November 3, 2019 Part 1: Elements of Kumkang’s AL-form system November 3, 2019 page AL-formworks’ elements Pin & Wedge Wall Panel Slab - Corner Beam - Prop head Slab panel November 3, 2019 page Pin & Wedge Wedge To be used for to secure and tighten the panels together Pin - Φ16 November 3, 2019 Page Pin & Wedge Pin & Wedge November 3, 2019 Page AL-formworks’ elements Pin & Wedge Wall Panel Slab - Corner Beam - Prop head Slab panel November 3, 2019 page Wall panels Including of standard and non-standard size panels There are internal and external wall panels November 3, 2019 Page Installing wall-panels el n a p l l Wa November 3, 2019 Page Rocker: r Rocke November 3, 2019 Page Inner wall all w r e n in panel November 3, 2019 Page 10 Part 3: Dismantling process November 3, 2019 page 50 Dismantling process Dismantling of Wall panels Dismantling of Slab panels and Beams Remain Prop stands and Prop heads Dismantling of Slab Corner Removal of AL-flat tie and tie bar shields Dismantling of Prop stands and prop heads November 3, 2019 page 51 Dismantling of Wall panels The formwork panels of the wall, column and beam section can be usually dismantled after 12 hours but subject to approval of the Engineer Ensure that the wall section panels are removed first follow by the column and beam sections The dismantle formwork panels shall be transferred to the next level/ floor for subsequent assembly process via the slab opening or staircase areas in orderly manner and to the appropriate section/area For the external wall section, the kickers on the upper portion of the floor level shall remain to support and align the next level/floor November 3, 2019 Page 52 November 3, 2019 Page 53 November 3, 2019 Page 54 Dismantling of Slab panels and Beams The formwork panels of the slabs section can be usually dismantled after 36 hours but subject to approval of the Engineer Ensure that the wall section panels are removed first follow by the column and beam sections The dismantle formwork panels shall be transferred to the next level/ floor for subsequent assembly process via the slab opening or staircase areas in orderly manner and to the appropriate section/area November 3, 2019 Page 55 a Remove Beams November 3, 2019 Page 56 b Dismantle Slab Panels November 3, 2019 Page 57 Remain Prop stands and Prop head November 3, 2019 Page 58 Dismantling of Slab Corner November 3, 2019 Page 59 Removal of AL-flat tie and tie bar shields a Remove AL-flat tie November 3, 2019 Page 60 b Remove Tie bar shield November 3, 2019 Page 61 Dismantling of Prop stands and prop heads When the cube tests show that the slab concrete is sufficiently strong, the prop stands and prop heads are removed and transferred to the next level November 3, 2019 Page 62 November 3, 2019 Page 63 Thank you for your attention! November 3, 2019 page 64 ... November 3, 2019 page Wall panels Including of standard and non-standard size panels There are internal and external wall panels November 3, 2019 Page Installing wall-panels el n a p l l... Page 29 Part 2: Assembly process November 3, 2019 page 30 Assembly process Preparation: Setting up level, marking of position and coating of formwork panel Assembly of wall formworks Assembly of... November 3, 2019 Page Inner wall all w r e n in panel November 3, 2019 Page 10 Assembled wall panels November 3, 2019 Page 11 AL- formworks’ elements Pin & Wedge Wall Panel Slab - Corner Beam