

Ngày đăng: 04/09/2021, 02:26

Xem thêm:

w