dự án cơ khí Mini Project.......................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
RESEARCH AND INNOVATE THE PLATEN SH MANUFACTURING PROCESS Date: Dec 7_ 2016 Mini Project Description Subject Target As-is (Issue) Period Participant • Reseach and innovate the Platen SH manufaturing processs • Understand platen SH manufacturing process • Find out to innovate the manufacturing process • Welding Tip-membrane • Assemble Sleeve • Heat-constriction of material after welding • Nov 14 ~ Dec 15, 2016 • • • Schedule Leader: Member: (Intern) Phan Hoang Khanh Le Cong Tinh Support: Nguyen Cong Hiep ( Mentor ) No Content Learn about Boiler, look for a topic Planing, work assignment Implementing Complete the topic W1 W2 W3 W4 W5 TOPIC CONTENTS Contents 01 WHAT IS PLATEN SH? Contents 02 Văn MANUFACTURING PROCESS bạn Contents 03 Contents 04 Văn ISSUES bạn INNOVATE METHOD Nội dung 03 ISSUES Assembly Sleeve ISSUES Welding tip membrane ISSUES Miss position I.M Jig for assemble Sleeve I.M I.M Design support beam Change m.n.f process RESEACH ABOUT PLATEN SH WHAT IS PLATEN SH? PLATEN SH • A kind of coils • Put at first place of heat air • Stand highest temperatur e RESEACH ABOUT PLATEN SH SLEEVE SET PLATEN SH DETAIL CONNECTOR MANUFACTURING PROCESS ISSUE ON MANUFACTURE Marking to assemble Sleeve - Waste of time - Incorrect Curvature after welding tip-membrane Reason: Material is softer at hight temperature, and the constriction when it get cold down Miss position because of heat-constriction Reason: The heat-constriction when material get cold down INNOVATION METHOD JIG FOR ASSEMBLE SLEEVE INNOVATION METHOD JIG FOR ASSEMBLE SLEEVE Clear size error Save MH / set 24MH/unit Shorten the work progress More professional INNOVATION METHOD DESIGN SUPPORT BEAM FOR WELDING TIP MEMBRANE 10 INNOVATION METHOD DESIGN SUPPORT BEAM FOR WELDING TIP MEMBRANE Reduce curvature after welding More favorable to workers 11 INNOVATION METHOD INNOVATE THE MANUFACTURING PROCESS PRESENT INNOVATION METHOD INNOVATION METHOD INNOVATE THE MANUFACTURING PROCESS 01 More accurate product 02 set: before: workers x days after: workers x 2.5 days Save 80,75 MH/set 1938 MH/unit 03 Shorten the work progress 13 THE END THANK YOU FOR WATCHING 14 .. .Mini Project Description Subject Target As-is (Issue) Period Participant • Reseach and innovate the