Thông tin tài liệu
Form FEV-RFA-V1.0 Project Address Package Employer Contractor : : : : : Feliz-En-Vista High-Rise Residential Development At Plot Y1, Thanh My Loi Ward, District 2, HCMC, VN Main Contract CapitaLand- Thien Duc Investment Co., Ltd CSCEC32 RFA Ref No : FEV-CSCEC32-ARCHI-MOS-RFA-031B- Method statement for Refuse chute installation REQUEST FOR APPROVAL (RFA) VINAQS CO., LTD ; RSP ARCHITECTS PLANNERS & ENGINEERS (Vietnam) LTD THAM & WONG CO.,LTD J.Roger Preston Vietnam Co., Ltd Mr Dang Thanh Sang, Nguyen Trung Hau Mr Le Dinh Luong,Nguyen Huu Thanh To : Attention Descipline : : Finishing work Subject : Method statement for Refuse chute installation From: Name: He Wei Date of Request: CC: Date to Reply : 22-Jul-19 CSCEC32 Main Contractor CL Project Manager 17-Jul-19 SCI RSP T&W JRP ATICHA VQS CIDECO DESCRIPTION: Dear Sirs, We would like to submit Method statement for Refuse chute installation Please review and approve Normal (07 days) Regards, Critical (03 days) 17-Jul-19 CSCEC32- Main Contractor Date: Signed: Name: He Wei REPLY: This review is for conformance with the general design concept and for general arrangement expressed in the documents. Review shall not be construed to mean that the reviewer accepts the detail calculations and dimensions shown in the shop drawings or any deviation from the requirements of the contract documents. Contractor is responsible for errors or omissions in the shop drawings; for meeting all requirements of the contract documents; for confirming and correlating job site dimensions; for information that pertains solely to fabrication process or to techniques of construction, and for the coordination of the work of all trades. It is understood that the notation on the submittal is not to be construed as an authorization for additional work or additional cost Tham&Wong reply: - We no objection for structure this MOS - The bolts test standard and number testing must be shown clearly in other submission Minh Khoa 18-Jul-2019 Signed: RSP The Engineer: TW JRP SCI ATICHA CDC Approved Not Approved Approved with comments but works can proceed on site CL Date: METHOD OF STATEMENT FOR INSTALLATION OF REFUSE CHUTE PROJECT : FELIZ EN VISTA ADDRESS : PLOT Y1, THANH MY LOI WARD, DISTRICT 2, HCM CITY ITEMS : PIPE SYSTEM GARBAGE CONTRACTORS: THE SECOND CONSTRCTION CO., LTD OF CHINA CONSTRUCTION THIRD ENGINEERING BUREAU (CSCEC32) SUBCONTRACTOR : SAI GON IMC INVESTMENT JOINT STOCK COMPANY HCM CITY, 2018 SAI GON IMC INVESTMENT JOINT STOCK COMPANY Page Index/Mục Lục Part I: Introduction/ Phần I: Giới thiệu Part II: Model of refuse chute/Phần II: Mơ hình ống rác Part III: Method of Statement/Phần III: Phương pháp thi công Part IV: Site Organization/ Phần IV: Tổ chức thi công APPENDIX: Ability to work bolts M14/ Khả chịu lực bu long M14 Testing certifications/ Các kết thí nghiệm Page PART I: INTRODUCTION PHẦN I: GIỚI THIỆU LOCATION/ ĐỊA ĐIỂM XÂY DỰNG - Items: PIPE SYSTEM GARBAGE - Project: