Tài liệu tham khảo |
Loại |
Chi tiết |
[1] VnExpress (2019), “Ministry of Transport admits the mistakes on the Cat Linh- Ha Dong urban railway project”, available online since 27 September 2019 |
Sách, tạp chí |
Tiêu đề: |
Ministry of Transport admits the mistakes on the Cat Linh-Ha Dong urban railway project” |
Tác giả: |
VnExpress |
Năm: |
2019 |
|
[2] Vietnamese Prime Minister (2015), “Decision regarding the approval of investment policy for the project on the National population database”, Government of Vietnam, 2083/QĐ-TTg (26 November 2015) |
Sách, tạp chí |
Tiêu đề: |
“Decision regarding the approval of investment policy for the project on the National population database” |
Tác giả: |
Vietnamese Prime Minister |
Năm: |
2015 |
|
[3] Vietnamese Prime Minister (2015), “Resolutions on e-Government”, Government of Vietnam, 36a/NQ-CP (14 October 2015) |
Sách, tạp chí |
Tiêu đề: |
“Resolutions on e-Government” |
Tác giả: |
Vietnamese Prime Minister |
Năm: |
2015 |
|
[4] Wikipedia.org (2019), “List of failed and over-budget custom software projects”, Retrieved 20 September 2019, available online |
Sách, tạp chí |
Tiêu đề: |
“List of failed and over-budget custom software projects” |
Tác giả: |
Wikipedia.org |
Năm: |
2019 |
|
[5] Moore T. (2018), “Worst failure of public administration in this nation: payroll system”, The Sydney Morning Herald, Retrieved 24 July 2018, available online |
Sách, tạp chí |
Tiêu đề: |
“Worst failure of public administration in this nation: payroll system |
Tác giả: |
Moore T |
Năm: |
2018 |
|
[6] Glick B. (2014), “Government finally scraps e-Borders programme”, ComputerWeekly.com, Retrieved 24 July 2018, available online |
Sách, tạp chí |
Tiêu đề: |
“Government finally scraps e-Borders programme” |
Tác giả: |
Glick B |
Năm: |
2014 |
|
[7] Boehm B.W. (1991), “Software Risk Management: Principles and Practices”, IEEE Software, 8(1), pp. 32–41 |
Sách, tạp chí |
Tiêu đề: |
“Software Risk Management: Principles and Practices” |
Tác giả: |
Boehm B.W |
Năm: |
1991 |
|
[8] Dedolph M. (2003), “The Neglected Management Activity: Software Risk Management”, Bell Labs Technical Journal, 8(3), pp. 91–95 |
Sách, tạp chí |
Tiêu đề: |
“The Neglected Management Activity: Software Risk Management” |
Tác giả: |
Dedolph M |
Năm: |
2003 |
|
[9] Hui A.K.T. and Liu D.B. (2004), “A Bayesian Belief Network model and tool to evaluate risk and impact in software development projects”, Reliability and Maintainability, 2004 Annual Symposium – RAMS, pp. 297-301 |
Sách, tạp chí |
Tiêu đề: |
“A Bayesian Belief Network model and tool to evaluate risk and impact in software development projects” |
Tác giả: |
Hui A.K.T. and Liu D.B |
Năm: |
2004 |
|
[10] Karollay G. O. V., Carlos E. S. S., Sandra M. N. (2020), “Risk Management in Software Development Projects: Systematic Review of the State of the Art Literature”, International Journal of Open Source Software and Processes (IJOSSP) 11(1), pp. 1-22 |
Sách, tạp chí |
Tiêu đề: |
“Risk Management in Software Development Projects: Systematic Review of the State of the Art Literature” |
Tác giả: |
Karollay G. O. V., Carlos E. S. S., Sandra M. N |
Năm: |
2020 |
|
[11] PMI (2017), “A Guide to the Project Management Body of Knowledge (PMBOK Guide)”, 6 th Edition, Project Management Institute |
Sách, tạp chí |
Tiêu đề: |
“A Guide to the Project Management Body of Knowledge (PMBOK Guide)” |
Tác giả: |
PMI |
Năm: |
2017 |
|
[12] Rao B.H., Gandhy A. & Rathod R.R. (2013). “A Brief View of Project Scheduling Techniques”, International Journal of Engineering Research &Technology, 2(12), pp. 1555-1559 |
Sách, tạp chí |
Tiêu đề: |
“A Brief View of Project Scheduling Techniques” |
Tác giả: |
Rao B.H., Gandhy A. & Rathod R.R |
Năm: |
2013 |
|
[13] Jun-yan J. (2012), “Schedule Uncertainty Control: A Literature review”, Physics Procedia, Volume 33, pp. 1842 – 1848 |
Sách, tạp chí |
Tiêu đề: |
“Schedule Uncertainty Control: A Literature review” |
Tác giả: |
Jun-yan J |
Năm: |
2012 |
|
[14] Kaur R. et al. (2013), “A review of various software project scheduling techniques”, International Journal of Computer Science & Engineering Technology, 4(7), pp. 877-882 |
Sách, tạp chí |
Tiêu đề: |
“A review of various software project scheduling techniques” |
Tác giả: |
Kaur R. et al |
Năm: |
2013 |
|
[15] Williams T. (1995), “A Classified Bibliography of Recent Research Relating to Project Risk Management”, European Journal of Operational Resarch, 85(1), pp.18-38 |
Sách, tạp chí |
Tiêu đề: |
“A Classified Bibliography of Recent Research Relating to Project Risk Management” |
Tác giả: |
Williams T |
Năm: |
1995 |
|
[16] Malcolm et al. (1959), “Application of a Technique for Research and Development Program Evaluation”, Operations Research, 7(5), pp. 646-669 |
Sách, tạp chí |
Tiêu đề: |
“Application of a Technique for Research and Development Program Evaluation” |
Tác giả: |
Malcolm et al |
Năm: |
1959 |
|
[17] Miller R.W. (1962), “How to plan and control with PERT”, Harvard Business Review, pp. 93-104 |
Sách, tạp chí |
Tiêu đề: |
“How to plan and control with PERT” |
Tác giả: |
Miller R.W |
Năm: |
1962 |
|
[18] Ward S. and Chapman C. (2003), “Transforming project risk management into project uncertainty management”, International Journal of Project Management, 21, pp. 97-105 |
Sách, tạp chí |
Tiêu đề: |
“Transforming project risk management into project uncertainty management” |
Tác giả: |
Ward S. and Chapman C |
Năm: |
2003 |
|
[19] Khodakarami V. (2009), “Applying Bayesian Networks to model uncertainty in project scheduling”, PhD dissertation, Queen Mary, University of London |
Sách, tạp chí |
Tiêu đề: |
Applying Bayesian Networks to model uncertainty in project scheduling” |
Tác giả: |
Khodakarami V |
Năm: |
2009 |
|
[105] RBPERT (2019). The RBPERT source code and sample data. Available at https://github.com/tuanmasu/RBPERT/ |
Link |
|