CONSTRUCTION METHOD STATEMENT FOR BORED PILE WORK EMPLOYER : PROJECTS MANAGEMENT UNIT NO. 2 (PMU 2) CONSULTANT: SMEC INTERNATIONAL PTY LTD. IN ASSOCIATION WITH APECO CONTRACTOR : : SONG HONG – TRI CO – THANH NAM JOINT OPERRATION

Trang 1

ROAD NETWORK IMPROVEMENT PROJECT NETWORK IMPROVEMENT PROGRAM

Contract package NIP/CP-14A: rehabilitation of national highway no.39-2

Trieu duong – diem dien SECTION

-***** -CONSTRUCTION METHOD STATEMENT

FOR BORED PILE WORK

EMPLOYER : PROJECTS MANAGEMENT UNIT NO 2 (PMU 2)

CONSULTANT: SMEC INTERNATIONAL PTY LTD IN ASSOCIATION WITH APECO CONTRACTOR : SONG HONG – TRI CO – THANH NAM JOINT OPERRATION

NOVEMBER, 2008

ROAD NETWORK IMPROVEMENT PROJECT NETWORK IMPROVEMENT PROGRAM

Contract package NIP/CP-8: rehabilitation of national highway no.39-2

TRIEU DUONG – DIEM DIEN SECTION

-***** -CONSTRUCTION METHOD STATEMENT

FOR BORED PILE WORK

EMPLOYER : PROJECTS MANAGEMENT UNIT NO 2 (PMU 2)

CONSULTANT: SMEC INTERNATIONAL PTY LTD IN ASSOCIATION WITH APECO CONTRACTOR : : SONG HONG – TRI CO – THANH NAM JOINT OPERRATION

For Contractor For Consultant FOR EMPLOYER

Nguyen Van Thanh

NIP/

CP14A