BAO MINH EZLAND APARTMENT District 9, HCMC PACKAGE: SUPERSTRUCTURE SCOPE OF WORKS Issuance date: 30-Oct-2017 Revision: 0A SUMMARY ITEMS DESCRIPTION Section No - General note All in-direct works, preparations works of Main Contractor (MC) during construction stage Section No - Construction preliminaries -1 17 71 10 03 30 BM BM AR AR T TP P0 03 TE TE N NR D F O I0 C SO W R EV A Construction hoarding Site Preparation Site Office and Office Facility Site Security & Management team Traffic, road maintenance and transportation HSE Construction method Bonds and insurance Authorities Approval Additional works All concrete and reinforcement works within footprint Section No - Civil & Structural Works Concrete works Reinforcement works Formworks Additional works All finishing works from the C&S works to handover to owner including roofing works, the landscape works Section No - Architectural Works Ap p 02 Masonry works Waterproofing works Tiling, hardener, stone, timber works Skimcoat and Emulsion painting works Ceiling / False ceiling works Roofing Doors and Windows works Metal works Kitchen Cabinets and Mirror cabinets Signage works Loose furniture for public areas, security room, Building Management Office Additional works All MEP works within footprint Section No - MEPF Works Lift works Plumbing works MVAC works Fire Fighting and Prevention works Electrical works Additional works All works are out of footprint, the landscape works are including landscape Section No - External works and infrastructure Leveling grading works Road, pavement, out side corridor floor works Gate & fence works Stormwater drainage system works Landscape works Swimming pool, balance tank, pool deck, water fountain playground, children's playround works Canopy main entrance works Loose furniture for pool deck, changing room, out door gym equipment and children playround MEP infrastructure works SUMMARY 1/18 BAO MINH EZLAND APARTMENT District 9, HCMC PACKAGE: SUPERSTRUCTURE SCOPE OF WORKS Issuance date: 30-Oct-2017 Revision: 0A SUMMARY ITEMS DESCRIPTION Ap p 02 -1 17 71 10 03 30 BM BM AR AR T TP P0 03 TE TE N NR D F O I0 C SO W R EV A River clearance, cleaning and other SUMMARY 2/18 BAO MINH EZLAND APARTMENT District 9, HCMC PACKAGE: SUPERSTRUCTURE SECTION NO - GENERAL NOTE Item Description Note A The Bill of Quantities are to be read in conjunction with all other sections contained in these documents which shall be construed as being complementary to one another The Quantities given are for information only and shall be checked and verified by the Contractors No Claim shall be allowed for errors or omissions int his Bill of quantities B Allow against the items or in the prices for everything contained in these Bill of Quantities which has a monetary value Items which are not priced or have dashes or other like marks inserted in the cash columns will be deemed to be of no value or included elsewhere in the tender and no Payment whatsoever will be included in Interim Payment in the event of no amounts being inserted Lump sums are not to be given when unit rates are applicable C All rates, amounts and / or percentage values in these Bills shall be entered up to two decimal places gor United States Dollars and no decimal places for Vietnamese Dong In cases where more than two decimal places are entered, only the first two decimals will be used D The rates and prices entered in the Bill shall be deemed to be the full inclusive value of the work covered by the several items including the following, unless expressly stated otherwise; -1 17 71 10 03 30 BM BM AR AR T TP P0 03 TE TE N NR D F O I0 C SO W R (ii) The supply of materials, equipment, plant, goods storage and cost in connection therewith including waste and delivery to Site EV A (i) Labour and costs in connection therewith (iii) All construction equipment plant and costs in connection therewith (iv) Fixing, erecting and installing or placing of materials, equipment, plant and goods in position including all necessary temporary works and materials (v) Movement of piling frames into position and about the Site, any necessary excavation or filling required to place the frames, raising or lowering the frames and any staging, barges or the like required to support the frames (vi) Driving/boring through and/or breaking up any soil material, sandstone, shale, rock or boulders and the like at any depth (vii) Removal of underground obstructions together and all work in connection therewith (viii) Removing all surplus spoil due to piling works from Site (ix) Replacing incorrectly piles, damaged piles and piles which fail under tests 02 (x) Safety equipment and measures such as oxygen tanks, breathing apparatus, etc for workers operating below the surface Ap p (xi) The cost of any additional work due to eccentricity of piles and/or damaged or displaced piles (xii) Idling time for all equipment, plant and labour for whatever reason, except on particular instruction from the Construction Manager (xiii) Sampling and testing materials, equipment, plant and goods, testing, workmanship, providing, storing, packing and transporting samples to and from the place of testing (xiv) General obligations, liabilities and risks involved in the execution of the Works set forth or reasonably implied in the tender documents including procurement of all necessary insurances (xv) Establishment charges, overheads and profit (xvi) Payment of all taxes, fees, charges as maybe imposed on the Contractor or due to the Works (xvii) Items against which no price or rate is entered shall be deemed to be covered by the other rates and prices in the Bill of Quantities (xviii) All rates and prices entered here inbelow shall be deemed to be in Vietnam Dongs E The Contractor is deemed to have read all other related documents, Specflcations and Bills of Quantities, etc and in particular to have studied the tender drawings to be fully aware of the full extent of the Works described under each Direct Contractor's Works and the corresponding interface with the Contractor's own Work General Note 3/18 BAO MINH EZLAND APARTMENT District 9, HCMC PACKAGE: SUPERSTRUCTURE SECTION NO - CONSTRUCTION PRELIMINARIES No Items Scope of Employer's Requirements Employer 1.1 1.2 Fence and hoarding during construction time Main Contractor will be handed over by Substrucutre Contractor Fence and hoarding during construction time Maintain and repair it as necessary to keep this condition during the construction period x Supply maintain and removal Sign board with name of Employerr, CM, PM, QS, Architect and M&E Consultant Maintain and repair it as necessary to keep this condition during the construction period x Site