BAO MINH EZ LAND APARTMENT District 9, HCMC PACKAGE: SUPERSTRUCTURE PRE TENDER ESTIMATION Issuance date: 30-Oct-2017 Revision:A SUMMARY DESCRIPTION TOTAL MOUNT (VND) Remark Including Section No - General note - EV Section No - Civil & Structural Works A - Section No - Construction preliminaries - -1 17 71 10 03 30 BM BM AR AR T TP P0 03 TE TE N NR D F O I0 C BO Q R Section No - Architectural Works - Section No - MEPF Works Section No - External works and infrastructure Total Project Cost (Excluded VAT) VAT 10% - Ap p 03 Total Project Cost (Included VAT) - SUMMARY 1/48 BAO MINH EZ LAND APARTMENT District 9, HCMC PACKAGE: SUPERSTRUCTURE PRE TENDER ESTIMATION Issuance date: 30-Oct-2017 Revision:A TOTAL DESCRIPTION TOTAL MOUNT (VND) Section No - General note Remark Including EV - -1 17 71 10 03 30 BM BM AR AR T TP P0 03 TE TE N NR D F O I0 C BO Q R Construction hoarding Site Preparation Site Office and Office Facility Site Security & Management team Traffic, road maintenance and transportation HSE Construction method Bank bond and insurance Authorities Approval Additional works Sub-Total for Construction preliminaries A Section No - Construction preliminaries - Section No - Civil & Structural Works Concrete works Reinforcement works Formworks Additional works Sub-Total for Structural Works - - Section No - Architectural Works - - p 03 Masonry works Waterproofing works Tiling, hardener, stone, timber works Skimcoat and Emulsion painting works Ceiling / False ceiling works Roofing Doors and Windows works Metal works Kitchen Cabinets and Mirror cabinets Signage works Loose furniture for public areas, security room, Building Management Office Additional works Sub-Total for Architectural Works Ap Section No - MEPF Works Lift works Plumbing works MVAC works Fire Fighting and Prevention works Electrical works Additional works Sub-Total for MEPF Works Section No - External works and infrastructure Leveling grading works Road, pavement, out side corridor floor works Gate & fence works Stormwater drainage system works Landscape works Swimming pool, balance tank, pool deck, water fountain playground, children's playround works TOTAL - 2/48 Canopy main entrance works - Loose furniture for pool deck, changing room, out door gym equipment and children's playround MEP infrastructure works River clearance, cleaning and other Additional works Sub-Total for External works and infrastructure - - Ap p 03 -1 17 71 10 03 30 BM BM AR AR T TP P0 03 TE TE N NR D F O I0 C BO Q R EV A Total Project Cost (Excluded VAT) TOTAL 3/48 BAO MINH EZ LAND APARTMENT District 9, HCMC PACKAGE: SUPERSTRUCTURE SECTION NO - GENERAL NOTE Item Description Note B Allow against the items or in the prices for everything contained in these Bill of Quantities which has a monetary value Items which are not priced or have dashes or other like marks inserted in the cash columns will be deemed to be of no value or included elsewhere in the tender and no Payment whatsoever will be included in Interim Payment in the event of no amounts being inserted Lump sums are not to be given when unit rates are applicable C All rates, amounts and / or percentage values in these Bills shall be entered up to two decimal places gor United States Dollars and no decimal places for Vietnamese Dong In cases where more than two decimal places are entered, only the first two decimals will be used D The rates and prices entered in the Bill shall be deemed to be the full inclusive value of the work covered by the several items including the following, unless expressly stated otherwise; -1 17 71 10 03 30 BM BM AR AR T TP P0 03 TE TE N NR D F O I0 C BO Q R EV A A The Bill of Quantities are to be read in conjunction with all other sections contained in these documents which shall be construed as being complementary to one another The Quantities given are for information only and shall be checked and verified by the Contractors No Claim shall be allowed for errors or omissions int his Bill of quantities (i) Labour and costs in connection therewith (ii) The supply of materials, equipment, plant, goods storage and cost in connection therewith including waste and delivery to Site (iii) All construction equipment plant and costs in connection therewith (iv) Fixing, erecting and installing or placing of materials, equipment, plant and goods in position including all necessary temporary works and materials 03 (v) Movement of piling frames into position and about the Site, any necessary excavation or filling required to place the frames, raising or lowering the frames and any staging, barges or the like required to support the frames Ap p (vi) Driving/boring through and/or breaking up any soil material, sandstone, shale, rock or boulders and the like at any depth (vii) Removal of underground obstructions together and all work in connection therewith (viii) Removing all surplus spoil due to piling works from Site (ix) Replacing incorrectly piles, damaged piles and piles which fail under tests (x) Safety equipment and measures such as oxygen tanks, breathing apparatus, etc for workers operating below the surface (xi) The cost of any additional work due to eccentricity of piles and/or damaged or displaced piles (xii) Idling time for all equipment, plant and labour for whatever reason, except on particular instruction from the Construction Manager General note 4/48 BAO MINH EZ LAND APARTMENT District 9, HCMC PACKAGE: SUPERSTRUCTURE SECTION NO - GENERAL NOTE Item Description Note (xiii) Sampling and testing materials, equipment, plant and goods, testing, workmanship, providing, storing, packing and transporting samples