1. Trang chủ
  2. » Kỹ Thuật - Công Nghệ

METHOD STATEMENT FOR PLASTERING & SKIM COAT WORK

133 28,3K 3

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

THÔNG TIN TÀI LIỆU

Thông tin cơ bản

Định dạng
Số trang 133
Dung lượng 24,11 MB

Nội dung

METHOD STATEMENT FOR PLASTERING & SKIM COAT WORK

Trang 1

Rivera Point Condominium Development

-DESIGN AND BUILD OF MAIN TENDER (PHASE 1A)

FOR PROPOSED CONDOMINIUM DEVELOPMENT AT DISTRICT 7,

HO CHI MINH, VIETNAM FOR M/S RIVIERA POINT LIMITED LIABILITY COMPANY

Riviera Point Project

METHOD STATEMENT FOR

PLASTERING &

SKIM COAT WORK

Construction Manager Engineering Manager Manager Design Manager QC/QA Manager Safety

C 28-Jan-2013 Issue for Acceptance SC Park M.Tan Bernarrd CM Leong

Trang 2

Document Reference and Revision: MS for Plastering & Skim Coat work Rev_A Submission Date: 19-Dec-12

Submission Description: Plastering and Skim Coat

Doc

① What is this (typical)?

② Revise the 5.1 Human Resources (revise No2, No11:why only one?)

③ Revise the 5.2.1 Summary Procedure ( a what is “checking following” b change “brick wall”

c structure clearance? d what is “mixing of cement mortar check time to time inspection”?

④ what is contract specification?(5.3)

⑤ a External mortar admixture? (5.4)

b mix ratio?(5.4)

⑥ Size of Metal mesh? (5.5)

⑦ a How many layer? (5.6) b what kind of nail?

c how to form in-corner bead?(5.6)

⑧ What kind of Sika Latex? (5.7)

⑨ a What is this drawing means?(5.8) b are you sure you want to install surface drainage if necessary? c what is this drawing means at 13page?(5.8)

⑩ a can vinyl sheet last?(5.9), b mixing yard made of timber? c what is this description?

⑪ How you check level in the centre?(5.10)

⑫ a The amount allowed by hand mixing(5.11.1)

b use concrete batching plant?

c how to get uniform color?

① MoS can’t reflect all situations happened on job site, so represent general method, specification, rules when we do the plastering & skim coat

② Please refer to Rev_B 7 th

page (so far, for basement plastering works, we have only one team scheduled According to progress, we submit additional teams for plastering & skim coat)

③ Please refer to Rev_B 9 th

page (a deleted b changed to plastering works” c refer to 27th Page d changed “check mixing of cement mortar”

④ Please refer to Rev_B appendix 5

⑤ a We have no external admixture, Skim coat have functions to resist water

b please refer to Reb_B 10th page

⑥ The size of width is 150, 75mm

⑦ a 2 layers b we submit the sample of nail, not yet approved c we will propose the detailed drawing before we make the mock up unit

⑧ Bonding agent mixed with cement mortar, and use named

“ sika latex Refer to annex6 99th page”

⑨ a The drawing shows transportation method by manpower

⑫ a under 0.036M3 of mortar quantity can use hand mixing

b mostly use mechanical mixer

Trang 3

mixing same time to get uniform color

d we will train the workers who control the mechanical mixer

A

① How many layers?, how thick?(5.11.2)

② Leveling peg: cement mortar or brick pat paste?(5.12)

③ Where is corner bead?(5.12)

④ a Render?, two coats, spattering dash coat & finished coat?(5.13)

b To separate internal & external plastering

c rc wall, brick wall?

d greater than 3.2m, shall be provided stiffener colum?

⑤ Is this plastering works description?(5.14,15,16,17, 18,19,20,23,24)

⑥ a Test report?, b tolerance?(5.25)

⑦ a What is all material t?(5.27)

b tolerance ?

① 2layers, internal thk is19mm, external thk is 20mm Skim coat thk is 1~3mm depending on surface condition

② Cement mortar will be used as Leveling peg

③ There is no corner bead

④ a Render mean plastering,

b one trade has combined into one MoS, if separate it has many duplicated pages internal and external plastering difference is only thk

c refer to Rev_B at 19th page

d irrelevant description, deleted

⑤ the description is for brick works deleted

⑥ a please refer to Rev_B’s appendix 4

b please refer to Rev_B 23th page

⑦ a main materials as cement, sand, metal mesh, nail

b moved to 5.25

Reviewer’s suggested status code for this revision only:

ICIC Consultant TYLIN Structural

Review Consultant

JRP MEP Review Consultant

KPK Cost Consultant Other (state)

Oth

er (stat e)

This section is to record the reviewing party’s suggested status code only: the official status code for the submitted item is recorded on the first sheet of this document

Trang 4

Document Reference and Revision: MS for Plastering & Skim Coat work Rev_A Submission Date: 19-Dec-12

Submission Description: Plastering and Skim Coat

② Based on item 9 of Plastering Specification, there are two coats of plastering with total thickness is 19mm Why is your MOS 15mm (page 11/121)?

