TẬP 2: BÁO CÁO KHẢO SÁT ĐỊA CHẤT KHẢO SÁT, THIẾT KẾ KỸ THUẬT CHI TIẾT, LẬP HỒ SƠ MỜI THẦU VÀ ĐÁNH GIÁ HỒ SƠ DỰ THẦU CHO CÁC HẠNG MỤC XÂY LẮP CỦA GIAI ĐOẠN 2 VÀ PHẦN VIỆC CÒN LẠI CỦA GI
Trang 1CLIENT: MEKONG DELTA REGION URBAN UPGRADING PROJECT MANAGEMENT UNIT
CAN THO CITY SUB-PROJECT
Project: MEKONG DELTA REGION URBAN UPGRADING
CAN THO CITY SUB-PROJECT
Package No CT-CS-4.15C: SURVEY, DETAILED ENGINEERING DESIGN, PREPARATION OF BIDDING DOCUMENTS AND EVALUATION OF BIDS UNDER COMPONENT 2 AND REMAINING WORKS OF COMPONENT 1 (LIA 4, 5)
VOLUME 2:
REPORT OF SOIL INVESTIGATION
ITEM 2.1: NGONG CANAL
SUBMITTED: JOINT VENTURE OF KUNHWA ENGINEERING & CONSULTING CO.,LTD WITH SUNJIN ENGINEERING & ARCHITECTURE CO.,LTD
AND JINWOO ENGINEERING CO.,LTD
Add: 5 Floor Nam Minh Long Building 61A-63A Vo Van Tan Street, Ward 6, District 3, HCM City
Tel: (08) 5449 5446 Fax: (08) 5449 5448
Trang 2VOLUME 2: REPORT OF SOIL INVESTIGATION
ITEM 2.1: NGONG CANAL
MEKONG DELTA REGION URBAN UPGRADING PROJECT
CAN THO CITY SUB-PROJECT
PACKAGE No 4-15C: SURVEY, DETAILED ENGINEERING DESIGN, PREPARATION OF BIDDING DOCUMENTS & EVALUATION OF BIDS UNDER
COMPONENT 2 & REMAINING WORKS OF COMPONENT 1
Manager of Topographic Survey: Nguyen Minh Chau Khanh
CLIENT: MEKONG DELTA REGION URBAN UPGRADING PROJECT
MANAGEMENT UNIT CAN THO CITY SUB-PROJECT
CONSULTANT: JOINT VENTURE OF KUNHWA ENGINEERING &
CONSULTING CO.,LTD WITH SUNJIN ENGINEERING & ARCHITECTURE
CO.,LTD AND JINWOO ENGINEERING CO.,LTD
Aug-2014
Trang 3STRUCTURE OF SURVEY REPORT
1) VOLUME 1: REPORT OF TOPOGRAPHICAL SURVEY
- APPENDIX 1.1: DRAWING OF TOPOGRAPHICAL SURVEY
- APPENDIX 1.2: ADJUSTMENT RESULT OF COORDINATE & ELEVATION
- APPENDIX 1.3: LOCATION MINUTE OF GPS & TRAVERSE CLASS 2
- APPENDIX 1.4: COLLECTED HYDROLOGY DATA
- APPENDIX 1.5: MEASURED DATA OF COORDINATE AND ELEVATION
2) VOLUME 2: REPORT OF SOIL INVESTIGATION
- ITEM 2.1: NGONG CANAL
- ITEM 2.2: SAO CANAL
- ITEM 2.3: SOUTH CANAL
- ITEM 2.4: BUN XANG LAKE, BRIDGES, SPILLWAYS & PUMPING
STATION
- ITEM 2.5: BUN XANG DRAINAGE BASIN
- ITEM 2.6: LIA4 AND LIA5
Trang 4INDEX
I APPROACH
1 LEGAL BASIS
2 APPLIED STANDARDS AND SPECIFICATIONS
1 GENERAL INTRODUCTION
2 SCOPE OF SOIL INVESTIGATION
3 PURPOSE AND TASK OF SOIL INVESTIGATION
4 CONTENT OF SOIL INVESTIGATION
4.1 DETERMINE COORDINATE & ELEVATION OF BHs
4.2 DRILLING WORK AND SAMPLING
4.3 TESTING
4.3.1 INSITU TEST 4.3.2 LABORATORY TEST 4.4 QUANTITY OF SURVEY
4.5 REPORT OF SOIL INVESTIGATION
4.5.1 TOPOGRAPHICAL FEATURE 4.5.2 HYDROLOGICAL FEATURE 4.5.3 GEOLIGICAL FEATURE 4.5.4 MECHANICAL & PHYSICAL PROPERTIES OF SOILS 4.5.5 CONCLUSION AND RECOMMENDATION
4.5.6 APPENDIX
Trang 5Package No.CT-CS-4.15C: Survey, Detailed Engineering Design, Preparation of Bidding Documents and Evaluation of Bids under Component 2 and Remaining works of Component 1
Report of soil ivestigation in Ngong Canal Page 1
MEKONG DELTA REGION URBAN UPGRADING PROJECT
CAN THO CITY SUB-PROJECT
PACKAGE No 4.15C: SURVEY, DETAILED ENGINEERING DESIGN, PREPARATION
OF BIDDING DOCUMENTS AND EVALUATION OF BIDS UNDER COMPONENT 2
AND REMAINING WORKS OF COMPONENT 1
VOLUME 2: REPORT OF INVESTIGATION
ITEM 2.1: NGONG CANAL Location: Xuan Khanh Ward, Ninh Kieu District, Can Tho City
- Decree No 112/2009/NĐ-CP dated 14 December 2009 of Government with respect to Cost Management of Construction Investment;
- Circular No 04/2010/TT-BXD dated 26 May 2010 of Ministry of Construction regarding Instruction of Carrying out and Management of Construction Investment Cost;
- Decree No 15/2013/NĐ-CP dated 06 February 2013 of Government with respect to Quality Management of Construction;
Trang 6Package No.CT-CS-4.15C: Survey, Detailed Engineering Design, Preparation of Bidding Documents and Evaluation of Bids under Component 2 and Remaining works of Component 1
Report of soil ivestigation in Ngong Canal Page 2
- Decree No 85/2009/NĐ-CP dated 15 October 2009 of Government with respect to Instruction of Bidding Law and Contractor Selection following Construction Law;
- Decree No 68/2012/NĐ-CP dated 12 September 2012 of Government with respect to Revising and Supplementing some articles of Decree No 85/2009/NĐ-CP dated 15th October 2009;
- Decision No 957/QĐ-BXD dated 29 September 2009 of Ministry of Construction regarding Informing Norm of Project Management and Construction Investment Consultancy;
- Circular No 05/2011/TT-BXD dated 9 June 2011 of Ministry of Construction regarding Stipulation of Checking, Appraisal and Acceptance Topographic Survey for Scheme and Design;
- Notice No 30/SXD-KTXD dated 11 January 2012 of Can Tho City Department of Construction regarding Informing Norm of Construction in Can Tho City – Survey Work;
- Contract No 03/NCDT/2014 date 29-April-2014 of Package No.CT-CS-4.15C:
“Survey, Detailed Engineering Design, Preparation of Bidding Documents and Evaluation of Bids under Component 2 and Remaining works of Component 1” in Mekong Delta Region Urban Upgrading – Can Tho City Sub-Project between Mekong Delta Region Urban Upgrading Project Management Unit - Can Tho city Sub-Project (CTPMU) and Kunhwa Engineering and Consulting Co.,Ltd in joint venture with Sunjin Engineering & Architecture Co.,Ltd and Jinwoo Engineering Co.,Ltd;
- Result of soil investigation on site.
