1. Trang chủ
  2. » Kinh Doanh - Tiếp Thị

Tài liệu produce ppt

2 102 0

Đang tải... (xem toàn văn)

THÔNG TIN TÀI LIỆU

Thông tin cơ bản

Định dạng
Số trang 2
Dung lượng 62,83 KB

Nội dung

PB-Nr: R05.04.03 Production Issued by Date Version Page Hr. Demmelmayer 00 1/2 Starting and storing the systems similar to R05.04.02 - system attempt 1 1 Process description: If the machinist prepared the necessary bundle, he gets from the beginning the vessel with the appropriate product and pulls themselves him to the appropriate production plant. It informs the operator that it begins with production. The vessel is placed under the lifting crane. The hooks of the lifting crane are hung up with the supporting device designated for it. Now the vessel is lifted on the deck. At the deck the vessel is placed on a supplied tanker. The tanker is placed now over the filler neck of the system. The sealing stamp is raised now by means of compressed air, whereby it seals the discharge opening of the tanker. Before opening the vessel discharge the machinist has himself to make sure that the product supply (Feeder) of extrusion is switched off. If it concerns a particularly fine-grained beginning, the funnel must be sealed, since otherwise when opening the vessel too much material over the auger arrived and thus extrusion blocks. Afterwards the vessel discharge is slowly opened, the material arrived into the funnel 2 Safety regulations: The lifting crane must be provided with the correct cross. The security must be locked correctly. It is to be noted that during removal no person is under the vessel 3 Operator: The driving out resin must be gotten with the blue excavator bucket by the beginning. Footstep during the nozzle bore no more material out, approx. 3 kg driving out resin with a shovel against the funnel inner walls are hurled, around funnels, auger and gutter-pipe - to clean. The used driving out resin is taken after that to extrude by the cooling tape and stored temporarily in the yellow excavator bucket. PB-Nr: R05.04.03 Production Issued by Date Version Page Hr. Demmelmayer 00 2/2 The filter body is taken and cleaned out of the sieve jigger. If a filter break should be ascertainable, this is to be communicated immediately in the QA.

Ngày đăng: 18/01/2014, 16:20

TÀI LIỆU CÙNG NGƯỜI DÙNG

TÀI LIỆU LIÊN QUAN

w