FELIZ EN VISTA - Address: PLOT Y1, THANH MY LOI.W, DISTRICT 2, HCM CITY SCOPE OF WORK/PHẠM VI CÔNG VIỆC: - The project consists of 04 blocks of apartments from 30 to 35 floors; Dự án gồm 04 Block nhà chung cư cao từ 30 tầng đến 35 tầng; - Each block has 03 operating Pipe System Garbage independent Mỗi Block có 03 Hệ thống thải rác độc lập MAIN FEATURES/CÁC ĐẶC ĐIỂM CHÍNH: - Refuse chute by concrete cellulose which serve D585 mm diameter 27mm thick ensure 120 minutes fire protection - Fire standard Vietnam; Hệ thống ống dẫn rác Bêtông Xellulo đường kính D585 mm dày 27mm đảm bảo chống cháy 120 phút - TC PCCC Việt Nam; - Door garbage in SUS 304 stainless steel materials at every level to ensure 120 minutes fire protection - Fire standard Vietnam; Cửa thu rác vật liệu inox SUS 304 tầng đảm bảo chống cháy 120 phút - TC PCCC Việt Nam; - System devices accompanied by piping junk such as forced ventilation system, spray wash cleaning systems, systems fire doors, door garbage reduction town Hệ thống thiết bị khác kèm theo hệ thống ống dẫn rác như: Hệ thống thơng gió cưỡng bức, hệ thống phun rửa làm sạch, hệ thống cửa ngăn cháy, cửa nhận rác giảm chấn… Page PART II: MODEL PIPE SYSTEM GARBAGE PHẦN II: MƠ HÌNH ỐNG RÁC 01 02 03 Note/Ghi 1: Exhaust fan/Quạt hút khí 2: Exhaust pipes/Ống khí 3: Belt exhaust pipe/Đai nối ống khí 04 4: Accessories Couplings/Măng xông nối ống 05 5: Sprinkler head/Đầu Sprinkler 06 6: Nozzle rain/Phễu phun rửa 07 7: Concrete pipes garbage cellulose/Ống dẫn rác Bê tông xenlulo 08 8: System shackle bearing U100/Hệ gông U chịu lực 9: Door garbage/Cửa thu rác 09 10: Devices connecting door/Cổ nối cửa thu rác 10 11 11: The belt keeps the tube/Đai giữ chịu lực 12: Joints melting/Mối nối nóng chảy 13: Counterweight system/Quả đối trọng 14: Tilt tube litter/Ống nghiêng xả rác 12 13 14 15 16 15: Belt inclined pipe support/Đai đỡ ống nghiêng 16: Fire doors/Cửa ngăn cháy 17: Lock key/Chốt khoá 18: Vehicles garbage/Xe nhận rác 17 18 Page EXHAUST FAN QUẠT HÚT KHÍ (1) Model: APL-1-4D Size: 400 mm Motor power: 150 w Power: 220 v Wind flow: 2500 ~ 3500 m3/h Materials: Powder coated steel/Thép sơn TĐ Made : Viet nam BELT EXHAUST PIPE ỐNG THỐT KHÍ (2) Diameter in: Dtr 270mm Diameter out: Dng 272,4 mm The thickness of the tube: 1,2mm Materials: Inox Made: IMC - Viet nam Belt pipe/ Đai nối ống Belt Exhaust Pipe Inox 304/ Ống khí Inox 304 ACCESSORIES COUPLINGS MĂNG XÔNG NỐI ỐNG (4) Size: 270 595 mm Materials: Galvanized steel/Thép mạ kẽm Made: IMC - Viet Nam Page CONCRETE PIPES GARBAGE CELLULOSE ỐNG DẪN BẰNG BÊ TÔNG (7) Beveled edges of yin and yang head tube/ Gờ vát âm dương đầu ống d n g đ ầ u Size out Øng: 585mm Size in Øtr : 531mm Materials: Concrete cellulose Made: IMC - Viet nam Pipe garbage/ Ống bê tông xenlul ố Belts Couplings/ Đai nối ống Paint/ Poly Este/Sơn Poly Este Page SYSTEM SHACKLE BEARING U100 HỆ GÔNG ĐỠ U (8) Size : U100x1000x4.2 mm Materials: Galvanized steel/Thép mạ kẽm Xuất xứ : IMC - Viet