Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống
1
/ 25 trang
THÔNG TIN TÀI LIỆU
Thông tin cơ bản
Định dạng
Số trang
25
Dung lượng
7,03 MB
Nội dung
RIVIERA POINT CONDOMINIUM DEVELOPMENT DESIGN AND BUILD OF MAIN TENDER (PHASE 1A) FOR PROPOSED CONDOMINIUM DEVELOPMENT AT DISTRICT 7, HO CHI MINH, VIETNAM FOR M/S RIVIERA POINT LIMITED LIABILITY COMPANY Riviera Point Project METHOD STATMENT FOR STONE WORK Relevant part reviewed by Checked by Prepared by Dept JY Lee QC/QA Safety Construction Engineering H Thu A Duc OJ Cho YC An Approved (by) Rev S1 Date 07-Nov-2013 Description Issue for Acceptance Project : Riviera Point Condominium Development Produced by : Ssangyong E&C Assessment Duration : 7days Document No : Refer to the submital list Ssangyong ICIC KLV Safety RPLLC SC Park M.Tan Bernarrd CM Leong RIVERA POINT CONDOMINIUM DEVELOPMENT DESIGN AND BUILD OF MAIN TENDER (PHASE 1A) FOR PROPOSED CONDOMINIUM DEVELOPMENT AT DISTRICT 7, HO CHI MINH, VIETNAM FOR M/S RIVIERA POINT LIMITED LIABILITY COMPANY CONTENTS Please! Refer to the MS for tiling work (General) * ANNEXS … Overview Drawings 1.1 … The process of the coating sealer at the factory 1.2 … The process of the screeding 1.3 … The process of the stone tiling … Certification Project:Rivera Point Condominium Development Produced by:Ssangyong E&C Assessment Duration : 7days Document No : Refer to the submital list RIVIERA POINT CONDOMINIUM DEVELOPMENT DESIGN AND BUILD OF MAIN TENDER (PHASE 1A) FOR PROPOSED CONDOMINIUM DEVELOPMENT AT DISTRICT 7, HO CHI MINH, VIETNAM FOR M/S RIVIERA POINT LIMITED LIABILITY COMPANY ANNEX Overview Drawings Project : Rivera Point Condominium Development Produced by : Ssangyong E&C Assessment Duration : 7days Document No : Refer to the submital list SsangYong E&C 3/25 07.11.2013 RIVIERA POINT CONDOMINIUM DEVELOPMENT DESIGN AND BUILD OF MAIN TENDER (PHASE 1A) FOR PROPOSED CONDOMINIUM DEVELOPMENT AT DISTRICT 7, HO CHI MINH, VIETNAM FOR M/S RIVIERA POINT LIMITED LIABILITY COMPANY ANNEX 1.1 The process of the coating sealer at the factory Project : Rivera Point Condominium Development Produced by : Ssangyong E&C Assessment Duration : 7days Document No : Refer to the submital list SsangYong E&C 4/25 07.11.2013 A B C DEVELOPER / LANDOWNER: brush CONCEPT ARCHITECTS STRUCTURAL DESIGN REVIEW VIETNAM CO.,LTD civil I structural I engineers I geotechanical I electrical M&E DESIGN REVIEW J ROGER PRESTON (Vietnam) Co ltd Stone ( Granite ,marble) LANDSCAPE ARCHITECTS SITE CONCEPTS INTERNATIONAL INTERIOR DESIGN SUYING DESIGN PTE LTD LOCAL ARCHITECTS STRUCTURE - ME At Factory MAIN CONTRACTOR SUBCONTRACTOR KEY PLAN 1st STEP: CLEANING STONE SURFACE CƠNG TRÌNH: PROJECT TITLE : 5/25 Residential Area of Riviera Point TÊN BẢN VẼ/ DRAWING TITLE: LE HONG AN SsangYong E&C KHU DÂN CƯ RIVIERA POINT NGUYEN PHUONG VU 07.11.2013 NGUYEN PHUONG VU A S-125 (1st layer) A B C Stone THK 20mm DEVELOPER / LANDOWNER: CONCEPT ARCHITECTS S - 125 STRUCTURAL DESIGN REVIEW VIETNAM CO.,LTD civil I structural I engineers I geotechanical I electrical M&E DESIGN REVIEW J ROGER PRESTON (Vietnam) Co ltd LANDSCAPE ARCHITECTS SITE CONCEPTS INTERNATIONAL INTERIOR DESIGN SUYING DESIGN