1. Trang chủ
  2. » Giáo Dục - Đào Tạo

Voyage plan checklist danh mục kiểm tra chuyến hành trình

1 147 0

Đang tải... (xem toàn văn)

THÔNG TIN TÀI LIỆU

Thông tin cơ bản

Định dạng
Số trang 1
Dung lượng 49,5 KB

Nội dung

The following standard emergency procedures have been reviewed : 1 Fire 1 Steering Failure 1 Medical Evacuation 1 Collision 1 Engine Failure 1 Man Overboard 1 Grounding 1 Pollution Incident 1 Electric Failure The Chief Engineer has been consulted regarding the following : 1 PreArrival tests and Inspection 1 InoperableMalfunctioning system 1 Stability considerations 1 OnGoing Maintenance items 1 Ballast Considerations 0 Other :…………………………….

Voyage Planning Checklist Vessel Name : BUNGO SPIRIT Voyage No ……………… Date : ……………………… Master’s Name : Capt From : ……………………… To : ……………………… In preparing the attached Voyage Plan the following publications were consulted : (check those used ) U.S coast Pilot/Sailing direction Tide Tables Radio Navigation Aids Local VTS Manual Tidal current Table Other Notice to Mariners Light List Other ♦ Above publications were each corrected through Notice to Mariners number : ……… …… ……………………… ♦ ……………………… Were not corrected Reason : ……………………………………………………………… Vessel tracklines are laid out on the charts numbers : BA Charts BAC AUS Charts ♦ Above charts were each corrected through Notice to Mariners numbers : ………………… ♦ Trackelines were checked by : Captain PHAM HONG VIET Radio/electronic broadcasts consulted : Pilot will be contacted Local broadcast Notice to Mariner Weather Radio Weather Facsimile : 4HRS B4 ARR At approx : ( where ) Tugs escort(s) will be contacted : By Pilot At approx : VHF/CH.16 By : ( Now ) : (When) The vessel destination berth/anchorage is : ………… m By (When) ( where ) Vessel draft is : NAVTEX INMARSAT Other ( Now ) Depth of water will be Forward (Name) ……… m At Low water Mtrs Aft Tide range is : The following standard emergency procedures have been reviewed : Fire Steering Failure Collision Engine Failure Grounding Pollution Incident m Medical Evacuation Man Overboard Electric Failure The Chief Engineer has been consulted regarding the following : Pre-Arrival tests and Inspection On-Going Maintenance items Inoperable/Malfunctioning system Ballast Considerations Stability considerations Other :…………………………… The following Navigation Officers and Bridge team members have been briefed on this voyage plan: Chief Officer 1- NGUYEN VAN THANG 2ND Officer 2- NGUYEN TRUNG HAI 3RD Officer 3- TRAN VU QUANG Boatswain 4- NGUYEN VAN HUE AB/A 5- DONG VAN VE AB/B 6- NGUYEN TIEN LONG AB/C 7- NGUYEN VAN CANH ……………………………………………… Master of BUNGO SPIRIT Date : ……………………

Ngày đăng: 02/08/2017, 09:43

TỪ KHÓA LIÊN QUAN

w