1. Trang chủ
  2. » Kỹ Thuật - Công Nghệ

RFI 1959 to 1993

42 6 0

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

THÔNG TIN TÀI LIỆU

Thông tin cơ bản

Định dạng
Số trang 42
Dung lượng 0,99 MB

Nội dung

EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 (OVERTIME WORKS) Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/1959 Date: 15-Sep-07 RFI No.: CSC/CM18-CM25/2.3/230 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Name: KO SHIMOKAZE Position: Resident Engineer Location of Works: CSC (CM18-CM25) Description of Activities: Inspection for Spun pile Driving WILL BE READY FOR INSPECTION ON 16-Sep-07 at 7:30 AM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION Thach Ngoc Truong Thi / WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 (OVERTIME WORKS) Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/1960 Date: 15-Sep-07 RFI No.: ECSI/L6/PC/3.2/171 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Name: KO SHIMOKAZE Position: Resident Engineer Location of Works: Line (Chau Van Liem St) Description of Activities: Inspection for compaction test WILL BE READY FOR INSPECTION ON 16-Sep-07 at 9:00 AM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS (FDT) of sand backfilling of trenches from M58 - M59 OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION Tran Minh Tri / WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 (OVERTIME WORKS) Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/1961 Date: 15-Sep-07 RFI No.: ECSI/L6/PC/3.2/172 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Name: KO SHIMOKAZE Position: Resident Engineer Location of Works: Line (Chau Van Liem St) Description of Activities: Inspection for compaction test WILL BE READY FOR INSPECTION ON 16-Sep-07 at 3:15 PM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS (FDT) of sand backfilling of trenches from M58 - M59 OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION Tran Minh Tri / WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/1916 Date: 15-Sep-07 RFI No.: ECSI/L3/PC/3.2/42 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Name: KO SHIMOKAZE Position: Resident Engineer Location of Works: Line (Tran Binh Trong St) Description of Activities: Inspection formwork for Belt joint WILL BE READY FOR INSPECTION ON 17-Sep-07 at 4:00 PM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS connection of Box culvert from M25 to M26 OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION Ho Quang Trinh / WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 (OVERTIME WORKS) Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/1917 Date: 15-Sep-07 RFI No.: ECSI/L3/PC/3.2/43 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Location of Works: Line (Tran Binh Trong St) Name: KO SHIMOKAZE Position: Resident Engineer Description of Activities: Inspection placing & sampling concrete for Belt joint connection of Box culvert from M25 to M26 WILL BE READY FOR INSPECTION ON 17-Sep-07 at 10:00 PM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION Ho Quang Trinh / WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/1962 Date: 15-Sep-07 RFI No.: ECSI/L3/PC/3.2/47 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Name: KO SHIMOKAZE Position: Resident Engineer Location of Works: Line (Tran Binh Trong St) Description of Activities: Inspection for compaction test WILL BE READY FOR INSPECTION ON 17-Sep-07 at 10:00 AM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS (FDT) of sand backfilling of trenches from M23 - M24 OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION Ho Quang Trinh / WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/1963 Date: 15-Sep-07 RFI No.: ECSI/L3/PC/3.2/48 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Name: KO SHIMOKAZE Position: Resident Engineer Location of Works: Line (Tran Binh Trong St) Description of Activities: Inspection for compaction test WILL BE READY FOR INSPECTION ON 17-Sep-07 at 3:00 PM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS (FDT) of sand backfilling of trenches from M23 - M24 OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION Ho Quang Trinh / WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/1964 Date: 15-Sep-07 RFI No.: ECSI/L4/MC/3.2/274 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Name: KO SHIMOKAZE Position: Resident Engineer Location of Works: Line (An Duong Vuong St) Description of Activities: Inspection Compaction test (FDT) WILL BE READY FOR INSPECTION ON 17-Sep-07 at 9:00 AM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS for sand bacfilling of Manhole M'35 OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION Truong Hoang Phuc / WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/1965 Date: 15-Sep-07 RFI No.: ECSI/L4/MC/3.2/275 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Name: KO SHIMOKAZE Position: Resident Engineer Location of Works: Line (An Duong Vuong St) Description of Activities: Inspection Compaction test (FDT) WILL BE READY FOR INSPECTION ON 17-Sep-07 at 3:00 PM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS for sand bacfilling of Manhole M'35 OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION Truong Hoang Phuc / WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/1966 Date: 15-Sep-07 RFI No.: ECSI/L4/PC/3.2/194 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Name: KO SHIMOKAZE Position: Resident Engineer Location of Works: Line (An Duong Vuong St) Description of Activities: Inspection Compaction test (FDT) WILL BE READY FOR INSPECTION ON 17-Sep-07 at 9:00 AM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS for sand bacfilling of trench from M'35 to M35 OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION Truong Hoang Phuc / WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/1980 Date: 15-Sep-07 RFI No.: CSC/CM18-CM25/2.2/008 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Location of Works: CSC (CM18-CM25) Name: KO SHIMOKAZE Position: Resident Engineer Description of Activities: Inspection for Excavation pit of segment S14 WILL BE READY FOR INSPECTION ON 17-Sep-07 at 10:00 AM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION Thach Ngoc Truong Thi / WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/1981 Date: 15-Sep-07 RFI No.: CSC/CM18-CM25/2.3/231 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Location of Works: CSC (CM18-CM25) Name: KO SHIMOKAZE Position: Resident Engineer Description of Activities: Inspection for Elevation & Coordinate of Head Pile after treatment WILL BE READY FOR INSPECTION ON 17-Sep-07 at 10:00 AM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION Thach Ngoc Truong Thi / WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: Date: 15-Sep-07 CONVEYANCE SEWER CONSTRUCTION WEIP/D/QC - 02/1982 RFI No.: CSC/CM18-CM25/2.2/009 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Location of Works: CSC (CM18-CM25) Name: KO SHIMOKAZE Position: Resident Engineer Description of Activities: Inspection Compaction test for sand bedding of segment S15 & S16 WILL BE READY FOR INSPECTION ON 17-Sep-07 at 9:00 AM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION Thach Ngoc Truong Thi / WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/1983 Date: 15-Sep-07 RFI No.: CSC/CM18-CM25/2.2/010 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Location of Works: CSC (CM18-CM25) Name: KO SHIMOKAZE Position: Resident Engineer Description of Activities: Inspection Elevation & Dimensions for sand bedding of segment S15 & S16 WILL BE READY FOR INSPECTION ON 17-Sep-07 at 2:00 PM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION Thach Ngoc Truong Thi / WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/1984 Date: 15-Sep-07 RFI No.: ECSI/L3/MC/3.2/104 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Location of Works: At (Thanh Tan An Lab) Name: KO SHIMOKAZE Position: Resident Engineer Description of Activities: Inspection days compressive test concrete for closure box-culvert from M23 to M24, sampling date 10/9/2007, class E WILL BE READY FOR INSPECTION ON 17-Sep-07 at 2:30 PM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION / WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/1985 Date: 15-Sep-07 RFI No.: ECSI/L3/MC/3.2/105 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Location of Works: At (Thanh Tan An Lab) Name: KO SHIMOKAZE Position: Resident Engineer Description of Activities: Inspection days compressive test concrete for wall and top of Manhole M25, sampling date 10/9/2007, class E WILL BE READY FOR INSPECTION ON 17-Sep-07 at 2:30 PM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION / WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/1986 Date: 15-Sep-07 RFI No.: ECSI/L5/MC/3.2/166 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Location of Works: At (Thanh Tan An Lab) Name: KO SHIMOKAZE Position: Resident Engineer Description of Activities: Inspection days compressive test concrete for wall and top of Manhole M'51, sampling date 10/9/2007, class E WILL BE READY FOR INSPECTION ON 17-Sep-07 at 2:30 PM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION / WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/1987 