PTE LTD LOCAL ARCHITECTS STRUCTURE - ME At Factory Note: Apply S-125 for - Granite Stone (15m2/L) - Marble Stone (10m2/1L) - Curing time 45 minute MAIN CONTRACTOR SUBCONTRACTOR KEY PLAN 2nd STEP: COATING 1st LAYER OF SEALER S - 125 CƠNG TRÌNH: PROJECT TITLE : KHU DÂN CƯ RIVIERA POINT Residential Area of Riviera Point TÊN BẢN VẼ/ DRAWING TITLE: LE HONG AN SsangYong E&C 6/25 NGUYEN PHUONG VU 07.11.2013 NGUYEN PHUONG VU A A S-125 (2nd layer) B C S-125 (1st layer) Stone THK 20mm DEVELOPER / LANDOWNER: CONCEPT ARCHITECTS S - 125 STRUCTURAL DESIGN REVIEW VIETNAM CO.,LTD civil I structural I engineers I geotechanical I electrical M&E DESIGN REVIEW J ROGER PRESTON (Vietnam) Co ltd LANDSCAPE ARCHITECTS SITE CONCEPTS INTERNATIONAL INTERIOR DESIGN SUYING DESIGN PTE LTD LOCAL ARCHITECTS STRUCTURE - ME Note: Apply S-125 for - Granite Stone (15m2/L) - Marble Stone (10m2/1L) - Curing time 45 minute MAIN CONTRACTOR SUBCONTRACTOR KEY PLAN 3rd STEP: COATING 2nd LAYER OF SEALER S - 125 CƠNG TRÌNH: PROJECT TITLE : KHU DÂN CƯ RIVIERA POINT Residential Area of Riviera Point TÊN BẢN VẼ/ DRAWING TITLE: LE HONG AN SsangYong E&C 7/25 NGUYEN PHUONG VU 07.11.2013 NGUYEN PHUONG VU A A B C DEVELOPER / LANDOWNER: CONCEPT ARCHITECTS STRUCTURAL DESIGN REVIEW VIETNAM CO.,LTD civil I structural I engineers I geotechanical I electrical M&E DESIGN REVIEW J ROGER PRESTON (Vietnam) Co ltd LANDSCAPE ARCHITECTS SITE CONCEPTS INTERNATIONAL INTERIOR DESIGN SUYING DESIGN PTE LTD LOCAL ARCHITECTS STRUCTURE - ME MAIN CONTRACTOR SUBCONTRACTOR KEY PLAN 4th STEP: CURING THE SEALER CƠNG TRÌNH: PROJECT TITLE : KHU DÂN CƯ RIVIERA POINT Residential Area of Riviera Point TÊN BẢN VẼ/ DRAWING TITLE: LE HONG AN SsangYong E&C 8/25 NGUYEN PHUONG VU 07.11.2013 NGUYEN PHUONG VU A RIVIERA POINT CONDOMINIUM DEVELOPMENT DESIGN AND BUILD OF MAIN TENDER (PHASE 1A) FOR PROPOSED CONDOMINIUM DEVELOPMENT AT DISTRICT 7, HO CHI MINH, VIETNAM FOR M/S RIVIERA POINT LIMITED LIABILITY COMPANY ANNEX 1.2 The process of the screeding Project : Rivera Point Condominium Development Produced by : Ssangyong E&C Assessment Duration : 7days Document No : Refer to the submital list SsangYong E&C 9/25 07.11.2013 A B C DEVELOPER / LANDOWNER: CONCEPT ARCHITECTS STRUCTURAL DESIGN REVIEW VIETNAM CO.,LTD civil I structural I engineers I geotechanical I electrical M&E DESIGN REVIEW J ROGER PRESTON (Vietnam) Co ltd LANDSCAPE ARCHITECTS SITE CONCEPTS INTERNATIONAL INTERIOR DESIGN SUYING DESIGN PTE LTD LOCAL ARCHITECTS STRUCTURE - ME MAIN CONTRACTOR SUBCONTRACTOR KEY PLAN 1st STEP: CLEANING CONCRETE SURFACE CÔNG TRÌNH: PROJECT TITLE : KHU DÂN CƯ RIVIERA POINT Residential Area of Riviera Point TÊN BẢN VẼ/ DRAWING TITLE: LE HONG AN SsangYong E&C 10/25 NGUYEN PHUONG VU 07.11.2013 NGUYEN PHUONG VU A A B C DEVELOPER / LANDOWNER: Mortar (1:3) Slab concrete CONCEPT ARCHITECTS STRUCTURAL DESIGN REVIEW VIETNAM CO.,LTD civil I structural I engineers I geotechanical I electrical M&E DESIGN REVIEW J ROGER PRESTON (Vietnam) Co ltd LANDSCAPE ARCHITECTS SITE CONCEPTS INTERNATIONAL INTERIOR DESIGN SUYING DESIGN PTE LTD LOCAL ARCHITECTS STRUCTURE - ME MAIN CONTRACTOR SUBCONTRACTOR KEY PLAN 2nd STEP: SCREEDING CƠNG TRÌNH: