1. Trang chủ
  2. » Luận Văn - Báo Cáo

GIẢI PHÁP NÂNG CAO HIỆU QUẢ THỰC HIỆN dự án tại CÔNG TY TNHH một THÀNH VIÊN TRƯỜNG THÀNHE

106 147 0

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

THÔNG TIN TÀI LIỆU

Thông tin cơ bản

Định dạng
Số trang 106
Dung lượng 1,78 MB

Nội dung

SOLUTION TO IMPROVING THE EFFECTIVENESS OF PROJECT IMPLEMENTATION AT TRUONG THANH ONE MEMBER LIMITED LIABILITY COMPANY Table of Contents ACKNOWLEDGEMENT .3 LIST OF TABLES & FIGURES .5 INTRODUCTION CHAPTER 1: BACKGROUND OF PROJECT’S EFFECTIVENESS IN BUSINESS 1.1 Project management, project progress and project’s effectiveness .7 1.1.1 Definitions, features related to Project and Project Management 1.1.2 Project’s procedure and effectiveness 12 1.2 Criteria to evaluate the effectiveness of project execution in a company 14 1.2.1 Profit – cost of a project (P/C) 14 1.2.2 Effectiveness of work and productivity .17 1.2.3 Evaluation of project quality 19 1.2.4 Evaluation of project implementation progress 20 1.3 Methods of evaluating the effectiveness of a project 22 1.3.1 Evaluating the effectiveness of a project by quantitative methodology 22 1.3.2 Evaluating the effectiveness of a project by qualitative method 23 CHAPTER 2: CURRENT SITUATION OF EFFECTIVENESS IN PROJECT IMPLEMENTING AT TRUONG THANH ONE MEMBER LIMITED LIABILITY COMPANY 27 2.1 Overview about Truong Thanh Company .27 2.1.1 General introduction about the company 27 2.1.2 Establishment history of the company: 27 2.1.3 Organization chart of company: 29 2.1.4 Capacity and experience to implement construction project .30 2.1.5 Particular projects of Truong Thanh Company .31 2.2.1 Results of deployed projects 32 2.2.2 Analyze quality of the project 36 2.2.3 Analyze the result of project implementation progress .37 2.2.4 Current situation about effectiveness of project implementation via making survey with experts and employees 38 2.3 Conclusion about effectiveness of project implementation in Truong Thanh One member Limited Liability Company 40 2.3.1 The strengths .40 2.3.2 The restrictions and weaknesses .41 2.3.3 Reasons for the restrictions and weaknesses 41 CHAPTER 3: SOLUTION FOR IMPROVING THE EFFECTIVENESS OF PROJECT EXECUTION AT TRUONG THANH COMPANY .43 3.1 Reform the organizing procedure and controlling the project’s progress 43 3.1.1 Diagram: .43 3.1.2 Explanation of the diagram 45 3.1.3 Changes comparing to the current procedure 47 3.2 Enhancing the human resources management and increase the productivity .48 3.3 Improve the cost controlling effectiveness 52 3.3.1 Control the material cost .52 3.3.2 Table of allocating the material cost of project 54 3.4 Complete the project’s quality management 57 CONCLUSION .60 REFERENCES i APPENDIX iii LIST OF TABLES & FIGURES No 1) 2) 3) Names Table 1.1 Table 1.2 Table 1.3 4) Table 2.1 5) 6) 7) Table 2.2 Table 2.3 Table 2.4 8) Table 2.5 9) Table 2.6 10 Table 3.1 11 Table 3.2 12 Table 3.3 13 14 15 16 17 18 19 20 21 Table 3.4 Table 3.5 Table 3.6 Table 3.7 Figure Figure 1.1 Figure 1.2 Figure 1.3 Figure 1.4 Content List of construction cost and controlling method Table of quality evaluation summary List of Experts interviewing Experience year to implement construction project – Truong Thanh Company Qualification statistics of employees – Truong Thanh Company Table of Regression analysis Table of Completed Regression Analysis (shortened) Table of collecting and evaluating quality of project – Project of embanking Uong River Collected result of questionnaire about project management Suggestion of performance evaluation model - KPI of Planning Division Suggestion of performance evaluation model - KPI of Labor and Salary Division Suggestion of performance evaluation model - KPI of Technical Division Table of material pricing Proposal of Table of Project’s cost monitoring - Material Proposal of Table of Total project’s cost managing Proposal of Table of Project’s quality evaluation Thesis researching procedure Project management function Project’s procedure Example of Gantt construction