Nam DOOR GARBAGE CỬA THU RÁC (9) Size frame: 550x550mm Size door: 450x450mm Materials: Inox SUS 304 thick 1.2mm Opening: Open vertical/ Mở dọc Made : IMC - Viet Nam Page Vành đai chịu lực THE BELT KEEPS THE TUBE HỆ KHUNG ĐAI ĐỠ CHỊU LỰC (11) Lỗ bắt bu lông M14 Hàn liên kết Size: Ø585 mm Materials: Galvanized Steel/Thép mạ kẽm Made : IMC - Viet Nam Tai gác L 1 (12); (13); (14) Made : IMC - Viet Nam 1: Ống thẳng 2: Mối nối nóng chảy 3: Quả đối trọng 4: Ống nghiêng 5: Cửa tự đóng ngăn cháy 6: Xe chứa rác Page PART III: METHOD OF CONSTRUCTION PHẦN III: PHƢƠNG PHÁP THI CÔNG STEPS IN CONSTRUCTION/ CÁC BƢỚCTHI CÔNG Step 1: Determine the axis, cos/ Bước 1: Xác định trục, cos Step 2: Install chains and belts/Bước 2: Lắp đặt hệ gông đai Step 3: Installation of piping junk/Bước 3: Lắp đặt ống dẫn rác Step 4: Install door garbage/ Bước 4: Lắp đặt Cửa thu rác Step 5: Install the Exhaust fan, pumps / Bước 5: Lắp đặt hệ thống quạt hút, máy bơm Step 6: Installation of piping tilt garbage/ Bước 6: Lắp đặt hệ thống ống nghiêng nhận rác Step 7: Install fire alarm and fire control system, Sprinkler head/ Bước 7: Lắp hệ thống cảnh báo cháy dập cháy, đầu Sprinkler Page Độ bền lý Mechanical Properties Tiêu chuẩn Standard Mác thép Grade CT3 Giới hạn chảy Yeild Point (N/mm2) Giới hạn bền kéo Tensile Strength (N/mm2) 250 340 ÷ 490 Độ giãn dài Elongation (%) 26 Tensile strength of steel / Giới hạn bền kéo thép 340 N/mm2 = 34000 N/cm2 Load capacity of the bar U150/ Khả chịu tải U150 là: Qu150 0,8.34000.18,655 507416N Vậy Qu150 = 50742 Kg Ability to work of anchor bolts M12/ Khả làm việc bu lông neo M12 - Tensile strength of the iron rule Statistics / Giới hạn bền kéo bu lông neo M12 4.8 N/mm2 = 4800 N/cm2 - Cross-sectional area of anchor bolts M12/ Diện tích mặt cắt ngang bu lông neo M12 là: 1,62 F= 1,13cm2 - The number of anchor bolts on the cross section is = / Số lượng Tăcke sắt mặt cắt ngang = Load capacity of anchor bolts M12/ Khả chịu tải tắc kê M12: QM 12 = 0,84.4800.1,13.4= 18224,64 N Vậy QM 12 = 1822,464 Kg Qtt = 1053 Kg < Qu150 = 29648 Kg Ensure bearing capacity / Đảm bảo khả chịu lực Bearing capacity of anchor bolts M12/ Khả chịu lực bu lông neo M12: Qtt = 1053 kg < QM 12 = 1822,464 Kg Ensure bearing capacity / Đảm bảo khả chịu lực Page 38 ... chuyển sang lắp đặt ống - Lắp đặt ống thứ tương tự thao tác lắp đặt ống thứ nhất, vị trí nối hai ống bơm keo Silicon vào bề mặt tiếp xúc hai ống, lắp đặt đai nối ống thép vào vị trí điểm nối ống đảm... head Lắp đặt mang xơng nối ống vào vị trí ống dẫn rác Lắp ống khí vào mang xông nối ống, quạt hút Lắp đặt nguồn điện quạt hút kiểm tra hoạt động quạt Lắp đặt máy bơm rửa tầng kỹ thuật tầng mái;... installed finish Nhà thầu xây dựng xây mặt phía trước nhà thầu IMC lắp đặt “Hệ thống ống thải rác? ?? xây hồn thi? ??n tường gạch (mặt phía trước) gain rác sau “Hệ thống ống thải rác? ?? lắp đặt hoàn thành
Ngày đăng: 18/08/2021, 18:15
Xem thêm: Biện pháp thi công lắp đặt ống rác nhà cao tầng