1. Trang chủ
  2. » Thể loại khác

Form cv for bui nguyen pho envir engineer

8 22 0

Đang tải... (xem toàn văn)

THÔNG TIN TÀI LIỆU

Nội dung

CURRICULUM VITAE (CV) Position Title & No Name of Firm Name of Expert Date of Birth Citizenship Environmental Specialist Nippon Koei Viet Nam Bui Nguyen Pho 08-6-1981 Vietnamese Education:  Master`s Degree of Environmental Science and Sustainable Development - Viet Nam National University, 2012  Bachelor`s Degree of Environmental Science - Hanoi University of Science, 2008  Bachelor`s Degree of Mathematics and Physics - Hung Yen Teachers Training College, 2002  Certificate for Safety, Health and Environment (EHS) includes: ISO14001:2015, OHSAS18001,…  Training for Safety and Environmental protection: 2014, 2015, 2016  Training for presentation skills: 2010 Employment Record Relevant to the Assignment Period Employing organization & title/position, contact information for references NKV (Nippon Koei Vietnam) - APAVE, A2Z join venture Environmental/ HSE Specialist June 2015 Present Country Vietnam Oriental Consultants Co., Ltd - TEDI, APECO, ITST joint venture Environmental/ HSE Specialist March 2014 - June 2015 July 2009 March 2014 June 2008 – July 2009 Vietnam Environmental Consultancy Center Transport Engineering Design Inc Environmental specialist - Vietnam Centre for Natural Resources and Environmental Studies (CRES) - Viet Nam National University Environmental Reseacher Vietnam Summary of Activities performed relevant to the Assignment Environmental Specialist: Reviewing EIA, EMP, EPC report Supervising environmental protection works Review and Approve Environmental reports Guide contractors to setup environment treatment items Supervising the implementation of environmental monitoring during project construction Identify safety hazards and propose preventive measures Environmental Specialist: Reviewing Environmental reports Supervising environmental protection works Guide contractors to setup environment protection items Supervising the implementation of environmental monitoring during project implementation Environmental specialist: Environmental condition survey and monitoring Investigation and consultation SocioEconomic condition in the project area Establish, writing Environmental Impact Assessment (EIA), Environmental Management Plan (EMP) and EPC report Environmental Reseacher: Survey, interview, collect documents Writing some parts of Social Impact Assesment report Membership in Professional Associations & Publications:  Viet Nam Association for Conservation of Nature and Environment (VACNE),  Vietnam Bridge and Road Association Language Skills: Vietnamese English Adequacy for the Assignment Speaking Mother Tongue Good Reading Mother Tongue Good Writing Mother Tongue Good Form CV for Environmental Engineer - Bui Nguyen Pho Page Detailed Tasks Assigned on Consultant’s Team of Experts  Inspection of the works according to the Environmental Impact Assesment, Environmental Management Program, Regulations of Viet Nam and Other Organization such as: JICA, ADB, WORLD BANK;  Record the daily activities, Environment and Socio-Economic condition survey;  Communicate with the Client and contractor for environmental protection regulation during construction;  Coordinate with project owners to report to agencies and complete environmental procedures of projects;  Review and Approve Environmental reports of contractor;  Periodically patrol on Safety and environmental, Report the inspection result to the Resident Engineer, Clients;  Summarize the monthly accomplishment and report to Resident Engineer;  Writing Environmental reports (EIA, EMP, EPC…, monthly report, semi - monthly and annual… reports) Work/ Assignments that Best Illustrates Capability to Handle the Assigned Tasks Reference to Prior (1) Name of Assignment or project : Ca Pass Road Tunnel Construction Project- NH1A, Phu Yen and Khanh Hoa Provinces in the form of BOT and BT -  Year: June 2015 - present (17 months)  Location : Phu Yen and Khanh Hoa Provinces, Vietnam  Client : Deo Ca Investment Joint Stock Company/ Funded by BOT and BT Main project features: Total length of project is 13.4km; in which: Ca Pass tunnel length 3.9km Co Ma tunnel length 0.5km and Approach road and bridges on route 9.0Km Tunnel: 02 single tubes (one way traffic on each tube) at 30m distance