project Example of method of setting up PERT chart in project management 22 23 24 Figure 2.1 Figure 2.2 Figure 3.1 Organization chart of Truong Thanh company Progress of project implementation – Truong Thanh Company Procedure of quality management of construction work INTRODUCTION IMPERATIVENESS OF THE TOPIC Preparing and implementing construction projects is currently the main activity of Truong Thanh One Member Limited Liability Company In particular, the management of construction project plays a critical role in ensuring the success and effectiveness of construction projects Therefore, in order to achieve effectiveness in business activities, it is necessary to focus on enhancing project management which is meaningful for Truong Thanh Company development Being the main person in charge of project management for construction works of Truong Thanh Company, spending the past years to learn and practice, I realize that besides the achieving results, the project management of the Company still remains the restrictions and weaknesses Although these weaknesses have affected on performance of the Company’s construction works especially in economic recession period, no method is applied to solve out the issues As a result, with the responsibility of manager and by learning from course at PSGM, I has made a decision to choose the topic: “SOLUTION TO IMPROVE EFFECTIVENESS IN PROJECT EXECUTION AT TRUONG THANH ONE MEMBER LIMITED LIABILITY COMPANY”, which is not only for my thesis, but also for Truong Thanh Company to eliminate the existing restrictions and weaknesses in order to improve the effectiveness in implementing the construction project in the future RESEARCH OBJECTIVES The paper will aim at the following objectives: Systematize the theories about project management, management procedure and - effectiveness of implementing investment project of construction Set up system for evaluating the effectiveness of the construction project Analyze and evaluate the current situation of the construction project in Truong Thanh One Member Limited Liability Company, leading to weaknesses and - shortcomings to find out the solution Propose the solution to enhance effectiveness of project implementation in Truong Thanh One Member Limited Liability Company RESEARCH’S OBJECT AND SCOPE 3.1 Research’s object The thesis focuses on making research the effectiveness of project implementation in Truong Thanh One Member Limited Liability Company in the following fields: Human resource management and labor productivity, cost management and cost savings, management of project progress 3.2 Research method The thesis refers to the projects within pass five years and proposes the solutions for the upcoming project in next years in Truong Thanh Company RESEARCH METHODOLOGY 4.1 Process of research (Look at Figure 1) Figure 1: Process of thesis research Source: Suggested by author Procedure interpretation: This thesis uses the method of applying theory to practice This paper will mention the project management procedure and the method of modern management Based on theory, by studying via direct observation and applying econometric models to imply to achievements in order to promote the strengths and find out the causes to fix and limit the weaknesses in current project management As a result, the practical solutions will be produced to enhance effectiveness of project implementation in Truong Thanh Company 4.2 Data collecting method 4.2.1 Secondary data: this is available data including: Data, textbooks about project management Available data of the industry Company’s data includes: process of current project implementation, summarized and detailed data, reports about completed project of the company, financial statement, etc 4.2.2 Primary data: this is data collected by the author by the following methods: 4.2.2.1 Interview: interview the experts, direct executives Interview’s purpose: Find out the opinion of direct executives to evaluate the current project implementation of the Company Interview’s