Tổng quan đường ống khí việt nam
PETROVIETNAM Energy for National Sustainable Development Presented by: Ngo Anh Hien Deputy General Manager Gas Division of PetroVienam Content OVERVIEW OF PIPELINE SYSTEM CURRENT GAS PIPELINE SYSTEMS DIRECTION TO DEVELOPMENT ON-GOING GAS PIPELINE PROJECTS UP-COMING GAS PIPELINE PROJECTS PETROVIETNAM Energy for National Sustainable Development Overview of Gas Pipeline System In 1981, the first developed gas field from Tien Hai – Song Hong basin with flowrate of 20 – 23 MMCM/year supplied to local industry. In 1995, the first associated gas from Bach Ho field – Cuu Long basin – with flowrate 1 MMCM/day supplied to Ba Ria Power Plant. In 2003, a first natural gas from Lan Tay field – Nam Con Son basin with flowrate of 2 MMCM/day supplied to Phu My Power Complex. By October 2008, the flowrate was increased to 20 MMCM/day. In 2007, a first associated gas from PM3-CAA overlapping area supplied to Ca Mau Power Complex. PETROVIETNAM Energy for National Sustainable Development Current Gas Pipeline Systems • Northern area – Thai Binh Pipeline • Rang Dong – Bach Ho – Phu My Pipeline • Nam Con Son Pipeline • PM3 – Ca Mau Pipeline • Low Pressure Pipeline PETROVIETNAM Energy for National Sustainable Development Current Gas Pipeline Systems PETROVIETNAM Energy for National Sustainable Development Northern area – Thai Binh Fields: Tien Hai C (07/1981) D14_STL (5/2004) Dong Quan D (2005) Specification: Length: ~20 km Diameter: Small (~6”) Description: Limited gas resources Supply gas to Tien Hai industrial zone, Thai Binh. CAMBODIA Ca Mau Comple x PM3-CAA O Mon Hiep Phuoc Dinh Co GPP Phu My Complex Cuu Long Basin Nam Con Son Basin Ma Lay Tho Chu Basin Bach Ho –Phu My PL: •Capacity: 2 bcmpa •Length: 117 km •Diameter: 16” Nam Con Son 1 PL: •Capacity: 7 bcmpa •Length: 400 km •Diameter: 26” PM3-Ca Mau PL: •Capacity: 2 bcmpa •Length: 330 km •Diameter: 18” Block B, 48 &52 Current Gas Pipeline Systems PETROVIETNAM Energy for National Sustainable Development Current Gas Pipeline Systems Southeast Region PETROVIETNAM Energy for National Sustainable Development LÔ 06.1 LÂ NTÂ Y- LANĐ Ỏ LÔ 11.2 MỎ NHÀ MÁ Y XƯ Û LÝ KHÍ NAM CÔ N SƠ N NHÀ MÁ Y XƯ Û LÝ KHÍ DINH CỐ TRUNG TÂ M PHÚ MỸ GDC BLOCK 06.1 LAN TAY & LAN DO BLOCK 11.2 BACH HO DINH CO TERMINAL NAM CON SON DINH CO GPP BACH HO BA RIA POWER PLANT BACH HO GAS DISTRIBUTION CENTER PHU MY GDS PHU MY 2.1 PHU MY 2.1 EXT. PHU MY 1 PHU MY 3 NAM CON SON GAS DISTRIBUTION CENTER PHU MY GDC PHU MY 2.2 PHU MY FERTILIZER LOW PRESSURE PM – MX - GD PHU MY INDUSTRIAL ZONE PHU MY - HCM OFFSHORE DINH CO AREA BA RIA AREA Max. capacity: 2.0 BCM/y Max. capacity: 7 BCM/y PHU MY 4 PHUONG DONG RANG DONG PHU MY 3 NHON TRACH 1 HIEP PHUOC CA NGU VANG NHON TRACH 2 STD/STV Rong Doi Moi Current Gas Pipeline Systems PETROVIETNAM Energy for National Sustainable Development Rang Dong – Bach Ho – Phu My Pipeline Ba Ria GDS Ba Ria Power Plant 1.5 Bcm/y, 