1. Trang chủ
  2. » Kỹ Thuật - Công Nghệ

Kết cấu dầm chữ U của các tuyến metro trên thế giới

330 913 4

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

THÔNG TIN TÀI LIỆU

Nội dung

Thống kê kết cấu cầu cạn dầm chữ U của các tuyến metro trên thế giới; phân tích kết cấu, giá thành xây dựng, biện pháp thi công, lắp đặt, hình ảnh minh họa của các tuyến metro điển hình trên thế giới.

U shape viaduct Presentation Jean Charles Vollery Civil Works Director Asia and Pacific Region No communication or reproduction without prior authorisation of SYSTRA The « U » shape structures • General Presentation of Systra • The concept : superstructures, substructures stations • The construction methods and project examples • Complementary informations No communication or reproduction without prior authorisation of SYSTRA General Presentation of Systra No communication or reproduction without prior authorisation of SYSTRA No communication or reproduction without prior authorisation of SYSTRA Shareholders An expertise based on the know-how of SNCF (French National Railways) and RATP (Paris Transit Authority) RATP Group SNCF Group (RATP International) (SNCF International) 50% FINANCIÈRE SYSTRA Banks 50% 72% SYSTRA 28% No communication or reproduction without prior authorisation of SYSTRA Geographical distribution of 2007 turnover 227ME 45,7 M€ 72,7 M€ 47,3 M€ 61,1 M€ Europe Americas, Africa Middle-East Asia France No communication or reproduction without prior authorisation of SYSTRA Group workforce in 2007 ~2000 SYSTRA S.A MVA Consultancy MVA Hong Kong + Asia SYSTRA Consulting SOTEC Ingénierie CANARAIL Citilabs SYSTRA Soctecni Other subsidiaries No communication or reproduction without prior authorisation of SYSTRA Group turnover in 2007 115,5 M€ SYSTRA S.A MVA Consultancy Italy + miscellaneous SYSTRA Consulting SOTEC Ingénierie CANARAIL MVA Hong Kong & Asia Citilabs No communication or reproduction without prior authorisation of SYSTRA Our market, Land Transportation • Mass Rapid Transit • Automated Guideway Transit • Light Rail Transit • Tram-train • Bus Rapid Transit • Commuter Rail • Conventional Rail • High Speed Rail • Monorails • Roads (major structures) No communication or reproduction without prior authorisation of SYSTRA Leading expertise • Transport Planning • Preliminary and basic design • Detailed engineering (Bridges, Tunnels, Architecture, Stations, Track, Power Supply, Electification, Signalling, etc…) • Construction Supervision • Construction Methods (assistance to contractors) • Project management • Training • Testing and commissioning • Restoration and rehabilitation of networks • Software development: Railsim, Cube (with Citilabs) • Infrastructure and building engineering • BOT and PPP (Equity partner in some cases) • Value Engineering / Integration between Systems and Civil Works (Ex U Shape viaduct) No communication or reproduction without prior authorisation of SYSTRA The « U » shape viaduct The Concept No communication or reproduction without prior authorisation of SYSTRA No communication or reproduction without prior authorisation of SYSTRA Taipei « U box » No communication or reproduction without prior authorisation of SYSTRA Taipei « U box » No communication or reproduction without prior authorisation of SYSTRA Taipei « U box » No communication or reproduction without prior authorisation of SYSTRA Taipei « U box » No communication or reproduction without prior authorisation of SYSTRA Taipei « U box » No communication or reproduction without prior authorisation of SYSTRA Taipei « U box » No communication or reproduction without prior authorisation of SYSTRA Taipei « U box » No communication or reproduction without prior authorisation of SYSTRA Taipei « U box » No communication or reproduction without prior authorisation of SYSTRA Very Long Spans No communication or reproduction without prior authorisation of SYSTRA No communication or reproduction without prior authorisation of SYSTRA Conclusions No communication or reproduction without prior authorisation of SYSTRA No communication or reproduction without prior authorisation of SYSTRA Summary of Advantages • Reduced Noise : Free Sound barriers, • Reduced Visual Impact : by 50%, • Reduced Disturbance during construction, • Improved Aesthectics, • Improved Quality • Reduced Cost : Up to 30% cost reduction, • Reduced Construction Time : Up to 60% reduction, • Reduced Maintenance, • Reduced Construction equipment Costs No communication or reproduction without prior authorisation of SYSTRA U Shape – Typical Spans Typical Spans in a range of 25 to 35m: • Santiago de Chile L4 and L5: 35m spans • Delhi Metro : 25m and 32m spans • Dubai Metro : 32m spans • Neihu Line (Taiwan) : 25m spans • Mumbai metro : 30m spans • Delhi Airport Link : 25m spans • Uijongbu LRT : 30m spans • Shanghai line : 30m spans • Lahore metro : 30m spans No communication or reproduction without prior authorisation of SYSTRA Construction Methodology : Suitable for all kind of standard and industrial construction Methods Full precast spans, segmental, cast in place, … Standard Span Lenghts : Typical and economical section in a range of 25-40m Up to 35/40m simple spans Medium and long Spans : Smooth transition with typical spans  Up to about 45m : continuous structures with same