0

highlights of the workshop

TOOLS AND ENVIRONMENTS FOR PARALLEL AND DISTRIBUTED COMPUTING pptx

TOOLS AND ENVIRONMENTS FOR PARALLEL AND DISTRIBUTED COMPUTING pptx

Điện - Điện tử

... support this, the process management of p4 is essential In p4, there are hierarchies between the processes of master and slave when they are created One of the limitations of p4 is due to the static ... dispersion of the system resources These are summarized in the following points: INTRODUCTION: BASIC CONCEPTS • There is a lack of a proper understanding of distributed computing theory the field ... 107 or 108 of the 1976 United States Copyright Act, without either the prior written permission of the Publisher, or authorization through payment of the appropriate per-copy fee to the Copyright...
  • 229
  • 599
  • 0
Evaluation and Management Services Guide potx

Evaluation and Management Services Guide potx

Cao đẳng - Đại học

... rather than absolute measures of risk The assessment of risk of the presenting problem(s) is based on the risk related to the disease process anticipated between the present encounter and the ... each type of history are depicted in the table below Further discussion of the activities comprising each of these elements is included below the table To qualify for a given type of history, ... the CC History of Present Illness HPI is a chronological description of the development of the patient’s present illness from the first sign and/or symptom or from the previous encounter to the...
  • 89
  • 272
  • 0
báo cáo hóa học:

báo cáo hóa học:" Tuberculosis and HIVNeeded: A New Paradigm for the Control and Management of Linked Epidemics" pot

Hóa học - Dầu khí

... at the healthcare delivery level Encouragingly, because the leadership of these often separate TB and HIV programs is usually situated within the structure of National Ministries of Health, there ... developed;[9,10] how and if these tests can be used, and whether their associated cost will be prohibitive in these settings is yet to be determined Likewise, the treatment of HIV in the setting of active TB ... between them to programs that partially or fully integrate the services they provide A variety of models of collaboration and integration will be necessary to suit the diverse characteristics of a...
  • 5
  • 469
  • 0
Multi agent system for control and management of distributed power systems

Multi agent system for control and management of distributed power systems

Y - Dược

... Furthermore, agents should be able to interact with each other irrespective of the platform they run on Most of these platforms offer functionalities that simplify the programming and the use of ... approach, the behaviours of the multi-agent system is design-directed rather that emergent The multi-agent system has been built with all the necessary interactions of agents to achieve the goals of the ... one of the controller agents fails, the other controller agents adapt to the situation and continue the system operation  Openness of the system: Multi-agent system allows manufacturers of distributed...
  • 245
  • 679
  • 0
Analysis of dynamic traffic control and management strategies

Analysis of dynamic traffic control and management strategies

Cao đẳng - Đại học

... Set of on-ramps upstream of the traffic bottleneck Section i, on which the OnC mechanism will be implemented J ioff Set of off-ramps upstream of the traffic bottleneck Section i, on which the OffC ... metering operations The state-ofthe-art of these strategies is discussed in detail The second part of the chapter is devoted to discuss the dynamic traffic modeling approaches Both the traffic simulation ... drivers can decide the shortest route based on their knowledge of the network The effectiveness of the method is thus relied on the drivers’ behavior such as their ability to discern the information...
  • 248
  • 357
  • 0
Customer Service - Principles of Service Marketing and Management - C Lovelock & L Wright

Customer Service - Principles of Service Marketing and Management - C Lovelock & L Wright

Tiếp thị - Bán hàng

... nature of these interactions strongly influences the customer's perceptions of service quality 14 Customers often judge the quality of the service they receive largely on their assessment of the ... will often involve the understanding of these other functions and periodic meetings with colleagues working in these areas In short, integration of activities between functions is the name of the ... the skill, the motivation, and the tools employed by the firm's representative and the expectations and behavior of the client which together will create the service delivery process moment of...
  • 387
  • 1,194
  • 6
identity management and trust services foundations for cloud computing

identity management and trust services foundations for cloud computing

Cơ sở dữ liệu

... adoption of the Internet in the 1980s helped to demonstrate the potential of the Internet, the community’s adoption of federated trust services is needed now to demonstrate and unlock the potential of ... is the process of validating identity This process, often called “identity proofing,” requires that users establish their identity by providing credentials that confirm they are who they say they ... identity proofing is done as part of the policies and procedures for the identity management system and may be overseen by the information security officer for the institution Alternatively, the information...
  • 10
  • 410
  • 0
Development of a Regional Risk Management Framework for APEC Economies for use in the Control and Prevention of Introduced Marine Pests

