1. Trang chủ
  2. » Kỹ Thuật - Công Nghệ

RFI 1445 to 1479

70 5 0

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

THÔNG TIN TÀI LIỆU

EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY SHIMIZU CORPORATION CONTROL PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT Date: 20 Aug 2007 WEIP/D/QC02/1445 RFI No.: ECSI/L3/MC/3.2/050 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S Name: KO SHIMOKAZE Position: Resident REPRESENTATIVE Engineer Location of Works: Line (Tran Description of Activities: Inspection for Rebar & Binh Binh st) inner formwork of Wall & Top of Mahole M23 WILL BE READY FOR INSPECTION ON RELEVANT INSPECTION AND TEST PLANS ATTACHED: OTHER DOCUMENTS 21 Aug 2007 at 9:00 AM MS- 009- 01 ECSI AND SIS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION WE REQUEST ELEMENTS: THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Signed by Signed and Accepted Copy to The Engineer’s SC - Site Engineer The Employer Representative Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY SHIMIZU CORPORATION CONTROL PLAN Signed: Signed: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY SHIMIZU CORPORATION CONTROL PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT Date: 20 Aug 2007 WEIP/D/QC02/1446 RFI No.: ECSI/L3/MC/3.2/051 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S Name: KO SHIMOKAZE Position: Resident REPRESENTATIVE Engineer Location of Works: Line (Tran Description of Activities: Inspection for Rebar & Binh Binh st) inner formwork of Wall & Top of Mahole M24 WILL BE READY FOR INSPECTION ON RELEVANT INSPECTION AND TEST PLANS ATTACHED: OTHER DOCUMENTS 21 Aug 2007 at 9:00 AM MS- 009- 01 ECSI AND SIS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION WE REQUEST ELEMENTS: THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Signed by Signed and Accepted Copy to The Engineer’s SC - Site Engineer The Employer Representative Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY SHIMIZU CORPORATION CONTROL PLAN Signed: Signed: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY SHIMIZU CORPORATION CONTROL PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT Date: 20 Aug 2007 WEIP/D/QC02/1447 RFI No.: ECSI/L3/MC/3.2/052 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S Name: KO SHIMOKAZE Position: Resident REPRESENTATIVE Engineer Location of Works: Line (Tran Description of Activities: Inspection for outer Binh Binh st) formwork of Wall & Top of Mahole M23 WILL BE READY FOR INSPECTION ON RELEVANT INSPECTION AND TEST PLANS ATTACHED: OTHER DOCUMENTS 21 Aug 2007 at 3:00 PM MS- 009- 01 ECSI AND SIS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION WE REQUEST ELEMENTS: THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Signed by Signed and Accepted Copy to The Engineer’s SC - Site Engineer The Employer Representative Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY SHIMIZU CORPORATION CONTROL PLAN Signed: Signed: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY SHIMIZU CORPORATION CONTROL PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT Date: 20 Aug 2007 WEIP/D/QC02/1448 RFI No.: ECSI/L3/MC/3.2/053 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S Name: KO SHIMOKAZE Position: Resident REPRESENTATIVE Engineer Location of Works: Line (Tran Description of Activities: Inspection for outer Binh Binh st) formwork of Wall & Top of Mahole M24 WILL BE READY FOR INSPECTION ON RELEVANT INSPECTION AND TEST PLANS ATTACHED: OTHER DOCUMENTS 21 Aug 2007 at 3:30 PM MS- 009- 01 ECSI AND SIS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION WE REQUEST ELEMENTS: THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Signed by Signed and Accepted Copy to The Engineer’s SC - Site Engineer The Employer Representative Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY SHIMIZU CORPORATION CONTROL PLAN Signed: Signed: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY SHIMIZU CORPORATION CONTROL PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC02 (OVERTIME WORKS ) IMPROVEMENT Works Section / Location: EXISTING COMBINED SEWER