Preparations Following TCVN/codes/norms/Manufacturer requirements x Temporary power for construction time, including power network Include connection with Service providers (EVN) installation, maintenance, consumption, remove but not including temporary Transformer for construction, Allowance for stand-by generator will use during the construction period, as long as full back up peractivities on site, lighting for night shift 2.2 Temporary Earthing system including supply, install, remove,…fee during construction time Include connection with Service providers (SAWACO) installation, maintenance, consumption, remove as long as full back up peractivities on site Temporary water for construction time 2.3 The water drainage system 2.4 Telephone - internet system 2.5 Temporary WC for CM, CS, Employer 2.6 Temporary WC for labour Site Arrangement Canteen 02 Guard post Washing bay 2.10 Temporary accommodation for workers 2.11 All other work that the contractor deems necessary to serve the construction for package 3.1 3.2 4.1 Ap p 2.9 x Include connection with Service providers (Viettel, ) - Number of telephone lines: 04 line, including connecting - LAN system and fiber internet with wifi, including connecting Following TCVN/codes/norms/Manufacturer requirements Communication charges x Facilities for Employer Office Security & Management team Site Security x x Safety training, rebar workshop, rebar fabrication yard, formwork workshop area, stores for materials All must ensure the sufficient area for use Finishing base made of concrete with 100 mm thick Following TCVN/codes/norms/Manufacturer requirements x If canteen is installed, it shall be located outside the building, with tight control of cleanliness and and approved by the authorities x Location anear Entrance gate, included: table, chair, light, fan,… x Main Contractor will be handed over by Substrucutre Contractor, maintain and repair it as necessary to keep this condition during the construction period Not allowed inside the Project and no any worker is allowed to stay on site Including but not limited to Site Office and Office Facility The Employer Office x Include connection, installation, maintenance, removeas well as for construction and testing & commissioning The water drainage system must be separate from the construction drainage system And Comply with DTM accessment & DTM approval for construction stage and EZLAND Method Statement Guidelines * To be provided for temporary toilets, cleaning, etc And Comply with DTM accessment & DTM approval for construction stage and EZLAND Method Statement Guidelines 2.7 2.8 x EV 2.1 x -1 17 71 10 03 30 BM BM AR AR T TP P0 03 TE TE N NR D F O I0 C SO W R x Fence for the rest of the sides surrounding the Site 1.3 1.4 x Hoarding, Entrance gates, Billboard for main faỗade building Main Contractor will be handed over by Substrucutre Contractor (follow axis A) A Remarks Contractor x x x x * Provide and maintain temporary site Office, for the Employer staff and Consultant, with private room for PD/PM with surficient working spaces for 20 staff minimum Meeting room with whiteboard for 30 people Temporary toilet Sample room, store rooms * Provide the private motorbike parking with roof * Daily cleaning Provide and maintain: - A3, A4 photocopier with functioning of color printing and color scanning, printing via wifi - A3 and A4 paper - Telephone: lines, full internet - Shelf, cabinets tables, chairs which is sufficient for working and meeting of 20 poeple - Walkie-Talkie: sets - Electric water heater including drink water x x Following TCVN/codes/norms/Manufacturer requirements To provide 24/7 security with patrol on site Cons Prelims x 4/18 BAO MINH EZLAND APARTMENT District 9, HCMC PACKAGE: SUPERSTRUCTURE SECTION NO - CONSTRUCTION PRELIMINARIES No Items Scope of Employer's Requirements Employer Allowance for site management staff mobilization and demobilization (including expat If any) including travelling, accommodation, out-ofpocket expenses Management team Traffic, road maintenance and transportation 5.1 Internal Traffic and maintenance 5.2 External traffic and maintenance x Control external traffic for trucks coming to site Periodic check the status of external road and repair immediately in during construction stage x HSE Hygiene 6.2 Safety 6.3 Environment 6.4 Rubbish cleaning 6.5 Site fire fighiting system Construction method * Time to time cleaning all site including roads surrounding site * Clean all dump truck before going out of site * Provide sufficient number of WC for workers * Organize regular pest control including mosquito, termite Including but not limited * Safety staff * First Aid * Safety instruction signage at all locations can be dangerous * Safety plan, evacuation plan, tools PPE for contractor * Safety walk way * Tools PPE for Employer staff and Consultant: 20 sets (included safety helmets, safety boots, reflective jackets) * Tools PPE for guests: 20 sets (included safety helmets, safety boots, reflective jackets) * Periodic inspect/test the machines, tower crane, hoist, etc x EV 6.1 7.1 Main Contractor can use internal road from substructure package and can propose additional road to make sure site transportation as required Temporary road need to be strong and clean during construction stage Maintain and repair during the construction period -1 17 71 10 03 30 BM BM AR AR T TP P0 03 TE TE N NR D F O I0 C SO W R x A 4.2 Remarks Contractor General Works protections 7.1.2 Durable and long term use 7.1.3 Survey & mornitoring 7.1.4 Scaffolding system and surrounding scaffolding 7.1.5 All necessary works independent checking of construction method Ap p 02 7.1.1 x * Control and limit dust continously * Provide temporary septic tank before discharging * The water drainage system must be separate from the construction drainage system * And Comply with DTM accessment & DTM approval for construction stage and EZLAND Method Statement Guidelines x * Provide center point for rubbish stores, discharge daily * Time to time cleaning the site out of water, rubbish x Provision of site security services during the Contract period x Following TCVN/codes/norms/Manufacturer requirements x Works need to be protected prior to carry our next works Hardener slab: - Surface protection: recommended to cover, protect the surface to avoid staining, discoloration, or mechanical impact All exposed sleeves / cables: - Proper boxes & cap to cover and secure to floor Works are designed and constructed well to make sure they are durable for long term use The nature of works should be designed based on location eg outdoor works and indoor works to make sure all works are suitable for respective