Tài liệu tham khảo |
Loại |
Chi tiết |
[1] Acharya, N.K., Lee, Y.D., and Im, H.M. (2006). “Investigating delay factors in construction industry: A Korean perspective.” Korean Journal of Construction Engineering and Management, Vol. 10, pp.177-190 |
Sách, tạp chí |
Tiêu đề: |
“Investigating delay factors in construction industry: A Korean perspective.” |
Tác giả: |
Acharya, N.K., Lee, Y.D., and Im, H.M |
Năm: |
2006 |
|
[2] Aibinu, A.A. and Odeyinka, A. (2006). “Construction delays and their causative factors in Nigeria.” J. Constr. Eng. Management, ASCE, Vol. 132, No. 7, pp. 667-677 |
Sách, tạp chí |
Tiêu đề: |
“Construction delays and their causative factors in Nigeria.” |
Tác giả: |
Aibinu, A.A. and Odeyinka, A |
Năm: |
2006 |
|
[3] Assaf, S.A. and Al Hejji, S. (2006). “Causes of delay in large construction projects.” Int. J. Project Management, Vol. 24, pp. 349-357 |
Sách, tạp chí |
Tiêu đề: |
“Causes of delay in large construction projects.” |
Tác giả: |
Assaf, S.A. and Al Hejji, S |
Năm: |
2006 |
|
[4] Bent Flyvbjerg, Mette K. Skamris Holm and Soren L. Buhl, 2003. “How common and how large are cost overruns in transport infrastructure projects?” Transport Reviews, 2003, vol. 23, no. 1, 71 – 88 |
Sách, tạp chí |
Tiêu đề: |
“How common and how large are cost overruns in transport infrastructure projects?” |
|
[5] Bent Flyvbjerg, Mette K. Skamris Holm and Soren L. Buhl, 2004. “What causes cost overrun in transport infrastructure projects?” Transport Reviews, 2004, vol. 24, no. 1, 3 – 18 |
Sách, tạp chí |
Tiêu đề: |
“What causes cost overrun in transport infrastructure projects?” |
|
[6] Chan, D.W.M. and Kumaraswamy, M.M. (1996), “An evaluation of construction time performance in the building industry.” Building and Environment, Vol. 31, No. 6, pp. 569-578 |
Sách, tạp chí |
Tiêu đề: |
“An evaluation of construction time performance in the building industry.” |
Tác giả: |
Chan, D.W.M. and Kumaraswamy, M.M |
Năm: |
1996 |
|
[7] Chang A. Shing-Tao (2002). “Reasons for cost and schedule increase for engineering design projects.” J. Management Eng., ASCE, Vol. 18, No. 1, pp. 29-36 |
Sách, tạp chí |
Tiêu đề: |
“Reasons for cost and schedule increase for engineering design projects.” |
Tác giả: |
Chang A. Shing-Tao |
Năm: |
2002 |
|
[8] Dissanayaka, S.M. and Kumaraswamy, M.M. (1999). “Comparing contributors to time and cost performance in building projects.” Building and Environment, Vol. 34, pp. 31-42 |
Sách, tạp chí |
Tiêu đề: |
“Comparing contributors to time and cost performance in building projects.” |
Tác giả: |
Dissanayaka, S.M. and Kumaraswamy, M.M |
Năm: |
1999 |
|
[9] Faridi, A.S. and El-Sayegh, S.M. (2006). “Significant factors causing delay in the UAE construction industry.” Construction Management and Economics, Vol. 24, No. 11, pp. 1167-1176 |
Sách, tạp chí |
Tiêu đề: |
“Significant factors causing delay in the UAE construction industry.” |
Tác giả: |
Faridi, A.S. and El-Sayegh, S.M |
Năm: |
2006 |
|
[10] Frimpong, Y., Oluwoye, J., and Crawford, L. (2003). “Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study.” Int. J. Project Management, Vol. 21, pp.321-326 |
Sách, tạp chí |
Tiêu đề: |
“Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study.” |
Tác giả: |
Frimpong, Y., Oluwoye, J., and Crawford, L |
Năm: |
2003 |
|
