Tài liệu tham khảo |
Loại |
Chi tiết |
1. Banki and Esmaeili (2009), “The Effects of Variability of the Mathematical Equations and Project Categorizations on Forecasting S-Curves at Construction Industry”. International Journal of Civil Engineering. 7(4), 258- 270 |
Sách, tạp chí |
Tiêu đề: |
The Effects of Variability of the Mathematical Equations and Project Categorizations on Forecasting S-Curves at Construction Industry”. "International Journal of Civil Engineering |
Tác giả: |
Banki and Esmaeili |
Năm: |
2009 |
|
2. Berny, J. and Howes, R. (1982). “Project management control using real time budgeting and forecasting models.” Contruction Paper 2, 19-40 |
Sách, tạp chí |
Tiêu đề: |
Project management control using real time budgeting and forecasting models.” "Contruction Paper |
Tác giả: |
Berny, J. and Howes, R |
Năm: |
1982 |
|
3. Blyth, K., and Kaka, A. P. (2006). “A novel multiple linear regression model for forecasting S-Curves.” Eng., Constr., Archit. Manage., 13(1), 82-95 |
Sách, tạp chí |
Tiêu đề: |
A novel multiple linear regression model for forecasting S-Curves.” "Eng., Constr., Archit. Manage |
Tác giả: |
Blyth, K., and Kaka, A. P |
Năm: |
2006 |
|
6. Chao, L. C. (2009). “Estimating Project S-Curves Using Polynomial Function and Neural Networks” J. Constr. Eng. Manage., 135(3), 169-177 |
Sách, tạp chí |
Tiêu đề: |
Estimating Project S-Curves Using Polynomial Function and Neural Networks” "J. Constr. Eng. Manage |
Tác giả: |
Chao, L. C |
Năm: |
2009 |
|
7. Hegazy, T., and Kassab, M. (2003). “Resource optimization using combined simulation and genetic algorithms.” J. Constr. Eng. Manage., 129(6), 698-705 |
Sách, tạp chí |
Tiêu đề: |
Resource optimization using combined simulation and genetic algorithms.” "J. Constr. Eng. Manage |
Tác giả: |
Hegazy, T., and Kassab, M |
Năm: |
2003 |
|
8. Jararah, R., Kulkarni, D., and T. O’Connor J. (2007). “Cash flow projections for selected TxDoT Highway projects.” J. Constr. Eng. Manage., 133(3), 235- 241 |
Sách, tạp chí |
Tiêu đề: |
Cash flow projections for selected TxDoT Highway projects.” "J. Constr. Eng. Manage |
Tác giả: |
Jararah, R., Kulkarni, D., and T. O’Connor J |
Năm: |
2007 |
|
9. Jepson, W.B. (1969). “Financial control of construction and reducing the element of risk.” The Building Economist 9 , 82-92 |
Sách, tạp chí |
Tiêu đề: |
Financial control of construction and reducing the element of risk.” "The Building Economist |
Tác giả: |
Jepson, W.B |
Năm: |
1969 |
|
10. Kaka, A. P., and Price, A. D. F. (1993). “Modeling standard cost commitment curves for contractors’ cash flow forecasting.” Constr. Manage. Econom., 11(4), 271-283 |
Sách, tạp chí |
Tiêu đề: |
Modeling standard cost commitment curves for contractors’ cash flow forecasting.” "Constr. Manage. Econom |
Tác giả: |
Kaka, A. P., and Price, A. D. F |
Năm: |
1993 |
|
11. Kenley, R., and Wilson, O. D. (1986). “A construction projects cash flow model - An idiographic approach.” Constr. Manage. Econom., 4(3), 213-232 |
Sách, tạp chí |
Tiêu đề: |
A construction projects cash flow model - An idiographic approach.”" Constr. Manage. Econom |
Tác giả: |
Kenley, R., and Wilson, O. D |
Năm: |
1986 |
|
