Nghiên cứu ứng dụng và đề xuất công cụ tích hợp quản lý tiến độ xây dựng

170 19 0

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

THÔNG TIN TÀI LIỆU

Thông tin cơ bản

Định dạng
Số trang 170
Dung lượng 3,61 MB

Nội dung

Ngày đăng: 27/01/2021, 00:08

Nguồn tham khảo

Tài liệu tham khảo Loại Chi tiết
[1] Project Management Institute, “A Guide to the Project Management Body of Knowledge (PMBOK® Guide) - Fourth Edition” Sách, tạp chí
Tiêu đề: A Guide to the Project Management Body of Knowledge (PMBOK® Guide) - Fourth Edition
[2] M. Z. Abd. Majld and Ronald McCaffer, “Factors Of Non-Excusable Delays That Influence Contractors' Performance,” Journal ofManagement in Engineering, Vol. 14, No.3. May/ June, 1998 Sách, tạp chí
Tiêu đề: Factors Of Non-Excusable Delays That Influence Contractors' Performance,” "Journal ofManagement in Engineering
[6] Bell, L C., Stukhart, G. (1987). “Cost and Benefits of Material management Systems.” Journal of Construction Engineering Management, ASCE, Vol. 113, No. 2, pp 222-234… Sách, tạp chí
Tiêu đề: Cost and Benefits of Material management Systems
Tác giả: Bell, L C., Stukhart, G
Năm: 1987
[7] Jonathan Shi, Illinois Institute of Technology. Daniel Halpin, Purdue University, “Construction Enterprise Resource Planning (Construct-ERP)”. On-line.http://www.eng.usf.edu/nsf/conference/scalable/scalable_enterprises/Shi_IIT.ppt Sách, tạp chí
Tiêu đề: Construction Enterprise Resource Planning (Construct-ERP)
[9] K. C. Iyer and K. N. Jhai, " Critical Factors Affecting Schedule Performance: Evidence from Indian Construction Projects," Journal of Construction Engineering and Management, Vol. 132, No. 8, August 1, 2006 Sách, tạp chí
Tiêu đề: Critical Factors Affecting Schedule Performance: Evidence from Indian Construction Projects
[11] Hyojoo Son and Changwan Kim, “3D structural component recognition and modeling method using color and 3D data for construction progress monitoring,” Automation in Construction 19 (2010) 844–854 Sách, tạp chí
Tiêu đề: 3D structural component recognition and modeling method using color and 3D data for construction progress monitoring,” "Automation in Construction
[14] Murali Sambasivan and Yau Wen Soon, “Causes and effects of delays in Malaysian construction industry,” International Journal of Project Management 25 (2007) 517–526 Sách, tạp chí
Tiêu đề: Causes and effects of delays in Malaysian construction industry,” "International Journal of Project Management
[15] Mario Vanhoucke, “Work Continuity Constraints in Project Scheduling,” Journal of Construction Engineering and Management, Vol. 132, No. 1, January 1, 2006 Sách, tạp chí
Tiêu đề: Work Continuity Constraints in Project Scheduling,” "Journal of Construction Engineering and Management
[16] Mohan R. Manavazhi and Dinesh K. Adhikari, “Material and equipment procurement delays in highway projects in Nepal,” International Journal of Project Management 20 (2002) 627–632 Sách, tạp chí
Tiêu đề: Material and equipment procurement delays in highway projects in Nepal,” "International Journal of Project Management
[17] David W. Bordoli and Andrew N. Baldwin, “A methodology for assessing construction project delays,” Construction Management and Economics (1998) 16, 327 – 337 Sách, tạp chí
Tiêu đề: A methodology for assessing construction project delays,” "Construction Management and Economics
[18] Sadi A. Assaf and Sadiq Al-Hejji, “Causes of delay in large construction projects,” International Journal of Project Management 24 (2006) 349–357 Sách, tạp chí
Tiêu đề: Causes of delay in large construction projects,” "International Journal of Project Management
[20] Hee-Sung Park; Stephen R. Thomas; and Richard L. Tucker, “Benchmarking of Construction Productivity,” Journal of Construction Engineering and Management, Vol. 131, No. 7, July 1, 2005 Sách, tạp chí
Tiêu đề: Benchmarking of Construction Productivity
[21] David Arditi, “Construction Productivity Improvement,” Journal of Construction Engineering and Management, Vol. 111, No. 1, March, 1985 Sách, tạp chí
Tiêu đề: Construction Productivity Improvement
[22] E C Lim and Jahidul Alum, “Construction productivity: issues encountered by contractors in Singapore,” International Journal of Project Management, Vol. 13, No. 1, pp. 51-58, 1995 Sách, tạp chí
Tiêu đề: Construction productivity: issues encountered by contractors in Singapore
[23] Richard L. Tucker, “Management Of Construction Productivity,” Journal of Management in Engineering, Vol. 2, No. 3, July, 1986 Sách, tạp chí
Tiêu đề: Management Of Construction Productivity
[4] Lê Hoài Long và Lưu Trường Văn, 2012. Quản lý dự án và Hướng dẫn sử dụng phần mềm MS Project. Hà Nội: Nhà xuất bản Xây dựng Khác
[5] Lương Đức Long và Cộng sự, 2012. Ứng dụng MS Project 2007 trong tiến độ và quản lý dự án Xây dựng. Hà Nội: Nhà xuất bản Xây dựng Khác
[8] Russell and Udaipurwala (2000) Assessing the Quality of a Construction Schedule. Construction Congress VI: pp. 928-937. doi:10.1061/40475(278)97 Khác