1. Trang chủ
  2. » Kỹ Thuật - Công Nghệ

RFI 1959 to 1993

42 6 0

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

THÔNG TIN TÀI LIỆU

EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 (OVERTIME WORKS) Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/1959 Date: 15-Sep-07 RFI No.: CSC/CM18-CM25/2.3/230 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Name: KO SHIMOKAZE Position: Resident Engineer Location of Works: CSC (CM18-CM25) Description of Activities: Inspection for Spun pile Driving WILL BE READY FOR INSPECTION ON 16-Sep-07 at 7:30 AM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION Thach Ngoc Truong Thi / WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 (OVERTIME WORKS) Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/1960 Date: 15-Sep-07 RFI No.: ECSI/L6/PC/3.2/171 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Name: KO SHIMOKAZE Position: Resident Engineer Location of Works: Line (Chau Van Liem St) Description of Activities: Inspection for compaction test WILL BE READY FOR INSPECTION ON 16-Sep-07 at 9:00 AM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS (FDT) of sand backfilling of trenches from M58 - M59 OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION Tran Minh Tri / WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 (OVERTIME WORKS) Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/1961 Date: 15-Sep-07 RFI No.: ECSI/L6/PC/3.2/172 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Name: KO SHIMOKAZE Position: Resident Engineer Location of Works: Line (Chau Van Liem St) Description of Activities: Inspection for compaction test WILL BE READY FOR INSPECTION ON 16-Sep-07 at 3:15 PM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS (FDT) of sand backfilling of trenches from M58 - M59 OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION Tran Minh Tri / WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/1916 Date: 15-Sep-07 RFI No.: ECSI/L3/PC/3.2/42 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Name: KO SHIMOKAZE Position: Resident Engineer Location of Works: Line (Tran Binh Trong St) Description of Activities: Inspection formwork for Belt joint WILL BE READY FOR INSPECTION ON 17-Sep-07 at 4:00 PM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS connection of Box culvert from M25 to M26 OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION Ho Quang Trinh / WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 (OVERTIME WORKS) Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/1917 Date: 15-Sep-07 RFI No.: ECSI/L3/PC/3.2/43 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Location of Works: Line (Tran Binh Trong St) Name: KO SHIMOKAZE Position: Resident Engineer Description of Activities: Inspection placing & sampling concrete for Belt joint connection of Box culvert from M25 to M26 WILL BE READY FOR INSPECTION ON 17-Sep-07 at 10:00 PM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION Ho Quang Trinh / WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/1962 Date: 15-Sep-07 RFI No.: ECSI/L3/PC/3.2/47 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Name: KO SHIMOKAZE Position: Resident Engineer Location of Works: Line (Tran Binh Trong St) Description of Activities: Inspection for compaction test WILL BE READY FOR INSPECTION ON 17-Sep-07 at 10:00 AM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS (FDT) of sand backfilling of trenches from M23 - M24 OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION Ho Quang Trinh / WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/1963 Date: 15-Sep-07 RFI No.: ECSI/L3/PC/3.2/48 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Name: KO SHIMOKAZE Position: Resident Engineer Location of Works: Line (Tran Binh Trong St) Description of Activities: Inspection for compaction test WILL BE READY FOR INSPECTION ON 17-Sep-07 at 3:00 PM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS (FDT) of sand backfilling of trenches from M23 - M24 OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION Ho Quang Trinh / WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/1964 Date: 15-Sep-07 RFI No.: ECSI/L4/MC/3.2/274 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Name: KO SHIMOKAZE Position: Resident Engineer Location of Works: Line (An Duong Vuong St) Description of Activities: Inspection Compaction test (FDT) WILL BE READY FOR INSPECTION ON 17-Sep-07 at 9:00 AM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS for sand bacfilling of Manhole M'35 OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION Truong Hoang Phuc / WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/1965 Date: 15-Sep-07 RFI No.: ECSI/L4/MC/3.2/275 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Name: KO SHIMOKAZE Position: Resident Engineer Location of Works: Line (An Duong Vuong St) Description of Activities: Inspection Compaction test (FDT) WILL BE READY FOR INSPECTION ON 17-Sep-07 at 3:00 PM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS for sand bacfilling of Manhole M'35 OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION Truong Hoang Phuc / WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/1966 Date: 15-Sep-07 RFI No.: ECSI/L4/PC/3.2/194 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Name: KO SHIMOKAZE Position: Resident Engineer Location of Works: Line (An Duong Vuong St) Description of Activities: Inspection Compaction test (FDT) WILL BE READY FOR INSPECTION ON 17-Sep-07 at 9:00 AM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS for sand bacfilling of trench from M'35 to M35 OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION Truong Hoang Phuc / WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/1980 Date: 15-Sep-07 RFI No.: CSC/CM18-CM25/2.2/008 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Location of Works: CSC (CM18-CM25) Name: KO SHIMOKAZE Position: Resident Engineer Description of Activities: Inspection for Excavation pit of segment S14 WILL BE READY FOR INSPECTION ON 17-Sep-07 at 10:00 AM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION Thach Ngoc Truong Thi / WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/1981 Date: 15-Sep-07 RFI No.: CSC/CM18-CM25/2.3/231 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Location of Works: CSC (CM18-CM25) Name: KO SHIMOKAZE Position: Resident Engineer Description of Activities: Inspection for Elevation & Coordinate of Head Pile after treatment WILL BE READY FOR