to and from the place of testing (xiv) General obligations, liabilities and risks involved in the execution of the Works set forth or reasonably implied in the tender documents including procurement of all necessary insurances EV (xvii) Payment of all taxes, fees, charges as maybe imposed on the Contractor or due to the Works A (xv) Establishment charges, overheads and profit -1 17 71 10 03 30 BM BM AR AR T TP P0 03 TE TE N NR D F O I0 C BO Q R (xviii) Items against which no price or rate is entered shall be deemed to be covered by the other rates and prices in the Bill of Quantities (xix) All rates and prices entered here inbelow shall be deemed to be in Vietnam Dongs 03 p Ap E The Contractor is deemed to have read all other related documents, Specflcations and Bills of Quantities, etc and in particular to have studied the tender drawings to be fully aware of the full extent of the Works described under each Direct Contractor's Works and the corresponding interface with the Contractor's own Work General note 5/48 BAO MINH EZ LAND APARTMENT District 9, HCMC PACKAGE: SUPERSTRUCTURE SECTION NO - CONSTRUCTION PRELIMINARIES Item Description Reference in Scope Qty Unit Rate Amount Remarks DIVISION A - CONSTRUCTION HOARDING Handed over, maintain and removal fence and hoarding during construction time incl entrance gates A B - Maintain and removal fence, hoarding incl entrance gates Supply maintain and removal Sign board with name of Employerr, CM, PM, QS, Architect and M&E Consultant Section 2, item 1.3 Section 2, item 1.4 15.00 1.00 months - sum SUB TOTAL for the Construction hoarding VND 0,000 DIVISION B - SITE PREPARATION G G H I J K L M N 1.00 15.00 15.00 15.00 sum - months - months - A E - Maintain and pay all charges for temporary electricty - Supply, install and maintain temporary earthing system - Generator set mobilization and demobilization including fuel consumption use Temporary water system Section 2, item 2.1 months - EV D Temporary electricty system, including power network - Supply and install, including power network Section 2, item 2.2 - Supply and install, including network - Maintain and pay all charges for temporary water 1.00 sum months -1 17 71 10 03 30 BM BM AR AR T TP P0 03 TE TE N NR D F O I0 C BO Q R C 15.00 Temporary drainage system - Supply and install, including network - Maintain and pay all charges Section 2, item 2.3 Telephone - internet system - Supply and install - Maintain and pay all charges Temporary WC on site for CM, CS, Employer, labour Section 2, item 2.4 1.00 O Section 2, item 2.8 P Maintain bridge car washing Section 2, item 2.9 Section 2, item 2.7 - 15.00 sum moths 1.00 15.00 sum months - 1.00 15.00 sum months sum - Section 2, item 2.5, 2.6 - Supply and install - Maintain and pay all charges Supply and maintain for storages, workshops area, Canteen, Supply and maintain for Guard post - 1.00 1.00 1.00 sum - months - SUB TOTAL for the Site Preparation VND 0,000 DIVISION C - SITE OFFICE AND OFFICE FACILITY Q R S T Temporary office and facilitites for Employer, PM, Consultant - Supply, maintain office - Photocopier, facilitities Temporary office and facilitites for contractors - Supply, maintain office - Photocopier, facilitities Section 2, item 3.1, 3.2 1.00 15.00 sum months - 1.00 15.00 sum months - SUB TOTAL for the Site Office and Office Facility VND 0,000 Site Security with peoples/shift (24/24) Section 2, item 4.1 Site management team Section 2, item 4.2 p U 03 DIVISION D - SITE SECURITY & MANAGEMENT TEAM - Project Director - Construction Manager X - Deputy Construction Manager Y - Contract Admin Manager Z Ap V W 15.00 months - 15.00 months 15.00 months - 15.00 months - 15.00 months - - QA/QC Manager 15.00 months - AA - HR/ Safety Manager 15.00 months - AB - Civil Engineer 15.00 months - AC - Quantity Surveyor 15.00 months - AD - Engineer - QA/QC 15.00 months - AE - Supervisor 15.00 months - AF - Site Clerk 15.00 months - SUB TOTAL for the Site Security & Management team VND 0,000 DIVISION E - TRAFFIC, ROAD MAINTENANCE AND TRANSPORTATION AG Internal Traffic and road maintenance Section 2, item 5.1 1.00 Cons Prelims sum - 6/48 BAO MINH EZ LAND APARTMENT District 9, HCMC PACKAGE: SUPERSTRUCTURE SECTION NO - CONSTRUCTION PRELIMINARIES Item AH Description External traffic road maintenance Reference in Scope Section 2, item 5.2 Qty Unit Rate Amount sum 1.00 SUB TOTAL for the Traffic, road maintenance and transportation Remarks - VND 0,000 DIVISION F - HSE AJ AK AL AM AN AO AP Hygiene Safety - Safety staff - Safety instruction signage, Safety walk way, safety railing - First Aid facilities - Tools PPE for Employer staff and Consultant, guests Environment Rubbish cleaning Site fire fighiting system Section 2, item 6.1 Section 2, item 6.2 15.00 months 15.00 months sum - sum sum - months months sum - 1.00 1.00 1.00 Section 2, item 6.3 Section 2, item 6.5 Section 2, item 6.6 15.00 15.00 1.00 VND DIVISION G - CONSTRUCTION METHOD AQ AR AS AT AV AW AX Section 2, item 7.6.1, 7.6.3 -1 17 71 10 03 30 BM BM AR AR T TP P0 03 TE TE N NR D F O I0 C BO Q R Tower cranes - Foundation - Demobilization & install, dismantling - Oeration & maintenance, inspection,… Hoists AY Section 2, item 7.1.3 AZ External scaffolding system Section 2, item 7.1.4 BA All necessary works independent checking of construction Section 2, item 7.1.5 method Material testing, submission of materials' sample for Section 2, item 7.1.6 approval Shopdrawing & as-built drawings Section 2, item 7.1.7 BC 1.00 1.00 15.00 sum sum months - 1.00 1.00 15.00 sum sum months sum - sum - sum - sum - sum - sum - Section 2, item 7.6.2, 7.6.3 - Foundation - Demobilization & install, dismantling - Oeration & maintenance ,inspection,… Mobilisation & Demobilization to other construction equipment and tools Survey & mornitoring BB 0,000 EV SUB TOTAL for the HSE A AI 1.00 1.00 1.00 1.00 1.00 1.00 SUB TOTAL for the Construction method VND 0,000 DIVISION H - BANK BOND AND INSURANCE BD BE BF BG Bank bond - Tender guarantee - Advance payment bond - Performance bond - Warranty Guarantee Insurance - Contractors' plant & equipment - Contractors' staff and workers - Contractors' all risks insurance and third party 03 BG BH BI Section 2, item 8.1 Section 2, item 8.2 Section 2, item 8.3 Section 2, item 8.4 1.00 1.00 1.00 1.00 sum sum sum sum Section 2, item 9.1 Section 2, item 9.2 Section 2, item 9.3 1.00 1.00 1.00 sum sum sum - VND 0,000 VND 0,000 p SUB TOTAL for the Bank bonb and insurance - Ap DIVISION I - AUTHORITIES APPROVAL BJ Authorities Approval Section 2, item 10 1.00 SUB TOTAL for the Authorities approval sum - DIVISION J - ADDITIONAL WORKS SECTION NO - CONSTRUCTION PRELIMINARIES Total of the section: Cons Prelims 0,000 7/48 BAO MINH EZ LAND APARTMENT District 9, HCMC PACKAGE: SUPERSTRUCTURE SECTION NO - CIVIL & STRUCTURAL WORKS Item Description Reference in Scope Qty Unit Rate Amount Remarks DIVISION A - CONCRETE WORKS 2,276.6 453.6 m3 m3 C D Concrete Grade B40 Blade shear walls Lift Core walls Section 3, item 1.3 Section 3, item 1.4 1,278.6 373.0 m3 m3 E F G H I Concrete Grade B30 Slab Beams Staircase Ramp Parapet wall for roof Section 3, item 1.1 Section 3, item 1.1 Section 3, item 1.5 Section 3, item 1.6 Section 3, item 1.7 9,105.6 450.0 107.9 52.2 37.1 m3 m3 m3 m3 m3 J K Waterproofing Concrete Grade B30 Slab of roof, tum floor Beams of roof, tum floor Section 3, item 1.2 Section 3, item 1.2 562.2 23.0 m3 m3 SUB TOTAL for the Concrete - A Section 3, item 1.3 Section 3, item 1.4 EV Concrete Grade B45 Blade shear walls Lift Core walls -1 17 71 10 03 30 BM BM AR AR T TP P0 03 TE TE N NR D F O I0 C BO Q R A B VND - DIVISION B - REINFORCEMENT WORKS L M N O P Q R Blade shear wall Lift Core wall Slab Beams Staircase Ramp Parapet wall for roof Section 3, item 1.3 Section 3, item 1.4 Section 3, item 1.1, 1.2 884,830.6 281,672.5 1,005,867.7 kg kg kg - Section 3, item 1.1, 1.2 163,699.7 kg - 12,489.2 8,265.3 3,750.0 kg kg kg - Section 3, item 1.5 Section 3, item 1.6 Section 3, item 1.7 SUB TOTAL for the Reinforcement VND - DIVISION C - FORMWORK WORKS S T U V W X Y Blade shear wall Side of core walls Slab Beams Staircase Ramp Parapet wall for roof Section 3, item 34,120.6 8,565.3 52,778.1 4,561.6 686.1 305.1 371.4 SUB TOTAL for the Formworks m2 m2 m2 m2 m2 m2 m2 - VND - VND - DIVISION D - ADDITIONAL WORKS 03 The Contractor can add here any items that he considers missing from this bill p SUB TOTAL for Additional works Ap SECTION NO - CIVIL & STRUCTURAL WORKS - Total of the section: Structure 8/48 BAO MINH EZ LAND APARTMENT District 9, HCMC PACKAGE: SUPERSTRUCTURE SECTION NO - ARCHITECTURAL WORKS Item Description Reference in Scope Qty Unit 10,046.0 8,484.4 16,124.9 2,390.1 - m2 m2 m2 m2 3,369.7 m2 24,103.1 m2 Rate Amount Remarks DIVISION A - MASONRY WORKS F Concrete blocks Section items 1.2 Wall 200mm thick, M75 by Cement block - Internal, including lintel & stiffener Wall 100mm thick, M75 by Cement block- Internal, including lintel & stiffener Plastering G H I J K L Section items 1.1 Section items 1.3, 1.4 External plastering to brickwork 1,5 cm thick, M75 by Waterproof cement mortar Internal plastering to brickwork 1,5 cm thick, M75 Internal plastering 1,5 cm thick to wall of Wc rooms area by waterproof Cement mortar 1,5 cm thick, M75 Internal plastering 1,5 cm thick to block work External plastering 1,5 cm thick, M75 to concrete by Waterproof cement mortar Internal plastering 1,5 cm thick, M75 to concrete by Cement mortar - 19,188.9 m2 34,884.9 m2 20,675.5 m2 54,945.5 m2 13,885.3 m2 33,874.7 m2 - - VND -1 17 71 10 03 30 BM BM AR AR T TP P0 03 TE TE N NR D F O I0 C BO Q R SUB TOTAL for the masonry works - A E Burnt clay brick Wall 100mm thick, M75- External , including lintel & stiffener Wall 200mm thick, M75- External , including lintel & stiffener Wall 100mm thick, M75- Internal, including lintel & stiffener Wall 200mm thick, M75- Internal, including lintel & stiffener DIVISION B - WATERPROOFING WORKS M N O P Q R Waterproofing for lift pit, STP, Septic tank (internal) Waterproofing for Domestic water tank + Fire tank (internal) Section items 2.1, 2.2 Section items 2.3 Waterproofing for apartment, shophouse toilet (skirting h=300mm) Section item 2.4 Waterproofing for apartment, shophouse balconies (skirting h= 300mm) Waterproofing for 11th floor garden roof, (skirting h=300mm) Section item 2.4 Section item 2.5 Waterproofing for top roof , tum floor (skirting h=300mm) Section item 2.6 1,490.5 m2 726.2 m2 5,453.9 m2 6,910.1 m2 432.4 m2 2,715.3 m2 SUB TOTAL for the waterproofing works DIVISION C - TILING, HARDENER, STONE, TIMBER WORKS Floors S V U Hardener Hardener to Staircase Hardener to parking area Hardener to ramps, including non-slip joint (width 20mm, depth 10mm) Section item 3.1 1,024.9 m2 Section item 3.2 Section item 3.2 4,274.6 m2 136.4 m2 37,268.37 X Wooden laminate Wooden laminate to floor in master bedroom X Homogeneous tiling Homogenous tiling to floor 600 mm x 600 mm in living room, kitchen Section item 3.9 area of apartments- including door-sill Section item 3.10 AC Homogenous tiling to floor 600 mm x 600 mm apartments Homogenous tiling to floor 300 mm x 300 mm including door-sill Homogenous tiling to floor 300 mm x 300 mm room Homogenous tiling to floor 300 mm x 