areas, Main Contractor to propose report of observation of subsidence and inclination for the building and neighbor buildings The scaffolding must be comply to safety requirement and adapted to each type of work Allowance for all necessary works independent checking of construction method x x x x x 7.1.6 Submission of materials' sample for approval including resubmision of alternatives and lor substitution Allowance for any cost in connection herewith for submission of materials' sample for approval including resubmision of alternatives and lor substitution 7.1.7 Preparing and submission all as buili drawings Including but not limited 7.2 Structure works Following TCVN/codes/norms/Manufacturer requirements 7.21 Excavation * Provide adapted construction method to make sure there is no any inclinations and displacements of compressed piles x Formwork for slab & Beam * To ensure the surface of areas that are not covered by false ceiling, are flat for direct putty and painting eg living room, bed room * Drawings and inspection sheet must be submitted to Consultant/PU for prior to permission to use * Inspection of formwork is mandatory for each demoulding * Use aluminum formwork for typical floors and plywood for other floors x 7.22 Cons Prelims All construction methods will be submitted for approval prior to commence works on site x x 5/18 BAO MINH EZLAND APARTMENT District 9, HCMC PACKAGE: SUPERSTRUCTURE SECTION NO - CONSTRUCTION PRELIMINARIES No Items Scope of Employer's Requirements Employer Remarks Contractor 7.23 Formwork for shear wall, columns and staircase,… * Use formwork based on standardized sizes and meets construction standards * Drawings and inspection sheet must be submitted to Consultant for prior to permission to use * Inspection of formwork is mandatory for each demoulding 7.24 Concrete * The slab must be poured out of the hot weather and rainy weather * All tests are required * Curing concrete is required to prevent hairline crack, using plastic / fabric sheet cover and chemical where required, x 7.25 Reinforcement Following TCVN/codes/norms/Manufacturer requirements x 7.3 Architecture works 7.31 Bricklaying 7.3.2 Plastering 7.3.3 Skim coat 7.3.4 Screeding/ rendering 7.3.5 Tiling 7.3.6 Emulsion Paint 7.3.7 Aluminum doors & windows 7.3.8 Wooden laminate flooring Cement / concrete block False ceiling 7.3.11 Wooden doors 7.3.12 Steel doors 7.4 MEP works 7.4.2 Electrical wiring system 7.4.3 Floor trap 7.4.4 Drilling and fixing Ap p 7.5 x x A x EV Quality requirements for MEP works 02 7.4.1 -1 17 71 10 03 30 BM BM AR AR T TP P0 03 TE TE N NR D F O I0 C SO W R 7.3.9 7.3.10 Following TCVN/codes/norms/Manufacturer requirements and "Reference Buiding Method Statement Guidelines" Ref: EZLAND -BM2016 - A0 Item 3.1 Following TCVN/codes/norms/Manufacturer requirements and "Reference Buiding Method Statement Guidelines" Ref: EZLAND -BM2016 - A0 Item 3.2 Following TCVN/codes/norms/Manufacturer requirements and "Reference Buiding Method Statement Guidelines" Ref: EZLAND -BM2016 - A0 Item 3.3 Following TCVN/codes/norms/Manufacturer requirements and "Reference Buiding Method Statement Guidelines" Ref: EZLAND -BM2016 - A0 Item 3.4 Following TCVN/codes/norms/Manufacturer requirements and "Reference Buiding Method Statement Guidelines" Ref: EZLAND -BM2016 - A0 Item 3.5 Following TCVN/codes/norms/Manufacturer requirements and "Reference Buiding Method Statement Guidelines" Ref: EZLAND -BM2016 - A0 Item 3.6 Following TCVN/codes/norms/Manufacturer requirements and "Reference Buiding Method Statement Guidelines" Ref: EZLAND -BM2016 - A0 Item 3.7 Following TCVN/codes/norms/Manufacturer requirements and "Reference Buiding Method Statement Guidelines" Ref: EZLAND -BM2016 - A0 Item 3.8 x x x x x x Following TCVN/codes/norms/Manufacturer requirements x Following TCVN/codes/norms/Manufacturer requirements x Following TCVN/codes/norms/Manufacturer requirements x Following TCVN/codes/norms/Manufacturer requirements x Following TCVN/codes/norms/Manufacturer requirements and "Reference Buiding Method Statement Guidelines" Ref: EZLAND -BM2016 - A0 Item 4.1 x Following TCVN/codes/norms/Manufacturer requirements and "Reference Buiding Method Statement Guidelines" Ref: EZLAND -BM2016 - A0 Item 4.2 Following TCVN/codes/norms/Manufacturer requirements and "Reference Buiding Method Statement Guidelines" Ref: EZLAND -BM2016 - A0 Item 4.3 Following TCVN/codes/norms/Manufacturer requirements and "Reference Buiding Method Statement Guidelines" Ref: EZLAND -BM2016 - A0 Item 4.4 x x x Metal Works 7.5.1 Installation of anchor bolt, metal works, metal accesories in wet/outdoor areas Following TCVN/codes/norms/Manufacturer requirements x 7.5.2 Installation of metal accesories in dry/indoor areas such as Hardware instalation and accessories doors stoppers,locks, Following TCVN/codes/norms/Manufacturer requirements handles, hinges, x 7.6 7.6.1 7.6.2 Tower cranes, hoits Tower cranes # 1, #2 Hoits Following TCVN/codes/norms/Manufacturer requirements Contractor is encouraged to use tower crane #1 which is being used for Substructure package In case that foundation of crane #1 does not meet Contractor's requirement, Contractor to propose new one to ensure schedule x Include: foundation,installation and erection, operation, dismantling and demobilization of tower cranes including licensed driver, banksman and maintenance, foundation and piling, embedded anchor bolts, mast jacking up, bracing, material landing platforms for cranes, power and fuel used for operation x Safety inspection cost and approval for use x As per Method statement by Contractor to make sure safety and construction schedule Include: foundation,installation and erection, operation, dismantling and demobilization of hoits including licensed driver, banksman and maintenance, foundation and piling, embedded anchor bolts, mast jacking up, bracing, material landing platforms for cranes, power and fuel used for operation x Cons Prelims 6/18 BAO MINH EZLAND APARTMENT District 9, HCMC PACKAGE: SUPERSTRUCTURE SECTION NO - CONSTRUCTION PRELIMINARIES No Items Scope of Employer's Requirements Employer 7.6.3 Remarks Contractor Safety inspection cost and approval for use x Equipment and tools Including but not limited: Mobilisation & Demobilization to other construction equipment and tools x Bonds Including but not limited 8.1 Tender guarantee x 8.2 Advance payment bond x 8.3 Performance bond x 8.4 Warranty Guarantee x Insurance Including but not limited Cotractors' plant & equipment x 9.2 Contractors' staff and workers x 9.3 Contractors' all risks insurance and third party x 10 Authority Approval 11 To estimate cost for testing and commissioning, handover, connect