1. Trang chủ
  2. » Tất cả

Algeria plan

8 5 0

Đang tải... (xem toàn văn)

THÔNG TIN TÀI LIỆU

Nội dung

P2 El Djazair 23 Mole el Hadjar 32 31 33 Mole Skikda 37 Brise - Lames Est Djen - Djen 36 LNG 35 Passe Sud ALGERIA MOROCCO 6°E ALGIERS © Shipping Guides Ltd., Reigate, United Kingdom 29 34 4°E 28 27 30 Bassin de Mustapha Bejaia (Bougie) 500 26 Jetee de Mustapha Dellys metres 25 Passe de Mustapha Bassin de l'Agha Jetee de l'Agha Algiers 22 19 Passe du Vieux Port Mole Ghara Djebilet 15 2°E Mole Bologhine 20 18 Mole Guelma Tenes 24 21 17 13 14 Jetee du Vieux Port Passe Nord Ibiza 16 Mole Oued Hamimine 12 11 10 Jetee Khair - Ed - Dinn EL DJAZAIR 0° Port Officers Port Captain Pilots Mole El Djezair Bassin du Vieux Port © Shipping Guides Ltd, Reigate, United Kingdom ALGIERS Oran Mole El Djefna Mole de Peche GENERAL - ALGERIA ALGERIA Majorca SPAIN Sardinia Formentera 38°N Jijel Annaba Skikda Mostaganem 36°N Arzew (Arzew El Djedid) ALGERIA Ghazaouet 34°N TUNISIA 2°W 8°E Country Plan ALGERIA ARZEW ALGERIA Refinery du Midi Exclusion Zone Anchorage 00°09’55” W ARZEW Fort ARZEW MEDITERRANEAN SEA P1 P2 S1 S2 P3 35°50’48” N Methane Liquefying Plant Exclusion Zone Exclusion Zone Tanker Berth 480m Exclusion Zone 480m Exclusion Zone SPM B1 Ammonia Plant B2 B3 M1 M2 SPM M3 M4 M5 M6 D1 Arzew-el-Djedid © Shipping Guides Ltd, Reigate, United Kingdom Layout ARZEW ALGERIA Fort de la Pointe Mole No Mole No Anchoring and Fishing Prohibited Mole No Mole No P0 Slip ARZEW P1 South Jetty Methane Port du Large Jetty P2 North Berth South Berth P3 S2 S1 Secondary Jetty 500 Methane Liquefying Plant metres © Shipping Guides Ltd, Reigate, United Kingdom Arzew P3 ARZEW ALGERIA B1 B2 ARZEW B3 ARZEW EL DJEDID (Not Operational) M1 LNG Berths M2 M4 M3 M5 LPG Berth M6 D1 LPG Berth 500 metres © Shipping Guides Ltd, Reigate, United Kingdom Arzew El Djedid ARZEW ALGERIA Bunker Arm Liquid Arm Liquid Arm Vapour Arm Liquid Arm Said to be 90m Mooring Hooks Mooring Hooks Control Room Four Gun Fire Extinguishers ARZEW ARZEW EL DJEDID Berth D1 - LPG Berth Plan Supplied By Ship's Master © Shipping Guides Ltd, Reigate, United Kingdom P4 Arzew El Djedid LPG Berth BEJAIA ALGERIA y NW Qua Dr y 10.5m doc k uay Q SW 10.5m Casbah Quay Gare Quay Central Quay 7.5m North Quay 7.5m PETROLEUM PORT Fishing Quay OLD PORT Pass Qua y Ne wQ uay 10.5m 12m Little S REAR PORT FORE PORT 13.5m eaward East Jetty Jetty South Jetty Bi g Se aw ar d Je t ty Main Entrance Clos ure Jett y Red Buoy Indicates 12m depth BEJAIA PORT DEVELOPMENT Dangerous Area © Shipping Guides Ltd, Reigate, United Kingdom Port Development BEJAIA ALGERIA Tugs Central Quay BEJAIA Harbour Master No r th Qu FORE PORT ay Pilots PETROLEUM PORT Fishing Quay OLD PORT Turning Circle Radius 250m FORE PORT Abdelkader Entrance Little S eaward East Jetty Jetty South Jetty Main Entrance © Shipping Guides Ltd, Reigate, United Kingdom Fore Port P5 BEJAIA ALGERIA BEJAIA MOORING ARRANGEMENT VALID FOR ALL THREE PIERS BERTH DESIGNED FOR 80,000 DWT VESSELS Loading Arms + Bunker Hose Ballast Stern Tug Line Not used for Mooring Line From Tug Headlines First headline ashore must be rope Breastlines Rope or Wire Rope springs Ship’s Hose Gangway Gantry Rope Spring Stern Lines First sternline ashore must be rope Spring Rope or Wire Breastlines Rope or Wire Rope Wire Buoy © Shipping Guides Ltd, Reigate, United Kingdom Mooring Arrangements ALGERIA P6 Layout © Shipping Guides Ltd, Reigate, United Kingdom Customs Harbour Master Fire Station Slipway South Quay Slipway North Quay DELLYS DELLYS DJEN-DJEN ALGERIA Access Channel DJEN-DJEN LAYOUT 23m North Quay East Quay General Cargo 11m Ro-Ro Berths 11m Service Port Port Captain © Shipping Guides Ltd, Reigate, United Kingdom Layout GHAZAOUET ALGERIA GHAZAOUET Mole D’Alger North Jetty Ro-Ro Terminal Proposed Extension Fish Docks Bassin de Skikda Slipway Zinc Works Mole de Djanet Bassin de Macherek Bassin D’Oran Two Brothers Mole de Batna Mole de Tlemcen Ro/Ro Mole de Constantine Two Sisters Bassin de Maghreb Ro-Ro Proposed Extension 200 400 metres © Shipping Guides Ltd, Reigate, United Kingdom Layout P7 MOSTAGANEM ALGERIA Lighthouse (White) MOSTAGANEM Outer Jetty Lighthouse (Red) Y X Draft 7.8 m NP3 Total Length – 217 m Draft 6.0 m Lighthouse (Green) O NP2 NP1 Port Captain Slipways Agent (MTA) Fish Quay North Entrance Main Gate Port Directorate South Entrance Gate Agent (GEMA) © Shipping Guides Ltd., Reigate, United Kingdom Layout SKIKDA P8 ALGERIA Old Port SKIKDA ALGERIA New Port P9 ...ARZEW ALGERIA Refinery du Midi Exclusion Zone Anchorage 00°09’55” W ARZEW Fort ARZEW MEDITERRANEAN SEA P1 P2 S1 S2 P3 35°50’48” N Methane Liquefying Plant Exclusion Zone Exclusion... Zone 480m Exclusion Zone SPM B1 Ammonia Plant B2 B3 M1 M2 SPM M3 M4 M5 M6 D1 Arzew-el-Djedid © Shipping Guides Ltd, Reigate, United Kingdom Layout ARZEW ALGERIA Fort de la Pointe Mole No Mole... South Berth P3 S2 S1 Secondary Jetty 500 Methane Liquefying Plant metres © Shipping Guides Ltd, Reigate, United Kingdom Arzew P3 ARZEW ALGERIA B1 B2 ARZEW B3 ARZEW EL DJEDID (Not Operational) M1

Ngày đăng: 29/03/2018, 20:18

TỪ KHÓA LIÊN QUAN

TÀI LIỆU CÙNG NGƯỜI DÙNG

TÀI LIỆU LIÊN QUAN

w