method statement for tiling work

Method statement of Tiling work

Method statement of Tiling work

... Service Corporation INTRODUCTION 1.1 PURPOSE This method statement describes the methodology for tiling of wall and floor at SMC project Tiling work will be carried out after all constructions ... well Tiling work will start only the working drawing has been prepared Working drawing will be separate submitted with this document Tiling work will be divided into two stages: firstly tiling ... apply for works at Factory No.1of SMC MANUFACTURING (VIET NAM) FACTORY-PHASE PROJECT Construction Reinforcement Concrete Structure works included: a Pile head treatment b Earth work c Formwork...

Ngày tải lên: 20/10/2016, 15:17

19 677 5
Method statement for ceiling work  Highrise building (english)

Method statement for ceiling work Highrise building (english)

... (PHASE 1A) FOR PROPOSED CONDOMINIUM DEVELOPMENT AT DISTRICT 7, HO CHI MINH, VIETNAM FOR M/S RIVIERA POINT LIMITED LIABILITY COMPANY Riviera Point Project METHOD STATEMENT FOR CEILING WORK Relevant ... (PHASE 1A) FOR PROPOSED CONDOMINIUM DEVELOPMENT AT DISTRICT 7, HO CHI MINH, VIETNAM FOR M/S RIVIERA POINT LIMITED LIABILITY COMPANY Introduction This method statement relates to the Ceiling work The ... (PHASE 1A) FOR PROPOSED CONDOMINIUM DEVELOPMENT AT DISTRICT 7, HO CHI MINH, VIETNAM FOR M/S RIVIERA POINT LIMITED LIABILITY COMPANY Scope of work The main scope of work is Ceiling work [ Site...

Ngày tải lên: 25/10/2018, 08:26

96 230 2
METHOD STATEMENT FOR PAINTING WORK

METHOD STATEMENT FOR PAINTING WORK

... FOR PROPOSED CONDOMINIUM DEVELOPMENT AT DISTRICT 7, HO CHI MINH, VIETNAM FOR M/S RIVIERA POINT LIMITED LIABILITY COMPANY SCOPE This method statement is for the Painting work The working Platform ... and smooth” please specify cover method? Duc, RPLLC Page 14/96 please separate method statement for gondola installation work Duc, RPLLC To provide: -Protection method to material during rainy ... MS for tower crane (General)”, please electric outlet The maximum size of gondola is 0.8mx7.5m Those information can be referred to the presentation data for working platform of architectural works...

Ngày tải lên: 06/01/2020, 17:44

152 31,1K 3
METHOD STATEMENT FOR UNDERGROUND PLUMBING WORK

METHOD STATEMENT FOR UNDERGROUND PLUMBING WORK

... TITLE METHOD STATEMENT FOR UNDERGROUND PLUMBING WORK EPC EPC DOCUMENT No VP1-0-L4-A-UYX-20023 Doosan Heavy Industries and Construction REV B Page | METHOD STATEMENT FOR UNDERGROUND PLUMBING WORK ... SEQUENCE WORK METHOD/ PROCEDURE 7 QUALITY CONTROL 11 ENVIRONMENT, HEALTH AND SAFETY (EHS) 11 Page | METHOD STATEMENT FOR UNDERGROUND PLUMBING WORK 1.0 PURPOSE ... hydrostatic test Page | METHOD STATEMENT FOR UNDERGROUND PLUMBING WORK Pressure test work flow chart: Preparation Filling and Venting Testing & Pressurizing Draining Preparation work - * Document The...

Ngày tải lên: 20/11/2023, 09:37

20 3 0
METHOD STATEMENT FOR TEST PILLING WORK (PREBORING PHC PILE)

METHOD STATEMENT FOR TEST PILLING WORK (PREBORING PHC PILE)

... Phong BOT Thermal Power Plant Project Document Title METHOD STATEMENT FOR TEST PILLING WORK (Pre-boring PHC Pile) Document No Document Type For Approval Returned Status AC Prepared by CRS Issued ... blows is around 10 blows/time for this test piling work The standard of Light blow(hammering height, rebound) for mass piling work shall be decided by this test piling work 20/03/2020 Just using ... Document supplement: - Welding work and inspection shall be in accordance with the Welding inspection report on ITP for this test piling work - Each layer welding work shall be done continuously...