content: o Current implementation process: achievements and weaknesses o Personnel organization, labor productivity and the factors effecting on labor o o productivity Project process, situation of late progress and the methods to improve Management of project cost and unofficial cost, the factors effecting on project costs o Proposals to enhance the effectiveness of project implementation List of interviewees: o Project leaders o Project designers o Managers of some departments 4.2.2.2 Survey: using questionnaires to choose major opinions o Scope of survey: over all company members o Survey’s objects: Manager and direct executives in project management o Survey’s objectives: Choose major opinion about current project implementation o Questionnaire making method:  Number of expected questions: 10 questions, including:  09 questions encoded the data in form of options (06 options for each question in which 05 options with available questions, the answerer tick the suitable one, the o rest for other opinion)  01 opening question for individual opinion Delivery and collection method of questionnaire: deliver and collect directly questionnaire Contact point to deliver and collect questionnaire is project manager 4.3 4.3.1 4.3.2 - or head/ vice head of each department Data analysis method Qualitative method Personal evaluation about situation of project implementation in the Company Based on survey’s result, collecting the opinion of employees Comparing with personal opinion to make conclusion Quantitative method Collecting the survey’s result to make conclusion Statistic and analyze the index of completed project, use regression model to analyze the objectives and factors effecting on this objectives - Comparing the results with each other to make conclusion 4.3.3 Combining 02 methods: Based on results of 02 methods, referring the critical notes for the analysis process 5.1 CONTRIBUTION OF THE TOPIC Theoretical basis: systemize the general issues of project management in the construction company at present 5.2 Factual basis: analyze and evaluate the situation of project management in Truong Thanh Company at present Based on applying scientific theories, the thesis will provide the oriented and direct solutions for Truong Thanh Company in order to improve the project management STRUCTURE OF THESIS The thesis includes: Introduction Chapter 1: Theoretical background of project’s effectiveness in business Chapter 2: Current situation of effectiveness in project implementing at Truong Thanh One Member Limited Liability Company Chapter 3: Solution for improving the effectiveness of project execution at Truong ThanhOne Member Limited Liability Company Conclusion CHAPTER 1: BACKGROUND OF PROJECT’S EFFECTIVENESS IN BUSINESS 1.1 Project management, project progress and project’s effectiveness 1.1.1 Definitions, features related to Project and Project Management The definition of “project” and “project management” has been defined by many of both international and domestic scholars, which are usually emphasized on a specific feature on purpose Abstractly it is “image of a situation or status which we want to achieve” For example, today we are visiting a blank area of land, in next five years we want to have a building with thousands of families living on that place It is a project of an apartment that we want to execute More specifically, project is “a specialized activity or a unique mission which is implemented by special method, resource and schedule to create a new entity” By that many projects has been and being implemented These projects are distinguished by their method, mission or resource used For example: the activity of transferring the teachers to mountain region teaching the children of elementary ages is called project of “The anti-illiteracy campaign for the minorities” Another example is the activity of purchasing the technical machine and training workers to operate to produce the goods or services; or building up the public infrastructures such as