INSPECTION ON 17-Sep-07 at 10:00 AM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION Thach Ngoc Truong Thi / WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: Date: 15-Sep-07 CONVEYANCE SEWER CONSTRUCTION WEIP/D/QC - 02/1982 RFI No.: CSC/CM18-CM25/2.2/009 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Location of Works: CSC (CM18-CM25) Name: KO SHIMOKAZE Position: Resident Engineer Description of Activities: Inspection Compaction test for sand bedding of segment S15 & S16 WILL BE READY FOR INSPECTION ON 17-Sep-07 at 9:00 AM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION Thach Ngoc Truong Thi / WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/1983 Date: 15-Sep-07 RFI No.: CSC/CM18-CM25/2.2/010 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Location of Works: CSC (CM18-CM25) Name: KO SHIMOKAZE Position: Resident Engineer Description of Activities: Inspection Elevation & Dimensions for sand bedding of segment S15 & S16 WILL BE READY FOR INSPECTION ON 17-Sep-07 at 2:00 PM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION Thach Ngoc Truong Thi / WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/1984 Date: 15-Sep-07 RFI No.: ECSI/L3/MC/3.2/104 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Location of Works: At (Thanh Tan An Lab) Name: KO SHIMOKAZE Position: Resident Engineer Description of Activities: Inspection days compressive test concrete for closure box-culvert from M23 to M24, sampling date 10/9/2007, class E WILL BE READY FOR INSPECTION ON 17-Sep-07 at 2:30 PM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION / WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/1985 Date: 15-Sep-07 RFI No.: ECSI/L3/MC/3.2/105 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Location of Works: At (Thanh Tan An Lab) Name: KO SHIMOKAZE Position: Resident Engineer Description of Activities: Inspection days compressive test concrete for wall and top of Manhole M25, sampling date 10/9/2007, class E WILL BE READY FOR INSPECTION ON 17-Sep-07 at 2:30 PM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION / WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/1986 Date: 15-Sep-07 RFI No.: ECSI/L5/MC/3.2/166 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Location of Works: At (Thanh Tan An Lab) Name: KO SHIMOKAZE Position: Resident Engineer Description of Activities: Inspection days compressive test concrete for wall and top of Manhole M'51, sampling date 10/9/2007, class E WILL BE READY FOR INSPECTION ON 17-Sep-07 at 2:30 PM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION / WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/1987 Date: 15-Sep-07 RFI No.: ECSI/L4/MC/3.2/278 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Location of Works: At (Thanh Tan An Lab) Name: KO SHIMOKAZE Position: Resident Engineer Description of Activities: Inspection days compressive test for levelling concrete of Manhole M34, sampling date 10/9/2007, class G WILL BE READY FOR INSPECTION ON 17-Sep-07 at 2:30 PM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION / WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/1988 Date: 15-Sep-07 RFI No.: ECSI/L3/MC/3.2/106 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Location of Works: At (Thanh Tan An Lab) Name: KO SHIMOKAZE Position: Resident Engineer Description of Activities: Inspection 28 days compressive test for levelling concrete of Manhole M25, sampling date 20/8/2007, class G WILL BE READY FOR INSPECTION ON 17-Sep-07 at 2:30 PM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/1989 Date: 15-Sep-07 RFI No.: ECSI/L3/MC/3.2/107 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Location of Works: At (Thanh Tan An Lab) Name: KO SHIMOKAZE Position: Resident Engineer Description of Activities: Inspection 28 days compressive test for levelling concrete of Manhole M26, sampling date 20/8/2007, class G WILL BE READY FOR INSPECTION ON 17-Sep-07 at 2:30 PM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/1990 Date: 15-Sep-07 RFI No.: ECSI/L5/MC/3.2/167 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Location of Works: At (Thanh Tan An Lab) Name: KO SHIMOKAZE Position: Resident Engineer Description of Activities: Inspection 28 days compression test concrete of wall (section 1) of Manhole M53, sampling date 20/8/2007, class E WILL BE READY FOR INSPECTION ON 17-Sep-07 at 2:30 PM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/1991 Date: 15-Sep-07 RFI No.: ECSI/L6/MC/3.2/169 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Location of Works: At (Thanh Tan An Lab) Name: KO SHIMOKAZE Position: Resident Engineer Description of Activities: Inspection 28 days compression test concrete for Access of Manhole M56, sampling date 20/8/2007, class E WILL BE READY FOR INSPECTION ON 17-Sep-07 at 2:30 PM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/1992 Date: 15-Sep-07 RFI No.: ECSI/L6/MC/3.2/170 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Location of Works: At (Thanh Tan An Lab) Name: KO SHIMOKAZE Position: Resident Engineer Description of Activities: Inspection 28 days compression test concrete for Access of Manhole M58, sampling date 20/8/2007, class E WILL BE READY FOR INSPECTION ON 17-Sep-07 at 2:30 PM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 (OVERTIME WORKS) Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT Date: 15-Sep-07 WEIP/D/QC - 02/1993 RFI No.: ECSI/TP/141 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Location of Works: Line (Su Van Hanh St) Name: KO SHIMOKAZE Position: Resident Engineer Description of Activities: Inspection for Excavation, underground utilities, backfilling and compaction of test pit type WILL BE READY FOR INSPECTION ON 17-Sep-07 at 10:00 PM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION Truong My / WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT SHIMIZU CORPORATION MANAGEMENT SYSTEM AND QUALITY CONTROL PLAN Appendix No ... REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 (OVERTIME WORKS) Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT Date: 15-Sep-07 WEIP/D/QC - 02 /1993 RFI No.: ECSI/TP/141... ECSI/L6/PC/3.2/171 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Name: KO SHIMOKAZE Position: Resident... REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 (OVERTIME WORKS) Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/1961 Date: 15-Sep-07 RFI No.: ECSI/L6/PC/3.2/172

Ngày đăng: 04/09/2021, 02:26

Xem thêm:

w