Tiêu đề Project Safety Plan
Tác giả Le Dinh Quyen, Park Yong Soo
Trường học Noi Bai – Lao Cai Highway Project
Chuyên ngành Safety Management
Thể loại safety plan
Năm xuất bản 2009
Thành phố Noi Bai
Định dạng
Số trang 32
Dung lượng 199,5 KB

Nội dung

Project Safety Plan POS-PSP-B1-EN Noi Bai – Lao Cai Highway Project Package A1: Km 0-080 ~ 26+700 PROJECT SAFETY PLAN SIGNATURE Prepared Position Le Dinh Quyen Safety Manager Park Yong Soo Project Director Checked Approved CONTENT Preface Safety Organization and Responsibility 2.1 Responsibility Revision B1: 15 September 2009 Page Noi Bai – Lao Cai Highway Project Package A1: Km 0-080 ~ 26+700 Safety Instruction and Training 3.1 Instruction and training on the Job 10 3.2 Special safety training 12 3.3 Emergency communication Implementation of the Daily Work Meeting and Weekly Progress Meeting 12 Recording of safety and reporting of accident 13 5.1 Recording of safety 5.2 Reporting of accidents Personal Protective Apparel & Other Site Safety Protection Measures 13 6.1 Personal protective apparel 13 6.2 Specification 6.3 Other safety equipment Safety of construction plant 7.1 General 7.2 Safety devices 7.3 Crane Inspection and Testing 7.4 Tool and equipment Inspection 7.5 Site Inspection of tools and equipment 18 7.6 Specific Safety Method of Specific Work Items: 18 Safe Operation 8.1 Lookout men and flagmen 8.2 Maintenance of facilities 8.3 Safety housekeeping 8.4 Working at height 8.5 Working around equipment/machineries 8.6 Pressurized equipment 8.7 Hand tools 8.8 Welding and cutting 8.9 Lifting and hoisting equipment Chemical Management 9.1 Chemical inventory 9.2 Handling procedures 9.3 Storage Revision B1: 15 September 2009 Project Safety Plan POS-PSP-B1-EN 10 12 13 13 14 14 16 16 17 17 18 19 19 19 19 20 20 22 22 22 24 24 24 24 24 Page Noi Bai – Lao Cai Highway Project Package A1: Km 0-080 ~ 26+700 10 First Aid 10.1 First aid base 10.2 First aid boxes 10.3 Medical arrangement 11 Fire Prevention 12 Emergency Preparedness 12.1 General 12.2 Emergency call out procedure 13 Access Control on Site 13.1 General 13.2 Boundary demarcation 13.3 Security check 14 Penalties for Safety Violations/Failure to Comply 14.1 Removal from site 14.2 Minor offences 14.3 Major offences 15 Safety in rain and flood season Project Safety Plan POS-PSP-B1-EN 25 25 26 26 26 27 27 28 30 30 30 30 31 31 31 31 31 Appendix: Site Safety General Organization Chart Revision B1: 15 September 2009 Page Noi Bai – Lao Cai Highway Project Package A1: Km 0-080 ~ 26+700 Project Safety Plan POS-PSP-B1-EN Preface The s afety i o p s if aramount a a t a cmportance o s s t sll t imes nd precedence over any and all other consideration The contracto execution and completion of the wok, having full regard for safety of all persons entitled to be upon the site and keep the site and the work in an orderly state appro avoidance of danger to such person The p rimary o o t bjective S P i t af he h dafety a f lan l s void um the performance of all work on field and to ensure effective control of them expected that every employee does his best effort to create a safe environment to work The Safety Program outlines the procedures essential for the protection of men and materials in work Every staff who supervises or directs the work of craftsmen shall pursue his best efforts to assure t s he o e afety e uf ach h s mployee o d I nder a h iss bupervision accountable for the protection of equipment and property within his area of responsibility Revision B1: 15 September 2009 Page Project Safety Plan POS-PSP-B1-EN Noi Bai – Lao Cai Highway Project Package A1: Km 0-080 ~ 26+700 Safety Organization and Responsibility Safety organization chart Project Director PARK YONG SOO Safety Manager LÊ ĐÌNH QUYỀN Deputy Manager VŨ VĂN THỤY First Aid Team Site Engineers Safety Checker (Sub-Contractor A) Worker Worker Construction/Site LEE SANG DON TRINH HUNG THO NGUYEN NGOC BICH Safety Checker Team Site Engineers Safety Checker (Sub-Contractor B) Worker Worker Site Engineers Safety Checker (Sub-Contractor C) Worker Worker 2.1 Responsibility 2.1.1 Project Director and Deputy Project Directors  Establishing the Safety Control Plan Revision B1: 15 September 2009 Page Project Safety Plan POS-PSP-B1-EN Noi Bai – Lao Cai Highway Project Package A1: Km 0-080 ~ 26+700  Taking a measure of accident prevention by coordination throughout the works  Site Patrol  Instruction and Support for Safety Education of Workers  Scheduling and Planning for an Installation of Equipments  Liaison for Authorized Parties  Promote full support of the Safety control Plan  Delegate responsibilities for the various safety functions at all levels of the Project  Maintain active involvement