[11] Garry D.Creedy, 2005. “Risk factors leading to cost overrun in highway projects.” The Queensland University of Technology Research Week International Conference, 4-8 July 2005, Brisbane, Australia |
Sách, tạp chí |
Tiêu đề: |
“Risk factors leading to cost overrun in highway projects.” |
|
[12] Garry D.Creedy, 2006. “Risk factors leading to cost overrun in the delivery of highway construction project.” Doctor of Philosophy thesis, Faculty of Built Environment and Engineering, Queenland University of Technology |
Sách, tạp chí |
Tiêu đề: |
“Risk factors leading to cost overrun in the delivery of highway construction project.” |
|
[13] Jomah Mohammed Al-Najjar, 2008. “Factors influencing time and cost overruns on construction projects in the Gaza Strip.” Master of Science thesis in Civil Engineering, Construction Management, The Islamic University of Gaza |
Sách, tạp chí |
Tiêu đề: |
“Factors influencing time and cost overruns on construction projects in the Gaza Strip.” |
|
[14] Kaming, P.F., Olomolaiye, P.O., Holt, G.D., and Harris, F.C. (1997). “Factors influencing construction time and cost overruns on highrise projects in Indonesia.” Construction Management and Economics, Vol. 15, No. 1, pp. 83-94 |
Sách, tạp chí |
Tiêu đề: |
“Factors influencing construction time and cost overruns on highrise projects in Indonesia.” |
Tác giả: |
Kaming, P.F., Olomolaiye, P.O., Holt, G.D., and Harris, F.C |
Năm: |
1997 |
|
[15] Koushki, P.A., Al-Rashid, K., and Kartam, N. (2005). “Delays and cost increases in the construction of private residential projects in Kuwait.”Construction Management and Economics, Vol. 23, No. 3, pp. 285-294 |
Sách, tạp chí |
Tiêu đề: |
“Delays and cost increases in the construction of private residential projects in Kuwait.” |
Tác giả: |
Koushki, P.A., Al-Rashid, K., and Kartam, N |
Năm: |
2005 |
|
[16] Kumaraswamy, M.M. and Chan, D.W.M. (1998). “Contributors to construction delays.” Construction Management and Economics, Vol. 16, No. 1, pp 17-29 |
Sách, tạp chí |
Tiêu đề: |
“Contributors to construction delays.” |
Tác giả: |
Kumaraswamy, M.M. and Chan, D.W.M |
Năm: |
1998 |
|
[17] Lo, T.Y., Fung, I.W.H., and Tung, K.C.F. (2006). “Construction delays in Hong Kong civil engineering projects.” J. Constr. Eng. Management, ASCE, Vol. 32, No. 6, pp. 636-649 |
Sách, tạp chí |
Tiêu đề: |
“Construction delays in Hong Kong civil engineering projects.” |
Tác giả: |
Lo, T.Y., Fung, I.W.H., and Tung, K.C.F |
Năm: |
2006 |
|
[18] Long Le-Hoai, Young Dai Lee and Jun Yong Lee, 2008. “Delay and cost overruns in vietnam large construction projects: a comparison with other selected countries.” KSCE Journal of Civil Engineering, 2008, vol. 12, no.6, 367 – 377 |
Sách, tạp chí |
Tiêu đề: |
“Delay and cost overruns in vietnam large construction projects: a comparison with other selected countries.” |
|
[19] Mansfield, N.R., Ugwu, O.O., and Doran, T. (1994). “Causes of delay and cost overruns in Nigeria construction projects.” Int. J. Project Management, Vol. 12, No. 4, pp. 254-260 |
Sách, tạp chí |
Tiêu đề: |
“Causes of delay and cost overruns in Nigeria construction projects.” |
Tác giả: |
Mansfield, N.R., Ugwu, O.O., and Doran, T |
Năm: |
1994 |
|
[20] Nida Azhar, Rizwan U. Farooqui, Syed M. Ahmed, 2008. “Cost overrun factors in construction industry of Pakistan.” First International Conference |
Sách, tạp chí |
Tiêu đề: |
“Cost overrun factors in construction industry of Pakistan.” |
|