300 mm Wc of security room, Wc of gym room AD Homogenous tiling to floor 300 mm x 600 mm for Apartment - Yard, Section item 3.13 balcony, loggia, washing room, including door-sill in Wc of kindergarten Section item 3.11 in changing rooms, m2 6,469.6 - m2 15,819.2 m2 3,578.4 m2 3,438.6 m2 20.5 m2 40.3 m2 3,914.8 m2 96.7 m2 177.4 m2 Section item 3.11 AF AG Ap AE Homogenous tiles 600 mm x 600mm for lobby rooms Section item 3.4 Homogenous tiles 600 mm x 600mm for Community rooms Section item 3.8 Homogenous tiling to floor 600 mm x 600 mm for kindergarten room Section item 3.8 AH Homogenous tiling to floor 600 mm x 600 mm for gym room, manager room, security room Section item 3.8 AI Homogenous tiles 600 mm x 600mm for Main lobby / lift lobby / corridor (F6) Section item 3.5 AJ AK Ceramic tiling Ceramic tiling to rubbish room Domestic water tank, fire tank Ceramic tiling to roof of 3F (F8) Section item 3.14 Section item 3.3 Section item 3.19 292.4 m2 87.5 m2 3,122.3 m2 122 236 89.2 - m2 m2 m2 AL Other Cutting the anti-slip line at the corner of steps Section item 3.1 AM Painting line for intrernal parking Section item 3.17 493.0478 Stone bazan to 11th floor garden roof incl screeding and curb Section item 3.15 (F12) Stone bazan to 11th floor garden roof incl screeding and curb Section item 3.15 (F13) Concrete grass block to 11th floor garden roof incl screeding (F11) Section item 3.15 101.234 AN AO - - p AB Section item 3.9 in Wc of apartments, Section item 3.11 03 AA - Section item W in small bedroom of - - VND Screeding for slab Screeding for slab by cement mortar Grade 75 Y EV A B C D 870.2 88.2 90.4 - m - m2 - m2 m2 m2 - Architecture 9/48 BAO MINH EZ LAND APARTMENT District 9, HCMC PACKAGE: SUPERSTRUCTURE SECTION NO - ARCHITECTURAL WORKS Item Description Reference in Scope Qty Unit Rate Amount Remarks - Ap p 03 -1 17 71 10 03 30 BM BM AR AR T TP P0 03 TE TE N NR D F O I0 C BO Q R EV A Walls Architecture 10/48 BAO MINH EZ LAND APARTMENT District 9, HCMC PACKAGE: SUPERSTRUCTURE SECTION NO 5.5 - MEP work: ELECTRICAL & ELV WORKS Item Description Specification Reference in Scope Unit Qty Amount (VND) Rate 1C-4mm2 Cu/XLPE/PVC 1C-2.5mm2 Cu/XLPE/PVC m m 2,553.00 5,946.08 - DF DG DH DI 1C-6mm2 Cu/PVC 1C-4mm2 Cu/PVC 1C-2.5mm2 Cu/PVC 1C-1.5mm2 Cu/PVC m m m m 90.00 25,225.00 149,596.00 123,090.00 DJ DK DL DM 3C-6mm2 Cu/XLPE/PVC 3C-4mm2 Cu/XLPE/PVC 4C-2.5mm2 Cu/XLPE/PVC 3C-2.5mm2 Cu/XLPE/PVC m m m m 165.30 1,464.00 176.00 156.00 DN DO DP DQ DR DS DT DX DX DY DZ EA EB EC (E)1C-240mm2 Cu/PVC (E)1C-185mm2 Cu/PVC (E)1C-120mm2 Cu/PVC (E)1C-95mm2 Cu/PVC (E)1C-70mm2 Cu/PVC (E)1C-35mm2 Cu/PVC (E)1C-25mm2 Cu/PVC (E)1C-16mm2 Cu/PVC (E)1C-10mm2 Cu/PVC (E)1C-6mm2 Cu/PVC (E)1C-4mm2 Cu/PVC (E)1C-2.5mm2 Cu/PVC (E)1C-1.5mm2 Cu/PVC Sub-material ( cos head, nut….) m m m m m m m m m m m m m lot 77.00 5.00 5.00 91.00 360.00 971.75 16,322.64 10,065.55 593.40 2,100.00 74,255.00 45,957.00 1.00 - Straight Type: Ladder 600WX100H Ladder 400WX100H Ladder 300WX100H EF EG EH EH.1 Trunking 400Wx100H Trunking 300Wx100H Trunking 200Wx100H Trunking 100Wx100H EV -1 17 71 10 03 30 BM BM AR AR T TP P0 03 TE TE N NR D F O I0 C BO Q R LV CABLE TRAY & CONDUIT EC ED EE A DD DE - m m m 63.83 22.43 212.10 - m m m m 44.90 148.40 2,094.30 300.30 - EI Cable ladder, trunking fittings : elbow, tee, cross… lot 1.00 - EJ Hangers, supports, bolt, and sub material for complete: lot 1.00 - m m m m m m m m m m m m m m m 66.00 495.00 110.00 88.00 660.00 5.00 5.00 1,465.00 3,300.00 304.00 30.00 128,310.00 2,150.00 1) Adjustable Horizontal Connector 2) Adjustable Vertical Riser 3) End Drop Out 4) Blind End Plates 5) Side Rail Clamp W/Bolt 6) Hold Down Clamp W/Bolt 7) Unistrut Spring Nut 8) Joint Connector, Earthing Bonding Jumper, 9) Shank Bolt & Nut, Hex Bolt & Nut 10) Expansion Joint Connector HDPE conduit 195/150 HDPE conduit 110/90 HDPE conduit 80/65 HDPE conduit 65/50 HDPE conduit 32/25 PVC conduit D40 (exposed Pipe) PVC conduit D40 (subsided Pipe) PVC conduit D32 (exposed Pipe) PVC conduit D32 (subsided Pipe) PVC conduit D25 (exposed Pipe) PVC conduit D25 (subsided Pipe) PVC conduit D20 (exposed Pipe) PVC conduit D20 (subsided Pipe) PVC D32 flexible conduit PVC D20 flexible conduit 7,500.00 - EZ PVC box embed wall for switch, socket and AC, fan power set 696.00 - PVC box embed wall for switch, socket and AC, fan power set 12,672.00 - Conduits fittings : elbow, tee, box, and sub material for complete lot 1.00 - FB p Ap FA 03 EK EL EM EN EO EP EQ ER ES ET EU EV EW EX EY LINGTING AND SMALL POWER - Electrical at public, hall, corridor, staircase, air terminal at roof FC FD FE FF FG FH FI FJ FK FL FM FN LED downlight 20W - Ceiling Mounted Led Light (Corridor) LED downlight 18W - Ceiling Mounted Led Light (kid , community room) LED downlight 12W - Ceiling Mounted Led Light (toilet) Ceiling Mounted Led Panel 600x600mm Ceiling Mounted Led Batten 1200mm Wall Mounted Led Batten 1200mm Wall Mounted Led Batten 1200mm WP IP65 Ceiling Mounted Led Batten 600mm(Stair lights) Ceiling Mounted Led Batten 600mm, WP IP65 Exit Light, Green/White, ceiling mounted, c/w battery inverrter pack minium 2hours Wall Mounted Emergency Lighting Fiiting Aviation lights set 752.00 set 93.00 - set set set set set set set 20.00 4.00 119.00 324.00 26.00 125.00 2.00 - set 159.00 - set set 307.00 4.00 - BAO MINH EZ LAND APARTMENT District 9, HCMC PACKAGE: SUPERSTRUCTURE SECTION NO 5.5 - MEP work: ELECTRICAL & ELV WORKS Item FO FP FQ Specification Reference in Scope 10A way - gang lighting switch 10A way - gang lighting switch Sensor Unit Qty Amount (VND) Rate set 125.00 - set 5.00 - set 1.00 - 370.00 - Single Socket Outlet