On the acceptance for operatuon of project construction including but not limit MEP systems as Fire Fighting, connect to public upon its complettion transportation, electric, plumbing, garbage, exhausted air, EV A 9.1 x x Ap p 02 -1 17 71 10 03 30 BM BM AR AR T TP P0 03 TE TE N NR D F O I0 C SO W R Allowance for obtaining from Authorities all notices,necessary application, licenses or permits for all other matters during Construction time Cons Prelims 7/18 BAO MINH EZLAND APARTMENT District 9, HCMC PACKAGE: SUPERSTRUCTURE SCOPE OF WORKS SECTION NO - STRUCTURE WORKS Scope of No Items Employer's Requirements Remarks Employer Concrete, Steel reinforcement Following TCVN/codes/norms/Manufacturer requirements Slab, beam Concrete B30- Holcim Steel reinforcement (SD 390) - Hoa phat/ Mien Nam / Pomina Vinakyoei or or equivalent 1.1 Roof slab, beam, tum floor Waterprofing Concrete B30- Holcim Steel reinforcement (SD 390) - Hoa phat/ Mien Nam / Pomina Vinakyoei or or equivalent 1.2 Blade shear walls x Concrete B45 (ground floor to 11th floor), B40 (upper floors), Holcim Steel reinforcement (SD 390) - Hoa phat/ Mien Nam / Pomina Vinakyoei or or equivalent 1.3 Lift Core walls x Concrete B45 (ground floor to 11th floor), B40 (upper floors), Holcim Steel reinforcement (SD 390) - Hoa phat/ Mien Nam / Pomina Vinakyoei or or equivalent 1.4 x * The steps will be casted in concrete, no solid brick steps Concrete B30- Holcim Steel reinforcement (SD 390) - Hoa phat/ Mien Nam / Pomina Vinakyoei or or equivalent Concrete B30- Holcim Steel reinforcement (SD 390) - Hoa phat/ Mien Nam / Pomina Vinakyoei or or equivalent Ramp 1.6 Parapet wall on roof Concrete B30- Holcim Steel reinforcement (SD 390) - Hoa phat/ Mien Nam / Pomina Vinakyoei or or equivalent x -1 17 71 10 03 30 BM BM AR AR T TP P0 03 TE TE N NR D F O I0 C SO W R 1.7 x A Staircase 1.5 Following TCVN/codes/norms/Manufacturer requirements '* Use formwork based on standardized sizes and meets construction standards * Drawings and inspection sheet must be submitted to Consultant for prior to permission to use * Inspection of formwork is mandatory for each demouldin x p 02 Formwork x Ap x EV Contractor Structure 8/18 BAO MINH EZLAND APARTMENT District 9, HCMC PACKAGE: SUPERSTRUCTURE SECTION NO - ARCHITECTURAL WORKS Scope of No Items Employer's Requirements Remarks Employer Contractor Masonry works Burnt clay Brick works * 200mm thickness burnt brick wall all facades/envelops of building * Link to concrete wall by tie bar * Laying bricks must comply with the manufacturer's requirements: the thickness of mortar joints, for laying a tolerance of 4mm on meters * solid brick line for each hollow brick lines * No holes of hollow brick facing out the facade, * solid brick layer for bottom of WC / bathroom wall, , wall all facades, wall for the steel door, aluminum door * Strengthen concrete beam for every wall which higher than 3m, 80x80x190 - Hollow Clay Brick/ 40x80x190 - Hollow Clay Brick Mac 75 *Wc wall use burnt clay brick Unit rate including Lintel & Stiffener refer to architecture design & structure drawing 1.1 Non-burnt blocks x * Use for all internal wall (100mm & 200mm thk where applicable), * Link to concrete wall by tie bar * Laying bricks must comply with the manufacturer's requirements: the thickness of mortar joints, for laying a tolerance of 3mm on meters (aluminium ruler) Unit rate including Lintel & Stiffener refer to architecture design & structure drawing, 1.2 x Plastering to brick wall * Use mortar as stated in specification of non burnt brick * Plastering must comply with the manufacturer's requirements: the thickness for laying and the flatnesse tolerance * Wire mesh to prevent crack at corner of wall, surround openings, along MEP conduit, along the joint btw different materials -1 17 71 10 03 30 BM BM AR AR T TP P0 03 TE TE N NR D F O I0 C SO W R Plastering to non-burnt blocks 1.4 1.5 Concrete louver blocks for faỗade (hollow type) Refer to architecture design All waterproofing works are 10 years warranty Waterproofing works STP, Septic tank Standard waterproofing product Waterproofing by waterproofing bitimen menbrane layer for internal wall and bottom, top slab Standard waterproofing product Waterproofing by waterproofing bitimen menbrane layer for internal wall Standard waterproofing product Waterproofing by bush cement - based waterproofing layer for internal wall and bottom, top slab Standard waterproofing product Waterproofing by bush cement - based waterproofing layer with skirting 300mm- refer architecture drawing Standard waterproofing product * Cementitious or Bitumen membrane with trees, root resistant, with skirting 300mm- refer architecture drawing * Hairline waterproofing crack resistantproduct Standard 2.1 2.2 Lift Domestic water tank, fire tank 2.3 Yard, Balcony, Loggia, aircon ledge, Wc 2.4 Terrace garden 2.5 Roof, tum floor * Cementitious or Bitumen membrane with skirting 300mm- refer architecture drawing * Hairline crack resistant 2.6 Tilings, hardener, stone, timber works Staircase including padded rooms , steps Hardener- Sikafloor Chapdur Grey (Sika) or equivalent, , including skirting Hardener direct on concrete steps, cutting the anti-slip line at the corner of steps 3.1 02 Parking area, ramp, p 3.2 GF lobby rooms Ap Domestic water tank, fire tank 3.3 3.4 3.5 3.6 3.7 3.8 3.11 3.12 3.13 3.14 Granite stone, hairline stainless steel Homogenous granit tiles , only surrounding lift doors Community rooms, children playround room, Gym room, manager room, security room with 70mm height skirting Apartment - Living room, kitchen area, small bedrooms, including door-sill Homogenous tiles 600mm x 600mm, ncl Screeding Laminate timber, with 70mm height skirting ncl Screeding Apartment - Wc floor, other area, including door-sill * Anti-slip homogenous tiles 300mm x 300mm , ncl screeding * Water resistant seals (pointing) * Anti-slip homogenous tiles 300mm x 300mm , ncl screeding * Water resistant seals (pointing) * Homogenous tiles 300mm x 600mm , ncl screeding * Water resistant seals (pointing) Homogenous tiles 300mm x 600mm, with 70mm height skirting ncl Screeding * Ceramic tiles 300mm x 300mm Garden 11F 3.15 3.16 3.17 Homogenous tiles 600mm x 600mm, with 70mm height skirting ncl Screeding, i Apartment - Master Bedrooms Rubbish stores floor x x x x Bazan stone Concrete grass block Finish wall by washed stone Door mats in carpet at entrances the carpet tile door mats at GF lobbies Painting line for intrernal parking Epoxy paint Following TCVN/codes/manufacturer Architecture Including water proofing for open floor x x x x x Lift frame 1F, 2F, 3F, Typical floors (jamb and lintel) Apartment - Yard, balcony, loggia, aircon ledges, including door-sill x x Lift frame GF Wc wall of Apartment and other area x *Homogenous tiles 600mm x 600mm , with 70mm in height skirting * Water resistant seals (pointing) * Homogenous tiles 600mm x 600mm , with 70mm in height skirting * Water resistant grouting (pointing) Apartment - Bathroom floor for shower area x * Ceramic tile * water resistant grouting (pointing) GF, 1F, 2F, 3F corridors & all typical corridors Including water meter rooms, electricity meter rooms, 3.9 3.10 Hardener direct on concrete floor, , including skirting Sikafloor Chapdur Grey (Sika) or equivalent *Ramp including non-slip joint x A 1.3 EV * Warterprofing mortar for external side * Warterprofing mortar for internal wall Wc * Normal mortar for internal side * The application of the cement must be by via a layer of scratch coat The dosage should be perfectly quantified by dosing and mechanic mixing * Wire mesh to prevent crack at corner of wall, surround openings, along MEP conduit, along the joint btw different materials * Strip lines / joints on facade where applicable x x x x x x x x x x x x x x 9/18 BAO MINH EZLAND APARTMENT District 9, HCMC PACKAGE: SUPERSTRUCTURE SECTION NO - ARCHITECTURAL WORKS Scope of No Items Employer's Requirements Remarks Employer 3.18 3.19 3.20 4.1 4.2 Ceramic tile backsplash to kitchen of apartment Ceramic tiling to roof of 3F (F8) *Finish by tiles * Water resistant seals (pointing) Ceramic tile Other area Refer to architecture design x x Putty and Emulsion painting works External wall on faỗade outdoor emulsion paints, special faỗade, water resistant, washable Finishing layer by spray concrete glue on the wall of faỗade GF By spray concrete glue Following TCVN/codes/manufacturer Indoor emulsion paints, The areas which are exposed to dirty, the paint has to be adapted for the intense dirty (washable paint mat, or similar) *Note: Shear wall of parking area use outdoor emulsion paints Parkings, technical rooms, corridors, lobby, community rooms, etc 4.3 4.4 x x x Apartment - Living room, bedrooms, kitchen area Indoor low VOC emulsion paints x Apartment - Bathroom ceiling and kitchen above the counter kitchen indoor moisture resistant low VOC emulsion paints All WC and have the access panel with sufficient size for maintenance x Apartment - Yard, balcony, loggia, aircon ledges, exter, outdoor emulsion paints 4.5 4.6 x Ceiling/False ceiling works mm thick gypsum board incl shadow line Standard gypsum board by Gyproc or equivalent Frame system Vinh tuong or equivalent 9mm thickness gypsum board, size 600x600mm Standard gypsum board by Gyproc or equivalent Frame system Vinh tuong or equivalent 9mm thickness moisture resistant gypsum board Standard gypsum board by Gyproc or equivalent Frame system Vinh tuong or equivalent * 9mm thickness gypsum board to hide copper pipes for aircon Standard gypsum board by Gyproc or equivalent Frame system Vinh tuong or equivalent No plastering Exposed gypsum ceiling, thickness mm 5.2 Apartment - WC 5.3 Apartment - bulk head, ME pile system 5.5 Bare soffit concrete slab & beam Roofing Roof Heat tile- U 200x200x75mm Crushed concrete-mesh steel, makes area slope thickness layer around 30mm 6.1 MDF door with melamine surface, fireproof Hardwares are in Germany brands like ABUS, WUERTH, HAFELE or equivalent Note: Door lock with modes: key lock, number lock, card MDF door, 900mm x 2200mm With stopper, door locks in Germany brands like ABUS, WUERTH, HAFELE or equivalent Other hardwares are standard equipments 7.1 Apartment - bedrooms door 7.2 Apartment - bathroom door Moisture resistant MDF door, 800mm x 2200mm With stopper, door locks in Germany brands like ABUS, WUERTH, HAFELE or equivalent 7.3 General Aluminum doors and windows 7.4 Glass partition, aluminum frame 7.5 Shower screen p 02 7.6 Fire rated doors Following TCVN/codes/manufacturer Metal works FF Staircase, and Community rooms All metal frame will have primer layer & finishing layers by oil paints 60mm diameter steel handrail Loggia, private loggia Out side corridor floor Steel plate 70mm x 5mm for handrail of all loggia, yard, private balcony ( H= 1.3m) Steel plate 70mm x 5mm for handrail of all corridor ( H= 1.3m) Steel Staircase for aparment Steel staircase with steel handrail Steel Staircase in shophouse Ramp and handicaped ramp 8.8 Stainless steel for lift, tanks V-protection for all columns/shear wall in parking area Steel staircase with steel handrail * 60mm diameter steel handrail * Follow TCVN/codes/norms and any specific requirement from Authorities on Handicaped Following TCVN/codes/manufacturer Galv V steel, 8.9 8.10 8.11 8.12 Steel grating for ram wide 300mm, (Included angle steel V50x50x5) Steel grid for parking area Steel frame lavabo include granit for changing room Partition laminat for Wc for changing room Following TCVN/codes/manufacturer Following TCVN/codes/manufacturer Following TCVN/codes/manufacturer Following TCVN/codes/manufacturer 8.2 8.3 8.4 8.5 Ap Aluminium louvers and louver 8.1 8.6 8.7 Other Canopy at GF walkway, drop-off and roof garden 11F 8.13 8.14 8.15 8.16 Speed reducer of parking Car stop Door mats in carpet at entrances x x x x x x x x x x Roller shutter doors 7.9 7.10 Where fire rated door is not required such as riser for water meter, electricity meter, etc Size of aluminum doors and windows as architectural design 8.36mm laminated tempered glass thickness minimum Hardware are in Germany brands like ABUS, WUERTH, HAFELE or equivalent Size of Glass partition as architectural design 8.36mm laminated tempered glass thickness minimum Hardware are in Germany brands like ABUS, WUERTH, HAFELE or equivalent * Fixed tempered glass panel for shower screen excluding glass door, height= 2000mm * Only master bathroom Staircase doors, technical room doors, doors for the GF lift lobby MDF door with veneer surface, wood frame, fireproof Hardwares are in Germany brands like ABUS, WUERTH, HAFELE or equivalent * For ramp of parking 7.8 x Following TCVN/codes/norms Doors and Windows Apartment - entrance door 7.7 x -1 17 71 10 03 30 BM BM AR AR T TP P0 03 TE TE N NR D F O I0 C SO W R 5.4 x A Concealed gypsum ceiling, thickness 9mm 5.1 EV Contractor * Steel frame, glass roof, including accessories * Canopy at GF is designed to protect the pedestrial walking from the entrance to GF lobbies * All canopies are designed for the long term used and durable in outdoor condition, * The width of canopy is wider than width of walkway below Following TCVN/codes/manufacturer Following TCVN/codes/manufacturer Following TCVN/codes/manufacturer Architecture x x x x x x x x x x x x x x x x x x x x 10/18 BAO MINH EZLAND APARTMENT District 9, HCMC