segments Or extended Pier Caps 45-55m : Composite through bridges 45-90m : U box in prestressed concrete More : Extradossed bridge, arch bridges, cable stayed bridges … With typical « U » shape segments Proven Construction Cost Savings : Up to 25-30% compared to conventional designs Very important construction schedule optimization Reduction of the maintenance Environmental : Reduction of permanent visual obstruction by half Sound barriers for free Structure borne vibrations similar to standard solutions and fully acceptable Other advantages : Simple construction : can be done by most of contractors Fully integrated structure with the system and operation Lowering of the profile and increase of passenger comfort No communication or reproduction without prior authorisation of SYSTRA •The « U » shape concept can bring very important savings to transportation projects together with better urban integration and environmental protection ; •SYSTRA is ready to study more in details for your future projects Thank You …… No communication or reproduction without prior authorisation of SYSTRA [...]... reproduction without prior authorisation of SYSTRA Construction Methods • Precast segmental, • Partially precast (lateral beams), • Full precast spans, • … Flexible for all industrial type of construction methods No communication or reproduction without prior authorisation of SYSTRA Substructures No communication or reproduction without prior authorisation of SYSTRA Summary: • Pier height reduced; • Reduction... prior authorisation of SYSTRA Standard design No communication or reproduction without prior authorisation of SYSTRA Standard design No communication or reproduction without prior authorisation of SYSTRA Alternative design « Double track U shape girder » No communication or reproduction without prior authorisation of SYSTRA Single track guideway: « Full precast U girders » No communication or reproduction...Introduction • Early 90’s a Value Engineering team composed of – Operator : Paris Metro Corporation RATP, – Engineering team from SYSTRA : E&M, Civil Works and Interfaces – Environmental department : RATP • The Value Engineering studies resulted in the « U » shape structure No communication or reproduction without prior authorisation of SYSTRA Superstructures No communication or reproduction without prior... caps» No communication or reproduction without prior authorisation of SYSTRA Stations No communication or reproduction without prior authorisation of SYSTRA Concept Summary No communication or reproduction without prior authorisation of SYSTRA The U shape viaduct is integrated into the stations: « Increase the level of standardization » No communication or reproduction without prior authorisation of... • A support for power and guard rail if any No communication or reproduction without prior authorisation of SYSTRA Thanks to the elimination of the parapet walls, we save on the SIDL weight: (Parapet already included in the structural section) No communication or reproduction without prior authorisation of SYSTRA Reduced visual impact : - 1,5 to 2 m « Important criteria in urban area » No communication... communication or reproduction without prior authorisation of SYSTRA Visual Impact No communication or reproduction without prior authorisation of SYSTRA Visual Impact No communication or reproduction without prior authorisation of SYSTRA Track level can be lowered by respecting the same vertical clearance: - 1,5 to 2 m « Flexural moment applied on the foundations, is reduced thanks to the reduction of the level... communication or reproduction without prior authorisation of SYSTRA Concept Summary Reduced Visual Impact Lowering of Profile of 1.5 to 2m Built In Sound Barriers Built In Derailment wall Built In Maintenance and Evacuation Path (Same level as car level) Integation of all system equipment No communication or reproduction without prior authorisation of SYSTRA The lateral web is also used as: • A noise barrier;... Reduction of concrete quantities; • Reduction of foundations No communication or reproduction without prior authorisation of SYSTRA With the alternative: « Piers are shorter and pier cap dimensions are reduced » No communication or reproduction without prior authorisation of SYSTRA Thanks to the reduction of the vertical loads and lever arm of the applied forces: « it is possible to reduce number of piles... authorisation of SYSTRA Stations comparison No communication or reproduction without prior authorisation of SYSTRA Possibility of a central platform in stations: « Number of some station equipments can be reduced by a half with a central plarform» No communication or reproduction without prior authorisation of SYSTRA No communication or reproduction without prior authorisation of SYSTRA ... No communication or reproduction without prior authorisation of SYSTRA Elevation comparison: No communication or reproduction without prior authorisation of SYSTRA Interfaces and other advantages : OCS pole height reduced No parapet needed No need to OCS pole foundat° Sound barriers already included Anti-derailment wall Cable through simplified not needed No drainage needed into the box No communication

Ngày đăng: 07/06/2016, 14:57

TỪ KHÓA LIÊN QUAN

TÀI LIỆU CÙNG NGƯỜI DÙNG

TÀI LIỆU LIÊN QUAN

w