Date: 20 Aug 2007 WEIP/D/QC02/1449 RFI No.: ECSI/L3/MC/3.2/054 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S Name: KO SHIMOKAZE Position: Resident REPRESENTATIVE Engineer Description of Activities: Inspection for casting Location of Works: Line (Tran and sampling of concrete of Wall & Top of Binh Binh st) Mahole M23 WILL BE READY FOR INSPECTION ON RELEVANT INSPECTION AND TEST PLANS ATTACHED: OTHER DOCUMENTS 21 Aug 2007 at 9:30 PM MS- 009- 01 ECSI AND SIS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION WE REQUEST ELEMENTS: THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Signed by Signed and Accepted Copy to The Engineer’s SC - Site Engineer The Employer Representative Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY SHIMIZU CORPORATION CONTROL PLAN Signed: Signed: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY SHIMIZU CORPORATION CONTROL PLAN Signed: Signed: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY SHIMIZU CORPORATION CONTROL PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT Date: 20 Aug 2007 WEIP/D/QC02/1473 RFI No.: ECSI/L5/MC/3.2/123 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S Name: KO SHIMOKAZE Position: Resident REPRESENTATIVE Engineer Description of Activities: Inspection for days Location of Works: At (Thanh Tan compressive test of concrete of Access of An Lab) Manhole M52, Dated sampling: 14 August, 2007 WILL BE READY FOR INSPECTION ON 21 Aug 2007 at 3:00 PM RELEVANT INSPECTION AND TEST PLANS ATTACHED: OTHER DOCUMENTS MS- 009- 01 ECSI AND SIS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION WE REQUEST ELEMENTS: THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Signed by Signed and Accepted Copy to The Engineer’s SC - Site Engineer The Employer Representative Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY SHIMIZU CORPORATION CONTROL PLAN Signed: Signed: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY SHIMIZU CORPORATION CONTROL PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT Date: 20 Aug 2007 WEIP/D/QC02/1474 RFI No.: ECSI/L5/PC/3.2/83 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S Name: KO SHIMOKAZE Position: Resident REPRESENTATIVE Engineer Description of Activities: Inspection for days Location of Works: At (Thanh Tan compressive test of concrete of closure box An Lab) culvert from Manhole M51 to M52, Dated sampling: 14 August, 2007 WILL BE READY FOR INSPECTION ON 21 Aug 2007 at 3:00 PM RELEVANT INSPECTION AND TEST PLANS ATTACHED: OTHER DOCUMENTS MS- 009- 01 ECSI AND SIS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION WE REQUEST ELEMENTS: THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Signed by Signed and Accepted Copy to The Engineer’s SC - Site Engineer The Employer Representative Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY SHIMIZU CORPORATION CONTROL PLAN Signed: Signed: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY SHIMIZU CORPORATION CONTROL PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT Date: 20 Aug 2007 WEIP/D/QC02/1475 RFI No.: ECSI/L6/PC/3.2/102 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S Name: KO SHIMOKAZE Position: Resident REPRESENTATIVE Engineer Description of Activities: Inspection for days Location of Works: At (Thanh Tan compressive test of concrete of closure box An Lab) culvert from M58 to M59, Dated sampling: 14 August, 2007 WILL BE READY FOR INSPECTION ON 21 Aug 2007 at 3:00 PM RELEVANT INSPECTION AND TEST PLANS ATTACHED: OTHER DOCUMENTS MS- 009- 01 ECSI AND SIS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION WE REQUEST ELEMENTS: THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Signed by Signed and Accepted Copy to The Engineer’s SC - Site Engineer The Employer Representative Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY SHIMIZU CORPORATION CONTROL PLAN Signed: Signed: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY SHIMIZU CORPORATION CONTROL PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT Date: 20 Aug 2007 WEIP/D/QC02/1476 RFI No.: ECSI/L6/MC/3.2/154 