in the Project’s safety status and safety morale  Ensure p i rompt a nvestigation o a a completed and follow-up action taken i ction w pn ny r 2.1.2 Construction Manager T heC onstruction M i t k f anagerH s b rs he fey t s igure of the project as follows The C onstruction M i r anager f t t s a esponsible d o s engineers and office engineers which includes their safety responsibilities ccident e or he The Construction Manager shall be prepared to accept the responsibility for administering the site safety programme during the absence of th Manager from the project The Construction Manager shall take an active part to the Safety Team He shall review the specifications and prints for safety compliance and relate his findings to this team T h e C o n s t r u c t i o n M a n a g e r w i l l c o - o r d i n a t e a c Manager regarding subcontractor performance and take whatever steps necessary for proper safety compliance He shall assist the Safety Manager on problems of a technical nature 2.1.3 Safety Manager  Reporting to the Project Director and informing decision of the Safety Control Plan to workers Revision B1: 15 September 2009 Page Noi Bai – Lao Cai Highway Project Package A1: Km 0-080 ~ 26+700 Project Safety Plan POS-PSP-B1-EN  Participation for the Safety Activity  Making a list of workers and designation of work group leaders  Implementation of a Safety Education to workers  Implementation of a Safety Inspection and Instruction  Confirming health conditions of workers  Enforcement of other authorized rules   Supervising safety trainings in accordance with the site requirements Co-coordinating the first aid and rescue services on site with certification to ensure the a ppointed e a employeesw p fre a quipped k i t a ith roper of a nurse Investigating all accidents, injuries, fires, property damage and other safety related incidents and prepare/submit the required reports Identify t c he lassification o i i t a o f njuries o t l f d hey re ccup injuries a t tnd f ake a he o tollow-up c o i cctionsw a n he ontrol accident forms to be filled Evaluating the needs and then, request of safety, first aid equipment needed on the job Ensure that safety equipment is maintained in Sound condition at all times    2.1.4 Site Engineer The Site Engineers are directly responsible for the control of site activities of this Project They are the key personnel in the implementation and maintenance of an effective job site health and safety programme, assisting the Safety Manager The standards for a good safety programme are established by the Safety Manager and Construction Manager The Site Engineers will be directly responsible for the success of Safety Control Plan as they are in direct cont Contractors Their abilities to instill good health and safety attitudes to the Sub-Contractors will reflect the success of the Safety Control Plane on site Site Engineers are responsible for a wide range of activities They must plan their health and safety activities with care and good effort as they have to carry other portions of their work programme such as cost, manpower allocation scheduling of the respective work within this Project Revision B1: 15 September 2009 Page Project Safety Plan POS-PSP-B1-EN Noi Bai – Lao Cai Highway Project Package A1: Km 0-080 ~ 26+700 The specific safety responsibilities of Site Engineers include, but are not limited to, the following: R e v i e w a l l w o r k a n d a l l n e w p e r s o n n e l f o r s a familiarization with safety requirements is an integral part of the tot responsibility Continual monitoring of the safety attitudes of Sub-Contractor responsibilities towards the safety of their trade and participations in the job safety effort Enforce on compliance with all established health and safety before and during performance of the work Conduct health and safety inspections and make corrections on a daily basis Initiate plans prior to the start of work to supply the tools, material equipment necessary to the job safely A s s i s t w i t h a c c i d e n t i n v e s t i g a t i o n s t o documentation with prompt corrections made after accident and to preve any recurrences Co-ordinate planning and work activities with other supervisory per performing work within, or adjacent to, their assigned work areas Site Engineers who have responsibility for contractor monitor Sub-Contractors’ compliance with the saf activity will be coordinated with the Safety Manager 2.1.5 Sub- contractor’s responsibility T o e n s u r e t h a t a l l t h e r e s p e c t i v e a g e n t s a n d e m p l o y e e s c o n f o r m contents of this Safety control plan To s upply e working Revision B1: 15 September 2009 w mployees a s eith