Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống
1
/ 33 trang
THÔNG TIN TÀI LIỆU
Thông tin cơ bản
Định dạng
Số trang
33
Dung lượng
22,55 MB
Nội dung
FREYSSINET VIETNAM CO.,LTD DỰ ÁN KHU NHÀ Ở ĐỂ BÁN CHO CBCNV LIÊN CƠ QUAN QUẬN LONG BIÊN WORK SEQUENCE FOR POST TENSIONING SLAB TRÌNH TỰ THI CƠNG SÀN PHẲNG DƯL 1) MATERIAL - EQUIPMENT/ VẬT TƯ - THIẾT BỊ 5B 3B 3B 5B Block/Đ ế neo Trumplate/ Bát neo Jaws/ Chấu neo 2B 3B 5B Duct / PT Strands/ Ống ghen Cáp dự ứng lực Mono Jack/ Stressing pump/ Grout pump/ Kích thủy lực đơn Bơm thủy lực cho kích đơn Máy bơm vữa 2) WORKING SEQUENCES/ TRÌNH TỰ THI CÔNG STEP 1: (BY FREYSSINET(FVN) /THỰC HIỆN BỞI FREYSSINET) OPEN SPACE FOR ACCOMMONDATE PT TENDON ALONG INSIDE THE PERIMETER BEAM RABAR BEFORE CASTING CONCRETE/ MỞ RỘNG THÉP CỘT ĐỂ DỄ DÀNG LẮP ĐẶT CÁP TRONG DẦM BIÊN TRƯỚC KHI ĐỔ BÊ TÔNG CỘT STEP 2: (BY ORTHER/ THỰC HIỆN BỞI CHỦ ĐẦU TƯ/NHÀ THẦU CHÍNH) CONSTRUCTION OF DESK FLOOR AND MOUNTED EDGE-BOARD AREA HAS TENDON ANCHORAGE/ LẮP ĐẶT VÁN KHUÔN ĐÁY SÀN VÀ VÁN KHUÔN BIÊN XUNG QUANH VỊ TRÍ CĨ ĐẦU NEO STEP 3: (BY FVN) MARK OUT ANCHOR LOCATIONS ON SIDE FORMWORK/ ĐỊNH VỊ VỊ TRÍ CỦA ĐẦU NEO LÊN VÁN KHN BIÊN STEP 4: (BY ORTHER/ CHỦ ĐẦU TƯ/NHÀ THẦU CHÍNH) SLOT AND BOLTS HOLE POSITIONS REQUIRED TO BE CUT AND DRILLED/ TẠO KHE MỞ VÀ LỖ BU LÔNG TRÊN VÁN KHUÔN BIÊN STEP 5: (BY FVN) BOLT ANCHOR AND RECESS FORMER ONTO THE EDGE-BOARD/ LẮP ĐẶT NEO VÀ ĐẦU HỘC VÀO VÁN KHUÔN BIÊN STEP 14: (BY ORTHER/ CHỦ ĐẦU TƯ/NHÀ THẦU CHÍNH) INSTALL ANTI-BURSTING REBAR ACCORDINGLY AS PER DESIGN/ LẮP ĐẶT THÉP GIA CƯỜNG ĐẦU NEO PHÙ HỢP VỚI THIẾT KẾ STEP 15: (BY ORTHER/ CHỦ ĐẦU TƯ/NHÀ THẦU CHÍNH) INSTALL TOP REBAR LAYERS (IF REQUIRED)/ LẮP ĐẶT LƯỚI THÉP LỚP TRÊN (NẾU CÓ) STEP 16: (BY FVN) PROVIED GROUT VENT AT ANCHORAGE & DEAD ENDS/ LẮP ĐẶT ỐNG BƠM VỮA TẠI ĐẦU KÉO VÀ ĐẦU CHẾT COMPLETION OF INSTALLATION & READY FOR INSPECTION