③ Page 12/121: The cement bags are stored on slab with 05 bags height, it means that about 500kg/m2 Please check with allowed live load of design whether it is overloaded for slab?

④ Mortar which is used for spatter-dash has to mix with bonding agent Sika Latex

⑤ Item 5.15; 5.16 are belonged to brick work MOS Why does SSY indicate in plastering MOS?

⑥ Item 5.25: Tolerance in plane is 10mm per 3m is not accepted

Since based on TCVN 5674-1992 it only allowed 2mm per 2m

⑦ Metal lath has to be applied before plastering at positions where brick wall is cut for installing concealed conduct Please show the typical detail of this case

⑧ It is not allowed to apply dry mortar on wet mortar which has high slump in order to avoid crack and hollow

⑨ For RC wall without plastering: Please state how to control to plastered layer of brick wall and concrete bare surface of RC wall are in line? And please provide detail of joint between plastered layer of brick wall and concrete bare surface of RC wall?

① Cement : sand= 1:4 is correct according to Specification Clause “plastering & Wall Tiling”

② Internal wall thk is 19mm, external wall thk is 20mm

③ Slab can bear 450kg/m2 according to structure design brief 7 th page, so within 9bags in 1m2 is safe

④ Revised Bonding agent mixed with cement mortar for plastering

Trang 5

Document Reference and Revision: Submission Date: 03-Jan-13

Submission Description: MS – Typical Plastering & Skim Coat Work

Doc

1 1 Lim, RPLLC Page 3/127 in item 4.1, provide the actual brand name of the materials for plastering skimming works Material brand is SEAMASTER

1 2 Lim, RPLLC Page 10/127-what is purpose of showing brickwork workforce? It’s the proposal manpower configuratio (Pg.7)

1 3 Lim, RPLLC Please separate the work method for plastering & skimming works We will prepare the separately method

1 4 Lim, RPLLC To describe how to mix the mortar Eg how many bags of cement, bucket of sand and how much water for 1 batch

1 batch of plastering mortar includes:

- 1 Cement bag, to be batched in 2 buckets (the 18liters – bucket)

- Sand: 8 buckets

- Water: 34 litre

1 batch of binder mortar includes:

- 1 Cement bag, to be batched in 2 buckets (the 18liters – bucket)

- Sand: 8 buckets

- Water: 29 litre

1 5 Lim, RPLLC There are groove line for external wall, please include installation of groove line strips in external plastering works Inserted accordingly (Pg 78)

1 8 Tuan/Tan, ICIC Please use sand specification TCVN7570:2006 & TCXD127:1985 for mortar We will comply

1 9 Tuan/Tan, ICIC Please provide treatment tie line between plastered brick wall and bare concrete surface (without plastering) because shrinkage crack will be

1 10 Tuan/Tan, ICIC SSY is required to test mortar (test result of trial mix) before using We will comply

Reviewer’s suggested status code for this revision only:

Trang 6

Rivera Point Condominium Development

-DESIGN AND BUILD OF MAIN TENDER (PHASE 1A)

FOR PROPOSED CONDOMINIUM DEVELOPMENT AT DISTRICT 7,

HO CHI MINH, VIETNAM FOR M/S RIVIERA POINT LIMITED LIABILITY COMPANY

Project : Riviera Point Condominium Development

6 Plant & Machinery

7 Communication : Call-up List

8 Power

9 Lighting

10 Access and Egress

11 Emergency Preparedness

12 Risk and Control

Trang 7

Rivera Point Condominium Development

-DESIGN AND BUILD OF MAIN TENDER (PHASE 1A)

FOR PROPOSED CONDOMINIUM DEVELOPMENT AT DISTRICT 7,

HO CHI MINH, VIETNAM FOR M/S RIVIERA POINT LIMITED LIABILITY COMPANY

Appendix 1 ……….… Risk Assessment & Job Safety Analysis

Appendix 2 ………… ………Organization Chart

Appendix 3 ……… Drawings

Appendix 4 ……… ……… … Check list

Appendix 5 ……… ……… Specification

Appendix 6 ……… ……… Material safety data sheet

Appendix 7 …….…… ……… First Aid Plan

Appendix 8 …….……… Material Specification

Trang 8

1

Introduction

The project site is located in District 7, HCMC of Vietnam

We recognize that safety, health and environment (SHE) are primary premise in all decisions, being made for successful construction and shall comply with the relavant local authorities of Ho Chi Minh City, Socialist Republic of Vietnam