Development of a Regional Risk Management Framework for APEC Economies for use in the Control and Prevention of Introduced Marine Pests

Báo cáo khoa học

...  Conclusions, including the results of the November 2001 Workshop Management Framework - Introd uced Marine Pests Management capabilities and approaches  APEC and the MRCWG have a role in liaising ... Background  Within APEC little is known on the introduction of marine pests  Little practical information on measures to prevent introductions  Lack of knowledge in what individual countries ... role in liaising with IMO, FAO, NACA to enhance the effectiveness of existing instruments within APEC  Institutional arrangements for managing the marine environment is fragmented in most economies...
  • 10
  • 583
  • 0
Tài liệu PROGRAM AND PROJECT MANAGEMENT SERVICES FOR SUCCESSFUL NETWORK DEPLOYMENTS AND OPTIMIZATION docx

Tài liệu PROGRAM AND PROJECT MANAGEMENT SERVICES FOR SUCCESSFUL NETWORK DEPLOYMENTS AND OPTIMIZATION docx

Phần cứng

... respected as the de facto standard for project management training ADC offers a spectrum of program and project management services At one end, we provide these service in support of other ADC Professional ... management of multivendor and program-level initiatives • Proven methodology, processes and tools • Complete management of the tactical aspects of the project or program • A single point of contact ... installation, commissioning, integration and decommissioning At the other end of the spectrum, ADC project managers work on behalf of our customers for large projects that involve multiple vendors...
  • 4
  • 479
  • 0
Tài liệu Change Control and Policy and Workpace Management Chapter11 pptx

Tài liệu Change Control and Policy and Workpace Management Chapter11 pptx

Hệ điều hành

... is set for the domain and the site, then the GP on any object in the OU is a combination of all three So, the combined control in the OU may be derived from the domain policy and the site policy ... Together The number one rule of change control policy engagement is this: Change control policy is enforced over the user by way of the computer In other words, the target of change control is the ... become a member of the change control team You should also get to know your users, the type of software and applications they need, and how they work with their computers, treat their computers,...
  • 40
  • 398
  • 1
iec 60092-375 ship board telecommunication cables and radio-frequency cables - general instrumentation, control and communication cables

iec 60092-375 ship board telecommunication cables and radio-frequency cables - general instrumentation, control and communication cables

Điện - Điện tử

... numerals, these are disposed one below the other and the dash is placed underneath the lower numeral Spacing and dimensions of the marks The dimensions of the marks and the spacing are given in the ... number of pairs The total number of pairs shall be: for pairs: 1,2*, 4, 7, 10, 14, 19, 24, 30,37 and 48; - for triples: - All pairs assembled together form the core assembly of the cable Covering of ... indicates the direction in which the number should be read Arrangement of the marks Two consecutive marks shall always be placed upside down in relation to one another The arrangement of the marks...
  • 28
  • 400
  • 3
Control and scheduling codesign flexible resource management in real time control systems   feng xia  you xian sun

Control and scheduling codesign flexible resource management in real time control systems feng xia you xian sun

Điện - Điện tử

... computer science The paper entitled "A mathematical theory of communication" by Shannon, published in 1948 [SHA48], builds the foundation of information theory The publication of the book "Cybernetics" ... these projects listed in Table 1.1, there are of course many others in related directions Regardless of the difference in the main topics, a common objective of these programs is to promote the ... adjustment Using the method, the sampling period of each task will be updated according to the current control performance of the relevant loop each time the task executes The objective of the update...
  • 256
  • 404
  • 1
Tài liệu Moist-Soil Management Guidelines for the U.S. Fish and Wildlife Service Southeast Region pptx

Tài liệu Moist-Soil Management Guidelines for the U.S. Fish and Wildlife Service Southeast Region pptx

Cao đẳng - Đại học

... (“stretch”) to keep the top of the plant above the water surface, the water can be raised to kill the lateral meristems for some distance up the stem After the impoundment is drained, the coffeebean can ... depends on the uniformity of each plant species within the impoundment and the desired accuracy of the estimate The dimensions of the blocks are adjustable, but collect a minimum of one sample ... is, therefore, a measure of precision (see example) the larger the SD, the lower the precision of the estimate The number of samples necessary to achieve a specified level of precision (95% confidence...
  • 44
  • 771
  • 0
Chapter 24 Congestion Control and Quality of Service pdf

