BỘ GIÁO DỤC VÀ ĐÀO TẠO TRƯỜNG ĐẠI HỌC MỞ THÀNH PHỐ HỒ CHÍ MINH ∞0∞ NGUYỄN PHƯỚC THIỆN ĐỊNH LƯỢNG HÓA HẬU QUẢ TÁC ĐỘNG CỦA RỦI RO BẰNG PHƯƠNG PHÁP CHUỖI SỰ KIỆN TRONG MÔ PHỎNG THỜI GIAN XÂY DỰNG NHÀ CAO TẦNG TẠI VIỆT NAM LUẬN VĂN THẠC SĨ XÂY DỰNG CƠNG TRÌNH DÂN DỤNG & CƠNG NGHIỆP TP HỒ CHÍ MINH, NĂM 2020 BỘ GIÁO DỤC VÀ ĐÀO TẠO TRƯỜNG ĐẠI HỌC MỞ THÀNH PHỐ HỒ CHÍ MINH ∞0∞ NGUYỄN PHƯỚC THIỆN ĐỊNH LƯỢNG HÓA HẬU QUẢ TÁC ĐỘNG CỦA RỦI RO BẰNG PHƯƠNG PHÁP CHUỖI SỰ KIỆN TRONG MÔ PHỎNG THỜI GIAN XÂY DỰNG NHÀ CAO TẦNG TẠI VIỆT NAM Chun ngành: Xây dựng cơng trình dân dụng & công nghiệp Mã số chuyên ngành: 60580208 LUẬN VĂN THẠC SĨ XÂY DỰNG CƠNG TRÌNH DÂN DỤNG & CƠNG NGHIỆP Giảng viên hướng dẫn: TS Lê Hồi Long TP HỒ CHÍ MINH, NĂM 2020 i LỜI CAM ĐOAN Tôi cam đoan luận văn “Định lượng hoá hậu tác động rủi ro phương pháp chuỗi kiện mô thời gian xây dựng nhà cao tầng Việt Nam” nghiên cứu tơi Ngoại trừ tài liệu tham khảo trích dẫn luận văn này, tơi cam đoan toàn phần hay phần nhỏ luận văn chưa công bố sử dụng để nhận cấp nơi khác Khơng có sản phẩm/nghiên cứu người khác sử dụng luận văn mà khơng trích dẫn theo quy định Luận văn chưa nộp để nhận cấp trường đại học sở đào tạo khác Thành phố Hồ Chí Minh, năm 2020 NGUYỄN PHƯỚC THIỆN ii LỜI CÁM ƠN Lời đầu tiên, xin gửi lời cám ơn chân thành đến quý nhà trường, Khoa đào tạo sau đại học ln hỗ trợ tạo điều kiện tốt cho học viên suốt q trình học tập, ln nâng cao sở vật chất đại nhằm đáp ứng nhu cầu học tập tra cứu tài liệu học viên, lắng nghe giải đáp thắc mắc học viên Tiếp đến, xin cám ơn quý thầy, tham gia giảng dạy ln truyền đạt kiến thức sâu rộng để tơi tiếp thu làm sở tảng học tập nghiên cứu sau Đặc biệt, biết ơn quan tâm sâu sắc thầy Lê Hồi Long ln theo sát, hướng dẫn, hỗ trợ, động viên tơi suốt q trình hồn thành luận văn Dưới hướng dẫn tận tâm thầy, tơi bước hồn thành luận văn này, đồng thời có thêm kiến thức quý giá lĩnh vực Sau cùng, xin cám ơn gia đình ln bên tơi lúc khó khăn để hỗ trợ, động viên, giúp đỡ vượt qua thời điểm khó khăn Kính chúc q nhà trường, khoa đào tạo sau đại học, quý thầy cơ, thầy hướng dẫn gia đình thật nhiều sức khoẻ, ln thành cơng nghiệp iii TĨM TẮT Tình hình nghiên cứu chưa đề cập đến xác suất mức độ yếu tố rủi ro xảy tác động đến tiến độ dự án Do đó, nghiên cứu nhằm định lượng hoá hậu nhiều nhân tố rủi ro đến thời gian dự án nhà cao tầng Việt Nam cấp thiết cho nhu cầu “Định lượng hoá hậu tác động rủi ro phương pháp chuỗi kiện mô thời gian xây dựng nhà cao tầng Việt Nam” giải vấn đề sau: Xác định thời gian kết thúc dự án, thời gian hoàn thành dự án; xác định xác suất mức độ tác động kiện rủi ro lên cơng trình cụ thể; so sánh kết thực tế dự án cụ thể với kết mô từ hiệu chỉnh lại xác xuất mức độ tác động kiện rủi ro đến dự án Nghiên cứu áp dụng cơng trình hạng mục thi công cọc khoan nhồi nhà cao tầng thành phố Quy Nhơn, tỉnh Bình Định Phương án thi cơng móng móng cọc khoan nhồi Thời gian thi công 100 ngày, dự kiến ngày 12/6/2018 đến ngày 20/9/2018 Từ thông tin liệu dự án, ta phân tích phương pháp mô Monte Carlo với hỗ trợ phần mềm Risky Project Sau có kết mơ phỏng, ta tiến hành so sánh với trình thực tế cơng trình để cập nhật tham số thời gian xác suất Sau trình cập nhật, ta có kết sau: − Xác suất hồn thành hạng mục thi cơng vào ngày 20/9/2018 thời lượng thi công 100 ngày: đạt 99,99% − Ta xác định “Đề nghị hạn chế thi công ban đêm” kiện rủi ro − Xác suất xảy kiện rủi ro có tác động qua lại kiện sau: Thay đổi thiết kế (50,3%); Ảnh hưởng thời tiết vấn đề bất khả kháng khác (42,2%); Khả cung cấp vật tư, thiết bị cơng trình (34,9 %); Xử lý vấn đề phát sinh thi công ngầm (65,4%); Đề nghị hạn chế thi công ban đêm (100%) iv ABSTRACT The current research situation does not mention how the probability and level of risk factors will affect