Each tube has two lanes of 10.9m wide, covering 02 lanes of carriageway 2x3.5m + safety strips + 1.0m + service ways 2x1.18m Road: Embankment width Bn=24m Pavement width Bm=22.5m, including: lanes carriageway x 3.75m + median strip width 1.5m + shoulder width 2x0.5m + emergency lane 2x2.5m Bridge deck: Bdeck = 24m and divided into two one-way sections Design speed: 80km/h  Position held : Environmental Specialist  - Communicate with the Client for environmental protection regulation during constrution Reviewing Environmental Impact Assessment, Environmental Management Plan reports of the project and Environmental reports of contractors Review and Approve Environmental reports of Contractors Supervising environmental protection works (including solid waste, hazardous waste, disposal, periodical environment monitoring ) and environmental protection compliance of contractors Recommended and guideline for contractors to implement measures to minimize the environmental impact of the construction (the mitigation of environmental impacts such as noise, dust, vibration, water, soil ) Guide contractors to setup environment treatment items (ventilation and dust filter in the tunnel, sewage disposal systems and wastewater treatment, sludge collection system, the storage areas for solid waste, household waste and hazardous waste) and monitoring the operation of items related to environmental Supervising the implementation of environmental monitoring during project implementation Coordinate with project owners to report agencies (monthly, semi-annual reports) and complete environmental procedures (water extraction permits, discharge permits, environmental periodic reporting ) in the construction process Identify safety hazards and environmental impacts and propose preventive measures Periodic Safety, Environmental and fire prevention Patrol in the construction process of the project, periodic EHS reports - (2) Activities performed: Reviewing Environmental reports, Supervising environmental protection works Review and Approve Environmental reports Coordinate with project owners to report agencies (monthly, semi-annual reports Guide contractors to setup environment treatment items, Supervising the implementation of environmental monitoring during project implementation, Identify safety hazards and propose preventive measures… Name of Assignment or project: National Highway No and Thanh Tri Bridge Interchange Project/ JICA  Year : March 2014 - June 2015 (16 months)  Location : Ha Noi, Vietnam  Client : Thang Long PMU - MOT/ Funded by JICA  Main project features: The project includes components: (i) Build up the ramps for going up and down at the intersection between Thanh Tri Bridge and National highway No.5; (ii) Expanding the overpass of NH5 from into lanes; (iii) Implementing relocation of 2km of railway Position held : Environmental Specialist  Form CV for Environmental Engineer - Bui Nguyen Pho Page  - Review environmental impact assessment report, environmental management plan of the project Supervise and inspect the environmental compliance of contractors Proposed solutions to minimize environmental pollution during construction; Supervising, monitoring the environmental condition in the construction stage of the project Coordinate with project owners to report to agencies and complete environmental procedures during construction of the project Implement environmental procedures according to policy of environmental and safety of regulations Guide contractors to setup environment treatment items (wastewater treatment systems, sludge collection system, the storage areas for solid waste, household waste and hazardous waste) and monitoring the operation of items related to environmental protection Recommended and guideline for contractors to implement measures to minimize the environmental impact of the construction process (the mitigation of environmental impacts such as noise, dust, vibration, water, soil, traffic accidents ) Responsible for weekly reporting to the project manager Cooperating with Japanese experts for site inspection Supervising sub-contractor on periodic environmental monitoring and propagation of HIV/AIDS prevention Identify risks and the impacts on the environment and propose measures to prevent, minimize with the aim to ensure safety and environmental protection