2 Applied standards and specifications
- Construction engineering survey – Basic principles : TCVN 4419 – 1987;
- Procedure of Exploratory boring for geological
engineering investigation : 22 TCN 259 – 2000;
- Standard of road engineering survey : 22 TCN 263 – 2000;
- Standard of road embankment survey and design on soft soil : 22 TCN 262 – 2000;
- Procedure of soil investigation for waterway projects : 22 TCN 260 – 2000;
Trang 7Package No.CT-CS-4.15C: Survey, Detailed Engineering Design, Preparation of Bidding Documents and Evaluation of Bids under Component 2 and Remaining works of Component 1
Report of soil ivestigation in Ngong Canal Page 3
- Volume of soil investigation in irrigational works : 14 TCN 195 – 2006;
- Construction Soil – Sampling and storage methods : TCVN 2683 – 2012;
- Standard penetration test (SPT) : TCVN 9351 – 2012;
- Field vane shear test (VST) : 22 TCN 355 – 2006;
- Density test : TCVN 4202 – 2012;
- Specific gravity test : TCVN 4195 – 2012;
- Natural moisture content test : TCVN 4196 – 2012;
- Atterberg Limits test : TCVN 4197 – 2012;
- Grain size analysis test : TCVN 4198 – 2012;
- Direct shear test : TCVN 4199 – 2012;
- Compressibility test : TCVN 4200 – 2012;
- Standard test method for one dimensional consolidation properties of soils (Cv)
: ASTM D2435;
- Standard test method for unconsolidated undrained triaxial compression test on
cohensive soils (UU) : ASTM D2850;
- Standard test method for consolidated undrained triaxial compression test on cohensive
- Unconfined compression test (Qu) : ASTM D2166;
- Concrete corrosion of water test : TCVN 3994:1985;
- Soils – Laboratory methods of determination of permeability coefficent
: TCVN 3994:1985;
- National technical regulation on the allowable limits of heavy metals in the soil
: QCVN 03:2008/BTNMT;
- Other current Vietnamese standards
II SOIL INVESTIGATION
1 General introduction
- Project: Mekong Delta Region Urban Upgrading – Can Tho City Sub-Project
Trang 8Package No.CT-CS-4.15C: Survey, Detailed Engineering Design, Preparation of Bidding Documents and Evaluation of Bids under Component 2 and Remaining works of Component 1
Report of soil ivestigation in Ngong Canal Page 4
- Location: Can Tho City
- Item: Ngong Canal in Xuan Khanh Ward, Ninh Kieu District, Can Tho City
- The Client: Mekong Delta Region Urban Upgrading Project Management Unit - Can Tho city Sub-Project
- Consultant: Kunhwa Engineering and Consulting Co.,Ltd in joint venture with Sunjin Engineering & Architecture Co.,Ltd and Jinwoo Engineering Co.,Ltd
2 Scope of soil investigation
- Ngong Canal: Start point connect to Rach Ngong 2 bridge and end point connect to Bun Xang lake in Xuan Khanh Ward, Ninh Kieu District Length is about 900m
3 Purpose and task of soil investigation
- Supplying the necessary geological data to serve detailed engineering design
- Carrying out drilling work, field tests, laboratory tests in order to:
+ Clarifying the structure of soil strata at project site
+ Determining distribution rule, soil thickness at project site, especially soil layers + Determining mechanical & physical properties of soil
+ Determining concrete corrosion property of ground water
4 Content of soil investigation
- Consultant carried out soil investigation on site from 19th June 2014 to 02nd July 2014 under supervision of the Client The soil investigation report has been finished on 15thAugust 2014 with the contents as follows:
4.1 Determine coordinate & elevation of boreholes
- Location of boreholes on site are determine by total station Leica TCR802 They are determined base on the basic benchmarks in the project area (VN2000 system)
- Elevation of boreholes are determined by levelling machine Geomax ZDL700 They are determined base on the basic benchmarks in the project area (Hon Dau system)
4.2 Drilling work and sampling
- Site preparation: After determining the borehole location, conduct to clear the site and
install the construction fence for drilling
Trang 9Package No.CT-CS-4.15C: Survey, Detailed Engineering Design, Preparation of Bidding Documents and Evaluation of Bids under Component 2 and Remaining works of Component 1
