1. Trang chủ
  2. » Kỹ Thuật - Công Nghệ

Project strategy sequence and execution plan Trình tự chiến lược dự án và kế hoạch thực hiện

111 2 0

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

THÔNG TIN TÀI LIỆU

Thông tin cơ bản

Định dạng
Số trang 111
Dung lượng 5,4 MB
File đính kèm 2 - Project Kick-Off Execution Plan.rar (6 MB)

Nội dung

PART I : OVERVIEW OF THE PROJECT PART II : THE GOAL OF THE PROJECT PART III : ADVANTAGES AND DISADVANTAGES PART IV : STRATEGIC PLANS PART V : SEQUENCE AND EXECUTION PLAN PART VI : FINANCIAL MANAGEMENT PART VII : PROPOSALS RECOMMENDATIONS PHẦN I : TỔNG QUAN VỀ DỰ ÁN PHẦN II : MỤC TIÊU CỦA DỰ ÁN PHẦN III : THUẬN LỢI VÀ KHÓ KHĂN PHẦN IV : KẾ HOẠCH CHIẾN LƯỢC PHẦN V : TRÌNH TỰ VÀ KẾ HOẠCH THỰC HiỆN PHẦN VI : QUẢN LÝ TÀI CHÍNH PHẦN VII : ĐỀ XUẤT – KIẾN NGHỊ

