Tài liệu tham khảo |
Loại |
Chi tiết |
1. Richardson, G. P. (1986) ‘Problems with causal‐loop diagrams’, System dynamics review. Wiley Online Library, 2(2), pp. 158–170 |
Sách, tạp chí |
Tiêu đề: |
System dynamics review |
|
2. Klir, G. J. et al. (1997) Fuzzy set theory: foundations and applications. Prentice-Hall, Inc |
Sách, tạp chí |
Tiêu đề: |
et al." (1997) "Fuzzy set theory: foundations and applications |
|
4. Shen, L. Y. et al. (2002) ‘Alternative concession model for build operate transfer contract projects’, Journal of construction engineering and management.American Society of Civil Engineers, 128(4), pp. 326–330 |
Sách, tạp chí |
Tiêu đề: |
et al." (2002) ‘Alternative concession model for build operate transfer contract projects’, "Journal of construction engineering and management |
|
5. Nandalal, K. D. W. and Simonovic, S. P. (2003) ‘Resolving conflicts in water sharing: A systemic approach’, Water Resources Research. Wiley Online Library, 39(12) |
Sách, tạp chí |
Tiêu đề: |
Water Resources Research |
|
6. Huerta, J. M. (2004) ‘A systems dynamics approach to conflict resolution in water resources: the model of the Lerma-Chapala watershed’, in 22nd International conference of the Systems Dynamics Society, pp. 25–29 |
Sách, tạp chí |
Tiêu đề: |
22nd International conference of the Systems Dynamics Society |
|
7. Ng, S. T. et al. (2007) ‘A fuzzy simulation model for evaluating the concession items of public–private partnership schemes’, Automation in construction. Elsevier, 17(1), pp. 22–29 |
Sách, tạp chí |
Tiêu đề: |
et al." (2007) ‘A fuzzy simulation model for evaluating the concession items of public–private partnership schemes’, "Automation in construction |
|
8. Ng, S. T. et al. (2007) ‘A simulation model for optimizing the concession period of public – private partnerships schemes’, International Journal of Project Management. Elsevier, 25(8), pp. 791–798. doi: 10.1016/j.ijproman.2007.05.004 |
Sách, tạp chí |
Tiêu đề: |
et al." (2007) ‘A simulation model for optimizing the concession period of public – private partnerships schemes’, "International Journal of Project Management |
|
9. Shen, L. Y. et al. (2007) ‘Using bargaining-game theory for negotiating concession period for BOT-type contract’, Journal of construction engineering and management. American Society of Civil Engineers, 133(5), pp. 385–392 |
Sách, tạp chí |
Tiêu đề: |
et al." (2007) ‘Using bargaining-game theory for negotiating concession period for BOT-type contract’, "Journal of construction engineering and management |
|
12. Ross, T. J. (2009) Fuzzy logic with engineering applications. John Wiley & Sons |
Sách, tạp chí |
Tiêu đề: |
Fuzzy logic with engineering applications |
|
13. Zhang, X. (2009) ‘Win–win concession period determination methodology’, Journal of Construction Engineering and Management. American Society of Civil Engineers, 135(6), pp. 550–558 |
Sách, tạp chí |
Tiêu đề: |
Journal of Construction Engineering and Management |
|
14. Khanzadi, M. et al. (2010) ‘Using Fuzzy-Delphi technique to determine the concession period in BOT projects’, in Information and Financial Engineering (ICIFE), 2010 2nd IEEE International Conference on. IEEE, pp. 442–446 |
Sách, tạp chí |
Tiêu đề: |
et al". (2010) ‘Using Fuzzy-Delphi technique to determine the concession period in BOT projects’, in "Information and Financial Engineering (ICIFE), 2010 2nd IEEE International Conference on |
|
15. Sheng, S. and Wang, C. (2011) ‘Determination of the Concession Period in a Transportation Infrastructure BOT Scheme Based on CPM Simulation’, in Management and Service Science (MASS), 2011 International Conference on. IEEE, pp. 1–4 |
Sách, tạp chí |
Tiêu đề: |
Management and Service Science (MASS), 2011 International Conference on |
|
16. Khanzadi, M. et al. (2012) ‘Integrating system dynamics and fuzzy logic modeling to determine concession period in BOT projects’, Automation in construction. Elsevier, 22, pp. 368–376 |
Sách, tạp chí |
Tiêu đề: |
et al". (2012) ‘Integrating system dynamics and fuzzy logic modeling to determine concession period in BOT projects’, "Automation in construction |
|
17. Xu, Y. et al. (2012) ‘System Dynamics (SD)-based concession pricing model for PPP highway projects’, International Journal of Project Management. Elsevier, 30(2), pp. 240–251 |
Sách, tạp chí |
Tiêu đề: |
et al." (2012) ‘System Dynamics (SD)-based concession pricing model for PPP highway projects’, "International Journal of Project Management |
|
18. Nasirzadeh, F. et al. (2014) ‘Determination of concession period in build- operate-transfer projects using fuzzy logic’, Iranian Journal of Management Studies.University of Tehran, Qom College, 7(2), p. 423 |
Sách, tạp chí |
Tiêu đề: |
et al." (2014) ‘Determination of concession period in build-operate-transfer projects using fuzzy logic’, "Iranian Journal of Management Studies |
|
3. Sterman, J. D. (2000) Business dynamics: systems thinking and modeling for a complex world |
Khác |
|
11. Radzicki, M. J. and Taylor, R. A. (2008) ‘Origin of system dynamics: Jay W. Forrester and the history of system dynamics’, US Department of Energy’s introduction to system dynamics |
Khác |
|
20. Nguyễn, Q. T. (2011) ‘Ứng dụng System Dynamic trong dự báo lợi nhuận của dự án bất động sản tại TP. HCM’, Luận văn thạc sĩ, Đại học Bách Khoa Tp. HCM |
Khác |
|
21. Huỳnh, T. Đ. (2011) ‘Đánh giá rủi ro ảnh hưởng đến sự thành công của các liên doanh trong quá trình đầu tư xây dựng bằng phương pháp AHP mờ’, Luận văn thạc sĩ, Đại học Bách Khoa Tp. HCM |
Khác |
|
22. Lý, T. T. (2011) ‘Ứng dụng phương pháp đánh giá tổng hợp mờ trong phân tích đánh giá rủi ro các dự án PPP giao thông tại Việt Nam’, Luận văn thạc sĩ, Đại học Bách Khoa Tp. HCM |
Khác |
|