Report of soil ivestigation in Ngong Canal Page 5
- Equipment: Using 01 drillling rigs XY-1, maximum depth is 100m
- Implementation method: Drilling work is implemented by spudding bit and washing
pumped circulately by bentonite solution, minimum diameter of the borehole is 91mm Bentonite solution is used to stabilize borehole wall and to clean borehole bottom before taking samples and implementing SPT With boreholes under water: Drilling rig will be put on the floating system and casing will be used in this case to prevent water
- Quantity of boreholes: See table 1 for details
- Drilling depth: See table 1 for details
- Taking samples: Drill to the proposed depth, stop drilling, wash the borehole bottom
for cleaning and then take the samples
- Sampling interval: Taking samples along the depth of borehole 2m interval average,
with the thin soil layer taking at least 01 sample
- Storage: Obtained samples must be descripted, labeled and sealed by plastic band or
paraffin Finally, they are maintained in the sampling box Samples are kept in the shade place and transferred to laboratory office for testing
- Borehole record: Drilling team have to record all information relevant to boreholes
such as boring log, description of soil, soil boundary, sample label, sample depth, SPT, water level, starting day, finished day These records will be transfred to lab office
- Site diary: Drilling team have to record operation activities every day from start to the
end such as day of machine mobilization, day of start & finish borehole, activities during drilling operation,… Site diary must be certified by Client or The Engineer every day
4.3 Testing
4.3.1 Insitu test
4.3.1.1 Standard penetration test (SPT)
- Purpose: To define strata boundary, state of cohesion soil, density of cohesionless soil
and bearing capacity of the subsoil in natural condition
- Equipment: A 63.5 kg free-fall hammer, direction rods and split spoon
- Testing method: When the testing proposal depth was reached, it is necessary to clean
the borehole bottom, then SPT equipment is set up for executing the test: free fall height
Trang 10Package No.CT-CS-4.15C: Survey, Detailed Engineering Design, Preparation of Bidding Documents and Evaluation of Bids under Component 2 and Remaining works of Component 1
Report of soil ivestigation in Ngong Canal Page 6
of 76cm for driving SPT split spoon into borehole bottom 45cm, counting each 15cm and recording Total of 30cm last will be counted as N-value(N30)
- Testing interval: 2m/nos
4.3.1.2 Vane shear test (VST)
- Purpose: To define natural shear strength of soil Su and sensitivity
- Equipment: Model LPC (France) which has some technical parameters as follows:
+ Capacity of measured box of force couple is 8 Kgm (80 Nm) Maximum shear strenth value can be meausred: 96 KN/m2 with D=60mm; 60 KN/m2 with D=70mm; 20 KN/m2 with D=100mm
+ Length of rod system is 1000mm
+ Hydraulic compression equipment is used to press rod system and shear vane to proposed depth
- Testing method: Shear vane is pressed to proposed depth by using hydraulic
compression machine Bitafonsa (France), fixing protective rod to machine frame and then installing measured box of force couple and protective rod Test is conducted fast with rotary speed of shear vane of 30/10 second, data will be recorded continuously every 10 second reaching maximum value plus measured data of 3 following times Test will be carryied out in natural and destructive condition
- Testing depth: 14m from existing surface
- Testing interval: 2m/nos
- Quantity of boreholes: See table 1 for details.
4.3.1.3 Water table monitoring
- Method: Water table will be recorded 24 hour after finishing
4.3.2 Laboratory test
4.3.2.1 Test of mechanical & physical soil properties
- Laboratory tests are conducted as follows:
Trang 11Package No.CT-CS-4.15C: Survey, Detailed Engineering Design, Preparation of Bidding Documents and Evaluation of Bids under Component 2 and Remaining works of Component 1
Report of soil ivestigation in Ngong Canal Page 7
A Physical properties
1 Grain size analysis test
2 Atterberg Limits test
3 Natural moisture content test
4 Specific gravity test