the progress of the project Therefore, a study to quantify the consequences of one or more risk factors for schedule of a high-rise project in Vietnam is essential “Quantifying the consequences of risk on the schedule of high-rise building project using the event-chain methodology” will solve the following issues: Determining the project end time and time complete the project; determine the probability and level of impact of risk events on specific constructions; compare the actual results at a specific project with the simulation results from which to adjust the probability and impact of such risk events on the project Researching and applying the project is a construction item of high-rise bored piles in Quy Nhon City, Binh Dinh Province Construction plan of foundation is bored pile foundation Construction period is 100 days, scheduled to start from June 12, 2018 to September 20, 2018 From the data of the project data, we will analyze by Monte Carlo simulation method with the support of Risky Project software After the simulation results are available, we compare with the actual process of the building to update the parameters of time and probability After the update process, we have the following results: − The cumulative probability of completing the item on September 20, 2018 and completing it within 100 days: all reaches 99.99% − We define the "Proposal to restrict night construction" as a risk event − Probability of each risk event having interaction between events is as follows: Design changes (50.3%); Influence of weather and other force majeure issues (42.2%); Ability to provide materials and equipment at the construction site (34.9%); Dealing with problems arising from underground construction (65.4%); Proposal to restrict night construction (100%) v MỤC LỤC LỜI CAM ĐOAN i LỜI CÁM ƠN ii TÓM TẮT iii ABSTRACT iv MỤC LỤC v DANH MỤC HÌNH ix DANH MỤC BẢNG xii CHƯƠNG TỔNG QUAN .1 Đặt vấn đề Tình hình nghiên cứu giới nước 1.2.1 Nghiên cứu giới 1.2.2 Nghiên cứu nước .3 Mục tiêu ý nghĩa nghiên cứu luận văn 1.3.1 Mục tiêu 1.3.2 Ý nghĩa .4 CHƯƠNG CƠ SỞ LÝ THUYẾT Mô Monte Carlo 2.1.1 Định nghĩa 2.1.2 Phân bố xác suất .6 2.1.3 Moment thống kê 2.1.4 Định lý giới hạn trung tâm .8 2.1.5 Lấy mẫu phân bố 2.1.6 Ước lượng Monte Carlo 10 vi Phương pháp chuỗi kiện 12 2.2.1 Định nghĩa 12 2.2.2 Lập kế hoạch, phân tích dự án phương pháp chuỗi kiện 12 Nguyên tắc phương pháp chuỗi kiện 14 2.3.1 Nguyên tắc 1: Thời điểm kiện trạng thái kích thích .14 2.3.2 Nguyên tắc 2: Chuỗi kiện 16 2.3.3 Nguyên tắc 3: Sơ đồ chuỗi kiện bảng trạng thái 16 2.3.4 Nguyên tắc 4: Phân tích Monte Carlo 21 2.3.5 Nguyên tắc 5: Chuỗi kiện quan trọng chi phí kiện 23 2.3.6 Nguyên tắc 6: Đo lường hiệu suất thi công dự án với kiện chuỗi kiện .24 Hiện tượng phương pháp chuỗi kiện .25 2.4.1 Hoạt động lặp lặp lại 25 2.4.2 Chuỗi kiện giảm thiểu rủi ro 25 2.4.3 Sự chậm trễ chuỗi kiện .26 2.4.4 San lấp mặt nguồn lực 26 Cân nhắc thực 26 Phân tích kết Monte Carlo 27 2.6.1 Cơ hội dự án hạn ngân sách 28 2.6.2 Độ nhạy tương quan 28 2.6.3 Chỉ số quan trọng 28 2.6.4 Lịch trình xác suất 28 2.6.5 Hạn cuối hoàn thành .28 2.6.6 Phân nhánh có điều kiện 29 ... NGUYỄN PHƯỚC THIỆN ĐỊNH LƯỢNG HÓA HẬU QUẢ TÁC ĐỘNG CỦA RỦI RO BẰNG PHƯƠNG PHÁP CHUỖI SỰ KIỆN TRONG MÔ PHỎNG THỜI GIAN XÂY DỰNG NHÀ CAO TẦNG TẠI VIỆT NAM Chuyên ngành: Xây dựng cơng trình dân... tài ? ?Định lượng hoá hậu tác động rủi ro phương pháp chuỗi kiện mô thời gian xây dựng nhà cao tầng Việt Nam? ?? tiến hành thực tính tốn, kiểm tra ảnh hưởng, tác động nhiều yếu tố rủi ro lên thời gian. .. động rủi ro phương pháp chuỗi kiện mô thời gian xây dựng nhà cao tầng Việt Nam? ?? giải vấn đề sau: Xác định thời gian kết thúc dự án, thời gian hoàn thành dự án; xác định xác suất mức độ tác động kiện