PROJECT TITLE : KHU DÂN CƯ RIVIERA POINT Residential Area of Riviera Point TÊN BẢN VẼ/ DRAWING TITLE: LE HONG AN SsangYong E&C 11/25 NGUYEN PHUONG VU 07.11.2013 NGUYEN PHUONG VU A A B C Adhesive ( ABA 500T) DEVELOPER / LANDOWNER: Mortar (1:3) Slab concrete CONCEPT ARCHITECTS STRUCTURAL DESIGN REVIEW VIETNAM CO.,LTD civil I structural I engineers I geotechanical I electrical M&E DESIGN REVIEW J ROGER PRESTON (Vietnam) Co ltd LANDSCAPE ARCHITECTS SITE CONCEPTS INTERNATIONAL INTERIOR DESIGN SUYING DESIGN PTE LTD LOCAL ARCHITECTS STRUCTURE - ME MAIN CONTRACTOR SUBCONTRACTOR KEY PLAN 3rd STEP: APPLYING THE ADHESIVE (ABA 500T) CƠNG TRÌNH: PROJECT TITLE : KHU DÂN CƯ RIVIERA POINT Residential Area of Riviera Point TÊN BẢN VẼ/ DRAWING TITLE: LE HONG AN SsangYong E&C 12/25 NGUYEN PHUONG VU 07.11.2013 NGUYEN PHUONG VU A RIVIERA POINT CONDOMINIUM DEVELOPMENT DESIGN AND BUILD OF MAIN TENDER (PHASE 1A) FOR PROPOSED CONDOMINIUM DEVELOPMENT AT DISTRICT 7, HO CHI MINH, VIETNAM FOR M/S RIVIERA POINT LIMITED LIABILITY COMPANY ANNEX 1.3 The process of the stone tiling Project : Rivera Point Condominium Development Produced by : Ssangyong E&C Assessment Duration : 7days Document No : Refer to the submital list SsangYong E&C 13/25 07.11.2013 A Stone THK 20mm B C Adhesive ( ABA 500T) Mortar (1:3) Slab concrete DEVELOPER / LANDOWNER: CONCEPT ARCHITECTS STRUCTURAL DESIGN REVIEW VIETNAM CO.,LTD civil I structural I engineers I geotechanical I electrical M&E DESIGN REVIEW J ROGER PRESTON (Vietnam) Co ltd LANDSCAPE ARCHITECTS SITE CONCEPTS INTERNATIONAL INTERIOR DESIGN SUYING DESIGN PTE LTD LOCAL ARCHITECTS STRUCTURE - ME MAIN CONTRACTOR SUBCONTRACTOR KEY PLAN 4th STEP: APPLYING PLATE STONE THK 20MM plication CƠNG TRÌNH: PROJECT TITLE : Residential Area of Riviera Point TÊN BẢN VẼ/ DRAWING TITLE: LE HONG AN SsangYong E&C KHU DÂN CƯ RIVIERA POINT 14/25 NGUYEN PHUONG VU 07.11.2013 NGUYEN PHUONG VU A A Stone THK 20mm B C Adhesive ( ABA 500T) Mortar (1:3) Slab concrete DEVELOPER / LANDOWNER: CONCEPT ARCHITECTS STRUCTURAL DESIGN REVIEW VIETNAM CO.,LTD civil I structural I engineers I geotechanical I electrical M&E DESIGN REVIEW J ROGER PRESTON (Vietnam) Co ltd LANDSCAPE ARCHITECTS SITE CONCEPTS INTERNATIONAL INTERIOR DESIGN SUYING DESIGN PTE LTD LOCAL ARCHITECTS STRUCTURE - ME MAIN CONTRACTOR SUBCONTRACTOR KEY PLAN 5th STEP: STONE THK 20MM INSTALLATION CƠNG TRÌNH: PROJECT TITLE : KHU DÂN CƯ RIVIERA POINT Residential Area of Riviera Point TÊN BẢN VẼ/ DRAWING TITLE: LE HONG AN SsangYong E&C 15/25 NGUYEN PHUONG VU 07.11.2013 NGUYEN PHUONG VU A A B C DEVELOPER / LANDOWNER: Rubber checker CONCEPT ARCHITECTS STRUCTURAL DESIGN REVIEW VIETNAM CO.,LTD civil I structural I engineers I geotechanical I electrical M&E DESIGN REVIEW J ROGER PRESTON (Vietnam) Co ltd Stone THK 20mm Checking the reverberation LANDSCAPE ARCHITECTS SITE CONCEPTS INTERNATIONAL INTERIOR DESIGN SUYING DESIGN PTE LTD LOCAL ARCHITECTS STRUCTURE - ME MAIN CONTRACTOR SUBCONTRACTOR KEY PLAN CƠNG TRÌNH: PROJECT TITLE : KHU DÂN CƯ RIVIERA POINT Residential Area of Riviera Point TÊN BẢN VẼ/ DRAWING TITLE: 7th STEP: CHECKING THE HOLLOWNESS LE HONG AN SsangYong E&C 16/25 NGUYEN PHUONG