in the construction process of the project - (3) Name of Assignment or project : National Highway No Expansion Through Quang Ngai Province Project (4)  Year: January 2014 – March 2014  Location: Quang Ngai Province , Vietnam  Client: Quang Ngai Department of Transportation  Main project features: Project will enhance the pavement of NH No.1 from Km1027+000 - Km1063 +877; expand from Km1092 +000 - Km1110+000 and adjust from Km1110+000- Km1125 +000  Position held: Environmental Expert  Activities performed: Research, review and exalted additional pavement problems affect on the residential areas along roadsides Studying problems of erosion, deposition in the horizontal position sewer lines Provide mitigation measures and reasonable compensation Name of Assignment or project: National Highway No.1 Expansion Through Ha Tinh Province  Year : December 2013  Location: Ha Tinh Province  Client: Ha Tinh Department of Transportation  Main project features: Expansion National Highway Construction from Km517+950 – Km556+000  Position held : Environmental Expert  Activities performed: Establish EIA report - Environmental survey (dust: PM10, TSS, Noise, Viberation, Underground water, water, soil…condition survey), Investigation and survey the socio-economic condition in Project area Establish Environmental Impact Assessment (EIA) report Submit and complete the EIA report to the authority agencies (5) Activities performed: Reviewing Environmental reports, Supervising environmental protection works Review and Approve Environmental reports Coordinate with project owners to report agencies (monthly, semi-annual reports) Guide contractors to setup environment treatment items, Supervising the implementation of environmental monitoring during project implementation, Identify safety hazards and propose measures to minimize unsafety issues Name of Assignment or project: Construction of Viaduct Section Mai Dich – South Thang Long /JICA  Year : October 2013 – December 2013  Location : Ha Noi  Client : PMU Thang Long/ Funded by JICA  Main project features: Total length of project is 6.1km, cross section B = 24m, Design speed: 120km/h  Position held : Environmental Expert  Activities performed : Investigate and study environmental and socio-economic condition in the residence area of the Project Establish Social Impact Assessment (SIA) and Resettlement Action Plan (RAP) report Form CV for Environmental Engineer - Bui Nguyen Pho Page (6) Name of Assignment or project: Viet Tri and Ninh Phuc Port Improvement - Northern Delta Transport Development Project -  Year: May 2013 – October 2013  Location: Phu Tho and Ninh Binh province  Client: Waterways PMU/ Funded by World Bank  Main project features : Strengthening the capacity to receive and transport in the port area of Viet Tri and Ninh Phuc through Dredging of the port, upgrade infrastructure sector as wharves, warehouses construction, roads to the port  Position held: Environmental Specialist  Activities performed: Supervise and inspect the environmental compliance of contractors Supervising and monitoring the environmental condition (dust PM10, TSS, Noise, Viberation, Underground water, water, soil…condition survey) in the construction stage of the project Submit and complete reports to the authority agencies Proposed solutions to minimize environmental pollution during construction (7) Name of Assignment or project: Subproject component of NH39-1 rehabilitation, Trieu Duong – Hung Ha section (Km42+714 - Km64+000) and bridges on alignment include Nai, Dong Tu and Go belong to Component C of Vietnam Road Asset Management Project -  Year: May 2013  Location: Hung Yen, Thai Binh Provinces  Client: Project Management Unit 3, Ministry of Transport/ Funded by Asian Development Bank (ADB)  Main project features: The project is implemented aiming at following objectives: Improvement of efficiency of Northern transport service; Reduction of traffic accident and Enhancement of institutional framework and finance for sustainable maintenance activity of Vietnam’s road network This Project has total length of around 20.18km spread on 12 communes/towns, Broad-bed = 12m according to class III of highway, the sections go through the residential areas are applied the urban road standards with designed velocity Vtk = 80km/hr (for section passing residential