12. Kim, Y., and Ballard, G. (2000). “Is the earned-value method an enemy of work flow?” Proc. 8th Annual Conf. of the Int. Group for Lean construction, IGLC-6(http://www.iglc.net/conferences/2000/papers/) |
Sách, tạp chí |
Tiêu đề: |
Is the earned-value method an enemy of work flow?” "Proc. 8th Annual Conf. of the Int. Group for Lean construction, IGLC-6 |
Tác giả: |
Kim, Y., and Ballard, G |
Năm: |
2000 |
|
13. MATLAB. (2009) “Neural network toolbox for use with MATLAB 7.8.0, R2009a.” User’s guide, Ver. 2, Math Works, Inc., Natick, mass |
Sách, tạp chí |
Tiêu đề: |
Neural network toolbox for use with MATLAB 7.8.0, R2009a.” "User’s guide |
|
14. Miskawi, Z. (1989). “An S-curve equation for projects control.” Constr. Manage.Econom., 7(2), 115-124 |
Sách, tạp chí |
Tiêu đề: |
An S-curve equation for projects control.” "Constr. "Manage.Econom |
Tác giả: |
Miskawi, Z |
Năm: |
1989 |
|
15. Navon, R. (1996). “Cash flow forecasting and updating for building projects.” Proj. Manage. J., 27(2), 14-23 |
Sách, tạp chí |
Tiêu đề: |
Cash flow forecasting and updating for building projects.” "Proj. Manage. J |
Tác giả: |
Navon, R |
Năm: |
1996 |
|
16. Ngô Mạnh Huy (2009). “Dự báo xác suất hoàn thành dự án bằng đường cong ngẫu nhiên”. Luận văn Thạc sỹ, Ngành Công nghệ và Quản lý Xây dựng, Đại học Bách Khoa Tp.HCM |
Sách, tạp chí |
Tiêu đề: |
Dự báo xác suất hoàn thành dự án bằng đường cong ngẫu nhiên |
Tác giả: |
Ngô Mạnh Huy |
Năm: |
2009 |
|
17. Peer, S (1982). “Application of cost-flow forecasting model.”J. Constr. Div., 108(2), 226-232 |
Sách, tạp chí |
Tiêu đề: |
Application of cost-flow forecasting model.”"J. Constr. Div |
Tác giả: |
Peer, S |
Năm: |
1982 |
|
18. Skitmore, M. (1992). “Parameter prediction for cash flow forecasting model.” Constr. Manage.Econom., 10(5), 397-413 |
Sách, tạp chí |
Tiêu đề: |
Parameter prediction for cash flow forecasting model.” "Constr. Manage.Econom |
Tác giả: |
Skitmore, M |
Năm: |
1992 |
|
19. Touran, A., Atgun, M., and Bhurisith, I. (2004). “Analysis of the United States Department of Transportation prompt pay provisions.” J. Constr. Eng.Manage., 130(5), 719-725 |
Sách, tạp chí |
Tiêu đề: |
Analysis of the United States Department of Transportation prompt pay provisions.” "J. Constr. Eng. "Manage |
Tác giả: |
Touran, A., Atgun, M., and Bhurisith, I |
Năm: |
2004 |
|
20. Tucker, S. N. (1988). “A single alternative formula for Department of Health and social Security S-curves.” Constr. Manage.Econom., 6(1), 13-23.Tài liệu tham khảo thêm |
Sách, tạp chí |
Tiêu đề: |
A single alternative formula for Department of Health and social Security S-curves.” "Constr. Manage.Econom |
Tác giả: |
Tucker, S. N |
Năm: |
1988 |
|
21. Chao, L. C. (2001). “Assessing earth-moving operation capacity by neural network-based simulation with physical factors.” Comput. Aided civ.Infrastruct. Eng., 16(4), 287-294 |
Sách, tạp chí |
Tiêu đề: |
Assessing earth-moving operation capacity by neural network-based simulation with physical factors.” "Comput. Aided civ. "Infrastruct. Eng |
Tác giả: |
Chao, L. C |
Năm: |
2001 |
|
4. Bromilow, F.J. and Henderson, J.A. (1974). Procedure of Reckoning and valuing of building Contracts. CSRO Division of Building Research Special Report |
Khác |
|