bridge, drainage, land road, railway; river and sea port, dyke, dam, lake, irrigational channel system …in which there are work such as factory, equipment…placed on land surface built at specific address is called the project of buildings construction investment It is type of project which Truong Thanh Company has been mainly focused on, and is different from other types of project which are without of construction activity or the works attached to land surface such as the project of buying auto, plane, and ship From the above mentioned facts, the definition of project should be: Project: a series of related activities which are implemented in the limited time with restricted human resources; especially budget in order to achieve a specific and clear target, which satisfy the demand of targeted object In other words, Project is a total combination of policies, activities and costs which is designed in order to achieve a goal in limited time Accordingly a project is including the following common features: First, objective: - A project is always having one or some clear objectives The directional objectives are consistent during the project period The final outcome is always compared with the initial objective in order to evaluate the suitability or success of project It is mentioned above as “status which we want to achieve” or “a specific mission needs to be executed” Constructing items: renovated 4th level blocks into office; new construction barrier wall between 9A/HĐ-XD 12/07/2010 Truong Thanh delegation of Headquarters; and sports Border Guard renovating 146,742,000 Truong Thanh 30/08/2010 company 30/08/2010 Handed Over Renovation - new construction 02 blocks garages into offices Station, 11/HĐ-XD/2010 16/06/2010 costructing project: Military guest house of maneuver battalion training - Border Guard Border 548,557,000 New housing for soldiers (02 13/HĐ-TCXD/ 2010 9/08/2010 maneuver battalion training - 16/06/20 Army of Long 16/10/2010 10/11/2010 360 4/08/2011 4/12/2011 300 5/03/2012 15/09/2012 30 4/11/2011 4/11/2011 10 An Army of Long An houses) gate checkpoints of Guard Border 4,996,803,000 Guard Army of Long An Border Guard Army of Long An Handed Over Handed Over Station House Station, WC for soldiers, staff, fence, fountain drainage system, 14/HĐ-TCXD/ 2011 10/05/2011 outdoor power systems, project: Border 4,230,572,000 maneuver battalion training - Guard Army of Long An Handed House/statio Over n Border Guard Army of Long An Station, constructing project: gate 15/2011/ HĐ-TCXD 5/10/2011 checkpoints of Soc Trang border station (893) Border 125,062,000 Guard Army of Long An 10 Handed Over station House, constructing project: Border Intermediate School 2nd 853/HĐ-TCXD/ 2011 16/12/2011 (phase 2) Items: The guesthouse, the infirmary, improvement Border 8,850,936,000 commander home D1, external Guard Army - Border Intermediate 170 3/06/2012 25/08/2012 90 5/09/2012 25/12/2012 580 12/01/2014 12/06/2014 345 28/08/2013 28/08/2014 250 15/07/2013 15/07/2013 90 6/10/2009 6/10/2009 Handed Over House School 2nd and internal road House 356b/ 2012/HĐXD 7/06/2012 School Border 2nd Border Intermediate (military village 1,595,959,000 roads) House, 1/2012/ HĐXD 11/06/2012 maneuver battalion training ( house for steering 7,773,829,000 Border Guard Headquarters of 20,511,907,000 929 and residential areas Phu Huu Ward, An Phu district, An Giang gói thầu số 4, đoạn từ K5+779,09 đến K5+938,24 Headquarters Border 2,710,835,000 Guard Headquarters of An Giang Sở Tổng thể nâng cấp đê Hà Nam, 8/07/2009 Guard of Ca Mau province 36/HĐXD Over House Guard Army of Long Border Supply water for border station 7/11/2012 Handed Running House An Ca Mau 27/HĐXD-2012 Intermediate Border Bo De border station (672)/ 17/09/2012 Army - Border School 2nd committee, Lecture halls) 05/HĐXD-2012 Guard 2,083,000,000 Over Handed Over Nông nghiệp phát triển nông thôn Quảng Ninh 11 Handed Handed Over Station Water supply Thi cơng xây dựng gói thầu số 16: Cứng hóa mặt đê tả Trà Lý từ 19/HĐXD 14/02/2009 K16+800 đến