ppropriate a a w Page afety q Project Safety Plan POS-PSP-B1-EN Noi Bai – Lao Cai Highway Project Package A1: Km 0-080 ~ 26+700 To attend Contractor’s safety meetings, when called upon, and to safety meetings for all his employees To r ectify u c nsafe a Manager and/or his staff To maintain good housekeeping R e p o r t a l l immediately To seek first aid for all injuries, however slight, at the first aid station To be entirely responsible for the implementation of safety measures and full compliance with regulations o h c f i is r ompany o b h a n espect all his employees To ensure that all staff and worker engaged on the project are in sound health and capable of carrying out there duties h onditions w r a c c i d e n t s t o b nd c t h e azards S hen C o n t r a c t o r ’ s S a f e t y 2.1.6 Operators / Workers Operators o w w r orkers w t p orking e e ith a r ools, f lant, q their health and safety with others working around them Therefore, there should be sufficient instructions provided to them They shall be respo followings: Use proper, correct and well-maintained tools and equipment for the jobs Wearing of efficient safety helmets and where necessary eye, goggles, ea protec tion, s afet y harnes s es and other pe rsona l protec tion e quipme nt for all personnel Maintain and keep tools in good condition at all times Report d i efects p o e to Supervisor Avoid improvising work which entails unnecessary risk Revision B1: 15 September 2009 n lant o a p r quipment r t h a s r Page ny oten Noi Bai – Lao Cai Highway Project Package A1: Km 0-080 ~ 26+700 Refrain abuse of welfare facilities Suggest ways for eliminating hazards Project Safety Plan POS-PSP-B1-EN Safety Instruction and Training The Safety Education shall be enforced for workers throughout the daily activities, while it raises safety consciousness of workers to prevent accident a) Orientation for the Newcomers Newcomer shall have an orientation directed by the Safety Engineer or group leader to be familiar with working atmosphere b) Education for a New Activity/Method A group leader shall give a description of an activity with tips of safety maters to eliminate any of unsafe factors 3.1 Instruction and Training on the Job Safety m eetings s o r cheduled b s b h na l egular o am asis hall for a S ll E ite o ngineers t P t r n p he a roject t p a o f eview new or changed operations and establish safe wor anticipated hazards Everyone required entering confined or enclosed spaces or atmospheres with immediate danger to life, shall be instructed as to the hazards involved and precautionary measures to be taken Training by qualified person on the use and c oares e f uch a p mergency e s ndb c rotectiveA quipm POSCO E&C staff shall comply with all specific regulations in dangerous or potentially dangerous areas All employees who have to handle poisons, caust substances, a r tre r equired i r o eceive t s h nstruction a use Information and knowledge on the potential hazards, personal hygiene, protective equipment and other personal protective measures required Revision B1: 15 September 2009 Page 10 Noi Bai – Lao Cai Highway Project Package A1: Km 0-080 ~ 26+700 10 11 12 13 Project Safety Plan POS-PSP-B1-EN Hook condition - swivel hook, wire sleeve, bearings a) Main hook b) aux hook Out rigger condition - hydraulic ram condition, footing pad condition Safety switch: a) Over hoist limit switch at boom top b) Should activate when the hook touches the anti tool block c) Reverse alarm switch - audible noise when crane reversing d) Horn and flashing light, during operation Lifting capacity table should be installed in operators cabin Load indicator in operator box Boom angle indicator to be installed on side of boom base For handling of steel structure, sling belts is required to prevent slippage of structure pieces For l ifting o l h f o ong, i w seavy l r p tems- o m ithw pecific or sling belts shall be used For sling belt, specific type of shackle for use with sling must be used All chain, wire rope, nylon slings to be used must be in good condition, and be accompanied by recent test certificate 7.4 Tools and Equipment Inspections All t ools ( eelectric, h xplosive, p g a ydraulic, e e neumatic, for electrical distribution, welding, oxyacetylene girder launching, jacking, hoisting, drilling , shall be inspected After a successful inspection a i n t nspection t r t d ago t hose n o t ecords n o he: ate company, e d xpiry w b a ate,t t e ill e T ttached a e to he quipm fail inspections will be removed from service 7.5 Site Inspections of Tools and Equipment During the daily and weekly safety inspections on site by the safety Department, special attention will be given to: the checking