HOÀN THIỆN LẮP ĐẶT & SẴN SÀNG NGHIỆM THU STEP 17: (BY ORTHER/ CHỦ ĐẦU TƯ/NHÀ THẦU CHÍNH) CONCRETING / ĐỔ BÊ TÔNG STEP 18: (BY ORTHER/ CHỦ ĐẦU TƯ/NHÀ THẦU CHÍNH) REMOVE SIDE FORM WORK AND PROVIDE WORKING PLATFORM/ THÁO DỠ VÁN KHUÔN BIÊN VÀ LẮP ĐẶT SÀN THAO TÁC STEP 19: (BY FVN) REMOVE RECESS FORM AND INSTALL ANCHORAGE BLOCK & JAWS / THÁO DỠ KHUÔN HỘP RECESS VÀ LẮP ĐẶT ĐẾ NEO VÀ CHẤU NEO STEP 20: (BY FVN) WHEN CONCRETE STRENGTH REACHS 30Mpa: CONDUCT STRESS TENDONS/ TIẾN HÀNH CĂNG KÉO CÁC BÓ CÁP KHI CƯỜNG ĐỘ BÊ TÔNG ĐẠT 30Mpa STEP 21: STRESSING RECORDS MUST BE APPROVED BY ENGINEER/ THÔNG QUA HỒ SƠ NGHIỆM THU CĂNG KÉO STEP 22: (FV) CUT STRANDS CAN BE PROCEED AFTER 24 HRS STRESSING AND RECORDS MUST BE APPROVED BY ENGINEER/ CẮT CÁP CÓ THỂ TIẾN HÀNH SAU KHI CĂNG KÉO 24 GIỜ VÀ HỒ SƠ ĐÃ ĐƯỢC PHÊ DUYỆT STEP 23: (BY ORTHER/ CHỦ ĐẦU TƯ/NHÀ THẦU CHÍNH) BACKFILL RECESS BY CONCRETE SAME GRADE OF SLAB CONCRETE/ ĐỔ BÊ TÔNG BỊT ĐẦU NEO BẰNG BÊ TÔNG CÙNG CẤP BÊ TÔNG SÀN STEP 24: (BY FV) TENDON AIR TEST/ KIỂM TRA CÁC BĨ CÁP BẰNG KHÍ NÉN TRƯỚC KHI BƠM VỮA STEP 25: (BY FV) TENDON GROUTING / BƠM VỮA COMPLETION OF PT SLAB/ SÀN DỰ ỨNG LỰC SAU KHI THÁO VÁN KHUÔN 4) CONSTRUCTION MATTER VẤN ĐỀ THI CÔNG DISPENSER IS POSITIONED ON THE SOFFIT NEAR WORKING AREA/ TANG CÁP ĐƯỢC ĐẶT LÊN VÁN KHUÔN SÀN GẦN KHU VỰC THI CÔNG ... - THI? ??T BỊ 5B 3B 3B 5B Block/Đ ế neo Trumplate/ Bát neo Jaws/ Chấu neo 2B 3B 5B Duct / PT Strands/ Ống ghen Cáp dự ứng lực Mono Jack/ Stressing pump/ Grout pump/ Kích thủy lực đơn Bơm thủy lực. .. CẤP BÊ TÔNG SÀN STEP 24: (BY FV) TENDON AIR TEST/ KIỂM TRA CÁC BÓ CÁP BẰNG KHÍ NÉN TRƯỚC KHI BƠM VỮA STEP 25: (BY FV) TENDON GROUTING / BƠM VỮA COMPLETION OF PT SLAB/ SÀN DỰ ỨNG LỰC SAU KHI... KHUÔN 4) CONSTRUCTION MATTER VẤN ĐỀ THI CÔNG DISPENSER IS POSITIONED ON THE SOFFIT NEAR WORKING AREA/ TANG CÁP ĐƯỢC ĐẶT LÊN VÁN KHUÔN SÀN GẦN KHU VỰC THI CÔNG