5 Natural density test
LABORATORY
TESTS
B Mechanical properties
1 Direct shear test
2 Consolidation test (Cv)
3 Unconsolidated undrained triaxial compression test (UU)
- Undisturbed samples (mechanical & physical properties):
+ Grain size analysis (P)
+ Natural moisture content (Wtn)
Trang 12Package No.CT-CS-4.15C: Survey, Detailed Engineering Design, Preparation of Bidding Documents and
Evaluation of Bids under Component 2 and Remaining works of Component 1
Report of soil ivestigation in Ngong Canal Page 8
4.3.2.2 Test of determining chemical properties of ground water:
- Test of determining chemical properties of ground water is implemented in accordance
with standard TCVN 3994:1985
4.3.2.3 Test of determining chemical properties of soil:
- Test of determining chemical properties of soil is implemented in accordance with
& physical properties
Consolidation test Cv
Triaxial compression test (UU)
Concrete corrosion
of water test
Chemical properties
Trang 13Package No.CT-CS-4.15C: Survey, Detailed Engineering Design, Preparation of Bidding Documents and Evaluation of Bids under Component 2 and Remaining works of Component 1
Report of soil ivestigation in Ngong Canal Page 9
4.5 Report of soil investigation
as follows:
1 Layer Đ: Backfill soil: The thickness is from 0.5 m (BH13) to 1.2m (BH17) No
sampling in this layer
SPT
Depth of top layer (m)
2 Layer 1: (CH/CL) Fat clay with organic somewhere with sand, greenish grey –
blackish grey, very soft - soft The thickness is from 26.1m (BH15) to 32.5m (BH13) SPT value: N30 is from 0 to 5 blows
Trang 14Package No.CT-CS-4.15C: Survey, Detailed Engineering Design, Preparation of Bidding Documents and Evaluation of Bids under Component 2 and Remaining works of Component 1
Report of soil ivestigation in Ngong Canal Page 10
SPT
Depth of top layer (m)
3 Layer 2: (CL) Lean clay with sand, greenish grey, firm This layer is only present
in BH13 and BH14, the thickness is from 1.6m (BH13) to 2.3m (BH14) SPT value: N30 is from 5 to 7 blows
SPT
Depth of top layer (m)
Thichness
4 Layer 3: (SC-SM)/SC Silty – Clayey sand, yellowish brown, medium dense This
layer is only present in BH15 and BH17, the thickness is from 1.2m (BH17) to 7.4m (BH15) SPT value: N30 is from 11 to 25 blows
SPT
Depth of top layer (m)
Thichness
Trang 15Package No.CT-CS-4.15C: Survey, Detailed Engineering Design, Preparation of Bidding Documents and Evaluation of Bids under Component 2 and Remaining works of Component 1
Report of soil ivestigation in Ngong Canal Page 11
5 Layer 4: S(CL) Lean clay, yellowish brown – reddishbrown, stiff The thickness is
from 2.4m (BH13) to 4.0m (BH17) and not finish at the bottom of borehole SPT value:
N30 is from 10 to 33 blows
SPT
Depth of top layer (m)
6 Layer 5: S(CL) Lean clay with sand,yellowish brown - reddish brown, stiff This
layer is only present in BH13 and BH17 The thickness is from 3.0m (BH17) , 3.0m (BH13) and not finish at the bottom of borehole SPT value: N30 is from 18 to 33 blows
SPT
Depth of top layer
Trang 16Package No.CT-CS-4.15C: Survey, Detailed Engineering Design, Preparation of Bidding Documents and Evaluation of Bids under Component 2 and Remaining works of Component 1
Report of soil ivestigation in Ngong Canal Page 12
4.5.4 Mechanical & physical properties of soils
Table 2
Layer name
Layer name
Layer name
Layer name
Layer name Layer Layer Layer Layer Layer
- Liquid limit % 56.0 45.3 27.7 41.4 35.3
- Plastic limit % 29.5 24.5 18.4 20.4 20.1
- Plasticity index 26.6 20.8 9.3 21.1 15.2
- Liquidility index B 1.10 0.67 0.40 0.28 0.38 + Cohesions Ctc kg/cm2 0.082 0.166 0.105 0.354 0.271 + Angle of internal friction ϕtc degree 3026’ 7053’ 22052’ 13010’ 16025’ + Compressibility coefficient a
1-2 kg/cm2 0.159 0.064 0.024 0.022 0.022
4.5.5 Conclusion and recommendation
- Base on the field investigation and laboratory test, there are some recommendation as follows: The layer No 1,2 is soft soil thus they are not suitable for foundation
- However, depending on the project items that have the choice of foundation solutions and foundation treatment methods to ensure the stability and economy