cực, 16A/250V set 1.00 - FT Double Socket Outlet, installed on ceiling cực, 16A/250V set 58.00 - FU Double Socket Outlet, water proof, IP65, cực, 16A/250V set 36.00 - FV FW Single Socket Outlet WP Double Lockable Cover set set 2.00 - FX Isolator, WP for AC 2P-25A set 7.00 - FY Isolator, WP for AC 3P-25A set 11.00 - FZ GA Junction Box Accessories for install set lot 10.00 1.00 - GC GD GE GF GI GJ GK Aparment Area Ceiling Mounted Led Light Ceiling Mounted Led Light Surface Mounted Led Light Ceiling Mounted Led Light (Water Proofing) 10A way - gang lighting switch 10A way - gang lighting switch 10A way - gang lighting switch 10A way - gang lighting switch GL GM GN GO GP GQ GR Double Socket Outlet cực, 16A/250V Socket Outlet, installed on ceiling cực, 16A/250V Socket Outlet, water proof, IP65, cực, 16A/250V Junction Box Isolator, WP for AC 2P-25A Isolator, WP for AC 2P-32A Accessories for installation GS GT GU GV GW GX GY GZ HA HB HC HE HF ESE terminal Copper cable 120mm2 Copper cable 70mm2 1C-120mm2 Cu/PVC 1C-50mm2 Cu/PVC 1C-35mm2 Cu/PVC 1C-25mm2 Cu/PVC 1C-10mm2 Cu/PVC Thermal exothermic welded connection Earth station & Copper tape 3x25mm Earthing bar for LV, ELV, lightning system Testing and commissioning Approval of authority 18W or equivalent set 1,689.00 17W or equivalent set 1,529.00 12W or equivalent set 933.00 20W-280mm or equivalent set 933.00 - set 3,024.00 - set 766.00 - set 756.00 - set 16.00 - set set set set 568.00 6,996.00 568.00 2,092.00 - lot 1.00 - set m m m m m m m set lot set lot lot 2.00 24 400 150.00 91.00 30.00 22.00 23.00 40 6.00 28 1.00 1.00 - Section items: 5.1~5.2 D16, 2400mm 03 TESTING AND COMMISISONING Testing and Commissioning for all system lot 1.00 Ap DIVISION D - ELV SYSTEM Section items: 4.2.1~4.2.7 and 7.1~7.7 TELEPHONE, DATA SYSTEM Section items: 4.2.1~4.2.7 and 7.1~7.7 HO HP HQ HR HS HT HU ELV Cable Tray Straight Type: Ladder 400WX100H Ladder 300WX100H Ladder 100Wx100H Trunking 100Wx100H Cable ladder, trunking fittings : elbow, tee, cross… HH HI HJ HK HL HM HN - - - VND p SUB TOTAL - ELECTRICAL SYSTEM Public Area RACK 42U MDF 1200 pair Fiber Optic Panel 64 ports IDF 30 pair ODF Fiber Mutilmode Cable Core Cat3 Cable Orther equipment Wifi access point PABX - Excluded Excluded LIGHTNING PROTECTION & EARTHING HG EV GB A set FS -1 17 71 10 03 30 BM BM AR AR T TP P0 03 TE TE N NR D F O I0 C BO Q R FR Description 10A way - gang lighting switch - - Reference in Scope Reference in Scope Reference in Scope Reference in Scope Reference in Scope Reference in Scope Reference in Scope set set 2.00 1.00 m m m m lot 22.43 277.04 2,585.32 1.00 - BAO MINH EZ LAND APARTMENT District 9, HCMC PACKAGE: SUPERSTRUCTURE SECTION NO 5.5 - MEP work: ELECTRICAL & ELV WORKS Item Description Specification HW Hangers, supports, bolt, And sub material for complete HX HY HZ IA IB IC ID IE Apartment Area Terminal Box Telephone socket RJ45 Data socket RJ45 Cat Cable, UTP Cat Cable, UTP PVC conduit D20 (exposed Pipe) PVC conduit D20 (subsided Pipe) Sub-material ( cos head, nut….) 100x100x70 mm IF IG IH II IJ IK IL IM IN IO IP IQ Public Area Main CATV Frame Floor CATV Frame CATV Receiver CATV Mixer Surge Aresstor Tape Off way Splitter 4-way Splitter 8-way Splitter 16-way Amplifier 30DB-220VAC RG-11 coaxial Cable RG-6 coaxial Cable IR IS IT IU IV IW IX IY Apartment Area Splitter 2-way Splitter 3-way Splitter 4-way Tivi socket RG-6 coaxial Cable PVC conduit D20 (exposed Pipe) PVC conduit D20 (subsided Pipe) Sub-material ( cos head, nut….) 1.00 set set set m m m m lot 568.00 1,258.00 1,258.00 15,070.00 15,070.00 14,300.00 1,450.00 1.00 - A EV -1 17 71 10 03 30 BM BM AR AR T TP P0 03 TE TE N NR D F O I0 C BO Q R 216.00 112.00 1.00 1,233.00 15,070.00 6,733.00 450.00 1.00 Section items: 4.2.1~4.2.7 and 7.1~7.7 IZ Recorder channel - 4TB JA Recorder 32 channel - 12TB JB JC JD JE JF JG JH JI Monitor 40'' with support Computer + CPU Software UPS Fiber switch F/D converter ODF Connector and sub material JJ Dome Camera, indoor JK Outdoor Camera, outdoor JL JM JN JO JP JQ Fiber Optic Multi Mode 2core Cat Cable, UTP PVC conduit D20 (exposed Pipe) PVC conduit D20 (subsided Pipe) Flexible conduit DN20 Conduits fittings : elbow, tee, box - set 1.00 - set 1.00 - set set set set set set set lot 1.00 1.00 1.00 1.00 10.00 1.00 1.00 1.00 - set 26.00 - set 9.00 - m m m m m lot 1,585.00 1,900.00 2,500.00 500.00 700.00 1.00 - Car parking card Safety sensor Barrier automatic Card reader Computer, desktop and sorfware Cat Cable, UTP 2Cx2.5 Cu/PVC/PVC Flexible HDPE conduit D32/25 Conduits fittings : elbow, tee, box set set set set set m m m lot 1,200.00 3.00 3.00 4.00 1.00 190.00 190.00 45.00 1.00 - ACCESS CONTROL (KEYCARD, LOCK) Key Card Card reader Unlock door push control set set set 1,200.00 12.00 12.00 - Electromagnetic lock set 12.00 - Conduits fittings : elbow, tee, box lot 1.00 - kVA 2.8-12mm, 2MP, IR 30m, TP 66, IK 10 2.8-12mm, 2MP, IR 30m, TP 66, IK 10 Section items: 4.2.1~4.2.7 and 7.1~7.7 BTS panel Combiner Anten Tape Off way Splitter 4-way Splitter 3-way Splitter 3-way Reference in Scope Reference in Scope Reference in Scope Reference in Scope Reference in Scope Reference in Scope Reference in Scope Ap p 03 MOBILE PHONE SIGNAL AMPLIFICATION SYSTEM CAR PARKING SYSTEM KL Amount (VND) Rate lot set set set set m m m lot CCTV SYSTEM KH KI KJ KK Qty Reference in Scope Reference in Scope Reference in Scope Reference in Scope Reference in Scope Reference in Scope Reference in Scope Reference in Scope Reference in Scope Reference in Scope Reference in Scope Reference in Scope Equipments JY JZ KA KB KC KD KE KF KG Unit Section items: 4.2.1~4.2.7 and 