PACKAGE: SUPERSTRUCTURE SECTION NO - ARCHITECTURAL WORKS Scope of No Items Employer's Requirements Remarks Employer Contractor Kitchen Cabinets, mirror cabinet Lower cabinet Moisture resistant MFC with melamin finish, including accessories Sink, faucet, water supply/drainage in MEP items Stone counter top Granite stone counter top with 200mm in height of skirting on counter top Only provide sink and faucet and power point for hood, no hood and hob, 9.1 9.2 Upper cabinet Moisture resistant MFC with melamin finish, including hardware Mirror cabinet Only master bathroom HMFC 18mm code 101T Mirror 5mm 9.4 10 10.1 10.2 10.3 10.4 11 Signage Beacon Entrance signage Directional signages Address signage x x x x x Loose furniture for public areas, security room, Building Management Office Lobby rooms 12 x Beacons on roof top (including structure & architecture) Entrance signage at GF (including structure & architecture) Public areas All apartments, all technicall rooms, lobbies, staircases, community rooms, rubbish stores, etc * Reception chairs, tables, guest chairs/tables * Decorative upon architecture * layer of doors, the second door with the secure keys for residentials only, Basic furniture chairs, tables, MFC 11.1 11.2 x Security rooms, Building Management Office x x Others *Waterproofing bathroom & bacony, steel staircase, concrete louver blocks, handrail of bacony, wall bick and plastering * Finish all the facades, including but not limited to doors to loggia, main entrance doors, sliding doors, windows, excluding finishing internal: floor, slab, door, cabinet, Shophouse x Ap p 02 -1 17 71 10 03 30 BM BM AR AR T TP P0 03 TE TE N NR D F O I0 C SO W R EV 12.1 A 9.3 x Architecture 11/18 BAO MINH EZLAND APARTMENT District 9, HCMC PACKAGE: SUPERSTRUCTURE SECTION NO - MEPF AND EXTERNAL WORKS Scope of No Employer's Requirements Remarks Employer A Mep for Public, Corridor, Roof Area Lifts Contractor Refer to drawings and technical specification for detailed scope EL-01: Passenger/Service/Fire lifts x Standard equipments, wellknown brand 1.2 EL-02: Passenger lifts x Standard equipments, wellknown brand 1.3 Steel beams for hoistway x 1.4 All finishing inside cabin lifts x 1.5 Provide and install camera inside cabin lifts x 1.6 Provide Fire Alarm Signal to control panel of Lifts x 1.7 Provide and install cable of camera to control panel of Lifts x 2.1 2.1.1 2.1.2 2.2 EV Refer to drawings and technical specification for detailed scope Plumbing System Water supply system: -1 17 71 10 03 30 BM BM AR AR T TP P0 03 TE TE N NR D F O I0 C SO W R A 1.1 Water supply system for main building c/w but not limited: Equipments, Pumps, control items, valves, piping and accessories Supply and install Swimming Pool Water drainage system: * Standard equipments x x 2.2.1 Equipments for septic tanks and storm water drainage system (STP) 2.2.2 Piping and accessories 2.2.3 Storm water drainage from rooftop x 2.2.4 Storm water Drainage for other floors x 2.3 Sanitary wares for public area x 2.4 Fill up all Plumbing opening, include fire rated filling x 2.5 Waterproof all Plumbing opening 2.6 Roof water tank - MEP items: sleeve and all MEP accessaries x 2.7 Testing quality of water by third parties x * Supply and install swimming pool c/w but not limited: Lighting, nozzle, pipe, wire, filter tank, pumps, water tap, control system, water treatment, cleaning tool and accessories * Clean up balancing tank for Testing and Commissioning work * The tenderer will supply and install swimming pool base on tender drawing * Refer to spec & drawings for detailed scope 02 x Ap p x x 3.1 Discharge to public system * Water tap included P-trap * Drain floor in WC * Accessories included: Normal package (6 items) By Artchitecture's scope Refer to drawings and technical specification for detailed scope ACMV system Ventilation system for main building, external garbage Room x MEP 12/18 BAO MINH EZLAND APARTMENT District 9, HCMC PACKAGE: SUPERSTRUCTURE SECTION NO - MEPF AND EXTERNAL WORKS Scope of No Employer's Requirements Remarks Employer Contractor 3.2 Ventilation system in shaft/risers x 3.3 Smoke extraction x 3.4 Air conditioner x 3.5 Fill up all HVAC opening, include fire rated filling x 3.6 Waterproofing all HVAC opening x 4.1 Mechanical ventilation with roof fan extractor UPVC pipe * Changing room, public WC * Drain pipe * Refrigated piping c/w insulation and cable By Artchitecture's scope Refer to drawings and technical specification for detailed scope Electrical High and low voltage Medium Voltage Power line system - From inside RMU to transformers include Manhole, conduit, M.V Switchgear x 4.1.2 Medium voltage cable from inside RMU to transformers include all related connection works x 4.1.3 From Medium Voltage Switchtgear panel to Transformer x 4.1.4 Transformer x * Standard equipments, wellknown brand * Transformer dry type * Include underground system with get approval from Authorities( Foundation by structure) 4.1.5 Generator system, include exhaust chimney with cover/cladding x * Standard equipments, wellknown brand * Genset: capacity sufficient for fire safety (incl pressurization) and public areas * Testing report of Generator smoke Quality 4.1.6 LV Distribution Board Main Distribution Board (include main power meter) x * Include all necessaries materials with get approval from Authorities( Foundation by structure) Distribution Board (exclude power meter) x * Include all necessaries materials with get approval from Authorities( Foundation by structure) * The power meter will be provide by power company(EVN) MCB Box in Utility Box x EV -1 17 71 10 03 30 BM BM AR AR T TP P0 03 TE TE N NR D F O I0 C SO W R Power Supply Cable, busway & accessories x 02 4.1.7 A 4.1.1 Power cable/ busway from Substation to Main Distribution Board and Local Distribution Board Standard equipments, wellknown brand Ap p x Power cable/ busway from Generator to Main Distribution Board x Power cable from Local Power Distribution Board to MCB Box x Power cable from MCB Box to power panel and MEP fitout x Provide 3phase power to Rolling doors (public area) x Provide phase power to MDF room and power to Communication system Panel (Data - Cable TV - Signal Booster system) x Provide power to control panel of Lifts x 4.1.8 Trunking, conduit & accessories x 4.1.9 Lights - Public area, corridor, lobbies, Community rooms, signages, changing room, public WC, pool, management office, switch and related control items x 4.1.10 Sockets, Isolater, Lighting Switch x 4.1.11 Fill up all EL opening, include fire rated filling x 4.2 * Standard equipments * for ramp from outside to GF, Refer to drawings and technical specification for detailed scope Extra