Trang 17Package No.CT-CS-4.15C: Survey, Detailed Engineering Design, Preparation of Bidding Documents and Evaluation of Bids under Component 2 and Remaining works of Component 1
Report of soil ivestigation in Ngong Canal Page 13
4.5.6 Appendix
- Borehole plan
- Boring log
- Soil profile
- Summary of soil test result
- Statistics of soil layers test result
- Triaxial test result (UU)
- Consolidation test result (Cv)
- Vane shear test result
- 9 mechanical and physical test result
- Concrete corrosion test of water result
- Chemical properties test of soil result
Trang 18CHỦ ĐẦU TƯ: BAN QUẢN LÝ DỰ ÁN NÂNG CẤP
ĐÔ THỊ VÙNG ĐỒNG BẰNG SÔNG CỬU LONG –
TIỂU DỰ ÁN THÀNH PHỐ CẦN THƠ
Dự án: NÂNG CẤP ĐÔ THỊ VÙNG ĐỒNG BẰNG SÔNG CỬU LONG – TIỂU DỰ ÁN THÀNH PHỐ CẦN THƠ
Gói thầu CT-CS-4.15C: KHẢO SÁT, THIẾT KẾ KỸ THUẬT CHI TIẾT, LẬP HỒ
SƠ MỜI THẦU VÀ ĐÁNH GIÁ HỒ SƠ DỰ THẦU CHO CÁC HẠNG MỤC XÂY LẮP CỦA GIAI ĐOẠN 2
VÀ PHẦN VIỆC CÒN LẠI CỦA GIAI ĐOẠN 1
TẬP 2: BÁO CÁO KHẢO SÁT ĐỊA CHẤT
PHẦN 2.1: KHU VỰC RẠCH NGỖNG
ĐỆ TRÌNH BỞI: LIÊN DANH CÔNG TY TNHH KUNHWA ENGINEERING & CONSULTING - SUNJIN ENGINEERING & ARCHITECTURE
VÀ JINWOO ENGINEERING
Địa chỉ: Lầu 5 Tòa nhà Nam Minh Long 61A-63A Võ Văn Tần, Phường 6, Quận 3, Tp HCM
Tel: (08) 5449 5446 Fax: (08) 5449 5448
Trang 19TẬP 2: BÁO CÁO KHẢO SÁT ĐỊA CHẤT
KHẢO SÁT, THIẾT KẾ KỸ THUẬT CHI TIẾT, LẬP HỒ
SƠ MỜI THẦU VÀ ĐÁNH GIÁ HỒ SƠ DỰ THẦU CHO CÁC HẠNG MỤC XÂY LẮP CỦA GIAI ĐOẠN 2
VÀ PHẦN VIỆC CÒN LẠI CỦA GIAI ĐOẠN 1
Chủ trì khảo sát địa hình: ThS Nguyễn Minh Châu Khanh Chủ trì khảo sát địa chất: Ks Nguyễn Trung Cần
CỬU LONG – TIỂU DỰ ÁN THÀNH PHỐ CẦN THƠ
CONSULTING – CÔNG TY TNHH SUNJIN ENGINEERING & ARCHITECTURE VÀ
CÔNG TY TNHH JINWOO ENGINEERING
Tháng 08-2014
Trang 20CẤU TRÚC BÁO CÁO KHẢO SÁT
1) TẬP 1: BÁO CÁO KHẢO SÁT ĐỊA HÌNH
- PHỤ LỤC 1.1: BẢN VẼ KHẢO SÁT ĐỊA HÌNH
- PHỤ LỤC 1.2: KẾT QUẢ ĐO LƯỚI KHỐNG CHẾ MẶT BẰNG & ĐỘ CAO
- PHỤ LỤC 1.3: GHI CHÚ ĐIỂM GPS VÀ ĐƯỜNG CHUYỀN CẤP 2
- PHỤ LỤC 1.4: SỐ LIỆU THỦY VĂN (MỰC NƯỚC THU THẬP)
- PHỤ LỤC 1.5: SỐ LIỆU ĐO HIỆN TRƯỜNG LƯỚI TỌA ĐỘ VÀ CAO ĐỘ 2) TẬP 2: BÁO CÁO KHẢO SÁT ĐỊA CHẤT
- PHẦN 2.1: KHU VỰC RẠCH NGỖNG
- PHẦN 2.2: KHU VỰC RẠCH SAO
- PHẦN 2.3: KHU VỰC RẠCH PHÍA NAM
- PHẦN 2.4: KHU VỰC HỒ BÚN XÁNG, CẦU, ĐẬP TRÀN VÀ TRẠM BƠM
- PHẦN 2.5: KHU VỰC LƯU VỰC THOÁT NƯỚC BÚN XÁNG
- PHẦN 2.6: KHU VỰC LIA4 VÀ LIA5
Trang 21MỤC LỤC
I MỞ ĐẦU
1 CĂN CỨ PHÁP LÝ
2 QUY TRÌNH QUY PHẠM ÁP DỤNG
II CÔNG TÁC KHẢO SÁT ĐỊA CHẤT
1 GIỚI THIỆU CHUNG
2 PHẠM VI KHẢO SÁT ĐỊA CHẤT
3 MỤC ĐÍCH VÀ NHIỆM VỤ CÔNG TÁC KHẢO SÁT ĐỊA CHẤT
4 NỘI DUNG CÔNG TÁC KHẢO SÁT ĐỊA CHẤT
4.1 XÁC ĐỊNH TỌA ĐỘ VÀ CAO ĐỘ HỐ KHOAN
4.2 CÔNG TÁC KHOAN VÀ LẤY MẪU
4.3 CÔNG TÁC THÍ NGHIỆM
4.3.1 THÍ NGHIỆM HIỆN TRƯỜNG 4.3.2 THÍ NGHIỆM TRONG PHÒNG 4.4 KHỐI LƯỢNG KHẢO SÁT
4.5 BÁO CÁO KHẢO SÁT ĐỊA CHẤT
4.5.1 ĐẶC ĐIỂM CHUNG VỀ ĐỊA HÌNH 4.5.2 ĐẶC ĐIỂM ĐỊA CHẤT THỦY VĂN 4.5.3 ĐẶC ĐIỂM ĐỊA CHẤT CÔNG TRÌNH 4.5.4 CHỈ TIÊU CƠ LÝ CÁC LỚP ĐẤT 4.5.5 KẾT LUẬN VÀ KIẾN NGHỊ
4.5.6 PHỤ LỤC
Trang 22Gói thầu CT-CS-4.15C: Khảo sát, thiết kế kỹ thuật chi tiết, lập hồ sơ mời thầu và đánh giá hồ sơ dự thầu cho các hạng mục xây lắp của giai đoạn 2 và phần việc còn lại của giai đoạn 1
Báo cáo khảo sát địa chất khu vực Rạch Ngỗng Trang 1
DỰ ÁN NÂNG CẤP ĐÔ THỊ VÙNG ĐỒNG BẰNG SÔNG CỬU LONG
TIỂU DỰ ÁN THÀNH PHỐ CẦN THƠ
GÓI THẦU CT-CS-4.15C: KHẢO SÁT, THIẾT KẾ KỸ THUẬT CHI TIẾT, LẬP HỒ
SƠ MỜI THẦU VÀ ĐÁNH GIÁ HỒ SƠ DỰ THẦU CHO CÁC HẠNG MỤC XÂY LẮP CỦA
GIAI ĐOẠN 2 VÀ PHẦN VIỆC CÒN LẠI CỦA GIAI ĐOẠN 1
TẬP 2: BÁO CÁO KHẢO SÁT ĐỊA CHẤT
PHẦN 2.1: KHU VỰC RẠCH NGỖNG Địa điểm: Phường Xuân Khánh, Quận Ninh Kiều, Tp Cần Thơ
I MỞ ĐẦU
1 Căn cứ pháp lý
- Luật Xây dựng số 16/2003/QH11 ngày 26/11/2003 của Quốc Hội;
- Luật đấu thầu số 61/2005/QH11 ngày 29/11/2005 của Quốc Hội;
- Căn cứ Nghị định số 12/2009/NĐ-CP ngày 12 tháng 02 năm 2009 của Chính phủ về quản lý dự án đầu tư xây dựng công trình;
- Căn cứ Nghị định số 83/2009/NĐ-CP ngày 15 tháng 10 năm 2009 của Chính phủ về sửa đổi, bổ sung một số điều của Nghị định số 12/2009/NĐ-CP;
- Thông tư số 03/2009/TT-BXD ngày 26/3/2009 của Bộ Xây dựng quy định chi tiết một
số nội dung của Nghị định số 12/2009 ngày 12/02/2009 của Chính phủ về Quản lý dự án đầu tư xây dựng công trình;
- Căn cứ nghị định 112/2009/NĐ-CP ngày 14/12/2009 của Chính phủ về quản lý chi phí đầu tư xây dựng công trình;