Ngày tải lên: 20/11/2023, 09:38

131 6 0
METHOD STATEMENT FOR PERMANENT PILLING WORK ON SHORE

METHOD STATEMENT FOR PERMANENT PILLING WORK ON SHORE

... Title Van Phong BOT Thermal Power Plant Project Document Title METHOD STATEMENT FOR PERMANENT PILLING WORK [ON SHORE] Document Type For Approval Document No VP1-0-L4-C-GEN-10021 Returned Status ... when the piling work to be carried out in different condition of ground level Chimney area the working plan was mention in VP1-O-L4-C-UHN-10054 Working plan of excavation works for Chimney 02/06/2020 ... Clarify code/standard for this requirement The frequency of MT test will be clarified and described in ITP for permanent piling work 02/06/2020 15 Testing for lateral and tension forces need to be...

Ngày tải lên: 20/11/2023, 09:39

53 8 0
METHOD STATEMENT FOR CONCRETE REPAIRING WORK

METHOD STATEMENT FOR CONCRETE REPAIRING WORK

... Project Title Van Phong BOT Thermal Power Plant Project Document Title METHOD STATEMENT FOR CONCRETE REPAIRING WORK Document Type For Approval Document No VP1-0-L4-C-GEN-10025 Returned Status NA Prepared ... primer layer 13 Before any remedial measure the cause of the crack needs to be assessed Lot4 revised in revision B 13/05/2020 O Closed 14 Missing method to repair crack for the floor for example in ... propose method for case by case specification 13/05/2020 15 Water leak test is needed after treatment Please add Lot4 revised in revision B 13/05/2020 16 11 Supplement repair method for Scaling...

Ngày tải lên: 20/11/2023, 09:40

22 5 0
METHOD STATEMENT FOR CW PIPE LINE CIVIL WORK

METHOD STATEMENT FOR CW PIPE LINE CIVIL WORK

... Earth works – Construction, check and acceptance 2.2 Drawing and Method Statement • VP1-0-L4-C-GEN-10007_ Rev C_ Method statement for General concrete work • VP1-0-L4-C-GEN-10008_ Rev B_ Method statement ... Backfilling Works D.1 Slip and trip of workers D1 Implement method statement / procedures on safe backfilling works D.2 Fall of workers and tools /equipment D.2a Strict supervision during backfilling works ... Safety boots for concrete activity - Role type working Set proper working shift (routines) for each team to prevent fatigue due to long time working - Wash hand, clean face and mouth before drink...

Ngày tải lên: 20/11/2023, 09:42

65 7 0
Ol1 2d34 010004 0 method statement for pile pressing work r2 15 apr 20

Ol1 2d34 010004 0 method statement for pile pressing work r2 15 apr 20

... PLANT METHOD STATEMENT FOR PILE PRESSING WORK Page of 54 EPC Project No :036909C SUBCON Doc No.: PTSCTPSK-D34-010004 SCOPE OF WORK/ PHẠM VI CÔNG VIỆC This Methoddescribes the pile installation work ... A1: OLEFINS PLANT METHOD STATEMENT FOR PILE PRESSING WORK Page of 54 EPC Project No :036909C SUBCON Doc No.: PTSCTPSK-D34-010004 DOCUMENT INFORMATION The following required information is minimum ... PLANT Rev Page of 54 PILE PRESSING WORK EPC Project No :036909C SUBCON Doc No.: PTSC-TPSK-D34010004 METHOD STATEMENT FOR PILE PRESSING WORK & PILE CUTTING WORK SUBCONTRACT DOCUMENT REVIEW Long...

Ngày tải lên: 20/11/2023, 09:48

54 6 0
METHOD STATEMENT FOR PLASTERING & SKIM COAT WORK

METHOD STATEMENT FOR PLASTERING & SKIM COAT WORK

... 10/127-what is purpose of showing brickwork workforce? It’s the proposal manpower configuratio (Pg.7) Lim, RPLLC Please separate the work method for plastering & skimming works Lim, RPLLC To describe how ... 1A) FOR PROPOSED CONDOMINIUM DEVELOPMENT AT DISTRICT 7, HO CHI MINH, VIETNAM FOR M/S RIVIERA POINT LIMITED LIABILITY COMPANY Riviera Point Project METHOD STATEMENT FOR PLASTERING & SKIM COAT WORK ... to be applied before plastering at positions where brick wall is cut for installing concealed conduct Please show the typical detail of this case ⑦ Please refer to MoS for Brick Works Rev_D page...