125 bar LBV-804 SDV-805 LBV 547 MMCM/y 22.5 - 24 bar Bach Ho Thi Vai Terminal Phu My GDS Dinh Co GPP Rang Dong PM1 PM 2.2 PM 2.1 PM 3 UREA PM 4 Phu My GDC STD/STV Ca Ngu Vang Rong Doi Moi Current Gas Pipeline Systems Nam Con Son Pipeline LBV Dinh Co GPP LBV Lan Tay Thi Vai Terminal Dinh Co Terminal Hai Thach Rong Doi PM 2.2 PM 4 PM 3 Phu My GDS Phu My GDC PETROVIETNAM Energy for National Sustainable Development PM 2.1 PM 1 Current Gas Pipeline Systems Low Pressure Gas Pipeline PETROVIETNAM Energy for National Sustainable Development Design Capacity: 1 BCMY Specification: Length: 15 km Description: Supply gas to the industrial zones along the trunk- pipeline to Ba Ria, Phu My area. [...]... Utilize gas reserves in the Central and Northern of Vietnam • Interconnect regional/national gas pipeline systems • Expand gas usage in other sectors such as resident, transportation, industry etc through low pressure and city gas pipeline system PETROVIETNAM Energy for National Sustainable Development Master Plan For Pipeline System PETROVIETNAM Energy for National Sustainable Development On-going... Ca Mau Province PETROVIETNAM Energy for National Sustainable Development Up-coming Gas Pipeline Projects Nam Con Son II Gas Pipeline Design Capacity: 7 BCMY Location: Southeast region Description: The 400 km line will be built in parallel with the 1st pipeline to transport gas from Block 05-2, 05-3 and 04-3 with consideration of re-serving for other potential gas fields in Nam Con Son basin and importing... RP3-RP2: 8.5km, 12” RP3-RC4: 16km, 10” RC4-RC5: 5.5km, 8” RC4-RCDM: 3.5km, 8” First gas: Energy for National Sustainable Development Southeast region Description: PETROVIETNAM 6.4 BCMY 12/2010 On-going Gas Pipeline Projects PETROVIETNAM Energy for National Sustainable Development On-going Gas Pipeline Projects Block B – O Mon Pipeline CARIGA LI Design Capacity: 6.4 BCMY Location: Southwest region Specification:... importing gas later First gas: 2014 PETROVIETNAM Energy for National Sustainable Development Up-coming Gas Pipeline Projects Block 102/106 & 103/107 – Thai Binh Pipeline Distances Hong Long - Landfall: ~55km Hac Long - Hong Long: 10,3km Bach Long - Hong Long: 17,4km Dia Long - Hong Long: ~20km Hong Long - Thai Binh: ~40km Thai Binh – Landfall: PETROVIETNAM Energy for National Sustainable Development . 11.2 MỎ NHÀ MÁ Y XƯ Û LÝ KHÍ NAM CÔ N SƠ N NHÀ MÁ Y XƯ Û LÝ KHÍ DINH CỐ TRUNG TÂ M PHÚ MỸ GDC BLOCK 06.1 LAN TAY & LAN DO BLOCK 11.2 BACH HO DINH CO TERMINAL NAM CON SON DINH CO GPP BACH. Complex. PETROVIETNAM Energy for National Sustainable Development Current Gas Pipeline Systems • Northern area – Thai Binh Pipeline • Rang Dong – Bach Ho – Phu My Pipeline • Nam Con Son Pipeline •. PM3 – Ca Mau Pipeline • Low Pressure Pipeline PETROVIETNAM Energy for National Sustainable Development Current Gas Pipeline Systems PETROVIETNAM Energy for National Sustainable Development Northern