- Thông tư 04/2010/TT-BXD ngày 26/05/2010 của Bộ Xây Dựng hướng dẫn việc lập và Quản lý chi phí dựán đầu tư xây dựng công trình;
- Căn cứ Nghị định số 15/2013/NĐ-CP của Chính phủ ngày 06 tháng 02 năm 2013 về quản lý chất lượng công trình xây dựng;
- Nghị định số 85/2009/NĐ-CP ngày 15/10/2009 của Chính phủ v/v hướng dẫn thi hành Luật Đấu thầu và lựa chọn nhà thầu xây dựng theo Luật Xây dựng;
Trang 23Gói thầu CT-CS-4.15C: Khảo sát, thiết kế kỹ thuật chi tiết, lập hồ sơ mời thầu và đánh giá hồ sơ dự thầu cho các hạng mục xây lắp của giai đoạn 2 và phần việc còn lại của giai đoạn 1
Báo cáo khảo sát địa chất khu vực Rạch Ngỗng Trang 2
- Căn cứ nghị định số 68/2012/NĐ-CP ngày 12 tháng 09 năm 2012 của Chính phủ về sửa đổi, bổ sung một số điều của Nghị định số 85/2009/NĐ-CP ngày 15 tháng 10 năm 2009;
- Quyết định số 957/QĐ-BXĐ ngày 29/9/2009 của Bộ Xây dựng về việc công bố Định mức chi phí quản lý dự án và đầu tư xây dựng công trình;
- Thông tư 05/2011/TT-BXD ngày 9 tháng 6 năm 2011 của Bộ Xây Dựng về việc quy định việc kiểm tra, thẩm định và nghiệm thu công tác khảo sát lập bản đồ địa hình phục
vụ quy hoạch và thiết kế xây dựng;
- Văn bản số 30/SXD-KTXD ngày 11/01/2012 của Sở Xây dựng thành phố Cần Thơ về việc công bố đơn giá xây dựng công trình trên địa bàn Thành phố Cần Thơ - Phần khảo sát xây dựng;
- Hợp đồng dịch vụ tư vấn số 03/NCDT/2014 ngày 29-04-2014 cho gói thầu 4.15C “Khảo sát, thiết kế kỹ thuật chi tiết, lập hồ sơ mời thầu và đánh giá hồ sơ dự thầu cho các hạng mục xây lắp của giai đoạn 2 và phần việc còn lại của giai đoạn 1” thuộc
CT-CS-Dự án nâng cấp đô thị vùng đồng bằng sông Cửu Long – Tiểu dự án Thành phố Cần Thơ giữa Ban quản lý dự án Nâng cấp đô thị vùng đồng bằng sông Cửu Long - Tiểu dự án Thành phố Cần Thơ và Liên danh Kunhwa Engineering and Consulting Co.,Ltd – Sunjin Engineering & Architecture Co.,Ltd – Jinwoo Engineering Co.,Ltd;
- Kết quả khảo sát địa chất hiện trường
2 Quy trình, quy phạm áp dụng
- Khảo sát Xây dựng - Nguyên tắc cơ bản : TCVN 4419 – 1987;
- Qui trình khoan thăm dò địa chất công trình : 22 TCN 259 – 2000;
- Qui trình khảo sát đường ô tô : 22 TCN 263 – 2000;
- Qui trình khảo sát thiết kế nền đường ô tô đắp trên đất yếu : 22 TCN 262 – 2000;
- Quy trình khảo sát địa chất công trình đường thủy : 22 TCN 260 – 2000;
- Thành phần, khối lượng khảo sát địa chất trong các giai đoạn lập dự án và thiết kế công trình thủy lợi : 14 TCN 195 – 2006;
- Đất xây dựng - Phương pháp lấy mẫu và bảo quản mẫu : TCVN 2683 – 2012;
- Thí nghiệm xuyên tiêu chuẩn (SPT) : TCVN 9351 – 2012;
- Thí nghiệm cắt cánh (VST) : 22 TCN 355 – 2006;
Trang 24Gói thầu CT-CS-4.15C: Khảo sát, thiết kế kỹ thuật chi tiết, lập hồ sơ mời thầu và đánh giá hồ sơ dự thầu cho các hạng mục xây lắp của giai đoạn 2 và phần việc còn lại của giai đoạn 1
Báo cáo khảo sát địa chất khu vực Rạch Ngỗng Trang 3
- Thí nghiệm nén ba trục sơ đồ UU : ASTM D2850;
- Thí nghiệm nén ba trục sơ đồ CU : ASTM D4767;
- Thí nghiệm nén nở hông (Qu) : ASTM D2166;
- Thí nghiệm mẫu nước ăn mòn bêtông : TCVN 3994:1985;
- Đất xây dựng công trình thủy lợi – Phương pháp xác định hệ số thấm trong phòng
: 14 TCN 139:2005;
- Quy chuẩn kỹ thuật quốc gia về giới hạn cho phép của kim loại nặng trong đất
: QCVN 03:2008/BTNMT;
- Và những tiêu chuẩn Việt Nam hiện hành khác
II CÔNG TÁC KHẢO SÁT ĐỊA CHẤT
1 Giới thiệu chung
- Tên dự án: Dự án nâng cấp đô thị vùng đồng bằng sông Cửu Long – Tiểu dự án Thành phố Cần Thơ
- Địa điểm: Tp Cần Thơ
- Hạng mục: Rạch Ngỗng tại Phường Xuân Khánh, Quận Ninh Kiều, Tp Cần Thơ
- Chủ đầu tư: Ban quản lý dự án Nâng cấp đô thị vùng đồng bằng sông Cửu Long - Tiểu
dự án Thành phố Cần Thơ
- Đơn vị Tư vấn: Liên danh Kunhwa Engineering and Consulting Co.,Ltd – Sunjin Engineering & Architecture Co.,Ltd – Jinwoo Engineering Co.,Ltd Sau đây gọi tắt là liên danh Tư vấn
Trang 25Gói thầu CT-CS-4.15C: Khảo sát, thiết kế kỹ thuật chi tiết, lập hồ sơ mời thầu và đánh giá hồ sơ dự thầu cho các hạng mục xây lắp của giai đoạn 2 và phần việc còn lại của giai đoạn 1
Báo cáo khảo sát địa chất khu vực Rạch Ngỗng Trang 4
2 Phạm vi khảo sát địa chất