Ngày tải lên: 06/01/2020, 17:44

133 28,3K 3
METHOD STATEMENT FOR SHOWER SCREEN WORK

METHOD STATEMENT FOR SHOWER SCREEN WORK

... (PHASE 1A) FOR PROPOSED CONDOMINIUM DEVELOPMENT AT DISTRICT 7, HO CHI MINH, VIETNAM FOR M/S RIVIERA POINT LIMITED LIABILITY COMPANY Riviera Point Project METHOD STATEMENT FOR SHOWER SCREEN WORK Relevant ... 1A) FOR PROPOSED CONDOMINIUM DEVELOPMENT AT DISTRICT 7, HO CHI MINH, VIETNAM FOR M/S RIVIERA POINT LIMITED LIABILITY COMPANY Introduction This method statement relates to the installation work for ... FOR PROPOSED CONDOMINIUM DEVELOPMENT AT DISTRICT 7, HO CHI MINH, VIETNAM FOR M/S RIVIERA POINT LIMITED LIABILITY COMPANY Definition & Abbreviation The abbreviations are used for this method statement, ...

Ngày tải lên: 06/01/2020, 17:45

150 28,2K 2
bien phap thi nghiem dong bien dang lon pda method statement for pile driving analysis pda  985

bien phap thi nghiem dong bien dang lon pda method statement for pile driving analysis pda 985

... head treatment worksalso carry out before PDA test for workin g pile Description of work sequence is as follows: 3.2.1 Preparation of PDA Testing 3.2.1.1 Preparation of pile head: For working pile, ... minimum drop of hammer is 2.0m Equipment of PDA test TEST METHODS 3.1 WORK FLOW Work flow is as follows 3.2 DESCRIPTION OF WORK SEQUENCE Before carrying out PDA Test, Proof coring of pile toe,Crosshole ... construction methods to meet theserequirements correspond to chapters and sections in thefollowing table: N o Requirements Implement ationplan – reference section The scope of work in the method statement...

Ngày tải lên: 17/01/2019, 10:43

17 172 0
METHOD STATEMENT FOR AUXILIARY BOILER INSTALLATION (BIỆN PHÁP lắp đặt lò hơi PHỤ KHỞI ĐỘNG)

METHOD STATEMENT FOR AUXILIARY BOILER INSTALLATION (BIỆN PHÁP lắp đặt lò hơi PHỤ KHỞI ĐỘNG)

... LP1-LLM-10QHA-M-M1A-CMS0001 METHOD STATEMENT FOR AUXILIARY BOILER INSTALLTION Revision: A Page of 44 Date:02/05/201 PURPOSE/ MỤC ĐÍCH The purpose of this method statement for Auxiliary Boiler installation ... Safe work Method statement procedure LP1-PTSC-10XXX-QA-G1-PRO-0003 Welding Control Procedure LP1PP PM-PTSC LONG PHU THERMAL POWER PROJECT Document No: LP1-LLM-10QHA-M-M1A-CMS0001 METHOD STATEMENT ... Revision: A METHOD STATEMENT FOR AUXILIARY BOILER INSTALLTION Page of 44 Date:02/05/201 LP1PP PM-PTSC LONG PHU THERMAL POWER PROJECT Document No: LP1-LLM-10QHA-M-M1A-CMS0001 Revision: A METHOD STATEMENT...

Ngày tải lên: 28/11/2020, 16:24

47 176 4
Bien phap thi cong lap dat thiet bi ve sinh METHOD STATEMENT FOR SANITARY FIXTURE INSTALLATION

Bien phap thi cong lap dat thiet bi ve sinh METHOD STATEMENT FOR SANITARY FIXTURE INSTALLATION

... of Works/Phạm vi công việc: - This method statement covers work related to provide guideline for the implementation of quality assurance on Plumbing & Sanitary Installation work to ensure conformance ... in charge of the works with all the staff concerned by this activity to explain and remind for the Method Statement (MS), Inspection & Testing Plan (ITP), Safety Produce: Method statement sanitary ... 3.3 Sequence of work/ Quy trình cơng việc 3.3.1 Preparation of Work for Site Fabrication/ Việc chuẩn bị cho công tác gia công công trường - Preparation work shall be carried out by workers Công...

Ngày tải lên: 21/03/2021, 15:17

17 66 1
Method statement for construction of access bridge by MVV

Method statement for construction of access bridge by MVV

... O&M GmBH Scope This document describes the procedures and method of work for carrying out the construction works for the new access bridge for the Energy From Waste CHP Facility at Devonport with ... of which is wide enough for two way traffic Furthermore the bridge structure that forms the northern crossing has a weight limit of 1.5 tons and is therefore unsuitable for vehicles larger than ... to a level suitable for the piling mat and formation for the abutment base If necessary, the sheet pile wall may be extended to the sides to ensure the stream is protected for the full width of...