7.1~7.7 CATV SYSTEM JR JS JT JU JV JW JX Reference in Scope SERCURITY CHECK POINT Section items: 4.2.1~4.2.7 and 7.1~7.7 - - BAO MINH EZ LAND APARTMENT District 9, HCMC PACKAGE: SUPERSTRUCTURE SECTION NO 5.5 - MEP work: ELECTRICAL & ELV WORKS Item KM Description Specification Qty Amount (VND) Rate 210.00 - Section items 16, 17 Testing and Commissioning for all system lot SUB TOTAL - ELV SYSTEM - 1.00 VND - DIVISION E - ADDITIONAL WORKS The Contractor can add here any items that he considers missing from this bill SUB TOTAL for Additional works VND Total of the section: - p 03 -1 17 71 10 03 30 BM BM AR AR T TP P0 03 TE TE N NR D F O I0 C BO Q R EV A SECTION NO 5.5 - ELECTRICAL & ELV WORKS Ap KO Unit set TESTING AND COMMISISONING KN Reference in Scope Check point for guard tour system -1 17 71 10 03 30 BM BM AR AR T TP P0 03 TE TE N NR D F O I0 C BO Q R EV A Remarks From RMU to Transformer Ap p 03 included included included included included included included included included included included included p Ap EV -1 17 71 10 03 30 BM BM AR AR T TP P0 03 TE TE N NR D F O I0 C BO Q R 03 A Remarks p Ap Included cover Included cover Included cover Included cover EV -1 17 71 10 03 30 BM BM AR AR T TP P0 03 TE TE N NR D F O I0 C BO Q R 03 A Remarks p Ap Kitchen room EV Bed room & living room Toilet & bathroom Bancony -1 17 71 10 03 30 BM BM AR AR T TP P0 03 TE TE N NR D F O I0 C BO Q R 03 A Remarks p Ap Included EV -1 17 71 10 03 30 BM BM AR AR T TP P0 03 TE TE N NR D F O I0 C BO Q R 03 A Remarks p Ap EV -1 17 71 10 03 30 BM BM AR AR T TP P0 03 TE TE N NR D F O I0 C BO Q R 03 A Remarks BAO MINH EZ LAND APARTMENT District 9, HCMC PACKAGE: SUPERSTRUCTURE SECTION NO 6.1 - EXTERNAL WORKS AND INFRASTRUCTURE Description Item A DIVISION A - LEVELING GRADING Leveling grading Supply soil ,back fill & compacting Reference in Scope Section item 1.1 Qty Unit 2,836.82 m3 SUB TOTAL for the leveling grading Rate Amount Remarks VND - DIVISION B - ROAD, PAVEMENT, OUTSIDE CORRIDOR FLOOR & THREE-STEP Pavement & walk way Existing road, compacted K>= 0.98 Mixed stone AGG 0x4 type 1, thick 150mm, K>= 0.98 Reinforced concrete stone 1x2 B150, thick 100mm Reinforced ,D6@200 Formwork Finish by porcelain taicera 400x400 incl screeding (F17) Finish by washed stone incl screeding (F19) Finish by washed stone incl screeding (F20) Finish by teraazzo tile incl screeding 400x400mm (F21) Section item 1.4 X Z AA AB AC AD AE AF AG Other Curb type size 180x220mm, including lean concrete Curb type size 180x220mm, including lean concrete Curb type size 100x220mm, including lean concrete Curb type size 100x220mm, including lean concrete Curb type size 100z220mm, including lean concrete Speed reducer Traffic line (edge of the bitumen road, R.C road, parking area, number, ) Section item 1.5 Section item 1.2 AO AP AQ AR AS AT External traffic Road surface cleaning Covered adhisive bitumen standard 1kg/m2 Asphalt concrete C12.5, thick 60mm Break up the existing pavement Finish by teraazzo tile 400x400mm (F21) Repair for manhole Out side corridor floor & three-step Natural ground is compacted K>= 0.98 Lean concrete B7.5 Spay waterproofing Concrete B20 Reinforcement Formwork Brush cement - based warterproofing Plastering for three-step Finish by porcelain taicera 400x400 incl screeding (F17) Skirting by tile for out side corridor Section item 1.4 AU AV AW AX AY AZ BA BC BD BE BF 03 p AN Railing for out side corridor floor, ramp (RL1, RL2,…RL10), hight 800mm Ap AH AI AJ AK AL AM 172.30 172.30 43.08 34.46 172.30 31.01 1,209.55 18.81 59.20 m2 m2 m3 m3 m3 m3 kg m2 m2 1,532.33 1,532.33 383.08 383.08 45.97 1,421.00 m2 m2 m3 m3 m3 m2 284.84 42.73 28.48 769.07 45.00 167.53 86.77 14.77 34.50 m2 m3 m3 kg m2 m2 m2 m2 m2 547.18 199.45 404.61 617.83 5.10 168.00 570.00 m m m m m m m 2,096.70 2,096.70 2,096.70 486.00 486.00 6.00 m2 m2 m2 m2 m2 nos 123.05 12.31 123.05 18.46 461.44 35.00 519.75 9.07 492.58 150.00 m2 m3 m2 m3 kg m2 m2 m2 m2 m - 123.00 m - SUB TOTAL for the road, pavement, out side corridor floor & threestep BP BQ BR VND Excavation Backfilling and compacting Move soil Lean concrete B7.5 Concrete B20 Reinforcement Formwork Plastering 1,5 cm thick, M75 to concrete by Cement mortar Emulsion paint to concrete Supply and install fence type high 2500mm (by steel D5 @120x200) 93.79 73.45 20.34 6.97 13.37 2,486.26 124.92 59.20 59.20 108.50 m3 m3 m3 m3 m3 kg m2 m2 m2 m Supply and install fence type high 800mm (by cylinder inox and steel chain) Supply and install fence type Supply and install fence type Supply and intall fence type 74.10 m - 2.10 3.70 m m m - SUB TOTAL for the Gate & Fence BS BT 0,000 Section item 2.1 DIVISION C - GATE &FENCE BG BH BI BJ BK BL BM BN BO - A Glasscrete Road - Type 3, Parking area Existing road, compacted K>= 0.98 Non-woven textile, tensile strength >+ 12KN/m Small grain stone, thick 250mm, E>50Mpa, K>=0.98 Mixed stone AGG 0x4 type 1, thick 250mm, K>= 0.98 Sand compacted thick 30mm Concrete grass block, thick 55mm Section item 1.3 R S T U V W m2 m2 m3 m3 m2 m2 m3 EV R.C Road - Type Existing road, compacted K>= 0.98 Non-woven textile, tensile strength >+ 12KN/m Small grain stone, thick 250mm, E>50Mpa, K>=0.98 Mixed stone AGG 0x4 type 1, thick 200mm, K>= 0.98 Covered by layer PE Concrete stone 1x2 B25, thick 180mm Reinforced D10@200 Formwork Joint of R.C road Section item 1.2 I J K L M N O P Q 1,309.00 1,309.00 323.53 392.70 1,232.20 1,232.20 5.07 -1 17 71 10 03 30 BM BM AR AR T TP P0 03 TE TE N NR D F O I0 C BO Q R Asphalt Road - Type Existing road, compacted K>= 0.98 Non-woven textile, tensile strength >= 12KN/m Small grain stone, thick 250mm Mixed stone AGG 