Low voltage(ELV) MEP 13/18 BAO MINH EZLAND APARTMENT District 9, HCMC PACKAGE: SUPERSTRUCTURE SECTION NO - MEPF AND EXTERNAL WORKS Scope of No Employer's Requirements Remarks Employer Contractor Tel - Data - Cable TV - Signal Booster (IBS) x 4.2.2 Wifi x For public areas in GF 4.2.3 CCTV System x * Standard equipments, wellknown brand * Refer to drawings for detailed scope * Provide and install camera inside of Lift cabin 4.2.4 Trunking accessories x Supply and installation trunking 4.2.5 Card access control system (barrier for parking) x * With key card * Number of card at least times number of the bedroom of the apartment 4.2.6 Key card for GF, 1F, 2F lobbies x Standard equipments, wellknown brand 4.2.7 Fill up all ELV opening, include fire rated filling Earthing and Lightning Protection System Earthing System 5.2 Lightning Protection System -1 17 71 10 03 30 BM BM AR AR T TP P0 03 TE TE N NR D F O I0 C SO W R 5.1 x Refer to drawings and technical specification for detailed scope x Testing report with get approval from Authorities x Refer to drawings and technical specification for detailed scope Fire Protection 6.1 Hydrants, Extinguisher and Sprinkler System x 6.2 Fire Alarm system x 6.3 Fill up all Firefighting opening, include fire rated filling 6.4 Waterproofing all Firefighting opening x By Artchitecture's scope p 02 x MEP for Apartments Electrical and ELV system Ap B Refer to drawings and technical specification for detailed scope 7.1 MCB, CB, MCB box x 7.2 Sockets, Switches x 7.3 Tel & Data socket ,TV sockets x 7.4 Interior Lighting Fixture -Living room, bedrooms, Bathroom, Kitchen, Balcony, loggia, yard, A/C ledge switch and related control items x 7.5 Power cable, conduit from power panel to MEP fitout x 7.6 ELV cable, conduit, sleeve from ELV box to Main equipment Port Switch, TV socket, ADSL Socket, Telephone Socket, ,.etc x 7.7 Fill up all EL and ELV opening, sleeve, include fire rated filling x EV A 4.2.1 * Tenderer provide at least 02 Service Providers to Client and ensure the Service Providers will cooperate with Tenderer in case of Tenderer is appointed to P03 - Main Contractor package * List of Service Providers need to be approved officially by Client * Tenderer will have to be responsible for working and supporting Service Provider about to supply and install ELV system included infrastructure area and hand-over to Client * The service provider will be in charge of the supply and installation of infrastructure outside including civil works, distribution network up to each ELV box of apartments and public rooms * The tenderer will supply and install ELV system in apartments and public rooms * Power cabling provision for aircon * Exclude Isolater for AC Refer to drawings and technical specification for detailed scope Water supply, drainage 8.1 Sanitary wares for apartments x 8.2 Water heater x MEP * Refer to drawings for detailed scope * Mirror is only normal WC Master WC by Architecture work * Accessories included: Normal package (6 items) 14/18 BAO MINH EZLAND APARTMENT District 9, HCMC PACKAGE: SUPERSTRUCTURE SECTION NO - MEPF AND EXTERNAL WORKS Scope of No Employer's Requirements Remarks Employer Contractor 8.3 Valves, Piping and all connection accessories x 8.4 Floor trap, drainage, water tap x 8.5 Fill up all Plumbing opening, sleeve, include fire rated filling x 9.1 9.2 Refer to drawings and technical specification for detailed scope MVAC Mechanical Ventilation Ventilation - WC x Fan included Ventilation - Kitchen x Fan included Air Conditioner Unit Single Split AC unit 9.3 N/A Copper pipes for aircon x Piping, condensate drainage and power for Air - x Fill up all HVAC opening, sleeve, include fire rated filling x Excluded, supply and install by Buyer Refer to drawings and technical specification for detailed scope 10 Electrical and ELV system * Concealled conduit, junction boxes, cables, Main MSB box and switches, * Power points for lightings, water heater, aircon * Exclude Isolater for AC * Exclude Lights, switches, sockets 11 Roller doors 12 Water supply & drainage 13 Air Conditioner: -1 17 71 10 03 30 BM BM AR AR T TP P0 03 TE TE N NR D F O I0 C SO W R EV A MEP for Shophouse C x x 13.1 Airconditioner machine 13.2 Copper pipes for aircon 13.3 Drain pipe for aircon D MEP infrastructure 14 Electrical and ELV system x N/A Refer to drawings and technical specification for detailed scope 14.2 Manhole and conduit from external to ELV room x p 02 x 14.5 14.6 14.7 15 15.1 15.2 15.3 15.4 15.5 15.6 Excluded, supply and install by Buyer x Medium Voltage Power line system - From EVN external approved connected to inside RMU including but not limited to: manhole, conduit, cable and sub material for complete, approval from Authorities 14.4 * Piping, valve, connection points for first floor and second floor * Excluded Sanitary wares x 14.1 Cable, trunking, conduits and accescorries incld MCB, CB x Public parking/street lights x Landscape lighting (including roof garden) x Fiber cable from extenal to inside ELV room x Ap 14.3 * Provide power points indoor rolling doors Electric connections including but not limited to: x Water supply & drainage, storm water drainage Water supply system from external BIWASE's pipe to water tank include water meter x Water supply - irrigation system x Water drainage - main connection incld connections accessories x Storm system from internal to External Manholes x Storm system (manhole, concrete pipe) from internal Manhole to External aprroved connected Manholes Install all sleeve and opening x Full system includes cable, mainhole, underground conduit from Control Panel to Distribution Board Refer to item: 4.2.1 * High voltage connection approval, * Transformer rooms approval * High voltage electric meter and 220V electric meter for individual apartments * Hand over all electric system to EVN to obtain power purchase contract Artchitecture's scope x MEP 15/18 BAO MINH EZLAND APARTMENT District 9, HCMC PACKAGE: SUPERSTRUCTURE SECTION NO - MEPF AND EXTERNAL WORKS Scope of No Employer's Requirements Remarks Employer Contractor Water supply connections including but not limited to: x * Water connection approval * Main water meter and individual meter for individual apartments * Hand over all water supply system to Sawaco to obtain water purchase contract Road, drainage system connections including but not limited to: x Road connection permit Storm water discharge permit Public lighting connection permit Wastewater discharge connections including but not limited to: x DTM approval Discharge permit Periodic environment supervision report Final approval for discharging of treated water, air & rubbish discharge plan 15.7 15.8 15.9 