VU 07.11.2013 NGUYEN PHUONG VU A RIVIERA POINT CONDOMINIUM DEVELOPMENT DESIGN AND BUILD OF MAIN TENDER (PHASE 1A) FOR PROPOSED CONDOMINIUM DEVELOPMENT AT DISTRICT 7, HO CHI MINH, VIETNAM FOR M/S RIVIERA POINT LIMITED LIABILITY COMPANY ANNEX Certificaiton Project : Rivera Point Condominium Development Produced by : Ssangyong E&C Assessment Duration : 7days Document No : Refer to the submital list SsangYong E&C 17/25 07.11.2013 DESIGN AND BUILD OF MAIN TENDER (PHASE 1A) FOR PROPOSED CONDOMINIUM DEVELOPMENT (RIVIERA POINT) AT DISTRICT 7, HO CHI MINH, VIETNAM FOR M/S RIVIERA POINT LIMITED LIABILITY COMPANY SEQUENCE FOR APPLY SEALER FOR EXTERNAL STONE Stone substrates preparation: ♠ Stone surface shall clean and dry Material and Application method: ♠ Sealer material is S-125 (one component) ♠ Apply material by brush ♠ Apply material for sides of stone piece Material application: ♠ Apply 1st layer of S -125 by brush/roller to the prepared stone surface The most importance is 1st layer so is shall be applied carefully Depend on the absorption of stone type, next one or two layers can be applied Curing time between two layers is ~45 minutes ♠ 15~30 minutes after last layer applied, using dry clothes to thoroughly clean the stagnate sealer material on finishing surface of stone to avoid the white colour layer remain Material consumption: Depend on type of stone ♠ Granite stone : ~ 15 m2 / litle ♠ Marble stone : ~ 10 m2 / little Curing : next step can be proceeded after 24 hours Test: After curing time, pour the liquid such as : water, coffee, sauce, tea…on treated stone surface The liquid shape can look like on the lotus leaf SsangYong E&C 18/25 07.11.2013 TAM THANH PHU COMPANY LIMITED Add: 78/5B Phan Van Hon St., Tan Thoi Nhat Ward, Dist.12,HCMC Tel: (84 8) 22111542 – 0903 354 234 Fax: (84 8) 62557426 Tax-code: 0308002377 E–mail: vietchemicals@gmail.com A/c No: 58337819 Asia Commercial Bank (ACB)-Cong Hoa Branch WATER – PROOF (S-125) MAINTENA S-125 is formulated for water-poof based modified oganiosilicone It penetrates into the stone and forms a lasting film which can effectively prevent the stone from dust and water-based pollution such as water, coffee, sauce and tea Application of S-125 can provide the effect of lotus leaf of water-proofing Modified organosilione Water Reducing the absorption effective to the contaminations based of water Light odor Economic Applicable for caring on all kinds of natural and artificial stone and stone crafts, ceramic tiles and concrete Liter/ctn liter liter 10 liter 12 20 20 Water proof – S125 SsangYong E&C Trang 19/25 07.11.2013 Aspect Colorless or light yellow transparent liquid Main composition Modified organosilicone PH 12—14 Density (25℃) 0.98—1.02 Main solvent Water Clean the stone surface to help the penetration Dry the stone or ceramics completely Apply with a brush or sprayer evenly on the surface, ensure the coverage Clean the excess off the surface after 15-30 minutes Re-application should be at 45 minutes interval Further process can be applied after 24 hours in cool and dry places Items Test result Absorption reduction ≥40% Note:stone sample 603 slab from Fujian Do not