K17+600 thuộc dự Ban QLDA 993,816,000 án tu bổ đê điều thường xuyên Sở NN&PTNT 85 10/05/2009 10/05/2009 200 8/03/2011 31/21/2014 150 1/10/2011 3/05/2012 180 6/02/2012 6/01/2013 180 26/05/2012 15/01/2013 Thái Bình Handed Over năm 2009 tỉnh Thái Bình Construction and equipment installation Sewer and Wastewater 17b/2010/HĐXL 20/08/2010 Treatment for urban area, Uong Bi town( North and South Project 7,395,243,000 Highway 18 from bridge of Sing management board of Uong Running Bi town river to bridge of Sen river) Construnting the package no.3 23/2011/ HĐXL 4/05/2011 project improving drainage of the streams area 1B-2A, Cam Trung Project 2,201,572,000 ward, Cam Pha Town 10/08/2011 water spillways, Thong construction 03/HĐKT 28/11/2011 about package Over Project Nhat 1,642,028,000 ward, Hoang Bo district Station, board of Cam Handed Pha Town Repair and upgrade Dong Vai 19/2011/ HĐXD management management board of Hoang Handed Over Bo district forwarder No.9b project: IaKla Border station gate (721) Border Guard Army of Gia Border Guard 5,599,377,000 Army of Gia Lai Lai 12 Handed Over Area 1B road, Cam Trung ward, 41/2011 /HĐXL 21/11/2011 Cam Pha Town –package no.1, construction, renovation, Project 4,201,453,000 upgrading 12/HĐKT 192/HĐ-XD 23/07/2009 15/07/2011 Survey, design and estimate K64 warehouse fire system Build tennis courts for Border Guard Army of Ha Giang 51/2011/ HĐ-XD 34/2011/ HĐ-XD 6/12/2011 6/12/2011 3/10/2011 120,000,000 998,649,000 Renovation and upgrade Nam Hai road, Cam Tay ward, Campha Army of Ha 597,406,000 management board of Cam Construnting the package no.1: Project Renovation and upgrade Ho Tung Cam Tay ward, 1,598,883,000 management board of Cam Campha province Pha town Construnting the package no.1: Project Renovation and upgrade Nguyen Du road, Cam Tay ward, Campha project: 22/08/2009 22/08/2009 45 29/08/2011 29/08/2011 90 5/03/2012 5/03/2012 120 4/04/2012 4/04/2012 150 1/03/2012 1/03/2012 5/05/2011 31/21/2011 Over Handed Over Handed Over 3,276,400,000 management board of Cam Handed Over Handed Over Handed Over Pha town renovation and new construction Border Guard Army Cao Bang 30 Handed Project Pha Town road, 19/04/2012 Guard town Mau 19/04/2012 Giang Construnting the package no.1 1/02/2010 Army of Ha Giang Border province 01/HĐ-XD board of Cam 150 Pha Town Border Guard Construnting the package no.1: 57/2011/ HĐ-XD management Border 10,810,335,000 Army Bang 13 Guard Cao 420 5/03/201 Handed Over Renovation 17/2013/ HĐXD 30/09/2013 and Border upgrade Donggiot road, Troi town, Hoang 5,024,605,000 Bo district 16/06/2011 project: Upgrade headquarters of 1264/HĐ-XD 8/08/2011 constructing construction package 2,054,595,000 No.10 1080/HĐ-XD 12/09/2011 constructing project: 419 (Mưong Pon)/ Bo 25/03/2014 25/09/2014 27/01/2012 27/01/2012 20/03/2012 20/08/2012 24/04/2012 30/06/2012 24/05/2012 10/08/2012 29/05/2013 29/12/2013 31/07/2013 31/07/2013 Mới Hoàn Thành 180 Guard Army of Phu 340 Yen 30/06/20 11 8/08/201 Handed Over Handed Over project: package No.10 border station Border Guard Army of Dien Border 10,546,316,000 station (348) construction Hoang 175 Bien project: project: An Ninh Dong border Station, of Border Border Guard Army of Dien Bien Station, Army District Construnting the package no.6 729/HĐ-XD Guard Border 7,260,000,000 Guard Guard Army of Dien 310 Bien 9/01/201 Handed Over Army of Dien Bien Station, constructing construction 1691/HĐ-XD 12/10/2011 package project: No.8: project: Dong Tac border station Border 7,943,857,000 (352) Border Guard Army of Phu Guard Army of Phu 220 Yen 12/10/20 11 Handed Over Yen (Phase 2) 1484/2012/HĐTCX D 16/10/2012 Si Lo Lau border station (289)/ Border Guard Army of Lai Chau Border 3,125,651,000 16/2012/ HĐ-XD 18/12/2012 (348) Border Guard Army of Phu Yen – Package Army of Lai Chau Border An Ninh Dong border station 7,261,716,000 Guard Guard Army of Phu Yen 14 230 210 22/10/20 12 18/12/20 12 Handed Over Handed Over Nhà Đồn House, headquarters barracks Border Guard Army of Lao Cai 19/HĐ-XD 421/HĐ-XD 27/12/2012 