ERECTING PREPARATION1 TRANSPORATION OF STRUCTURE ELEMENTS 5.. When a long member is laid on 2 rail carriages, it should be supported on 2 different points, so the carriages can be rotate

Trang 1

CONSTRUCTION METHOD 2

CIVIL AND INDUSTRIAL ASSEMBLY ENGINEERING

Dr KHOA DANG PHAM

Ha Noi - 2014

Trang 3

FACTORY CONSTRUCTION SITE

REMOVING

(Bốc xếp)

MOVING(vận chuyển)

LOWERING(Hạ - TO INTENDED PLACE)

OF STRUCTURE ELEMENTS

Trang 4

PRINCIPLES (6):

1) TRANSPORATION OF STRUCTURE ELEMENTS

1 Strenth of element must obtain that for moving For concrete one, strength must having at least 70% of R28

2 Element situation during moving should be similar to that at working condition(just to avoid stresses occurred different as disigned)

Trang 6

PRINCIPLES (6):

3 ERECTING PREPARATION

1) TRANSPORATION OF STRUCTURE ELEMENTS

3 Bending elements must be chocked by using wooden pieces following designedpositions (hook position)

Trang 7

PRINCIPLES (6):

4 When members laid on each other, supported (chocked) points should be on a vertical direction

Trang 8

3 ERECTING PREPARATION

1) TRANSPORATION OF STRUCTURE ELEMENTS

5 When a long member is laid on 2 rail carriages, it should be supported on 2 different points, so the carriages can be rotated during transportation

PRINCIPLES (6):

Support point – rotation point

Trang 9

6 Length of structure member should be fit on truck, so it could be passed at corner ofstreets or roads.

PRINCIPLES (6):

Trang 10

3 ERECTING PREPARATION

1) TRANSPORATION OF STRUCTURE ELEMENTS

Trang 12

3 ERECTING PREPARATION

1) TRANSPORATION OF STRUCTURE ELEMENTS

Trang 14

Q < 250 KG

3 ERECTING PREPARATION

1) TRANSPORATION OF STRUCTURE ELEMENTS

Trang 15

MEMBERS ARRIVED CONSTRUCTION SITE

Trang 16

2) ARRANGEMENT OF ELEMENTS ON SITE

PRINCIPLES (2):

3 ERECTING PREPARATION

1) Member should laid in working radius of crane

Trang 17

PRINCIPLES (2):

Trang 18

2 Places of laid members should follow the location of crane, in which the crane canpick up them as much as possible Heavy member is laid near the crane

Lightweight member is laid far from crane

PRINCIPLES (2):

3 ERECTING PREPARATION

2) ARRANGEMENT OF ELEMENTS ON SITE

Trang 20

3) PRE-ERECTION (AMPLIFICATION)

ROOF STRUCTURE(SPACE FRAME WITH SPHERE NODES)

3 ERECTING PREPARATION

Trang 22

3) PRE-ERECTION

3 ERECTING PREPARATION

Trang 24

3) PRE-ERECTION

3 ERECTING PREPARATION

Trang 26

3) PRE-ERECTION

3 ERECTING PREPARATION

Trang 28

3) PRE-ERECTION

3 ERECTING PREPARATION

Trang 30

- Improve crane working capacity

- Reduce working period of crane

- Redure erection time

- Reduce scaffold quantities of erection

- Work is easy on ground

- Reduce erection expenses

3) PRE-ERECTION

3 ERECTING PREPARATION

Trang 32

4) STRENGTHENING OF STRUCTURE MEMBERS

3 ERECTING PREPARATION

Trang 34

4) STRENGTHENING OF STRUCTURE MEMBERS

3 ERECTING PREPARATION

Internal force in working state Internal force in erection state

Trang 36

4) STRENGTHENING OF STRUCTURE MEMBERS

3 ERECTING PREPARATION

Trang 38

5) DIRECTION OF ASSEMBLY

ALONG SIDE ERECTION CROSS SIDE ERECTION

3 ERECTING PREPARATION

Trang 39

COMBINED DIRECTION OF ASSEMBLT