We will develop the construction method with the focus to avoid any harm to the health and safety of owner’s personnel, contractor employees and the public and also to minimize adverse effect to the natural and around environment

All necessary specifications, inspection and quality control will be complied with the contract documents, specification

If there is any discrepancy in the descriptions below, it will be designated by RPLLC

2

The abbreviations are used for this method statement, as shown below :

Definition & Abbreviation

1) Project Definition

- Project: Riviera Point Project (Phase 1A)

- Main-Contractor: Ssangyong Engineering & Construction Co.Ltd

2) Project Abbreviation

- PD: Project Director, PJC: Project company, KPLS: Keppel Land Safety team

- SHE: Safety Health Environment, RFT: Raft, SAC: Safety Awareness Center

- QA: Quality Assurance, QC: Quality Control, QS: Quality Surveyor

- DWG: Drawing, BSMT: Basement, FDN: Foundation, BLK: Block,

Trang 9

[ Site Location of Riviera Point Project ]

3

Scope of work

Trang 10

4

4.1 Materials for Plastering work

Resources (Materials, Equipments & Human Resources)

4.2 Equipments for Plastering work

Trang 11

12 Hacking machine 2010 set 5

4.3 Plan of Vertical supplying material by Hoist

Hoist will be reach 4 levels below from the level that is in progress of RC Work

Hoist

Material

Trang 12

4.10 Equipment Location & Lifting Loading Chart

4.11 Losistics Plan for Item

Trang 13

4.12 Losistics Efficiency Chart

4.13 Hoisting time schedule

Trang 14

5

5.1 Human Resources – Deployment of Manpower

Sequence of work

Trang 15

For site Organization Chart, please kindly refer to Annex 2

1) Brick work Workforce Configuration (Engineer : 1 shift)

Trang 16

5.2 Working Flow Chart

5.2.1 Summary Procedure of Plastering working for 1 cycle

PLASTERING WORKS

FINISH

COMPLETE PLASTERING

SAND & OTHER

admixture, mesh, anchor.)

NOTE: Inspection of Debonding

surface should be after totally cured

before application of painting and

or other finishing works

INS : INSPECTION

START

AREA REPARATION

EMBEDDED PIPE OF M&E SERVICES

FIXING OF LEVEL PEG &

Trang 17

floor.Clearing of area in any obstruction prior to plastering Spatter dash on

Removing of debris & laitance Removing & clean of all loosed mortar on

concrete surface if necessary

Fixing of internal or external corner bead and other accesoriec

Installation of metal lath Setting out groove line and or knife joint if necessary

5.3 Specific standard

Mortar M1 shall be used to internal( thk 19mm)

Cement Approved Brand ( Fico, Holcim, Nghi Son or

Sand

Rough sand shall be clean, natural, uncrushed or partially crushed sand of a light color, free from organic matter, suitable for use in plastering and approved by the Engineer

Water Shall be clean

Strength Composition Cement / Dry Sand = 1 /4

Trang 18

5.5 Metal Lath(mesh)

- Local normal metal lath

- Width : 150mm, 75mm

- Supplier : Ly Quoc Phong Co., ltd

5.6 Metal Lath(mesh) position

Trang 20

5.7 Bonding Agent

- Supplier : Vinkems, Sika Co., LTD

5.8 Material handling, storage and delivery

crane, tower crane, fork lift and/or by manual as appropriate

above ground level and covered by plastic protection in order to prevent water The bagged cement shall be stored in piles not more than 9 bags within 1M2

Trang 21

 Skim coat material, local normal metal lath, nails, etc shall be stored in

a dry place

the materials

Trang 22

5.9 Mixing Yard Preparation

waterproofing, but shall have vinyl sheetI(or plywood) and mortar backing, curb around mixing yard by brick wall 100mm height(or timber have same height), 120mm width and render both side shall be provided

M&E section to install water supply pipe and drain system

5.10 Preparation of works

efflorescence, and any other deleterious substance prior to commencement of rendering

the joint with a strip of expanded metal lath 150 mm wide The expanded metal

and have sufficient depth to permit satisfactory concealment without surface

Trang 23

blemish to plastering coat

(external) mortar grout

scaffolds and work platform with enough strong handrails

Trang 24

5.11 Construction method

5.11.1 Use of Mortar

only for small quantity

plant until attaining uniform color, and the correct amount of water shall be added to achieve workability

within 120 minutes shall be discarded as “Reject”

discarded

( 0.036m3) mixed with 4 gauge box (0.162m3) of sand

Trang 25

5.11.2 Thickness of plastering

Trang 26

5.12 Leveling Peg

and also identify the thickness of plastering

paste on to the wall surface at the size of 30 x 30 mm, with its outer most point indicating the wall finish surface