- Rạch Ngỗng: Điểm đầu giao với cầu Rạch Ngỗng 2 điểm cuối giao với Hồ Bún Xáng thuộc phường Xuân Khánh, quận Ninh Kiều Chiều dài rạch khoảng 900m
3 Mục đích và nhiệm vụ công tác khảo sát địa chất
- Cung cấp các dữ liệu địa chất cần thiết nhằm phục vụ cho công tác thiết kế chi tiết
- Thực hiện công tác khoan, thí nghiệm hiện trường và thí nghiệm trong phòng nhằm mục đích:
+ Làm sáng tỏ cấu trúc nền thiên nhiên tại vị trí dự kiến xây dựng công trình
+ Xác định quy luật phân bố, chiều dày của các lớp đất đá trong phạm vi dự kiến xây dựng, đặc biệt là lớp sẽ dự kiến đặt móng của công trình
+ Xác định các chỉ tiêu cơ lý của các lớp đất đá phục vụ thiết kế nền móng công trình
+ Xác định tính chất ăn mòn bêtông của nước dưới đất
4 Nội dung công tác khảo sát địa chất
- Liên danh Tư vấn đã tiến hành công tác khảo sát hiện trường từ ngày 19/06/2014 đến ngày 02/07/2014 dưới sự giám sát của đại diện Chủ đầu tư Công tác thí nghiệm và lập báo cáo được hoàn thành vào ngày 15/08/2014, với các nội dung chính như sau:
4.1 Xác định tọa độ và cao độ hố khoan
- Công tác định vị hố khoan được thực hiện bằng máy toàn đạc điện tử Leica TCR802 Tọa độ các hố khoan được xác định dựa vào tọa độ của các mốc chuẩn của dự án (hệ tọa
độ VN2000)
- Công tác xác định cao độ các hố khoan được thực hiện bằng máy thủy bình Geomax ZDL700 Cao độ các hố khoan được xác định dựa vào cao độ của các mốc chuẩn của dự
án (hệ cao độ Hòn Dấu)
4.2 Công tác khoan và lấy mẫu
- Chuẩn bị mặt bằng hố khoan: Sau khi định vị vị trí hố khoan, tiến hành dọn dẹp mặt
để phục vụ công tác thi công
- Thiết bị: Huy động 01 máy khoan XJ-100
Trang 26Gói thầu CT-CS-4.15C: Khảo sát, thiết kế kỹ thuật chi tiết, lập hồ sơ mời thầu và đánh giá hồ sơ dự thầu cho các hạng mục xây lắp của giai đoạn 2 và phần việc còn lại của giai đoạn 1
Báo cáo khảo sát địa chất khu vực Rạch Ngỗng Trang 5
- Phương pháp tiến hành: Phương pháp khoan bằng ống khoan bơm rửa tuần hoàn
bằng dung dịch bentonite, đường kính hố khoan 110mm Dung dịch sét bentonite được
sử dụng trong quá trình khoan để ổn định vách lỗ khoan và làm sạch đáy hố khoan trước khi lấy mẫu cơ lý và thí nghiệm xuyên động tiêu chuẩn (SPT) Với những hố khoan dưới nước: dàn khoan sẽ được đặt trên hệ phao nổi và sử dụng hệ thống ống chống để ngăn nước
- Số lượng hố khoan: Xem trong bảng 1
- Độ sâu khoan: Xem trong bảng 1
- Lấy mẫu: Khi khoan đến độ sâu cần lấy mẫu thì dừng khoan cho thổi rửa sạch đáy hố
khoan và tiến hành lấy mẫu
- Khoảng cách lấy mẫu: Lấy mẫu dọc theo chiều sâu hố khoan khoảng 2m lấy 01 mẫu
- Bảo quản mẫu: Mẫu đất được lấy lên, mô tả, cho vào ống bảo quản, dán nhãn, bọc kín
bằng băng keo nhựa plastic hoặc sáp parafin và cho vào thùng mẫu bảo quản Mẫu được bảo quản nơi ẩm và râm mát, sau đó được khẩn trương vận chuyển kịp thời về phòng thí nghiệm cơ lý để thí nghiệm
- Lập phiếu lưu ký hố khoan: Tổ khoan đã ghi chép đầy đủ vào phiếu nhật ký hố khoan
toàn bộ các chi tiết có liên quan đến hố khoan như hình trụ địa chất, mô tả đất đá, ranh giới các lớp đất, số hiệu mẫu, độ sâu lấy mẫu, thí nghiệm xuyên tiêu chuẩn, độ sâu mực nước xuất hiện và ổn định, ngày khởi công và ngày kết thúc Phiếu nhật ký hố khoan này
sẽ được giao nộp về phòng thí nghiệm
- Lập nhật ký công trường: Tổ khoan đã ghi chép toàn bộ những hoạt động liên quan
trong suốt quá trình thực hiện công tác ngoài hiện trường theo từng ngày và theo trình tự thời gian từ khi khởi công cho đến khi kết thúc công tác như ngày chuyển trang thiết bị, ngày khởi công và kết thúc hố khoan, diễn biến trong quá trình khoan,… Nhật ký công trường có sự xác nhận của bộ phận giám sát của chủ Đầu tư hoặc đơn vị tư vấn giám sát từng ngày
4.3 Công tác thí nghiệm
4.3.1 Thí nghiệm hiện trường
4.3.1.1 Thí nghiệm SPT
Trang 27Gói thầu CT-CS-4.15C: Khảo sát, thiết kế kỹ thuật chi tiết, lập hồ sơ mời thầu và đánh giá hồ sơ dự thầu cho các hạng mục xây lắp của giai đoạn 2 và phần việc còn lại của giai đoạn 1
Báo cáo khảo sát địa chất khu vực Rạch Ngỗng Trang 6
- Mục đích: Xác định ranh giới địa tầng, trạng thái của đất loại sét, độ chặt của đất loại
cát
- Thiết bị: 1 búa 63,5kg, cần dẫn và mũi xuyên tiêu chuẩn
- Cách tiến hành thí nghiệm: Khi khoan đến độ sâu cần thí nghiệm, thổi rửa sạch đáy