expose to rain in 24 hours Do not apply under zero degree White marks may occur on the treated surface and it will not affect the protective effect Please clean it with water Small area test is recommended before application to make sure the color change and protective effect can be accepted One year if stored in cool places in original package Water proof – S125 SsangYong E&C Trang 20/25 07.11.2013 Q/ZLJG0013—2002 Clean with water immediately after application Work place: product of weak base, please wear proper gloves Rinse with water immediately in case of contact Keep way from metal, wood, cloth, it may cause color fading Rinse with water immediately in case of contact with skin or eyes call a specialized doctor in serious case If you have any question don’t hesitate to contact with Mr.Việt-0903 354 234 Water proof – S125 SsangYong E&C Trang 21/25 07.11.2013 SsangYong E&C 22/25 07.11.2013 SsangYong E&C 23/25 07.11.2013 ABA 655V Additive For Mortar & Screed Phụ gia Latex dùng cho vữa lớp láng Product Description ABA 655V is a water dispersion primer designed to improve shear and tensile bond of sand/cement screeds, waterproofing coatings, plasters, render mortars and paint It is use for treating porous substrates and materials Mô tả sản phẩm: ABA 655V chất kết dính thiết kế nhằm tăng cường khả chịu lực cắt lực kéo căng cho bề mặt láng vữa cát/ ximăng, lớp sơn chống thấm, thạch cao, vữa tô sơn Sản phẩm dùng để xử lý bề mặt rỗng Thus, it can be used as a primer to prevents gypsum substrates from breaking off from the chemical reaction between gypsum and cement aluminates Vì vậy, sản phẩm sử dụng lớp lót ngăn ngừa việc gãy vỡ hệ thạch cao phản ứng hóa học thạch cao xi măng Aluminates Primer Feature/Benefits • Water resistance • Excellent adhesive bond strength • reduce water absorption of porous substrates • Preventing over-rapid drying Trộn ABA 655V với vữa dán gạch gốc xi-măng ABA, làm tăng khả chống thấm nước tăng độ kết dính cho loại gạch có độ hút nước thấp gạch mosaic, gạch bóng kính ABA 655V dùng cho nội thất ngoại thất Khi trộn vào vữa ximăng, ABA 665V tạo hệ thống polymer có điều chỉnh, có khả kháng nước cao, chống mài mòn có độ bền cao Những hỗn hợp trộn khơng độc hại ứng dụng cho nước sinh hoạt Additive Feature/Benefits • Low water-cement ratio • Reduces shrinkage • Increase durability & toughness • High water resistance, wear resistance and durability Lớp lót - Đặc điểm/ Lợi ích: Chống nước Độ kết dính tuyệt vời Giảm nước ngấm vào bề mặt rỗ Ngăn chặn việc rút nước làm khô nhanh Application Range • Primer • As an latex additive for renders • Abrasion resistant flooring • Bedding tiles for external use including swimming pools Specification Clause The additive shall be ABA 655V – a liquid additive for use with OPC, sand Chỉ định sản phẩm: Chất phụ gia phải ABA 655V – chất lỏng phụ gia sử dụng với xi-măng, vữa tô cát/xi-măng keo dán gạch thông dụng ABA 500T Application Notes Packaging 20 litres pail and 200 litres drum Shelf Life 12 months when stored in the original unopened container, in a dry o o warehouse with 50% relative humidity and between 10 C and 30 C Coverage / Dosage Approximately coverage