areas,Vtk=60km/hr)  Position held: Environmental Specialist  - Activities performed: Establish Environmental Impact Assessment (EIA) and Environmental Management Plan (EMP) report Environmental survey (dust: PM10, TSS, Noise, Viberation, Underground water, water, soil…condition survey), Investigation and survey the socio-economic condition in Project area Establish Environmental Impact Assessment (EIA) report Submit and complete the EIA report to agencies Establish Environmental Management Plan (EMP) report Reports according to Framework for Safety Policy, Social and Environmental of Asian Develope Bank (ADB) (8) Name of Assignment or project: Sub-Project of NH38 Improvement, Section from Quan Goi - Yen Lenh (Km33+963-km52+716) and Bridges including Sat Bridge and Bun Bridge belonging to Component C, Vietnam Road Asset Management -  Year: April 2013 - May 2013  Location: Hai Duong, Hung Yen, Thai Binh, Ha Giang, Nghe An, Tuyen Quang and Bac Ninh Provinces  Client: No.2 Project Management Unit, Ministry of Transport/ Funded by World Bank  Main project features: The project is implemented aiming at following objectives: Improvement of efficiency of Northern transport service; Reduction of traffic accident and Enhancement of institutional framework and finance for sustainable maintenance activity of Vietnam’s road network The main objective of the project is to enhance traffic capacity of the NH38 The project shall be studied in investment in: Improving of NH38 Quan Goi - Yen Lenh section with a total length of about 29.5km, of which: Construction of bypass sections with a total length of about 15.8km; Keeping the existing NH38 of about 5.5km (Km38+325 to Km43+760); Repaving NH38 pavement for Km33+963 - Km38+400; Km43+600 - 47+600 sections with a total length of about 8.2km; Construction of 13 at-grade intersections; Construction of 06 new bridges with each bridge’s length < 200m; Drainage system and traffic safety  Position held: Environmental Specialist  Activities performed: Establish Environmental Impact Assessment (EIA) and Environmental Management Form CV for Environmental Engineer - Bui Nguyen Pho Page Plan (EMP) report - Environmental survey (dust: PM10, TSS, Noise, Viberation, Underground water, water, soil…condition survey), Investigation and survey the socio-economic condition in Project area Establish Environmental Impact Assessment (EIA) report Submit and complete the EIA report to agencies Establish Environmental Management Plan (EMP) report Reports according to Framework for Safety Policy, Social and Environmental of Asian Develope Bank (ADB) (9) Name of Assignment or project: NH5 - Section from Ha Noi – Hai Duong (Km11+000 – Km93+000), belonging Vietnam Road Asset Management -  Year: April 2013  Location: Hai Duong, Hung Yen, Thai Binh, Ha Giang, Nghe An, Tuyen Quang and Bac Ninh Provinces  Client: No.2 Project Management Unit, Ministry of Transport/ Funded by World Bank  Main project features: The subproject will be implemented in thirty-eight communes of the ten districts of Ha Noi City, Hung Yen Province, Hai Duong Province and Hai Phong City The routine maintenance and emergency repair activities of subproject include managing and maintaining the pavement, bridges, electrical system, taking care the tree and shrub in the separator, protecting the road corridor, emergency repairing the drainage system, slope protection, auxiliary works  Position held: Environmental Specialist  Activities performed: Establish Environmental Protection Commitment (EPC) report Environmental survey (dust: PM10, TSS, Noise, Viberation, Underground water, water, soil…condition survey), Investigation and survey the socio-economic condition in Project area Establish Environmental Impact Assessment (EIA) report Submit and complete the EIA report to agencies Reports according to Framework for Safety Policy, Social and Environmental of Asian Develope Bank (ADB) Name of Assignment or project: NH.39 section from Vo Hoi – Diem Dien (Km91+000 - Km107+522), belonging to Component C, Vietnam Road Asset Management (10) -  Year: March 2013 - April 2013  Location: Thai Binh Province  Client: No.2 Project Management Unit, Ministry of Transport/ Funded by World Bank  Main project features: The Project locates in districts of Dong Hung and Thai Thuy, Thai Binh province The Project has total length