Date: 15-Sep-07 RFI No.: ECSI/L4/MC/3.2/278 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Location of Works: At (Thanh Tan An Lab) Name: KO SHIMOKAZE Position: Resident Engineer Description of Activities: Inspection days compressive test for levelling concrete of Manhole M34, sampling date 10/9/2007, class G WILL BE READY FOR INSPECTION ON 17-Sep-07 at 2:30 PM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION / WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/1988 Date: 15-Sep-07 RFI No.: ECSI/L3/MC/3.2/106 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Location of Works: At (Thanh Tan An Lab) Name: KO SHIMOKAZE Position: Resident Engineer Description of Activities: Inspection 28 days compressive test for levelling concrete of Manhole M25, sampling date 20/8/2007, class G WILL BE READY FOR INSPECTION ON 17-Sep-07 at 2:30 PM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/1989 Date: 15-Sep-07 RFI No.: ECSI/L3/MC/3.2/107 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Location of Works: At (Thanh Tan An Lab) Name: KO SHIMOKAZE Position: Resident Engineer Description of Activities: Inspection 28 days compressive test for levelling concrete of Manhole M26, sampling date 20/8/2007, class G WILL BE READY FOR INSPECTION ON 17-Sep-07 at 2:30 PM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/1990 Date: 15-Sep-07 RFI No.: ECSI/L5/MC/3.2/167 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Location of Works: At (Thanh Tan An Lab) Name: KO SHIMOKAZE Position: Resident Engineer Description of Activities: Inspection 28 days compression test concrete of wall (section 1) of Manhole M53, sampling date 20/8/2007, class E WILL BE READY FOR INSPECTION ON 17-Sep-07 at 2:30 PM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/1991 Date: 15-Sep-07 RFI No.: ECSI/L6/MC/3.2/169 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Location of Works: At (Thanh Tan An Lab) Name: KO SHIMOKAZE Position: Resident Engineer Description of Activities: Inspection 28 days compression test concrete for Access of Manhole M56, sampling date 20/8/2007, class E WILL BE READY FOR INSPECTION ON 17-Sep-07 at 2:30 PM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/1992 Date: 15-Sep-07 RFI No.: ECSI/L6/MC/3.2/170 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Location of Works: At (Thanh Tan An Lab) Name: KO SHIMOKAZE Position: Resident Engineer Description of Activities: Inspection 28 days compression test concrete for Access of Manhole M58, sampling date 20/8/2007, class E WILL BE READY FOR INSPECTION ON 17-Sep-07 at 2:30 PM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT MANAGEMENT SYSTEM AND QUALITY CONTROL SHIMIZU CORPORATION PLAN REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 (OVERTIME WORKS) Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT Date: 15-Sep-07 WEIP/D/QC - 02/1993 RFI No.: ECSI/TP/141 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Location of Works: Line (Su Van Hanh St) Name: KO SHIMOKAZE Position: Resident Engineer Description of Activities: Inspection for Excavation, underground utilities, backfilling and compaction of test pit type WILL BE READY FOR INSPECTION ON 17-Sep-07 at 10:00 PM RELEVANT INSPECTION AND TEST PLANS ATTACHED: MS- 009- 01 ECSI AND SIS OTHER DOCUMENTS REMARKS - PERSON IN CHARGE: PCI REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION SHIMIZU CORPORATION Truong My / WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS: Element Approved Not Approved Date RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS Based on the above comments / observations the next stage may / may not proceed Approved by The Engineer’s Representative Checked by PCI’ Inspector Signed and Accepted SC - Site Engineer Signed: Signed: Signed: Name: Name: Name: Date: Date: Date: Appendix No EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT SHIMIZU CORPORATION MANAGEMENT SYSTEM AND QUALITY CONTROL PLAN Appendix No ... REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 (OVERTIME WORKS) Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT Date: 15-Sep-07 WEIP/D/QC - 02 /1993 RFI No.: ECSI/TP/141... ECSI/L6/PC/3.2/171 From: SHIMIZU CORPORATION REPRESENTATIVE Name: BUI NGOC TOAN Sign: _ Position: Chief of QC Engineer TO THE ENGINEER’S REPRESENTATIVE Name: KO SHIMOKAZE Position: Resident... REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02 (OVERTIME WORKS) Works Section / Location: EXISTING COMBINED SEWER IMPROVEMENT WEIP/D/QC - 02/1961 Date: 15-Sep-07 RFI No.: ECSI/L6/PC/3.2/172

Ngày đăng: 04/09/2021, 02:26

w