Chapter 24 Congestion Control and Quality of Service pdf

Quản trị mạng

... profiles 24.4 24-2 CONGESTION Congestion in a network may occur if the load on the network the number of packets sent to the network— is greater than the capacity of the network the number of ... In the slow-start algorithm, the size of the congestion window increases exponentially until it reaches a threshold 24.14 Figure 24.9 Congestion avoidance, additive increase 24.15 Note In the ... avoidance algorithm, the size of the congestion window increases additively until congestion is detected 24.16 Note An implementation reacts to congestion detection in one of the following ways:...
  • 48
  • 590
  • 0
Air Force Service Procurement - Approaches for Measurement and Management pptx

Air Force Service Procurement - Approaches for Measurement and Management pptx

Khoa học xã hội

... designate an official to be responsible for the management of the procurement of services The Secretary of Defense was authorized by the FY02 Act to establish the dollar thresholds and other criteria ... performance of the purchasing organization with respect to cost For example, the cost of programming services rose sharply during much of the 1990s, independent of the actions of any particular firm Rather ... commitments The “right” number of suppliers will depend on the importance of the good or service to the company, including the risks inherent in interruption of its provision, and the potential...
  • 88
  • 447
  • 0
COORDINATION / INFORMATION MANAGEMENT AND SUPPORT SERVICES pptx

COORDINATION / INFORMATION MANAGEMENT AND SUPPORT SERVICES pptx

Cao đẳng - Đại học

... are at the very end of the development prioritisation list by their respective governments Because of the above-mentioned reasons they ended up being some of the most vulnerable areas of the three ... mapping: Based upon the inter-agency group’s ongoing broad mapping of the capacity of their offices and partners in the region to considerably scale -up interventions in the key areas of livelihoods ... conflicts in these areas people from either side of the border have been immigrating to momentarily more secure areas on either side At the same time being too far from the seats of governments they...
  • 156
  • 403
  • 0
Tuberculosis - Clinical diagnosis and management of tuberculosis, and measures for its prevention and control doc

Tuberculosis - Clinical diagnosis and management of tuberculosis, and measures for its prevention and control doc

Sức khỏe giới tính

... writing of each section Ninth step: Writing the guideline The first draft version of the guideline was drawn up by the technical team in accord with the decision of the GDG The guideline was then ... director  the NCC-CC manager  an NCC-CC senior research fellow  the NICE commissioning manager  the technical team Sign-off workshop At the end of the guideline development process the GDG met ... recommendations' highlights the debate of the GDG This section sets out the GDG decision-making rationale, providing a clear and explicit audit trail from the evidence to the evolution of the recommendations...
  • 307
  • 399
  • 0
Oracle Enterprise Manager Grid Control 11gR1: Business Service Management pdf

Oracle Enterprise Manager Grid Control 11gR1: Business Service Management pdf

Hệ điều hành

... continuation of the preceding steps The final steps of the lifecycle then feed back into the first step This feedback is critical in gathering the requirements for the next version of the service ... one of the offerings of the travel portal) can be modeled as an aggregation of the average response time within the application server as well as the average time spent in the execution of database ... absence of the above holistic view, the DBA will not be able to project the business impact of this IT maintenance The following image provides a perspective of a component-centric view of the database...
  • 360
  • 967
  • 0
Tuberculosis Clinical diagnosis and management of tuberculosis, and measures for its prevention and control pot

Tuberculosis Clinical diagnosis and management of tuberculosis, and measures for its prevention and control pot

Cao đẳng - Đại học

... staff, on the basis of: D(GPP) • • the length of time the index case was in contact with others • whether contacts are unusually susceptible to infection • 1.8.4.5 the degree of infectivity of the ... tested for it, their families and carers, and the public • The full guideline – all the recommendations, details of how they were developed, and summaries of the evidence on which they were based ... equipment is used, the reason should be explained to the person with TB The equipment should meet the standards of the Health and Safety Executive See section 1.5.3 for further details of MDR TB infection...
  • 66
  • 456
  • 0
Understanding itiL ® service portfolio Management and the service catalog doc

Understanding itiL ® service portfolio Management and the service catalog doc

Cao đẳng - Đại học

... of the Office of Government Commerce and is used here by BMC Software, Inc., under license from and with the permission of OGC All other trademarks or registered trademarks are the property of ... trademark of the Office of Government Commerce, is registered in the U.S Patent and Trademark Office, and is used here by BMC Software, Inc., under license from and with the permission of OGC IT ... Office) Published for the Office of Government Commerce under license from the Controller of Her Majesty’s Stationery Office, 2007 PAG E > About BMC Software BMC Software delivers the solutions IT...
  • 10
  • 376
  • 0

Xem thêm