of around 13.21km, basically it follows existing NH39 route including: Improvement of 10,190m road, starting from Km91+000 (NH39 station) and ending at Km107+519.05 (NH39 station) New construction of 3.020m in sections of Km91+700 - Km92+100, Km93+300 Km94+400, Km95+000 - Km95+320, Km97+100 - Km97+700, Km99+350 - Km99+700 and Km100+150 - Km100+400 for standard local relocations Improvement of 02 intersections at Km98+576 (crossing road to Thuy Lien) and Km107+519.05 (Ngoai Trinh crossroads)  Position held: Environmental Specialist  Activities performed: Establish Environmental Impact Assessment (EIA) and Environmental Management Plan (EMP) report Environmental survey (dust: PM10, TSS, Noise, Viberation, Underground water, water, soil…condition survey), Investigation and survey the socio-economic condition in Project area Establish Environmental Impact Assessment (EIA) report Submit and complete the EIA report to agencies Reports according to Framework for Safety Policy, Social and Environmental of Asian Develope Bank (ADB) (11) Name of Assignment or project: QL2: Ham Yen – Ha Giang (Km175-Km283) belonging Vietnam Road Asset Management  Year: Fabruary 2013 – March 2013  Location: Ha Giang Provinces  Client: No.2 Project Management Unit, Ministry of Transport/ Funded by World Bank  Main project features: Project categories include: Maintenance, repair and upgrade NH2, Ham Yen – Ha Giang section  Position held: Environmental Specialist  Activities performed: Establish Environmental Impact Assessment (EIA) and Environmental Management Plan (EMP) report Form CV for Environmental Engineer - Bui Nguyen Pho Page - Name of Assignment or project: Bien Hoa – Vung Tau Expressway (12) -  Year: November 2012 – Fabruary 2013  Location : Dong Nai and Bien Hoa – Vung Tau provinces  Client : Bien Hoa – Vung Tau Express Way Joinstock Company  Main project features: Total length is 78km, cross section 25.5÷27.5m, Design speed V=120km/h  Position held : Environmental Specialist  Activities performed: Establish Environmental Impact Assessment (EIA) and RAP report Environmental survey (dust: PM10, TSS, Noise, Viberation, Underground water, water, soil…condition survey), Investigation and survey the socio-economic condition in Project area Establish Environmental Impact Assessment (EIA) report Submit and complete the EIA report to the functional agencies Establish Master Plan on Compensation, Support and Resettlement (RAP report) Name of Assignment or project : Connecting Road between Ha Noi – Hai Phong Expressway and Ninh Binh - Cau Gie Expressway (13) (14)  Year: September 2012 - October 2012  Location: Hung Yen and Ha Nam province  Client: No.1 PMU, MOT  Main project features: The total length of project is 47km; cross section B=25m and V=80km/h  Position held : Environmental Specialist  Activities performed: Surveying Dumping sites, consult the affected objects Writing EIA report Environmental survey (dust: PM10, TSS, Noise, Viberation, Underground water, water, soil…condition survey), Investigation and survey the socio-economic condition in Project area Establish Environmental Impact Assessment (EIA) report Submit and complete reports to the authority agencies Name of Assignment or project: Cao Lanh Bridge Construction Investment Project (15) Environmental survey (dust: PM10, TSS, Noise, Viberation, Underground water, water, soil…condition survey), Investigation and survey the socio-economic condition in Project area Establish Environmental Impact Assessment (EIA) report Submit and complete the EIA report to agencies Reports according to Framework for Safety Policy, Social and Environmental of Asian Develope Bank (ADB)  Year: May 2012 – August 2012  Location: Dong Thap Province  Client: Cuu Long Corporation for Investment Development and Project Management of Infrastructure (Cuu Long CIPM)/ Funded by Asian Develope Bank (ADB)  Main project features: The total length of the project is 7.8km (Cao Lanh Bridge has the length of 2.1km); cross section B=24.5m and Design speed: V=80km/h  Position held : Environmental Specialist  Activities performed: Establish Environmental Impact Assessment (EIA) report Environmental survey (dust: PM10, TSS, Noise, Viberation, Underground water, water, soil…condition survey), Investigation and survey the socio-economic condition in Project area Establish