0x4 type 1, thick 300mm Covered adhisive bitumen standard 1kg/m2 Asphalt concrete C12.5, thick 60mm Concrete for detail between R.c road and asphalt road, B25 Section item 1.2 B C D E F G H DIVISION D - STORM WATER DRAINAGE SYSTEMS Manhole Cajuput pile with L=4m, 25 pile/m2 Excavation Move soil - VND Section item 3.1 6,144.00 137.58 137.58 6.1 Ext m m3 m3 0,000 - 44/48 BAO MINH EZ LAND APARTMENT District 9, HCMC PACKAGE: SUPERSTRUCTURE SECTION NO 6.1 - EXTERNAL WORKS AND INFRASTRUCTURE Description Item CP CQ CR Unit Rate Amount Cajuput pile with L=4m, 25 pile/m2 Excavation Move soil Concrete M150 Concrete M200 Formwork Supply & install the D400 culvert, load H10 Supply & install the D400 culvert, load H30 Supply & install the D600 culvert, load H30 Supply & install the support of D400 culvert Supply & install the support of D600 culvert Supply & install the joint of D400 culvert (inluding cement to joint pointing of culvert) Supply & install the joint of D600 culvert (inluding cement to joint pointing of culvert) Back fill by the sand to level existing, K=0.9 Remarks 12.29 1.50 6.14 40.70 4.16 3365.1 404.98 247.90 17.00 15.30 61.78 m3 m3 m3 m3 m3 kg m2 kg nos m m3 - 23,717.38 425.04 425.04 24.04 41.07 137.95 62.54 316.40 15.20 73.00 4.00 37.00 m m3 m3 m3 m3 m2 m m m nos nos nos - 2.00 nos 302.10 m3 Section item 3.1 Cluvert pile D400, D600 CE CF CG CH CI CJ CK CL CM CN CO Qty SUB TOTAL for the Storm water drainage stems A BV BW BX BY BZ CA CB CC CD Reference in Scope Sand compacted K>=0.95 for cajuput pile scap Mix stone compacted Lean concrete M150 Concrete M200 Concrete M250 Reinforcement Formwork Sully & intall steel V50x50x5 Sully & intall cover by cast iron Sully & intall steel fine rack, 900x250mm (inlucding screen) Back fill by the sand to level existing, K=0.9 -1 17 71 10 03 30 BM BM AR AR T TP P0 03 TE TE N NR D F O I0 C BO Q R VND EV BU - 0,000 DIVISION E - LANDSCAPE WORKS CS GF landscape incl softscape and hardscape, including: Supply & install Bench Bench (GN4) CT CU CV CW CX CY CZ Trees, including supply and lay soil mix Olumeria obtusa (SDT) Coros nucifera (CDC) Terminalia mantaly (CD) Hymenocallis littiralis (BTB) Acanthus intergrifolius (AO) Zoysia japonoca (LW) Cycas revoluta (TT) DA 11F landscape incl softscape and hardscape, including: Supply & install planter box Planter box (BH1) DB DC DD Supply & install Bench Bench (GN1) Bench (GN2) Bench (GN3) DE DG DH DI DJ DK DL DM DN Trees, including supply and lay soil mix Olumeria obtusa (SDT) Bambusa multiplex (TR) Pennisetum alopecuroides- pink (LX) Pennisetum alopecuroides- white (MBT) Hymenocallis littiralis (BTB) Acanthus intergrifolius (AO) Zoysia japonoca (LW) Supply & install drainage grascell Supply & install geotextile layer DO DIVISION F - SWIMMING POOL, BALANCE TANK, POOL DECK, WATER FOUNTAIN PLAYGROUND, CHILDREN'S PLAYGROUND Structure works Piling Supply Spun pile, D500 Section item 4.1 13.00 each 3.00 10.00 22.00 255.65 45.56 649.20 4.00 each each each m2 m2 m2 each 5.00 each 4.00 5.00 1.00 each each each 5.00 18.00 20.00 8.00 8.10 20.55 101.91 101.91 101.91 each each each each m2 m2 m2 m2 m2 Section item 4.2 SUB TOTAL for the Landscape works VND Section item 5.1 03 384.00 Pile compressing Pile cut off and Connection (Concrete, Reinforcement) DR DS DT Excavation Excavation Backfilling and compacting Soil remove Concrete- - Waterproofing concrete PVC 0.15mm layer Lean concrete 100mm thk, B7.5 Pile cap, slab for swimming pool, balance tank Wall for swimming pool, balance tank Pool deck floor Water fountain playground, children's playground Section item 5.2 DU DV DW DX DY DZ Reinforcement Pile cap, slab for swimming pool, balance tank Wall for swimming pool, balance tank Pool deck floor Water fountain playground, children's playground Section item 5.2 EA EB EC ED EE EF EG EH Formwork Pile cap, slab for swimming pool, balance tank Wall for swimming pool, balance tank Pool deck floor Water fountain playground, children's playground EI Other Water stop for swimming pool, balance tank EJ Finishing works Brick wall for water fountain playground, thickness 200mm 0,000 - 384.00 m - 21.00 nos - 425.09 98.10 326.99 m3 m3 m3 503.66 48.96 90.08 36.17 22.29 38.70 m2 m3 m3 m3 m3 m3 10,089.02 10,359.26 2,563.49 4,450.64 kg kg kg kg Section item 5.3 116.29 361.68 17.00 21.31 m2 m2 m2 m2 Section item 5.4 143.98 m2 4.16 m2 Ap p DP DQ m - 6.1 Ext - 45/48 BAO MINH EZ LAND APARTMENT District 9, HCMC PACKAGE: SUPERSTRUCTURE SECTION NO 6.1 - EXTERNAL WORKS AND INFRASTRUCTURE Description Item EK EL EM EN EO EP EQ ER ES ET EU EV EW EX EY EZ Plastering to brickwork 1,5 cm thick, M75 Finish brick wall by tile Waterproofing for swimming pool, balancing tank- external Waterproofing for swimming pool, balancing tank- internal Waterproofing for pooldeck, water fountain playground, children's playground Mosaic tiling to pool, water fountain playground (F15) Tile for pool deck (including edge) (F16) Ceramic tiling to balancing tanks Rubber granules for water fountain playground floor (F18) Rubber panel for children's playground (F18a) Reference in Scope Qty Unit Rate - Section item 5.9 Section item 5.10 319.39 185.76 103.16 19.50 298.10 m2 m2 m2 m2 m2 - Metal works Steel grating for pool deck area, (Including angle steel V50x50x5) Section item 5.12 Steel grating for adults swimming pool, (Including angle steel V50x50x5) Section item 5.12 89.10 52.00 m m - Steel grating for kids swimming pool, (Including angle steel V50x50x5) Section item 5.12 27.20 m - Stainless steel ladder for adults swimming pool Stainless steel ladder for kids swimming pool Ladder to balance tank Cover for balance