1. Trang chủ
  2. » Kỹ Thuật - Công Nghệ

MDF Fiber Defibrator System-VẬN HÀNH HỆ THỐNG NGHIỀN SỢI MDF [Compatibility Mode]

77 87 3

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

THÔNG TIN TÀI LIỆU

Thông tin cơ bản

Định dạng
Số trang 77
Dung lượng 6,81 MB

Nội dung

Defibrator™ system training MDF machinery © Metso Corporation 2007 2007-03-07 Metso Panelboard / Defibrator training 2007 Defibrator™ system © Metso Corporation 2007 2007-03-07 Metso Panelboard / Defibrator training 2007 Layout © Metso Corporation 2007 2007-03-07 Metso Panelboard / Defibrator training 2007 Layout © Metso Corporation 2007 2007-03-07 Metso Panelboard / Defibrator training 2007 Defibrator system Components • • • • • • • • • • • Surge bin SBRA 2900/40 Screw feeder ADI 500 Preheater PVA 1600/11 Preheater discharge screw Defibrator feeder DFA 500L Defibrator EVO 56 Auxiliary systems Refiner segments Blow valve Blow line DN 125/150 Diverter valve DN 125 © Metso Corporation 2007 2007-03-07 Metso Panelboard / Defibrator training 2007 Defibrator system topics • • • • • • • • • • • Surge bin Screw feeder Preheater Side-feed unit Refiner Refiner auxiliaries Refiner segments Blow valve Blow line Diverter valve Sealing water © Metso Corporation 2007 2007-03-07 » Metso Panelboard / Defibrator training 2007 Surge bin © Metso Corporation 2007 2007-03-07 Metso Panelboard / Defibrator training 2007 Surge bin functions Presteaming • • Reduced evaporation in the dryer with presteaming Temperature equalisation - • Moisture equalisation - • More uniform fibre quality Natural rosin reduction - Thaws chips in cold climates More uniform fibre quality Screw feeder squeeze-out water » © Metso Corporation 2007 2007-03-07 Metso Panelboard / Defibrator training 2007 Surge bin functions Level control • Raw material buffer - • Constant residence time - • More uniform fibre quality More uniform moisture after the dryer Constant level and non-uniform residence time Better utilisation of equipment before surge bin - 10 Allows for short stops before surge bin Lower average load Improved cleaning of raw material » © Metso Corporation 2007 2007-03-07 Metso Panelboard / Defibrator training 2007 Segment cost over time 18 16 14 Costs per tonne ($) 12 Total 10 Energy Shutdown Segment 100 200 300 400 500 600 Segment running time (h) 63 © Metso Corporation 2007 2007-03-07 Metso Panelboard / Defibrator training 2007 700 800 900 000 Segment change 64 © Metso Corporation 2007 2007-03-07 Metso Panelboard / Defibrator training 2007 Defibrator system topics • • • • • • • • • • • 65 Surge bin Screw feeder Preheater Side-feed unit Refiner Refiner auxiliaries Refiner segments Blow valve Blow line Diverter valve Sealing water © Metso Corporation 2007 2007-03-07 » Metso Panelboard / Defibrator training 2007 Blow valve 66 © Metso Corporation 2007 2007-03-07 Metso Panelboard / Defibrator training 2007 Drain valve and blow valve 67 © Metso Corporation 2007 2007-03-07 Metso Panelboard / Defibrator training 2007 Blow line 68 © Metso Corporation 2007 2007-03-07 Metso Panelboard / Defibrator training 2007 Defibrator system topics • • • • • • • • • • • 69 Surge bin Screw feeder Preheater Side-feed unit Refiner Refiner auxiliaries Refiner segments Blow valve Blow line Diverter valve Sealing water © Metso Corporation 2007 2007-03-07 » Metso Panelboard / Defibrator training 2007 Diverter valve Compact ball valve 70 © Metso Corporation 2007 2007-03-07 Metso Panelboard / Defibrator training 2007 Diverter valve principle Normal operation to cyclone Heating dryer pipe for 20 s Cleaning cyclone pipe for 20 s 71 © Metso Corporation 2007 2007-03-07 Metso Panelboard / Defibrator training 2007 Switching from cyclone to dryer Normal operation to dryer Defibrator system topics • • • • • • • • • • • 72 Surge bin Screw feeder Preheater Side-feed unit Refiner Refiner auxiliaries Refiner segments Blow valve Blow line Diverter valve Sealing water » © Metso Corporation 2007 2007-03-07 Metso Panelboard / Defibrator training 2007 Sealing water system 73 © Metso Corporation 2007 2007-03-07 Metso Panelboard / Defibrator training 2007 Sealing water system Pump system • • • • Preheater discharge screw Agitator Defibrator feeder Mechanical seal flush water - Same or parallel system Advantage to steam Load on dryer » PI 74 © Metso Corporation 2007 2007-03-07 Metso Panelboard / Defibrator training 2007 Sealing water system Flow sheet (principal) PI FIA PI FIA PI PI PS 75 © Metso Corporation 2007 2007-03-07 Metso Panelboard / Defibrator training 2007 FIA PI FIA Sealing water system Sealing function • Systems - • Adjustment - • – 10 l/min per packing box l/min to mechanical seal Inlet pressure 13 bar(e) Counterpressure approx bar above process pressure Alarm 76 Preheater discharge screw Agitator Defibrator feeder Mechanical seal (flush water) – l/min alarm bar above preheater pressure » © Metso Corporation 2007 2007-03-07 Metso Panelboard / Defibrator training 2007 Process control system (HMI) Defibrator area 77 © Metso Corporation 2007 2007-03-07 Metso Panelboard / Defibrator training 2007 ... / Defibrator training 2007 Defibrator system © Metso Corporation 2007 2007-03-07 Metso Panelboard / Defibrator training 2007 Layout © Metso Corporation 2007 2007-03-07 Metso Panelboard / Defibrator. .. Panelboard / Defibrator training 2007 Defibrator system Components • • • • • • • • • • • Surge bin SBRA 2900/40 Screw feeder ADI 500 Preheater PVA 1600/11 Preheater discharge screw Defibrator feeder... 500L Defibrator EVO 56 Auxiliary systems Refiner segments Blow valve Blow line DN 125/150 Diverter valve DN 125 © Metso Corporation 2007 2007-03-07 Metso Panelboard / Defibrator training 2007 Defibrator

Ngày đăng: 14/05/2020, 21:53

TỪ KHÓA LIÊN QUAN

TÀI LIỆU CÙNG NGƯỜI DÙNG

TÀI LIỆU LIÊN QUAN

w