ADDITIONAL SUPPORT (BACK PROPING) ADDITIONAL SUPPORTS (BACKPROPPING) UNDERNEATH SOFFIT AT THE AREA OF DISPENSER./ THÊM CÁC THANH CHỐNG Ở PHÍA DƯỚI VÁN SÀN TẠI KHU VỰC ĐẶT TANG CÁP DETAIL DRAWING OF THE DISPENSER IS POSITIONED ON THE SOFFIT BẢN VẼ CHI TIẾT CỦA TANG NHẢ CÁP ĐẶT TRÊN VÁN KHUÔN SÀN TYPE AND PROOF LOAD OF BACKPROPPING QUY CÁCH VÀ TẢI TRỌNG CHO PHÉP CỦA CÂY CHỐNG 5) BACKPROPPING CALCULATION FOR PT SLAB TÍNH TỐN GIÀN GIÁO CHỐNG CHO SÀN DƯL (BY FVN – FOR REFERENCE ONLY) CALCULATION REPORT OF BACKPROPPING UNDER CONSTRUCTION/ BÁO CÁO TÍNH TOÁN GIÀN GIÁO CHỐNG TRONG XÂY DỰNG.ON (BY FVN – FOR REFERENCE ONLY) CALCULATION REPORT OF BACKPROPPING UNDER CONSTRUCTION/ BÁO CÁO TÍNH TỐN GIÀN GIÁO CHỐNG TRONG XÂY DỰNG (BY FVN – FOR REFERENCE ONLY) CALCULATION REPORT OF BACKPROPPING UNDER CONSTRUCTION/ BÁO CÁO TÍNH TỐN GIÀN GIÁO CHỐNG TRONG XÂY DỰNG (BY FVN – FOR REFERENCE ONLY) CALCULATION REPORT OF BACKPROPPING UNDER CONSTRUCTION/ BÁO CÁO TÍNH TỐN GIÀN GIÁO CHỐNG TRONG XÂY DỰNG (BY FVN – FOR REFERENCE ONLY) CALCULATION REPORT OF BACKPROPPING UNDER CONSTRUCTION/ BÁO CÁO TÍNH TỐN GIÀN GIÁO CHỐNG TRONG XÂY DỰNG 6) KEY POINTS – SAFETY ĐIỂM MẤU CHỐT - AN TOÀN Honeycombed concrete /Bê tông rỗ tổ ong Concrete broken at live and dead ends during stress or after load transfer due to quality of concrete or lack vibrator compaction concrete Bê tông bị phá hoại đầu neo sống đầu neo chết căng kéo truyền tải trọng chất lượng bê tơng thiếu kiểm sốt bê tông đầm rung không tốt Remedial works of blast slab concrete/ Cách khắc phục sàn bê tông bị nổ Repair works by concrete or sika Việc sửa chữa bê tông sika Consequence of poorly controlled concrete: Hậu bê tơng thiếu kiểm sốt : - - Lost money/ Mất thêm chi phí - - Waste time for remedial actions/ Lãng phí thời gian khắc phục cố - - Delayed schedule/ Làm chậm tiến độ 5.WHAT IS THE CAUSE CRACKS ON THE SLAB!/ NGUYÊN NHÂN GÂY RA VẾT NỨT CHO SÀN! Reason cause by material (Ready mix concrete) a Temperature of concrete should not be over 30 degree, some time the aggregate expose to sun the temperature too high, or cement pump directly from factory still in high temperature ==> need to use ice water to mix concrete to control the temperature of concrete not excess 30 degree b Problem with scale of batching plant so that the cement amount too much c Problem itself with cement about the chemical proportion, too much CaO will lead to consume water too much d Admixture problem, with new generation of admixture this possibility is limited but if the supplier use old generation of admixture the problem more likely happen especially with no mesh rebar ==> check what type of admixture e What’s kind of sand used grind sand or nature sand, grind sand that is make the concrete consume water fast, experience grind sand make more problem than natural sand Reason cause by curing concrete: the shrinkage crack depend on the loss of water on surface and different temperature of out side and inside concrete, during concrete hardening inside very hot compare to outside (quite many mistake that the hot weather is more crack than cold) => the point to curing and control crack is to keep the surface hot and wet Normally people use one membrane of clear PVC not to loose water moisture when concrete hardening and another thick membrane to keep heat The sika antisol S which will create membrane on the concrete surface to keep water and heat, if the worker and apply correctly If the application not correct problem severely happen However, is quite simple is to arrange worker to watering continuously on the first 24 hours Preventive method in this case is temporary stop to find out problem if it is serious Review the mix Check the scale system of batching plant and the QA/QC procedure to maintain concrete temperature Test the cement sample (it quite cheap and fast to have result) NOTE: Highly recommendation use the water for curing concrete TO PREVENT SLAB CRACKS/ NGĂN CHẶN VẾT NỨT CHO SÀN Soffit slab support must be firmly contacted/ Giàn giáo ván khuôn đáy sàn phải liên kết chắn Concrete quality must be controlled/ Chất lượng bê tơng phải kiểm sốt Vibrator must be enough with the volume of area to pour the concrete/ Đầm rung cần phải đủ với khối lượng khu vực đổ bê tông Cold joint must be controlled/ Kiểm soát mạch ngừng sau mẻ bê tông Curing method have to implement or used curing compound/ Bảo dưỡng phải tiến hành sử dụng hợp chất bảo dưỡng SAFETY/ AN TOÀN Click to edit Master title style Freyssinet provide their employees full package of personal protective equipments Freyssinet cung cấp cho nhân viên đầy đủ trang thiết bị bảo vệ cá nhân Some recommendations regarding safety activities on site during post- tensionning work Một số khuyến nghị hoạt động an tồn cơng trường q trình thi cơng cáp ứng suất trước Standard platform which, is installed at the edge of concrete slap, is provided with handrail 1.1m high, midrail 0.5m high, and toeboard, during the post-tensionning work Lắp đặt sàn công tác tiêu chuẩn mép sàn bê tông, trang bị đầy đủ tay vịn cao 1.1m, lan can cao 0.5m, chắn mũi, q trình thi cơng ứng suất trước THANK YOU! TRÂN TRỌNG CÁM ƠN! ... during the post-tensionning work Lắp đặt sàn công tác tiêu chuẩn mép sàn bê tông, trang bị đầy đủ tay vịn cao 1.1m, lan can cao 0.5m, chắn mũi, trình thi công ứng suất trước THANK YOU! TRÂN TRỌNG... trang thi? ??t bị bảo vệ cá nhân Some recommendations regarding safety activities on site during post- tensionning work Một số khuyến nghị hoạt động an tồn cơng trường q trình thi cơng cáp ứng suất... ĐẶT TRÊN VÁN KHUÔN SÀN TYPE AND PROOF LOAD OF BACKPROPPING QUY CÁCH VÀ TẢI TRỌNG CHO PHÉP CỦA CÂY CHỐNG 5) BACKPROPPING CALCULATION FOR PT SLAB TÍNH TỐN GIÀN GIÁO CHỐNG CHO SÀN DƯL (BY FVN –