100 mm away from finished wall surface

weight to make another leveling pegs

length of the spatula which is used to spread mortar to its finish surface

Trang 27

5.13 Application of Plasering to Walls, Ceilings, Parapets, Beams and columns

Plastering works shall be applied two layer of plastering & finished paint

bedded compactly

Trang 28

 All frames shall be carefully fixed and stayed in position and shall be anchored into walls, one end securely to frame, and other end built into joints of masonry Anchors shall be spaced as shown on the drawings

Trang 29

5.14 Mock-up Location:

plastering to demonstrate the proposed quality of materials and workmanship for approval at Site

for all of the plastering works for this project

5.15 Inspection for concrete block:

checking list

arranged well co-ordinate to proceed smoothly

5.16 Inspection for plastering materials:

in plane shall not exceed as below

- 3mm per 2 meter : good plastering

Trang 30

5.17 Defective recovering works

5.17.1 Check for Defective Works ( by check list )

5.17.2 Remedial Action for Debonding Plaster Area

rectangle with edges under-cut to form a dovetail

manner as specified for the original work

the surrounding work

5.18 Quality control plan

Trang 31

5.18 Quality control plan

approval prior to use on site

Trang 32

5.19 Safety Plan

No JOB STEPS

HAZARDS

A Identify List Personnel Required:

- Supervisors, Foreman,

- Workers, Laborers

Personnel that have attended the project HSE induction and are familiar with the task to be performed and JSA that supports the work and addresses the hazards identified in the process

Forman / Supervisor

Personal protective equipment will be issued as

a last defense mechanism in the protection of personnel from hazards identified in the process of the activities All personal protective equipment issued to personnel shall be of a standard, which is fit for purpose, inspected and found to be free from damage, instruction

in its use and fitting has been given to each employee issued with it

Forman / Supervisor / Worker

inspection by the project plant group to ensure the equipment does not expose the personnel or the environment to risk of danger

or contamination

Forman / Supervisor

B

Storage-Moving Handle Moving Ensure workers wear safety gloves, eyes protection etc…

Stack of bricks in tidy

When lifting, keep back straight and lift with legs not back Never twist when lifting

Clear access all times

Forman / Supervisor / Workers

personal

Install sign board at the edge for the warning at height

Forman / Supervisor / Workers

Materials drop down from

Trang 33

Collapse of Wet Wall in Heavy

Wind and Rain

The high of the wet wall is not over 2m for each bricklaying time

The second time bricklaying must be continued next day

The brick wall must be covered by plastic sheet

in heavy rain

Forman / Supervisor / Worker

Defective of Hand Tools,

Materials and Equipments

Inspect hand tools materials at daily prior to starting work

Mark defective hand tools, material and place it out of service

Forman

Lighting Good lighting during time of darkness Forman /

Supervisor / Worker

Electricity Check equipment daily for defects

Always earth ground welding generator sets, the cable do not cause a trip hazard at the work site

Forman / Worker

Cement Dust in Mechanical Mixing

Ensure workers wear safety PPE all times to avoid cement dust and wet mortar Forman / Worker

Completion & Cleaning

Up Always clean the work site of debris andrubbish upon completion.Always roll back cables and

power leads andstore tidy.Ensure the supervisor inspects the jobs site oncompletion

Forman /Supervisor / Worker

T H E S A F E T Y M A N A G E M E N T

Trang 34

5.20 Datum control

5.30.1 Controling of Line offset & marking

checked

Laser Perpedticuler Instrument

Hole ø100

Trang 35

by Laser perpendicular instrument

5.21 Material Lifting

Trang 36

0989 798928

Site Engineer Pham Cong Hoan

GROUP 1

Supervisor Tran Van Ha

Trang 37

6.2 Organization chart for Electrical emergency network

Notice.:

Auto Transfer Switch inside

MR Tai0909-919-309

ENGINEER

MR CHUNG98-322-3077SUPERVISOR

012-0301-8041

MR LEEM&E MANAGER

ASSISTANT MANAGER

MR KIM

0913-897-712

MR HoangLocal manager0120-333-2415

Trang 38

6.3 Configuration for Safety manager

Trang 39

7

7.1 Temporary Power Supplying Plan

Power

temporary power from the generator, Its specification is shown as below

In case of Black out

Trang 40

7.2 Power Supplying Circuit & Lighting Circuit

Distributor

Distributor

Main Distributor Distributor

Ngày đăng: 06/01/2020, 17:44

TỪ KHÓA LIÊN QUAN

w