1. Trang chủ
  2. » Kỹ Thuật - Công Nghệ

Thư trình BPTC

2 0 0

Đang tải... (xem toàn văn)

THÔNG TIN TÀI LIỆU

Nội dung

HAI PHONG URBAN TRANSPORT DEVELOPMENT PROJECT PACKAGE CW3A: CONSTRUCTION OF RAO TUNNEL AND APPROACH ROADS SECTION KM 13+450 -:- KM 16+100 CC1- TASCO JOINT VENTURE Ref: CC1-TASCO/CW3A/MS-………./2017 Date: ……/……/ 2017 To: Bui Huu Thang - The Resident Engineer The Engieer’s Site Office, No 107, Ngo Gia Tu Street, Dang Lam Ward, Hai An District, Hai Phong City, Viet Nam Cc: Project Management Unit of Regional Transport Works (PMURTW) Subject: Submission the demonstration and method statement of RC Ditch B=0.5m & B=0.8m / Đệ trình thuyết minh vẽ biện pháp thi công rãnh BTCT B=0.5m & B= 0.8m Dear Sir, / Thưa Ngài , The Contractor would like to submit the demonstration and method statement drawing of RC Ditch B=0.5m & B=0.8m to the Engineer for review and approval / Nhà thầu xin đệ trình thuyết minh vẽ biện pháp thi công rãnh BTCT B=0.5m & B=0.8m lên Kỹ sư để kiểm tra chấp thuận Your kind support and corporation is to be highly appreciated/ Chúng đánh giá cao hợp tác giúp đỡ quý Ngài Yours sincerely!/ Trân trọng! Hoang Trung Thanh Contractor’s Representative Filled at: As above CC1-TASCO JV Management Board Attachment : 04 sets of the document HAI PHONG URBAN TRANSPORT DEVELOPMENT PROJECT PACKAGE CW3A: CONSTRUCTION OF RAO TUNNEL AND APPROACH ROADS SECTION KM 13+450 -:- KM 16+100 CC1- TASCO JOINT VENTURE

Ngày đăng: 28/04/2023, 01:42

w