Al form advantages (english)

52 54 1
Al form advantages (english)

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

Thông tin tài liệu

December 5, 2017 December 5, 2017 page December 5, 2017 page USING CAD FACILITIES IN DESIGNING December 5, 2017 page DESIGNING WALL PANEL LAYOUT DESIGNING BEAM PANEL LAYOUT DESIGNING SLAB CORNER LAYOUT (SC) DESIGNING SLAB PANEL LAYOUT DESIGNING STAIR PANEL LAYOUT PRECISE DIMENSION OF STRUCTURE ELEMENTS December 5, 2017 page 10 HIGH NUMBER OF USED TIMES 70% REUSED FOR OTHER PROJECTS  Al-form can be used for more than 100 times This mean each pieces can be used at not only projects  For conventional form, we have to supply again when the form surface is damaged or forms are cut into useless small pieces As for Al-form, only one time supply we can even use for others projects  Usually, up to 80% of al-form elements are standard and can be reused in new projects December 5, 2017 Page 38 CONVENTIONAL FORM AL FORM For plywood, cutting is unavoidable These cut pieces will become trash No need cutting on working area No trash, only form materials December 5, 2017 Page 39 ELIMINATE REPAIRING COST  As mentioned above, Al-form system let us have high exact size and good concrete surface This mean repairing cost is minimized  For conventional form, quality concrete surface and size vitally depend on workmanship  This is a major hidden saving, as builders are very reluctant to admit the true costs of locating and repairing costs December 5, 2017 Page 40 CONVENTIONAL FORM PLASTERING December 5, 2017 Page 41 CONVENTIONAL FORM PLASTERING December 5, 2017 Page 42 CONVENTIONAL FORM NEED REPAIRING December 5, 2017 Page 43 AL-FORM - PAINTING CAN START RIGHT AFTER CONCRETE FORMING December 5, 2017 Page 44 AL-FORM - PAINTING CAN START RIGHT AFTER CONCRETE FORMING December 5, 2017 Page 45 MONO SLAB SYSTEM  All the al-form will be moved up and used for next floors, so the shoring floors is very tidy  Conventional form need two shoring floors, dismantle and moving up this shoring system take much more time than Al-form method December 5, 2017 page 46 SHORING FLOORS CONVENTIONAL FORM all slab, beam formworks & supporting system remain for lower floors December 5, 2017 AL FORM Only prop head & support remain All other form is moved up and setting again Page 47 SHORING FLOORS CONVENTIONAL FORM all slab, beam formworks & supporting system remain for lower floors December 5, 2017 AL FORM Only prop head & support remain All other forms is moved up and setting again Page 48 December 5, 2017 page 49 SHORING FLOORS CONVENTIONAL FORM December 5, 2017 AL FORM Page 50 SHORING FLOORS CONVENTIONAL FORM December 5, 2017 AL FORM Page 51 Thank you for your attention! December 5, 2017 page 52 ... CONVENTIONAL FORM December 5, 2017 AL FORM Page 18 CONCRETE SURFACE CONVENTIONAL FORM December 5, 2017 AL FORM Page 19 December 5, 2017 page 20 ĐỐI VỚI CROWNE PLAZA * Work schedule for Typical Floor... CONVENTIONAL FORM WORKING PROCESS BEFORE DISMANTLING December 5, 2017 AFTER DISMANTLING Page 11 AL FORM WORKING PROCESS BEFORE DISMANTLING December 5, 2017 AFTER DISMANTLING Page 12 CONVENTIONAL FORM. .. SURFACE  Eliminate number of construction joints because all the vertical & horizontal concrete elements is simultaniously casted in using Al- form  When using plywood, after a limited number of

Ngày đăng: 03/11/2019, 18:14

Tài liệu cùng người dùng

  • Đang cập nhật ...

Tài liệu liên quan