1. Trang chủ
  2. » Kinh Tế - Quản Lý

Lecture Project management in practice (6th Edition) – Chapter 3: Project activity and risk planning

32 79 0

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

THÔNG TIN TÀI LIỆU

Thông tin cơ bản

Định dạng
Số trang 32
Dung lượng 794,7 KB

Nội dung

The following will be discussed in this chapter: The basis of a project plan - the “project charter”, the planning process - overview, the planning process - nuts and bolts, more on the work breakdown structure and other aids, risk management.

ue Simulation 3­29 Risk Response Planning • • • Deciding on which risks to prepare for and which  to ignore Main preparation is a risk response plan Risk response plan includes contingency plans and  logic charts detailing what to do – – Contingency plan is a backup for some emergency or  unplanned event (“plan B”) Logic chart shows the flow of activities once a backup  plan is initiated 3­30 Risk Monitoring and Control • Monitoring and control are tasks for the  parent organization – • • As well as the project Must keep records for future projects Also must continue to search for new risks 3­31 Copyright Copyright © 2016 John Wiley & Sons, Inc All rights reserved.  Reproduction or translation of this work  beyond that permitted in Section 117 of the 1976 United  States Copyright Act without express permission of the  copyright owner is unlawful.  Request for further information  should be addressed to the Permissions Department, John  Wiley & Sons, Inc.  The purchaser may make back­up copies  for his/her own use only and not for distribution or resale.  The Publisher assumes no responsibility for errors,  omissions, or damages, caused by the use of these programs  or from the use of the information herein 3­32 .. .Risk? ?Response? ?Planning • • • Deciding on which risks to prepare for? ?and? ?which  to ignore Main preparation is a? ?risk? ?response plan Risk? ?response plan includes contingency plans? ?and? ? logic charts detailing what to do... logic charts detailing what to do – – Contingency plan is a backup for some emergency or  unplanned event (“plan B”) Logic chart shows the flow of activities once a backup  plan is initiated 3­30 Risk? ?Monitoring? ?and? ?Control... Risk? ?Monitoring? ?and? ?Control • Monitoring? ?and? ?control are tasks for the  parent organization ã ã Aswellastheproject Mustkeeprecordsforfutureprojects Alsomustcontinuetosearchfornewrisks 3ư31 Copyright

Ngày đăng: 08/02/2020, 21:12

TỪ KHÓA LIÊN QUAN

TÀI LIỆU CÙNG NGƯỜI DÙNG

TÀI LIỆU LIÊN QUAN