25/03/2013 (Package No.19: constructing Border 10,063,090,000 Cai floors) Apachai border station - Border Border of Dien Bien; 1,733,717,000 package No.4 30/09/2013 Guard Army of Phu Yen; Package no.6+7: stone embankment , Border 4,657,499,000 15/07/2013 21/06/2013 5/09/2013 13/05/2014 13/05/2014 Running 25/09/2016 25/09/2016 Running 365 18/04/2014 18/06/2014 Running 480 18/02/2012 20/09/2012 80 9/06/2011 9/06/2011 82 Huong Nguyen Border Station (637); Package No.11 1/04/201 Công Handed Over Guard Army of Phu 345 Yen leveling, road, operator house 25/2013/ HĐ-XD 31/12/2014 Guard Army of Dien Đang Thi 13/12/2013 Bien Aggregate repair station / Border 17/2013/ HĐ-XD 2/01/201 Army of Lao item: staff and sodiers housing, Guard Army Guard Border 24,348,537,000 Guard Army of Thua 790 Thien Hue 16/07/20 13 Repair housing of commander, 01/2013/ HĐ-XD 18/04/2013 housing of soldiers dinning room and No.1+2, kitchen Border 4,669,260,000 maneuver battalion training - Guard Army of Long An Border Guard Army of Long An lecture 03/2010/ HĐ-XD 26/10/2010 hall 4, project: Community College of Lai Chau Community 21,052,000,000 –package No.12 Chau The concrete road aroand the 02/HĐ/VISTRUON GTHANH/2011 21/03/2011 plant and road of billet yard Vietnam Corporation - College of Lai Italia Steel Vietnam 3,701,275,000 Italia Steel Corporation 15 Handed Over Handed Over House Station, constructing project: gate 15/2011/ HĐ-TCXL 5/10/2011 6HĐ/VIS TRUONGTHANH/ 25/05/2011 2011 checkpoints Border station of Border 125,062,000 An improvement the slag tank factory Vietnam Vietnam - Italia Steel 158,879,000 Corporation 23/12/2011 construction Border Guard Army of Cao Bang House, 3rd 46/2012/ HĐXD 25/05/2012 regiments Border 10,745,219,000 20/06/2013 Battalion, 395th 2nd divisional Packge 10th Border station Muong Min (499) Package 18/HĐ-XD/2013 8/07/2013 9,393,819,000 14,260,486,000 HĐXDBQLDA Steel 15 10/06/2011 10/06/2011 17/03/2013 15/08/2013 200 18/08/2013 18/08/2013 350 5/06/2014 15/12/2014 Running 175 30/12/2013 30/06/2014 Running 60 27/07/2010 27/07/2010 Guard 345 395th divisional Military zone 25/12/20 11 Over Handed Over Handed Over Handed Over Guard Army of Thanh Hoa No.02 (housing for soldiers N2), residential structures divisional / 1,793,736,000 power line, Nguyen Luong Bang – Tay Son Hanoi Military Zone Project laying underground cable routes, 18/05/2010 11/04/2011 - Army of Cao Border soldiers N1+N2/c1/d15/fBB3 266/2010/ 11/04/2011 Bang ( construction project no.5) 01/2013/ HĐ-XD Italia Handed 30 Corporation Station, Renovation and new 04/ HĐXD Army of Long Soc Trang(893) in Guard 3,821,456,000 management board transport 16 urban Handed Over House, constructing project: Xich 14/HĐXD 19/05/2010 Tho Village School, commune primary school of Thong Nhat Project 3,330,405,000 ward, Hoanh Bo, Quang Ninh Management Board 19/05/20 of 10 25/11/2010 25/06/2011 15/02/2011 20/12/2012 16/11/2010 6/12/2011 Handed Over Hoanh Bo Project 57/2010/ HĐQLDA 15/11/2010 Road to Ha Tu ward clinics, Ha Long city Constructing 82/HĐ-XD 13/11/2010 project: 1,885,466,000 4,085,963,000 ward, Hoanh Bo district 30/2011/ HĐXD 29/12/2011 cultural house Son Duong, Hoang Bo District Board of Ha 90 15/11/20 10 Handed Over Long city Project canal reservoir Roc Ca, Thong Nhat Management Management Board 13/11/20 of 10 Handed Over Hoanh Bo Project 4,290,260,000 Management Board of 90 1/01/201 1/04/2012 Pause Hoanh Bo brigade hall suite; package no.5: 2013/HĐXD 19/09/2013 construction and purchase hall Brigade 6,619,659,000 tools 01/HĐKT 14/10/2010 stations (721) Border Guard Army of Gia Lai 235 28/11/2013 31/12/2014 20/08/2011 25/12/2011 Running Station, constructing the package No.9A, project: Border guard 242/ Military Zone Border 7,982,855,000 Guard Army of Gia Lai 17 300 16/10/20 10 Handed Over Station, constructing and installation clinics combined civil 429/HĐ-BCHBP 9/04/2011 and military health – border guard stations Bu Gia Map (785) - Border 875,322,393 Guard 12/04/20 Army of Binh 12/07/2011 12/07/2011 150 