of equipment tags, the observation of c orrect u ( se, u oincluding s g t c se o f h afety t a t ear), t he condition and use of non-mechanical equipment such as ladders and scaffolding Any equipment in poor condition will be removed from service by the Department, without any further warning to the Subcontractor Larger equipment that can not be easily removed will be shut down if found to be in poor condition, for example material and personnel hoists, bar cutting machines Revision B1: 15 September 2009 Page 18 Noi Bai – Lao Cai Highway Project Package A1: Km 0-080 ~ 26+700 Project Safety Plan POS-PSP-B1-EN 7.6 Specific Safety Method of specific work items: Specific aSfetyMethod of specific work items shall be submitted separately and s h a l l b e p a r t o f e a c h w o r k s i tr ei omra nPd d u r i n g t h e e x e c u ot ifo tnh es p e c i f i c w o r k ,s b a s i c s a f e t y p r e c a u t i o n s s h a l l b e i m p l e mweonrt ke de ft of i c i e n talnyd t o prevent any accident or casualty Safe Operation 8.1 Lookout men and flagmen Whether lookout men and flag men are required for the protection of suc traffic the contractor shall provide such lookout men and flagmen that necessary for the safety 8.2 Maintenance of facilities Where the construction work interferes with road traffic the contractor shall provide and maintain all necessary barricades, suitable and sufficient lig danger signal and other sign, provide a sufficient number of watchmen and take a n ll ecessary p f t precautions o t w aor t he s orotection the public 8.3 Safety Housekeeping Daily Safety Housekeeping Cycle Keeping the site in a clean, tidy and sanitary condition Rubbish s cle ared dai ly and not all owed t o acc umulat e on s ite and chec king of s afety facilities at the end of the day on daily basis before leaving the site, shall be performed by all workers and checked by their Site Engineers The night shift w ork following the earlier day w ork requires the concluded work done schedule with the daily safety duties carried out Weekly Safety Housekeeping Cycle Before the start of the work on each Monday morning, safety information of the previous week carried out and its activities with the planned schedule for the current week shall be informed to all staff and workers Cleaning of work places by all workers s hall be carried out after the group discussion on Saturday morning before the start of that day’s work Monthly Safety Housekeeping Patrol/Cycle Revision B1: 15 September 2009 Page 19 Noi Bai – Lao Cai Highway Project Package A1: Km 0-080 ~ 26+700 Project Safety Plan POS-PSP-B1-EN Monthly Safety Patrol attended by representatives of VEC and the Engineer shall be carried out with reports prepared by the Safety Manager from these patrols These reports shall be issued to all attendees at the Safety Patrols and also to discuss any issues at the Daily Meeting for follow-up actions The monthly patrol shall be held at end of each month as part of the monthly schedule m w eeting d hereby o s f iscussion a s s / n uggestion schedule relating to the patrol can be taken into action for the f month 8.4 Working at Height Where works are to be carried out at height, scaffolding erec will be carried out at elevated area Safety concerning the erection, maintenance and dismantling of these scaffoldings is mandatory to ensure safe operati site All s caffoldings t b i o e a r nspected/checked i a r b t t egula manufacturers or the legal requirements for well-maintained condition Trained and competent workers with supervision for this work Any deflective parts of the scaffolding materials shall be removed from the storage area Working platform shall be sufficiently strong, properly overloaded with toe-boards to prevent falling objects Erect barricades or overhead shelter wherever practicable to prevent person from being struck by falling objects Open-sides/working platforms h than safe allowable height may be properly barricaded All p ersonnel w a h orking h t w tt peights s gave a a o ear times Routine checks on erected scaffoldings e.g Daily site check, Monthly safety patrol, etc shall inspect such scaffolding to ensure the tag of checks conducted as per requirements Safety n s ets b h hould a t se ung i e round t s a he caffolding height to prevent any falls of materials 8.5 Working around Equipment/Machineries Limitation of working space for works to be carried out within construction site may affect movements of workers As a result, accident may happen when machineries accidentally knocked/hit workers working too close to them If such situation arises, the followings must be observed: Revision B1: 15 September 2009 Page 20

Ngày đăng: 20/11/2023, 21:24

w