tank (Including angle steel V50x50x5) Section item 5.11 Section item 5.11 Section item 5.11 2.00 1.00 3.00 3.00 nos nos nos nos - Section item 5.5 Section item 5.5 Section item 5.6 Section item 5.7 Section item 5.7 EV Section item 6.1 Structure works - A VND DIVISION G - CANOPY MAIN ENTRENCE WORK Concrete- - Waterproofing concrete Lean concrete 100mm thk, B7.5 Canopy foundation, B20 Section item 6.1 FD FE Reinforcement Canopy foundation Section item 6.1 FF FG Formwork Canopy foundation -1 17 71 10 03 30 BM BM AR AR T TP P0 03 TE TE N NR D F O I0 C BO Q R FA FB FC Excavation Excavation Backfilling and compacting Soil remove 92.37 62.80 29.57 m3 m3 m3 4.06 29.57 m3 m3 6,500.64 kg 51.20 m2 259.10 m2 Section item 6.1 Section item 6.2 Finish works Steel frame, glass canopies including accessories SUB TOTAL for the Canopy main entrence work VND DIVISION H - LOOSE FURNITURE FOR POOL DECK, OUT DOOR GYM EQUIPMENT AND CHILDREN'S PLAYGROUND FI Lounge chair of pool deck FJ Furniture of changing room Children's playground equipment, including: Supply & install train slide series, including accessories (K1) Supply & install train slide series, including accessories (K2) Supply & install Animal swing, including accessories (K3) Supply & install Animal swing, including accessories (K4) Supply & install Animal swing, including accessories (K5) Supply & install train slide series, including accessories (K6) FK FL FM FN FO FP Remarks m2 m2 m2 m2 m2 SUB TOTAL for the swimming pool, balance tank, Water fountian playgrounp, Children's playground FH Amount 9.07 9.07 399.95 445.42 503.66 Section item 7.1 14.00 set Section item 7.2 Section item 7.3 1.00 sum 1.00 1.00 2.00 1.00 1.00 1.00 set set set set set set SUB TOTAL for the Loose furniture for out door gym equipment and children playground - 0,000 - VND - VND 0,000 VND 0,000 DIVISION I - RIVER CLEARANCE, CLEANING AND OTHER River clearance and cleaning Final cleaning before hand over Final touch up of public areas before hand over Section item 8.1 Section item 8.2 Section item 8.3 1.00 1.00 1.00 sum sum sum SUB TOTAL for the River clearance, cleaning and other 03 DIVISION J - ADDITIONAL WORKS p The Contractor can add here any items that he considers missing from this bill Ap FQ FR FS SUB TOTAL for Additional works Total of the section: 6.1 Ext - 46/48 BAO MINH EZ LAND APARTMENT District 9, HCMC PACKAGE: SUPERSTRUCTURE SECTION NO 6.2 - MEP INFRASSTRUCTURE WORKS Item Description Specification Unit Qty Amount (VND) Rate Section 6.2 items: 14.1~14.7 DIVISION A - M.V ELECTRICAL INSTALLATION A Reference in Scope Medium Voltage Power line system - From EVN's external connect approved to inside RMU including but not limited to: manhole, conduit, cable and sub material for complete, approval from Authorities - lot 1.00 - Section 6.2 items: 14.1~14.7 & 5.1~5.2 DIVISION B - LIGHTING OUTDOOR INSTALLATION - B Street Led Lighting, on Steel Pole 8m 100W, IP66 set 14.00 C Led Light for Landscape, on Steel Pole 3M IP 65, 30W, AC85265V set 19.00 - D Wall mounted lighting,out door lamp E27x2 set 55.00 - Floodlight Led Lighting P65, 32W, AC85-265V set 3.00 - F Led step-light Recessed wall mounting waterproof, IP 67 set 10.00 - G Led step-light, 3W - 220V set 6.00 H I J K L M N O 1C-6mm2 Cu/XLPE/PVC 1C-2.5mm2 Cu/XLPE/PVC 1C-25mm2 Cu/PVC 1C-16mm2 Cu/PVC Sub-material ( cos head, nut….) HDPE conduit 110/90 HDPE conduit 65/50 HDPE conduit 50/40 Conduits fittings : elbow, tee, box, and sub material for complete m m m m lot m m m 3,812.57 1,500.00 120.00 98.00 1.00 55.00 741.20 266.50 lot 1.00 - lot 1.00 - Q Testing, commisisoning and electric connection approval from Authorities SUB TOTAL - ELECTRICAL VND DIVISION D - WATER SUPPLY - MAIN CONNECTION UP TO PUMP ROOMS R S T U V W HDPE pipe, PN16 Gate Valve PN16 Check Valve PN16 Main Water meter Document fee Accessories (tap, support, vv, …) Section 6.2 items: 15.1~15.9 DN100 DN100 DN100 DN100 HDPE pipe, PN16 HDPE pipe, PN16 HDPE pipe, PN16 Gate Valve PN16 Gate Valve PN16 Water meter Hose tap Accessories (tap, support, vv, …) m set set set lot lot 57.00 2.00 1.00 1.00 m m m set set set set lot 364.00 160.00 14.00 2.00 28.00 1.00 28.00 1.00 1.00 Section 6.2 items: 15.1~15.9 DIVISION E - WATER SUPPLY ORTHERS X Y Z AA AB AC AD AE EV -1 17 71 10 03 30 BM BM AR AR T TP P0 03 TE TE N NR D F O I0 C BO Q R P A E DN50 DN25 DN20 DN50 DN20 DN50 DN20 Section 6.2 items: 15.1~15.9 DIVISION F - WATER DRAINAGE Pipe uPVC PN 10 Pipe uPVC PN 10 Pipe uPVC PN 10 Accessories (tap, support, vv, …) DN200 DN 125 DN80 AJ Testing, commisisoning and Water supply, Waste water discharge connection approval from Authorities Ap p 03 AF AG AH AI SUB TOTAL - PLUMBING WORKS - - - - m m m lot 6.00 4.50 31.00 1.00 - lot 1.00 - VND - DIVISION G - ADDITIONAL WORKS AK The Contractor can add here any items that he considers missing from this bill SUB TOTAL - ADDITIONAL WORKS DIVISION 6.2 -MEP INFRASSTRUCTURE WORK VND Total of the section: - p Ap EV -1 17 71 10 03 30 BM BM AR AR T TP P0 03 TE TE N NR D F O I0 C BO Q R 03 A Remarks ... Pumps Hanger, support & accessories AD AE AF AG Domestic Water Tank Float Valve Gate Valve Foot Valve Electronic water level AH AI AJ BE Valve and Accessories BF Gate Valve PN16 BG Gate Valve PN16... 71 10 03 30 BM BM AR AR T TP P0 03 TE TE N NR D F O I0 C BO Q R 03 A Remarks Page 23 of 48 p Ap EV -1 17 71 10 03 30 BM BM AR AR T TP P0 03 TE TE N NR D F O I0 C BO Q R 03 A Remarks Page 24 of... Axial - Air FLow : 450L/s - Pressure Head : 400Pa - Aparment Area AR TEF AS KEF AT Flexible for fan AU AV AW AX AY AZ BA BB BC - Type : Ceiling mounted - Air FLow : 20L/s - Pressure Head : 30 Pa