Ngày tải lên: 17/10/2022, 09:03

12 3 0
METHOD STATEMENT FOR 800MM BORED PILE CONSTRUCTION wadrillco original MS

METHOD STATEMENT FOR 800MM BORED PILE CONSTRUCTION wadrillco original MS

... out rapidly Method Statement for Bore Pile works Project : PHU MY BRIDGE PHU CUONG Co., Ltd • • • • • • • • STEP - - TREATMENT OF BENTONITE SLURRY Recovered bentonite will be treated for re-use ... will be used for backfilling This will be carried our about 24 hours after the poured concrete has hardened STEP 10 MONITORING, RECORDING AND SAMPLING Method Statement for Bore Pile works Project ... that correction procedures promptly undertaken should the necessity arise. (for wet hole) Method Statement for Bore Pile works Project : PHU MY BRIDGE PHU CUONG Co., Ltd Boring will stop when...

Ngày tải lên: 08/09/2014, 09:44

15 2,8K 2
METHOD STATEMENT FOR PRESSURE TEST ( MONG DUONG 1)

METHOD STATEMENT FOR PRESSURE TEST ( MONG DUONG 1)

... MD1-0-T-054-05-00195 METHOD STATEMENT FOR PRESSURE TEST Rev A Page of 17 Mong Duong1 Thermal Power Plant Project METHOD STATEMENT FOR PRESSURE TEST REV DATE DESCIPRITON BY CHECKED APPROVED A Dec 17, 2012 ISSUE FOR ... Scope  This method statement describes the instructions for general requirements of pressure test of piping for the TWO(2) X 500 MW Mong Duong Thermal Power Plant  This method statement shall ... installing work METHOD STATEMENT FOR PRESSURE TEST Doc No.: MD1-0-T-054-05-00195 Rev A Page of 17 4.4 Piping Engineer The Piping Engineer shall perform installation of piping and field work for pressure...

Ngày tải lên: 15/01/2016, 20:46

21 1,9K 13
METHOD STATEMENT FOR STORAGE TANKS

METHOD STATEMENT FOR STORAGE TANKS

... Acid plant METHOD STATEMENT METHOD STATEMENT FOR STORAGE TANKS WITH ROOF Rev-0 Page 10 1500 MTPD Phosphoric Acid plant 4500 MTPD Sulphuric Acid plant METHOD STATEMENT METHOD STATEMENT FOR STORAGE ... Thick = 3.617 Tones METHOD STATEMENT FOR STORAGE TANKS WITH ROOF Rev-0 Page 1500 MTPD Phosphoric Acid plant 4500 MTPD Sulphuric Acid plant METHOD STATEMENT METHOD STATEMENT FOR STORAGE TANKS WITH ... MTPD Sulphuric Acid plant METHOD STATEMENT METHOD STATEMENT FOR STORAGE TANKS WITH ROOF Rev-0 Page 14 1500 MTPD Phosphoric Acid plant 4500 MTPD Sulphuric Acid plant METHOD STATEMENT Complete erection,...

Ngày tải lên: 25/08/2016, 22:05

27 1,2K 0
Method Statement of Painting work

Method Statement of Painting work

... apply for works at Factory No.1 of SMC MANUFACTURING (VIET NAM) FACTORY-PHASE PROJECT Construction Reinforcement Concrete Structure works included: a Pile head treatment b Earth work c Formwork ... work Page 22 leaking of and other site clean Action by Forman / Supervisor / Worker Forman / Supervisor / Worker Forman / Supervisor / Worker Forman / Supervisor ... Scaffolding & platform: Safe and adequate scaffolding, platform, ladder will be provided to site before starting painting work They will be installed ready before starting to conform with all applicable...

Ngày tải lên: 20/10/2016, 14:55

22 1,3K 4
GUIDELINES FOR WRITING WORK METHOD STATEMENTS IN PLAIN ENGLISH pdf

GUIDELINES FOR WRITING WORK METHOD STATEMENTS IN PLAIN ENGLISH pdf

... - writing effective work method statements 20 Introduction Why we need work method statements? The purpose of a work method statement is: • to outline a safe method of work for a specific job ... to your situation © WorkCover NSW Contents Page Introduction Part A Suggested proforma Proforma for work method statements Part B Points to remember when writing work method statements in plain ... assurance Remember that a work method statement is part of a site safety plan This plan should include: • Induction Training • Register of Hazardous Substances • Work Method Statement • OHS Procedures...

Ngày tải lên: 19/03/2014, 08:20

24 743 2
w