Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống
1
/ 52 trang
THÔNG TIN TÀI LIỆU
Thông tin cơ bản
Định dạng
Số trang
52
Dung lượng
13,15 MB
Nội dung
ADVANTAGES OF USING Kumkang Kind AL-form system 11/3/19 11/3/19 page 11/3/19 page USING CAD FACILITIES IN DESIGNING 11/3/19 page DESIGNING WALL PANEL LAYOUT DESIGNING BEAM PANEL LAYOUT DESIGNING SLAB CORNER LAYOUT (SC) DESIGNING SLAB PANEL LAYOUT DESIGNING STAIR PANEL LAYOUT PRECISE DIMENSION OF STRUCTURE ELEMENTS 11/3/19 page 10 HIGH NUMBER OF USED TIMES 70% REUSED FOR OTHER PROJECTS Al-form can be used for more than 100 times This mean each pieces can be used at not only projects For conventional form, we have to supply again when the form surface is damaged or forms are cut into useless small pieces As for Al-form, only one time supply we can even use for others projects Usually, up to 80% of al-form elements are standard and can be reused in new projects 11/3/19 Page 38 CONVENTIONAL FORM AL FORM For plywood, cutting is unavoidable No need cutting on working area These cut pieces will become trash No trash, only form materials 11/3/19 Page 39 ELIMINATE REPAIRING COST As mentioned above, Al-form system let us have high exact size and good concrete surface This mean repairing cost is minimized For conventional form, quality concrete surface and size vitally depend on workmanship This is a major hidden saving, as builders are very reluctant to admit the true costs of locating and repairing costs 11/3/19 Page 40 CONVENTIONAL FORM PLASTERING 11/3/19 Page 41 CONVENTIONAL FORM PLASTERING 11/3/19 Page 42 CONVENTIONAL FORM NEED REPAIRING 11/3/19 Page 43 AL-FORM - PAINTING CAN START RIGHT AFTER CONCRETE FORMING 11/3/19 Page 44 AL-FORM - PAINTING CAN START RIGHT AFTER CONCRETE FORMING 11/3/19 Page 45 MONO SLAB SYSTEM All the al-form will be moved up and used for next floors, so the shoring floors is very tidy Conventional form need two shoring floors, dismantle and moving up this shoring system take much more time than Al-form method 11/3/19 page 46 SHORING FLOORS CONVENTIONAL FORM AL FORM all slab, beam formworks & supporting system remain for lower Only prop head & support remain floors All other form is moved up and setting again 11/3/19 Page 47 SHORING FLOORS CONVENTIONAL FORM AL FORM all slab, beam formworks & supporting system remain for lower Only prop head & support remain floors All other forms is moved up and setting again 11/3/19 Page 48 11/3/19 page 49 SHORING FLOORS CONVENTIONAL FORM 11/3/19 AL FORM Page 50 SHORING FLOORS CONVENTIONAL FORM 11/3/19 AL FORM Page 51 Thank you for your attention! 11/3/19 page 52 ... CONCRETE SURFACE CONVENTIONAL FORM 11/3/19 AL FORM Page 18 CONCRETE SURFACE CONVENTIONAL FORM 11/3/19 AL FORM Page 19 11/3/19 page 20 ĐỐI VỚI CROWNE PLAZA * Work schedule for Typical Floor (APT - 7days)... 10 CONVENTIONAL FORM WORKING PROCESS BEFORE DISMANTLING 11/3/19 AFTER DISMANTLING Page 11 AL FORM WORKING PROCESS BEFORE DISMANTLING 11/3/19 AFTER DISMANTLING Page 12 CONVENTIONAL FORM WORKING... SURFACE Eliminate number of construction joints because all the vertical & horizontal concrete elements is simultaniously casted in using Al- form When using plywood, after a limited number of using