per 20 litres pail are:2 • Screed: m at bed thickness of 15mm, m as a self supporting screed at 40mm • Render coat; 10 m at bed thickness of 10mm Substrate Preparation Substrate must be clean of dust, oil, grease and all contaminating materials Ensure surfaces are dry, with no residue or permanent damp New brickwork, walls should be left at least days prior to rendering Mixing Render or screed: • Prepare a 1:0.5 ABA 655V to water dilution (by volume) • For renders mix 27 litres of diluted ABA 655V with 40 kg of cement to 120 kg of clean sand • For screeds mix 21 litres of diluted ABA 655V with 40 kg of cement to 120 kg of clean sand SsangYong E&C Phụ gia - Đặc điểm/ Lợi ích: Giảm tỉ lệ nước pha vào xi măng Giảm co ngót Tăng độ bền độ dẻo Chịu nước tốt hơn, chịu mài mòn bền vững Những lưu ý thi cơng: Đóng gói: Thùng 20 lít Thời hạn sử dụng: 12 tháng lưu giữ với bao bì đóng kín, nơi 0 khô với độ ẩm tương đối 50% nhiệt độ 10 C đến 30 C Định mức sử dụng: (thùng 20 lít) Lớp hồ xi-măng: 100m 2 Vữa láng: m cho độ dày 15mm, m cho hệ vữa độc lập dày 40mm Vữa trát: 10 m cho độ dày 10mm Khi pha với vữa dán gạch ABA 500T, tỷ lệ trộn 5-6 lít ABA 655V cho bao ABA 500T 25 kg Chuẩn bị bề mặt: Bề mặt phải thật bụi, dầu, mỡ chất làm bẩn Đảm bảo bề mặt khô, không ẩm ướt Đối với tường gạch mới, phải chờ ngày trước trát vữa Pha trộn: - Lớp hồ xi-măng: trộn phần xi-măng : phần ABA 655V theo trọng lượng (hoặc phần xi-măng : phần ABA 655V theo thể tích) - Vữa Trát láng: Pha loãng ABA 655V với nước theo tỷ lệ 1:0.5 (theo thể tích) Vữa trát: 27 lít ABA 655V pha loãng cho 40 kg xi-măng 120 kg cát Vữa láng: 21 lít ABA 655V pha loãng cho 40 kg xi-măng 120 kg cát Vữa dán gạch ABA gốc xi-măng: Thay nước ABA 655V theo hướng dẫn in bao bì 24/25 07.11.2013 Thao khảo tỉ lệ pha theo bảng dưới: Below is the dosage in ratio guideline: Dilution ABA Water 655V Render mix Screeds mix 1 0.5 0.5 Diluted ABA 655V 1 Cement Clean Sand 1.48 1.9 4.44 5.71 Pha loãng ABA Nước 655V Vữa trát Vữa láng Application RENDER COAT • First apply a slurry coat using a roller, brush or a flat trowel, to a maximum thickness of 2mm While the slurry coat is still wet, apply render over it Ensure firm pressure on the trowel to work with the render into good contact with the surface • Renders are applied in the normal manner up to 13mm thick and allow to take initial set Renders in excess of 13mm should be applied in a two coat operation 1 0.5 0.5 ABA 655V pha 1 Xi măng Cát 1.48 1.9 4.44 5.71 Thi công: Vữa trát Trước tiên sử dụng cọ lăn, cọ, bay trát lớp hồ xi-măng với độ dày tối đa 2mm, trát lớp vữa tô lớp hồ ướt Phải đảm bảo lực trát thật mạnh để lớp vữa tiếp xúc với bề mặt cách tốt Thông thường lớp vữa trát có độ dày 13mm cho lần trát chờ khơ Nếu dộ dày vượt q 13mm cần trát làm hai lần SCREED • First apply the slurry coat using a roller, brush or a flat trowel, to a maximum thickness of 2mm while the slurry coat is still wet, apply the screed mix Using the straight edge, trowel or timber batten to level the screed Recommended minimum thickness of screed 15mm Screed should be left with a good float finish to create a key for tiling / waterproofing Vữa láng Trước tiên sử