31/12/2011 31/12/2011 240 31/05/2012 31/05/2012 650 12/08/2013 11 Phuoc Border Guard Army of Binh Handed Over Phuoc Water 45/2011/ HĐ-TCXD 28/07/2011 project: supply, water construcing supplu border station 759, Border Guard Army Border 708,809,000 1446/2011/HĐXD 4/10/2011 project: Border headquarters of Kon Tum Army of Dak Nong of Dak Nong Station, Guard Border 13,038,906,000 Guard Army of Kon Tum Handed Over Handed Over Road, Package no.02: Building of road base, road surface Project foundations, drainage systems and 16/2011/ HĐXD 1/11/2011 traffic safety systems from Km 10+275 - Km 12+300, project: Rescue road, Buon Choah ward, 5,164,710,000 Management Board of Dak Nong Krong No district 18 Pause Road, Package no.02: Building of road base, road surface Project foundations, drainage systems and 17/2011/ HĐXD 1/11/2011 traffic safety systems from Km 7,282,334,000 10+275 - Km 12+300, project: Management Board of Dak 570 24/05/2013 Pause 230 22/06/2012 22/06/2012 260 8/09/2012 28/10/2013 270 23/09/2012 15/09/2013 150 5/11/2012 5/11/2012 270 26/03/2013 31/21/2014 90 22/11/2012 22/11/2012 Nong Rescue road, Buon Choah ward, Krong No district Package No.9a, project: Border 63/2011/ HĐTCXD 5/11/2011 Guard Army of Nam Na (751) / Border 5,785,000,000 Border Guard Army of Dak Nong 1491/ 2011/ HĐXD 129/2011/ HĐXD 23/12/2011 28/12/2011 Station, maneuver battalion training (Package 2nd) House, headquarters of Song Thanh (663) (Package No 11) 8/06/2012 district, Gia Lai Categories: background, road surface, Border Guard 13,776,400,000 1027/ HĐXD 29/06/2012 (Package No 11) 2,666,000,000 24/08/2012 - Renovation, repair and water painting categories Guard Army of Kon Tum Handed Over Handed Over Handed Over Project 3,295,670,000 Management Board of Duc Handed Over Co Border 14,098,412,000 Guard Army of Kon Tum Phuoc Thuan Border station (492) 27/HĐXD Army of Dong Thap Border drainage House, headquarters of Kon Tum Army of Dak Nong Road to hospital of Duc Co 15/2012/ HĐXD Guard Border 1,551,662,709 Army Guard of Ba Ria-Vung Tau 19 Handed Over Handed Over Project management House, psychiatric hospital in Gia 01/2012/ HĐXD 17/10/2012 Lai; Tender package No.6: stone embankment, leveling , side gate, board 1,784,026,000 fence specialized medical - Gia 120 14/02/2013 14/02/2013 270 6/07/2013 6/07/2013 31/12/2012 31/12/2012 80 17/06/2013 17/06/2013 60 28/05/2013 28/05/2013 60 28/05/2013 28/05/2013 Handed Over Lai provincial Department of Water 582/2012/HĐXD 9/10/2012 supply for Health Commander of marine delegation 28 and population 2,958,899,000 clusters 3/10/2012 Border Guard Army of Dak Border Guard - marine delegation 28 Border Guard Nam Na Border station (751)/ 65/2012/ HĐTCXD the 693,550,000 Nong- package 9b Army of Dak Nong Handed Over Handed Over Project 24/2013/ HĐXD 29/03/2013 Road between line and line 3, Duc Co district, Gia Lai province 891,000,000 Management Board of Duc Handed Over Co Project 25/2013/ HĐXD 29/03/2013 Road B1 area, Chu Ty ward, Duc Co district, Gia Lai province 574,736,000 Management Board of Duc Handed Over Co Project 26/2013/ HĐXD 29/03/2013 Road A6 + A7 area, Chu Ty ward, Duc Co district, Gia Lai province 655,066,000 Management Board of Duc Co 20 Handed Over Dak Mam road to station 07 (759) Project – province road from Km + 000 05/HĐXD 17/06/2013 - Km + 900 and road linking 18,437,105,000 axis N7, Dak Mam ward, Krong Hon Quan district, Binh Phuoc 3,557,155,000 Province 01/2013/ HĐXD 25/07/2013 of 640 19/03/2015 19/03/2015 Running Project building headquarters of Khai Tan 20/06/2013 Board Krong No No province, Dak Nong province 16/2013/ HĐ-XD Management Management Board of Hon 150 9/09/201 6/02/2014 Pause Quan district Border Guard Civil and military health clinics Loc Tan – Loc Ninh - Bình Phước 453,666,000 Army of Binh Phuoc 60 25/07/20 13 23/09/2013 23/09/2013 11/02/2014 25/09/2014 14/12/2013 14/12/2013 20/12/2012 20/12/2012 Handed Over Province Bypass 09a/HĐKT/2013 15/08/2013 system; Road transportation command station, flagpole/ Shooting School 01; 