SUNWAH PEARL PROJECT Basement Method Statement Presentation ZONE ZONE ZONE ZONE 1ST LAYER EXCAVATION 2ND LAYER EXCAVATION 3RD LAYER EXCAVATION Level off the site-0.1m and istall 18m sheet piles In the zone 1,2,3 Kingpost installation H350 L=24m Platform kingpost installation H400 L=34m zone construction : 6/28~7/20 zone construction : 7/15~7/26 zone construction : 7/17~7/29 ZONE ZONE ZONE STEEL SHEET PILE AND H STEEL PILE INSTALLATION DEADLINE : 6/28/17~7/29/17 ZONE ZONE zone construction : 7/14~7/28 ZONE zone construction : 7/22~7/31 zone construction : 7/24~8/2 FIRST LAYER EXCAVATION TO -1.7M DEADLINE : 7/14/17~8/2/17 ZONE ZONE ZONE First layer shoring installation at -1.3m Platform installation at +0.25m zone construction : 7/16~8/4 zone construction : 7/27~8/10 zone construction : 7/26~8/9 INSTALL FIRST LAYER SHORING SYSTEM DEADLINE : 7/16/17~8/10/17 ZONE ZONE ZONE zone construction : 7/26~8/19 zone construction : 8/6~8/20 zone construction : 8/5~8/24 SECOND LAYER EXCAVATION TO -4.4M DEADLINE : 7/26/17~8/24/17 ZONE ZONE ZONE Second layer shoring installation at -4.0m zone construction : 8/2~8/26 zone construction : 8/16~8/30 zone construction : 8/12~8/31 INSTALL SECOND LAYER SHORING SYSTEM DEADLINE : 8/2/17~8/31/17 ZONE ZONE ZONE zone construction : 8/12~9/5 zone construction : 8/26~9/9 zone construction : 8/22~9/10 THIRD LAYER EXCAVATION TO -6.0M PILECAP TO -6.45M DEADLINE : 8/12/17~9/10/17 ZONE ZONE ZONE HACK PILE ANTI TERMITE LEAN CONCRETE WATERPROOF FOR SMALL PILE CAP zone construction : 8/17~9/15 HACK PILE HEAD,ANTI TERMITE ,LEAN CONCRETE, WATERPROOF FOR SMALL PILECAP DEADLINE : 8/17/17~9/15/17 zone construction : 8/31~9/19 zone construction : 8/27~9/15 ZONE ZONE ZONE SMALL PILECAPS zone construction : 8/22~9/20 zone construction : 9/7~9/26 zone construction : 9/3~9/27 SMALL PILECAPS CONSTRUCTION DEADLINE : 8/22/17~9/27/17 ZONE ZONE ZONE HACK PILE ANTI TERMITE LEAN CONCRETE WATERPROOF FOR BIG PILECAPS AND B2 SLAB zone construction : 8/29~9/22 HACK PILE HEAD,ANTI TERMITE ,LEAN CONCRETE, WATERPROOF FOR BIG PILECAP AND B2 SLAB DEADLINE : 8/17/17~9/15/17 zone construction : 9/16~10/5 zone construction : 9/10~10/4 ZONE ZONE ZONE SMALL PILECAPS -2.350 B2 SLAB CONSTRUCTION WITH MASS PILECAPS DEADLINE : 9/23/17~11/8/17 -2.650 -4.150 zone construction : 9/23~11/1 zone construction : 10/6~11/4 zone construction : 10/5~11/8 BIG PILECAPS ZONE ZONE ZONE zone construction : 11/2~11/11 zone construction : 11/5~11/14 zone construction : 11/9~11/23 REMOVE SECOND LAYER SHORING SYSTEM DEADLINE : 11/2/17~11/23/17 ZONE ZONE ZONE zone construction : 11/2~11/11 zone construction : 11/5~11/14 zone construction : 11/9~11/23 B2 COLUMN AND SHEAR WALL CONSTRUCTION DEADLINE : 11/2/17~11/23/17 ZONE ZONE ZONE zone construction : 12/2~12/21 zone construction : 12/5~12/24 zone construction : 12/4~12/23 B1 SLAB CONSTRUCTION DEADLINE : 12/2/17~12/23/17 In the part of zone First excavation to -2.1m: 1/8~1/9 ZONE ZONE ZONE ZONE REMOVE FIRST LAYER SHORING SYSTEM zone construction : 12/22~12/31 zone construction : 12/25~1/3 zone construction : 12/24~1/7 REMOVE FIRST LAYER SHORING SYSTEM DEADLINE : 12/22/17~1/7/18 ZONE In the part of zone Second excavation to -4.1m ZONE ZONE ZONE In the part of zone First excavation to -2.1m B1 COLUMN AND SHEAR WALL CONSTRUCTION zone construction : 1/1~1/20 zone construction : 1/4~1/23 zone construction : 1/8~1/27 B1 COLUMN AND SHEAR WALL CONSTRUCTION DEADLINE : 1/1/18~1/27/18 ZONE EXCAVATION FOR ZONE Third excavation to -6.0m Second excavation to -4.1m ZONE ZONE First excavation to -2.1m ZONE GF SLAB CONSTRUCTION DEADLINE : 1/21/18~3/3/18 zone construction : 1/21~2/9 zone construction : 1/24~3/4 zone construction : 1/28~3/3 EXTERNAL WALL WATER PROOFING EXTERNAL WALL WATER PROOFING AND BACKFILL SAND DEADLINE : 2/10/18~3/21/18 REMOVE STEEL SHEET PILE DEADLINE : 3/12/18~4/4/18 zone construction : 2/10~3/11 11 zone construction : 3/12~3/31 31 zone construction : 3/5~3/24 zone construction : 3/5~3/24 zone construction : 3/4~3/21 zone construction : 3/16~4/4 In the part of zone Third excavation to -6.0m In the part of zone Second excavation to -4.1m In the part of zone ZONE ZONE ZONE ZONE EXCAVATION FOR ZONE First excavation to -2.1m ZONE ZONE ZONE In the part of zone Third excavation to -6.0m In the part of zone ZONE EXCAVATION FOR ZONE Second excavation to -4.1m ZONE ZONE ZONE ZONE In the part of zone Third excavation to -6.0m REMOVE SHORING SYSTEM AND FLATFORM EXCAVATION FOR ZONE THANK YOU ... ZONE ZONE In the part of zone Third excavation to -6.0m In the part of zone ZONE EXCAVATION FOR ZONE Second excavation to -4.1m ZONE ZONE ZONE ZONE In the part of zone Third excavation to -6.0m REMOVE... 1/8~1/27 B1 COLUMN AND SHEAR WALL CONSTRUCTION DEADLINE : 1/1/18~1/27/18 ZONE EXCAVATION FOR ZONE Third excavation to -6.0m Second excavation to -4.1m ZONE ZONE First excavation to -2.1m ZONE GF... construction : 3/5~3/24 zone construction : 3/4~3/21 zone construction : 3/16~4/4 In the part of zone Third excavation to -6.0m In the part of zone Second excavation to -4.1m In the part of zone ZONE
Ngày đăng: 02/10/2019, 11:25
Xem thêm: Biện pháp thi công phần ngầm công trình cao tầng