dụng cọ lăn, cọ, bay trát lớp hồ xi-măng với độ dày tối đa 2mm, thi công lớp láng lớp hồ ướt Dùng thước thẳng, bay bàn chà gỗ làm phẳng lớp láng Độ dày tối thiểu lớp láng 15mm Lớp láng phải hoàn thiện cách tốt trước chống thấm lát gạch Product Limitations • If ABA 655V is to be used on heated concrete slabs, it must be used undiluted • In exterior conditions, it is essential to provide protection from all extremes of climate during the whole fixing process • Protect ABA 655V liquid from frost – not allow freezing Tính hạn chế sản phẩm: Khơng pha lỗng ABA 655V dùng bề mặt bê-tơng nóng Trong điều kiện thi cơng ngồi trời với điều kiện khí hậu khắc nghiệt, phải che chắn bảo vệ suốt q trình thi cơng Giữ ABA 655V tránh sương giá không bị đông cứng Safety Data ABA 655V is non-toxic, however to avoid skin contact protective clothing should be worn Should it come into contact with eyes wash immediately with plenty of water and seek medical treatment Sức khỏe an toàn: ABA 655V không độc, nhiên phải mặc đồ bảo hộ để tránh tiếp xúc với da Nếu bị dính vào mắt phải rửa nước đưa đến bệnh viện User Notes The technical details and recommendations contained in this data sheet are given in good faith and represent the best of our knowledge and experience at time of printing It is the responsibility of the user to ensure that the products are used in accordance with ABA’s instructions and in applications for which they are intended Lưu ý người sử dụng: Các chi tiết kỹ thuật hướng dẫn đáng tin cậy tài liệu tất kiến thức kinh nghiệm muốn truyền đạt đến người sử dụng Người sử dụng phải có trách nhiệm đảm bảo sản phẩm phải sử dụng theo hướng dẫn ứng dụng ABA Technical Data Thông số kỹ thuật: Product Identity (Liquid) Colour & Form: Specific Density: pH: Inflammability: Application Data o Drying Time @ 30 C Final Performance Damp resistance Ageing resistance Resistance to acids and alkalis Đặc tính sản phẩm (chất lỏng) Màu sắc dạng Chất lỏng, nhớt, màu trắng Trọng lượng riệng 1.01 kg/ lít Độ pH 9-11 Cháy nổ khơng Dữ liệu thi công: Thời gian khô 30 C Khoảng 30 phút Hiệu sau cùng: Kháng ẩm Tốt Chống lão hóa Tốt Chống muối kiềm Tốt White, translucent liquid 1.01kg/L 9-11 No Approx 30 mins Good Good Good Overseas Office / Stockist’s Stamp ARDEX SINGAPORE PTE LTD 26 TUAS AVENUE SINGAPORE 639376 TEL: +65 6861 7700 FAX: +65 6862 3381 EMAIL: sales@ardex.com.sg ABA 655V is manufactured by Ardex Singapore Pte Ltd ABA 655V sản xuất ARDEX Singapore Pte., Ltd Revision: Feb 2012 (Hiệu chỉnh tháng 02 năm 2012) SsangYong E&C 25/25 www.ardex.com.sg 07.11.2013 ... 1A) FOR PROPOSED CONDOMINIUM DEVELOPMENT (RIVIERA POINT) AT DISTRICT 7, HO CHI MINH, VIETNAM FOR M/S RIVIERA POINT LIMITED LIABILITY COMPANY SEQUENCE FOR APPLY SEALER FOR EXTERNAL STONE Stone... (S-125) MAINTENA S-125 is formulated for water-poof based modified oganiosilicone It penetrates into the stone and forms a lasting film which can effectively prevent the stone from dust and water-based... TENDER (PHASE 1A) FOR PROPOSED CONDOMINIUM DEVELOPMENT AT DISTRICT 7, HO CHI MINH, VIETNAM FOR M/S RIVIERA POINT LIMITED LIABILITY COMPANY CONTENTS Please! Refer to the MS for tiling work (General)