Operation & Maintenance work of the entire system from turn-on and thereafter during the defects liabilities period after the date of practical completion x -1 17 71 10 03 30 BM BM AR AR T TP P0 03 TE TE N NR D F O I0 C SO W R EV A x 02 17 Testing, commissioning and hand-over of the complete installation p 16 MEP Testing, commissioning and hand-over Ap E MEP 16/18 BAO MINH EZLAND APARTMENT District 9, HCMC PACKAGE: SUPERSTRUCTURE SECTION NO - EXTERNAL WORKS AND INFRASTRUCTURE No Leveling grading, road, pavement, walk way, out side corridor floor & three-step Leveling grading x Parking area, Glasscrete Road Concrete grass block tile x Pavement, walk way, Out side corridor floor & three-step Natural ground is compacted K>= 0.98 Reinforcement concrete floor Spay waterproofing and Brush cement - based warterproofing * Finish floor refer architecture drawing * handrail of out side corridor x Other Concrete kerb, Curb for road Traffic line for road, parking area by epoxy paint Slow speed line x Including structure anh architecture: Fence type Fence type (including finishing paint for embankments) Fence type Fence type x 1.2 1.4 1.5 Gate & fence Gate & fence 3.1 Storm water drainage systems Including all concrete pipe D600, D400, manhole, grating (iron cast), connecting to water drainage system x Landscape works Incld year of maintenance works x Including softscape & hardscape, Basic grass, shrub and trees , incld soil, drainage cell, tree maintenance Hardcape with bench, planter boxes with ceinforcement concrete with finish by fiberstone * Water children playround area with concrete floor finish by rubber granules * Children playround area with concrete floor finish by rubber panel x Including softscape & hardscape, Basic grass, shrub and trees , incld soil, drainage cell, tree maintenance Hardcape with bench, planter boxes with ceinforcement concrete with finish by fiberstone * Sink, faucet and power point for BBQ x 4.1 11F 4.2 02 Swimming pool, balance tank, pool deck, water fountain playground, children's playround works Piling Supply Spun pile D500 including, compressing, cut off and connection Including but not limited: Replacing incorrectly piles, damaged piles and piles which fail under tests The cost of any additional work due to eccentricity of piles and/or damaged or displaced piles Concrete B7.5 * Waterprofing Concrete B30, Steel reinforcement (SD 390) * Waterproof B8 Concrete, Steel reinforcement Holcim Hoa phat/ Mien Nam / Pomina Vinakyoei or or equivalent 5.1 5.2 5.3 Ap p x Water supply & drainage, storm water drainage systems GF Remarks x -1 17 71 10 03 30 BM BM AR AR T TP P0 03 TE TE N NR D F O I0 C SO W R 2.1 Contractor * Site backfill to reach design level * Use the soil that was excavated for foundation * Bitumen road, concrete road, Concrete grass block road * Follow TCVN/norms/codes External traffic (for road No.13): Renovate existing road outside the project before handing over the works, including: road surface cleaning, 60mm thick asphalt concrete cover, remove up the existing tiling layer of pavement, then finish by teraazzo tile new, repair manholes, Road 1.3 Scope of Employer A 1.1 Employer's Requirements EV Items Formwork Following TCVN/codes/norms/Manufacturer requirements x x x Sika waterbar V20 5.4 Water stop Waterproofing for pool 5.5 5.6 Waterproofing for pool deck, water fountain playground, children playround works Slab, wall of pool 5.7 5.8 Ceramic tiling to balancing tanks Pool deck x Following TCVN/codes/manufacturer Waterproofing for pool, balancing tank (outside surface of external wall and underside of bottom slab) Waterproofing for pool, balancing tank (inside surface of wall) x Following TCVN/codes/manufacturer Spay waterproofing and Brush cement - based warterproofing x Following TCVN/codes/manufacturer * Mosaic * Water resistant grouting (pointing) Ceramic tiling 300x300 Finish floor by tile, ncl Screeding Ext x x 17/18 BAO MINH EZLAND APARTMENT District 9, HCMC PACKAGE: SUPERSTRUCTURE SECTION NO - EXTERNAL WORKS AND INFRASTRUCTURE No Items Employer's Requirements Water fountain children playround Scope of Employer * With reinforcement concrete floor finish by rubber granules Following TCVN/codes/manufacturer 5.9 Children's playround x 5.11 Stainless steel ladder Including all swimming pool, balance tank x 5.12 Grating for drainage trench Including pool deck, swimming pool x 5.13 Retaining brick wall for water fountain playground Brick wall finish refer Art's drawing Canopy main entrence 6.1 Concrete, Reinforcement, Formwork Concrete B7.5 * Waterprofing Concrete B30, Steel reinforcement (SD 390) * Waterproof B8 Holcim Hoa phat/ Mien Nam / Pomina Vinakyoei or or equivalent 'Following TCVN/codes/norms/Manufacturer requirements 6.2 Steel frame, glass canopies Following TCVN/codes/norms/Manufacturer requirements Refer architecture drawing 7.1 7.2 7.3 8.1 8.2 Pool deck basic pool furniture Changing rooms & public WC Full finishes including but not limited to wet-dry areas, shower partitions / doors, sanitary wares & accessories, Equipment for children's playround River clearance, cleaning and other River Final cleaning Final touching up x x The second before handing over to owner Final cleaning entired project before before handing over to owner x Allowance for obtaining from Authorities all notices,necessary application, licenses or permits for the intallation of incoming services, inspection of DOC and all other matters except Construction license, Pink book x x x p 02 Authority Approval x Ap x Refer architecture drawing Touch up public area before handing over to owner Repair and maintain the road, pavement duuring construction, and give back the oirinal status when completion of works 8.3 x A Loose furniture for pool deck, changing room, children's playround equipment -1 17 71 10 03 30 BM BM AR AR T TP P0 03 TE TE N NR D F O I0 C SO W R x EV Remarks x * With reinforcement concrete floor finish by rubber granules Following TCVN/codes/manufacturer 5.10 Contractor Ext 18/18 ... maintenance and transportation 5.1 Internal Traffic and maintenance 5 .2 External traffic and maintenance x Control external traffic for trucks coming to site Periodic check the status of external road and... install Swimming Pool Water drainage system: * Standard equipments x x 2. 2.1 Equipments for septic tanks and storm water drainage system (STP) 2. 2 .2 Piping and accessories 2. 2.3 Storm water drainage... Employer Allowance for site management staff mobilization and demobilization (including expat If any) including travelling, accommodation, out-ofpocket expenses Management team Traffic, road maintenance

Ngày đăng: 05/11/2019, 00:08

TỪ KHÓA LIÊN QUAN

w