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S Name: KO SHIMOKAZE Position: Resident REPRESENTATIVE Engineer Description of Activities: Inspection for days Location of Works: At (Thanh Tan compressive test of concrete of wall and top of An Lab) Manhole M58, Dated sampling: 14 August, 2007 WILL BE READY FOR INSPECTION ON 21 Aug 2007 at 3:00 PM RELEVANT INSPECTION AND TEST PLANS ATTACHED: OTHER DOCUMENTS MS- 009- 01 ECSI AND SIS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION WE REQUEST ELEMENTS: THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Signed by Signed and Accepted Copy to The Engineer’s SC - Site Engineer The Employer Representative Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY SHIMIZU CORPORATION CONTROL PLAN Signed: Signed: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY SHIMIZU CORPORATION CONTROL PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT Date: 20 Aug 2007 WEIP/D/QC02/1477 RFI No.: ECSI/L6/MC/3.2/155 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S Name: KO SHIMOKAZE Position: Resident REPRESENTATIVE Engineer Description of Activities: Inspection for days Location of Works: At (Thanh Tan compressive test of concrete of wall and top of An Lab) Manhole M56, Dated sampling: 14 August, 2007 WILL BE READY FOR INSPECTION ON 21 Aug 2007 at 3:00 PM RELEVANT INSPECTION AND TEST PLANS ATTACHED: OTHER DOCUMENTS MS- 009- 01 ECSI AND SIS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION WE REQUEST ELEMENTS: THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Signed by Signed and Accepted Copy to The Engineer’s SC - Site Engineer The Employer Representative Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY SHIMIZU CORPORATION CONTROL PLAN Signed: Signed: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY SHIMIZU CORPORATION CONTROL PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT Date: 20 Aug 2007 WEIP/D/QC02/1478 RFI No.: ECSI/L6/PC/3.2/103 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S Name: KO SHIMOKAZE Position: Resident REPRESENTATIVE Engineer Description of Activities: Inspection compaction Location of Works: Line (Chau test (FDT) of sand backfilling of trenches from Van Liem St) M57 - M58 WILL BE READY FOR INSPECTION ON RELEVANT INSPECTION AND TEST PLANS ATTACHED: OTHER DOCUMENTS 21 Aug 2007 at 10:00 AM MS- 009- 01 ECSI AND SIS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION WE REQUEST ELEMENTS: THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Signed by Signed and Accepted Copy to The Engineer’s SC - Site Engineer The Employer Representative Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY SHIMIZU CORPORATION CONTROL PLAN Signed: Signed: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY SHIMIZU CORPORATION CONTROL PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT Date: 20 Aug 2007 WEIP/D/QC02/1479 RFI No.: ECSI/L6/PC/3.2/104 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S Name: KO SHIMOKAZE Position: Resident REPRESENTATIVE Engineer Description of Activities: Inspection compaction Location of Works: Line (Chau test (FDT) of sand backfilling of trenches from Van Liem St) M57 - M58 WILL BE READY FOR INSPECTION ON RELEVANT INSPECTION AND TEST PLANS ATTACHED: OTHER DOCUMENTS 21 Aug 2007 at 4:00 PM MS- 009- 01 ECSI AND SIS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION WE REQUEST ELEMENTS: THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Signed by Signed and Accepted Copy to The Engineer’s SC - Site Engineer The Employer Representative Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY SHIMIZU CORPORATION CONTROL PLAN Signed: Signed: Name: Name: Date: Date: Date: Appendix No ... PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT Date: 20 Aug 2007 WEIP/D/QC02/1446 RFI No.: ECSI/L3/MC/3.2/051... ECSI/L3/MC/3.2/051 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S Name: KO SHIMOKAZE Position: Resident REPRESENTATIVE... PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT Date: 20 Aug 2007 WEIP/D/QC02/1447 RFI No.: ECSI/L3/MC/3.2/052

Ngày đăng: 04/09/2021, 02:26

Xem thêm:

w