PROJECT STRATEGY SEQUENCE AND EXECUTION PLAN PROJECT STRATEGY SEQUENCE AND EXECUTION PLAN PROJECT/DỰ ÁN : PROJECT ABCDEFGHIJKL LOCATION/VỊ TRÍ : DEFGHIJKLMNOP PROJECT STRATEGY SEQUENCE AND EXECUTION PLAN TABLE OF CONTENTS DANH MỤC TRÌNH BÀY PART I PART II PART III PART IV PART V PART VI PART VII : OVERVIEW OF THE PROJECT : THE GOAL OF THE PROJECT : ADVANTAGES AND DISADVANTAGES : STRATEGIC PLANS : SEQUENCE AND EXECUTION PLAN : FINANCIAL MANAGEMENT : PROPOSALS - RECOMMENDATIONS PHẦN I PHẦN II PHẦN III PHẦN IV PHẦN V PHẦN VI PHẦN VII : TỔNG QUAN VỀ DỰ ÁN : MỤC TIÊU CỦA DỰ ÁN : THUẬN LỢI VÀ KHÓ KHĂN : KẾ HOẠCH CHIẾN LƯỢC : TRÌNH TỰ VÀ KẾ HOẠCH THỰC HiỆN : QUẢN LÝ TÀI CHÍNH : ĐỀ XUẤT – KIẾN NGHỊ PROJECT STRATEGY SEQUENCE AND EXECUTION PLAN PART I: OVERVIEW OF THE PROJECT PHẦN I: TỔNG QUAN VỀ DỰ ÁN PROJECT STRATEGY SEQUENCE AND EXECUTION PLAN GENERAL INFORMATION ABOUT THE PROJECT THÔNG TIN CHUNG VỀ DỰ ÁN • PROJECT LOCATION VỊ TRÍ DỰ ÁN Lơ đất A1 – A6, Khu biệt thự cao cấp Redstar, P Phước Mỹ, Q Sơn Trà, TP Đà Nẵng • TOTAL LAND AREA TỔNG DIỆN TÍCH KHU ĐẤT 5,491.1 m2 • CONSTRUCTION AREA DIỆN TÍCH XÂY DỰNG 2,200 m2 • TOTAL BUILDING AREA TỔNG DIỆN TÍCH SÀN XÂY DỰNG 55,091m2 • ROOF PEAK HEIGHT CHIỂU CAO ĐỈNH MÁI 105 m • BUILDING DENSITY MẬT ĐỘ XÂY DỰNG 40.06 % PROJECT STRATEGY SEQUENCE AND EXECUTION PLAN ENTITY OF THE PROJECT CÁC ĐƠN VỊ THAM GIA DỰ ÁN • EMPLOYER CHỦ ĐẦU TƯ Cơng ty Cổ phần Địa ốc ALPHANAM • ARCHITECTURAL DESIGN THIẾT KẾ KIẾN TRÚC Công ty CP tư vấn thiết kế Salvador Perez Arroyo cộng (S-DESIGN) • STRUCTURAL DESIGN THIẾT KẾ KẾT CẤU Công ty cổ phần Xây Dựng RECO • MECHANICAL DESIGN THIẾT KẾ CƠ ĐIỆN • PROJECT MANAGEMENT CONSULTING TƯ VẤN QUẢN LÝ DỰ ÁN Chủ đầu tư trực tiếp quản lý • CONTRACTOR NHÀ THẦU CHÍNH Cơng ty cổ phần Xây Dựng Công Nghiệp (DESCON) PROJECT STRATEGY SEQUENCE AND EXECUTION PLAN SCOPE OF WORK PHÂN CHIA PHẠM VI CƠNG VIỆC • Temporary Site Facilities Temporary Offices, storage, and Overall Site Facilities • Protection Works for Adjacent Building General protection • All Reinforced Concreting Works Superstructure from First Floor • All Architectural Works From Basement to Roof • External Works Landscape, parking, walkways, Swimming Pool, Children Playground, Water Feature • MEPF Lift, Aircon, Fire fighting system, lighting, electrical, plumbing and sanitary PROJECT STRATEGY SEQUENCE AND EXECUTION PLAN PART II: THE GOAL OF THE PROJECT PHẦN II: MỤC TIÊU CỦA DỰ ÁN PROJECT STRATEGY SEQUENCE AND EXECUTION PLAN SAFETY AN TOÀN QUALITY CHẤT LƯỢNG IMPROVEMENT CẢI TIẾN TARGET MỤC TIÊU FOREIGN RELATIONS ĐỐI NGOẠI PROGRESS TIẾN ĐỘ INTERNAL ĐỐI NỘI FINANCE TÀI CHÍNH PROJECT STRATEGY SEQUENCE AND EXECUTION PLAN SAFETY/AN TOÀN Target Mục tiêu Priority Ưu tiên In Charge Đảm trách Schedule Thời gian 1.1 - No serious incident throughout construction progress 1.1 - Không để xảy cố an tồn nghiêm trọng suốt q trình thi cơng A GĐDA, CHT, GS, ATLĐ 03.2015 11.2016 1.2 - Ensure that no more than minor safety incident 1.2 – Đảm bảo khơng nhiều vụ an tồn nhỏ A GĐDA, CHT, GS, ATLĐ 03.2015 11.2016 1.3 – Ensure to strictly follow Company’s safety rules and management 1.3 – Bảo đảo tuân thủ tốt qui định, hệ thống ATLĐ công ty A GĐDA, CHT, GS, ATLĐ 03.2015 11.2016 1.4 – Ensure all works from high to medium risk are analyzed before construction 1.4 – Đảo bảo tất cơng tác có rủi ro an tồn từ cao đến trung bình phân tích rủi ro trước thi công A GĐDA, CHT, GS, ATLĐ 03.2015 11.2016 Status Tình trạng SAFETY AN TỒN PROJECT STRATEGY SEQUENCE AND EXECUTION PLAN SAFETY (cont'd)/ AN TOÀN (tt) Target Mục tiêu Priority Ưu tiên In Charge Đảm trách Schedule Thời gian 1.5 Ensure that 100% equipment be checked for safety condition before operation 1.5 – Đảo bảo 100% thiết bị kiểm tra điều kiện an toàn trước thi công B GĐDA, CHT, GS, ATLĐ 03.2015 11.2016 1.6 - Health and Safety Director performs inspection at least time / week 1.6 – GĐDA tham gia kiểm tra ATLĐ lần/ tuần B GĐDA 03.2015 11.2016 1.7 - Ensure industrial hygiene at the request of the top of management 1.7 – Bảo đảm công tác vệ sinh công nghiệp theo yêu cầu cao BGĐ A GĐDA, CHT, GS, ATLĐ 03.2015 11.2016 1.8 - Ensure arrangement of equipment, the work site is neat and tidy at the request of the higher management 1.8 – Bảo đảm công tác xếp thiết bị, mặt thi công ngăn nắp gọn gàng theo yêu cầu cao BGĐ A GĐDA, CHT, GS, ATLĐ 03.2015 11.2016 Status Tình trạng SAFETY AN TỒN

Ngày đăng: 23/08/2023, 08:02

TỪ KHÓA LIÊN QUAN

TÀI LIỆU CÙNG NGƯỜI DÙNG

  • Đang cập nhật ...

TÀI LIỆU LIÊN QUAN

w