1,973,465,200 Headquarters of Legion 03 180 Running 02;03 Constructing 314/2013/HĐXD 14/11/2013 and boiler house, varieties fungus, mushroom Vocational installation growers house, School 947,719,000 Farmers' electrical equipment 11/HĐXD/2010 19/11/2010 Constructing salute the flag yard for Capital Commander Vietnam 30 15/11/20 13 Handed Over Association 1,069,833,000 Capital Commander 21 Handed Over Station, 15/HĐXD/2010 17/12/2010 construction project: Repair college team camp fire 1,007,768,000 protection - Capital Commander Station, construction the package 06/HĐXD 28/04/2011 No8: commander house and office of Ung Hoa board military constructiing Commander 40 26/01/2011 26/01/2011 242 26/12/2011 3/04/2012 170 30/10/2011 30/05/2012 15 5/07/2011 5/07/2011 60 7/02/2012 7/02/2012 Ung Hoa board 10,074,325,000 military commanders commanders Station, Capital Handed Over Handed Over package No13: Build dining room, library, training house for ready to fight 18/HĐXD 13/05/2011 Project: investment and building 19,238,242,000 barracks and technical areas DTG Capital Commander Handed Over 47/Capital commander (armored battalion) Constructing project lights for 23/HĐXD 20/06/2011 salute the flag yard, sáng sân chào đền chiếu cờ, Centre 306,192,000 Capital Commander Handed Over Agencies of Capital Commander House, renovated barracks college team, 86/HĐXD 9/12/2011 repairing Technical Bureau Constructing package No2: Office, Activities House N3 and N4 Capital synthesis/ 3,172,240,000 Commander \ Technical Bureau 22 Handed Over House for command and work : board military commanders Ung 01/HĐXD 16/03/2012 Hoa The construction pakage Ung Hoa board 2,751,381,000 No7: auxiliary items for Ung Hoa military 90 14/06/2012 14/06/2012 30 23/04/2012 23/04/2012 90 4/04/2012 4/04/2012 90 14/01/2013 14/01/2013 90 28/02/2013 28/02/2013 90 6/09/2013 6/09/2013 commanders Handed Over board military commanders House for command and work : Ung 02/HĐXD 24/03/2012 Hoa board commanders military Constructing package No.6: Equipment and Ung Hoa board 171,057,000 military commanders auxiliary items of Ung Hoa board Handed Over military commanders Fire prevention systems, project: 38/HĐXD 5/01/2012 barracks and technical areas 195,000,000 DTG47/ Capital Commander Capital Commander Handed Over Shooting school of Hoa Thach 15/HĐXD 16/10/2012 Capital Commander: Command station - live firing areas for tanks 1,706,438,236 Capital Commander Handed Over - armored Constructing pakage motorcycle 25/HĐXD 30/11/2012 weapons, no.4: repair workshop, project: Renovate Capital 6,301,914,000 barracks and repairing synthesis / Commander Technical \ Handed Over Bureau Technical Bureau General 05/2013/ HĐXD 8/06/2013 Tennis courtsbadminton court of Regiment 692 logistics 1,929,568,000 department \hanoi commander 23 Handed Over KOYO Items: leveling , Build gate, fence 01/HĐXD 5/09/2013 KOYO MACHINE Viet Nam 5,596,000,000 Co,ltd Items: 2406/HĐXD 24/06/2013 internal roads pakage 19,388,009,300 center 2/02/2014 120 22/10/2013 22/10/2013 350 11/09/2014 11/09/2014 Handed Over Guard Army training MACHINE Viet Nam Handed Over Co,ltd No.13: Constructing the remaining items Border Nam 2/02/2014 KOYO and infrastructure; office… - KOYO Constructing 26/09/2013 Viet 150 Co,ltd MACHINE Viet Nam Co,ltd 10/2013/ HĐXD MACHINE Border 9,796,349,000 Guard Army training center 24 Running ... MEMBER LIMITED LIABILITY COMPANY 2.1 Overview about Truong Thanh Company 2.1.1 General introduction about the company  Name of company: Công ty TNHH thành viên Trường Thành  Name for international... whenever needed Hardly check whether the local authority’s ability is meeting the requirement for - project implementing The responsibility is not confirmed or clear In controlling: - Do not... to more productivity, and decrease the cost In addition, this system can find out the good employees to appreciate which let the increasing loyalty To increase the - productivity of employee is

Ngày đăng: 30/11/2018, 13:28

TÀI LIỆU CÙNG NGƯỜI DÙNG

TÀI LIỆU LIÊN QUAN

w