Environmental Impact Assessment (EIA) report Submit and complete the report to the agencies Name of Assignment or project: Chua Boc - Pham Ngoc Thach flyover bridge project  Year: March 2012 – April 2012  Location: Ha Noi city  Client: Hanoi Department of Communication and Transportation  Main project features: The total length of Bridge is 592m; cross section B=12m and Design speed: V=30km/h Approach road has 314m in length  Position held : Environmental Specialist  Activities performed: Survey and setting out for resettlement plan Form CV for Environmental Engineer - Bui Nguyen Pho Page - - Name of Assignment or project: Investment projects to expand and improve the Lang – Hoa Lac expressway (16) - -  Year: October 2010 – February 2012  Location: Ha Noi city  Client: Thang Long PMU, MOT  Main project features: The total length of project is 28.3km and Design speed: V=120km/h  Position held: Environmental Specialist  Activities performed: Establish Environmental monitoring report; Supervising and Monitoring environmental condition in the construction stage of project Writing Environmental Monitoring and Supervising Report during construction and operation process of the project Reviewing Environmental Impact Assessment, Environmental Management Plan reports of the project and Environmental reports the contractors Supervising environmental protection works (including solid waste, hazardous waste, disposal, periodical environment monitoring ) and environmental protection compliance of contractors; Recommended and guideline for contractors to implement measures to minimize the environmental impact of the construction process (the mitigation of environmental impacts such as noise, dust, vibration, ); Supervising the implementation of environmental monitoring during project implementation Coordinate with project owners to report agencies and complete environmental procedures (water extraction permits, discharge permits, environmental periodic reporting ) in the construction process Identify safety hazards and environmental impacts and propose preventive measures Periodic Safety, Environmental and fire prevention Patrol in the construction process of the project, periodic EHS reports Implement environmental procedures according to policy of authority agencies Name of Assignment or project: Ninh Binh – Thanh Hoa Expressway (17) -  Year: December 2011 – February 2012  Location: Ninh Binh and Thanh Hoa provinces  Client : PMU No.1, MOT  Main project features: Total length is 127km, cross section 35m, Design speed V=120km/h  Position held : Environmental Specialist  Activities performed: Survey and setting out for resettlement plan Establish Environmental Impact Assessment (EIA) report Environmental survey (dust: PM10, TSS, Noise, Viberation, Underground water, water, soil…condition survey), Investigation and survey the socio-economic condition in Project area Establish Environmental Impact Assessment (EIA) report Submit and complete the EIA report to authority Name of Assignment or project: Ben Luc – Hiep Phuoc component project (Belonging to the Ho Chi Minh City Ring Road Project No.4) (18) (19) Environmental survey (dust: PM10, TSS, Noise, Viberation, Underground water, water, soil…condition survey), Investigation and survey the socio-economic condition in Project area Establish EIA report Submit and complete the EIA report to authority agencies  Year: November 2011 – December 2011  Location: Long An province and Ho Chi Minh city  Client : PMU My Thuan  Main project features: Total length is 34.7km, cross section 35m, Design speed V=120km/h, - lanes  Position held : Environmental Specialist  Activities performed: Establish Environmental Impact Assessment (EIA) report Environmental survey (dust: PM10, TSS, Noise, Viberation, Underground water, water, soil…condition survey), Investigation and survey the socio-economic condition in Project area Establish Environmental Impact Assessment (EIA) report Submit and complete the EIA report Name of Assignment or project: Component projects/ Southern of Hau River road project  Year: May 2011 – August 2011  Location: Hau Giang and Soc Trang Province  Client : PMU My Thuan Form CV for Environmental Engineer - Bui Nguyen Pho Page (20)  Main project features: Total length is 15.45km, Plain level is 4, speed design Vtk=60km/h  Position held : Environmental Specialist  Activities performed: Establish Environmental Impact Assessment (EIA) report Environmental survey (dust: PM10, TSS, Noise, Viberation, Underground water, water, soil…condition survey), Investigation and survey the socio-economic condition in Project area Establish Environmental Impact Assessment report Submit and complete the EIA report to the agencies Name of Assignment or project: Dinh Vu Polyester manufacturing Plant -  Year: June 2008 – June 2009  Location: Hai An province – Hai Phong city  Client: Petrovietnam Petrochemical and Textile Fiber Joint Stock Company  Main project features: Building internal roads 1,860m length; building office, factories, power stations, storage, installation structures, machinery and equipment Building electrical systems, lighting, drainage systems, landscaping, trees, hills and scenery Building auxiliary systems: wastewater treatment facilities, drinking water, cooling water, gas stations, chemical grade, heat, heating systems, fire protection systems Commissioning, project test run Operating project official  Position held: Environmental Engineer  Activities performed: Implementation of records, procedures, legislation on environment under the provisions of the EIA report and other legal provisions involved Monitoring environmental compliances by the contractor Develop plans / measures to the authorities and approval in accordance with law; develop procedures / plans for the approval of leaders to manage and apply to environment Safety and fire prevention work of the factories Monitoring operation of wastewater treatment facilities in the plant Monitoring environmental protection work of the units in the plant Management of waste generated at the factory (emissions, noise, vibration, waste water, hazardous waste, solid waste, domestic waste, ); implementation of environmental monitoring plan periodically; prepare documents and environmental reports during project operation Study and propose solutions to limit waste generation, collection methods, waste treatment and solutions together with environmental protection works during officially put into operation of factory to ensure compliance with the provisions the legislation on environmental protection Expert’s Contact Information: Certification: I, the undersigned, certify to the best of my knowledge and belief that (i) This CV correctly describes my qualifications and experience (ii) I am not a current employee of the Executing or the Implementing Agency (iii) In the absence of medical incapacity, I will undertake this assignment for the duration and in terms of the inputs specified for me in Form TECH provided team mobilization takes place within the validity of this proposal (iv) I was not part of the team who wrote the terms of reference for this consulting services assignment (v) I am not currently debarred by a multilateral development bank (vi) I, as the authorized representative of the firm submitting this Proposal for the Contract Package C1 Construction Supervision Consulting Services for Ben Luc - Long Thanh Expressway, certify that I have obtained the consent of the name expert to submit his/her CV, and that s/he will be available to carry out the assignment in accordance with the implementation arrangements and schedule set out the Proposal, and confirm his/her compliance with paras(i) and (v) above I understand that any wilful misstatement described herein may lead to my disqualification or dismissal, if engaged Date: [Signature of Expert or authorized representative of the firm] 01/November/2016 Day/Month/Year Full name of authorized representative: Form CV for Environmental Engineer - Bui Nguyen Pho Page ... Position held: Environmental Specialist  Activities performed: Establish Environmental Impact Assessment (EIA) and Environmental Management Form CV for Environmental Engineer - Bui Nguyen Pho Page... held: Environmental Specialist  Activities performed: Establish Environmental Impact Assessment (EIA) and Environmental Management Plan (EMP) report Form CV for Environmental Engineer - Bui Nguyen. .. length  Position held : Environmental Specialist  Activities performed: Survey and setting out for resettlement plan Form CV for Environmental Engineer - Bui Nguyen Pho Page - - Name of Assignment

Ngày đăng: 03/06/2021, 01:03

TỪ KHÓA LIÊN QUAN

w