The following standard emergency procedures have been reviewed : 1 Fire 1 Steering Failure 1 Medical Evacuation 1 Collision 1 Engine Failure 1 Man Overboard 1 Grounding 1 Pollution Incident 1 Electric Failure The Chief Engineer has been consulted regarding the following : 1 PreArrival tests and Inspection 1 InoperableMalfunctioning system 1 Stability considerations 1 OnGoing Maintenance items 1 Ballast Considerations 0 Other :…………………………….
Trang 1Voyage Planning Checklist Vessel Name : BUNGO SPIRIT Voyage No ……… From : ……… Date : ……… Master’s Name : Capt To : ………
In preparing the attached Voyage Plan the following publications were consulted : (check those used )
U.S coast Pilot/Sailing direction Tide Tables Radio Navigation Aids
Above publications were each corrected through Notice to Mariners number : ……… …… ………
Vessel tracklines are laid out on the charts numbers :
AUS Charts
Above charts were each corrected through Notice to Mariners numbers : ………
Trackelines were checked by : Captain PHAM HONG VIET
Radio/electronic broadcasts consulted : Local broadcast Notice to Mariner NAVTEX
Pilot will be contacted : 4HRS B4 ARR At approx : By : VHF/CH.16
Tugs escort(s) will be contacted : By Pilot At approx : By :
The vessel destination berth/anchorage is : Depth of water will be At Low water
(Name) Mtrs Vessel draft is : ………… m Forward ……… m Aft Tide range is : m
The following standard emergency procedures have been reviewed :
The Chief Engineer has been consulted regarding the following :
Pre-Arrival tests and Inspection Inoperable/Malfunctioning system Stability considerations
On-Going Maintenance items Ballast Considerations Other :……… The following Navigation Officers and Bridge team members have been briefed on this voyage plan:
………
Master of BUNGO SPIRIT Date : ………