hố khoan, lắp đặt dụng cụ thí nghiệm SPT, tiến hành đóng búa với chiều cao rơi 76cm cho mũi xuyên ngập vào trong đất nền 45cm, đếm số búa của từng vạch 15cm và ghi lại tổng số búa của 30cm đoạn sau là giá trị thí nghiệm (N30)
- Mật độ thí nghiệm: khoảng 2m tiến hành 1 lần
4.3.1.2 Thí nghiệm Cắt cánh VST
- Mục đích: Xác định sức kháng cắt trạng thái tự nhiên Su và độ nhạy S của đất
- Thiết bị: Máy LPC do Pháp sản xuất với các thông số kỹ thuật như sau:
+ Hộp đo ngẫu lực có khả năng đo ngẫu lực cực đại 8 Kgm (80 Nm) cho phép đo sức kháng cắt đến 96 KN/m2 đối với cắt cánh D = 60mm; 60 KN/m2 đối với cắt cánh D = 70mm; 20 KN/m2 đối với cắt cánh D = 100mm
+ Hệ thống cần ty và cần bao đồng tâm có chiều dài 1000mm
+ Thiết bị nén thủy lực Bitafonsa (Pháp sản xuất) dùng để nén hệ thống cần đồng tâm
và cánh cắt đến độ sâu yêu cầu
- Cách tiến hành thí nghiệm: Cánh cắt được đưa đến độ sâu thí nghiệm bằng máy nén
thủy lực, cố định cần bảo vệ vào khung máy, lắp hộp đo ngẫu lực cố định và cần bảo vệ Thí nghiệm được tiến hành nhanh với tốc độ quay của cánh cắt 3o/10 giây, các số liệu được ghi nhận cho mỗi 10 giây/lần đọc, giá trị ghi nhận liên tục cho đến khi đạt giá trị cực đại + số liệu 3 lần đo tiếp theo Thí nghiệm thực hiện ở hai trạng thái tự nhiên và phá hủy
- Chiều sâu thí nghiệm: 14m tính từ mặt đất hiện hữu
- Mật độ thí nhiệm: Khoảng 2m tiến hành 1 lần
- Khối lượng thí nghiệm : xem bảng 1
4.3.1.3 Quan trắc mực nước ngầm
- Phương pháp: Quan trắc mực nước ổn định tại hố khoan sau 24h kể từ khi khoan
xong
Trang 28Gói thầu CT-CS-4.15C: Khảo sát, thiết kế kỹ thuật chi tiết, lập hồ sơ mời thầu và đánh giá hồ sơ dự thầu cho các hạng mục xây lắp của giai đoạn 2 và phần việc còn lại của giai đoạn 1
Báo cáo khảo sát địa chất khu vực Rạch Ngỗng Trang 7
4.3.2 Thí nghiệm trong phòng
4.3.2.1 Thí nghiệm xác định các chỉ tiêu cơ lý của mẫu đất
- Các thí nghiệm được tiến hành như sau:
+ Khối lượng thể tích tự nhiên (γw)
+ Khối lượng riêng (γs)
Trang 29Gói thầu CT-CS-4.15C: Khảo sát, thiết kế kỹ thuật chi tiết, lập hồ sơ mời thầu và đánh giá hồ sơ dự thầu
cho các hạng mục xây lắp của giai đoạn 2 và phần việc còn lại của giai đoạn 1
Báo cáo khảo sát địa chất khu vực Rạch Ngỗng Trang 8
4.3.2.2 Thí nghiệm mẫu nước ăn mòn bê tông
- Thí nghiệm mẫu nước ăn mòn bê tông theo tiêu chuẩn TCVN 3994:1985
4.3.2.3 Thí nghiệm thành phần hóa học mẫu đất
- Thí nghiệm thành phần hóa học mẫu đất theo tiêu chuẩn QCVN 03 :2008/BTNMT
4.4 Khối lượng khảo sát
- Khối lượng: 08 hố khoan và 05 hố cắt cánh
Thí nghiệm SPT
Thí nghiệm VST
Thí nghiệm
9 chỉ tiêu cơ
lý
Thí nghiệm nén cố kết
Cv
Thí nghiệm nén 3 trục
UU
Thí nghiệm mẫu nước ăn mòn bêtông
Thí nghiệm thành phần hóa học của mẫu đất
Trang 30Gói thầu CT-CS-4.15C: Khảo sát, thiết kế kỹ thuật chi tiết, lập hồ sơ mời thầu và đánh giá hồ sơ dự thầu cho các hạng mục xây lắp của giai đoạn 2 và phần việc còn lại của giai đoạn 1
Báo cáo khảo sát địa chất khu vực Rạch Ngỗng Trang 9
4.5 Báo cáo khảo sát địa chất
4.5.1 Đặc điểm chung địa hình
- Khu vực khảo sát là đường đất hiện hữu, tương đối bằng phẳng, xung quanh là nhà hiện hữu
4.5.2 Đặc điểm địa chất thủy văn
- Mực nước ổn định sau khi kết thúc 24h tại các hố khoan khoảng -1.6m
4.5.3 Đặc điểm địa chất công trình
- Căn cứ vào tài liệu khoan khảo sát tại hiện trường và kết quả thí nghiệm trong phòng, xác định được 05 lớp đất Đặc điểm phân bố và tính chất cơ lý của các lớp được trình bày trong hình trụ, mặt cắt địa chất và bảng tổng hợp chỉ tiêu cơ lý các lớp đất Cụ thể, các lớp đất phân bố như sau:
1 Lớp Đ: Lớp đất mặt: Bề dày thay đổi từ 0.5 m (BH13) đến 1.6m (BH17) Không
lấy mẫu thí nghiệm trong lớp này
SPT
Độ sâu mặt lớp (m)
2 Lớp 1: (CH/CL) Sét rất dẻo, lẫn hữu cơ đôi chỗ lẫn cát, màu xám xanh - đen,
trạng thái dẻo chảy –dẻo chảy Bề dày lớp quan sát được thay đổi từ 26.1m (BH15) đến 32.5m (BH13) Thí nghiệm hiện trường cho giá trị N30 từ 0 đến 5 búa
Trang 31Gói thầu CT-CS-4.15C: Khảo sát, thiết kế kỹ thuật chi tiết, lập hồ sơ mời thầu và đánh giá hồ sơ dự thầu cho các hạng mục xây lắp của giai đoạn 2 và phần việc còn lại của giai đoạn 1
Báo cáo khảo sát địa chất khu vực Rạch Ngỗng Trang 10
SPT
Độ sâu mặt lớp (m)
3 Lớp 2: (CL) Sét ít dẻo lẫn cát, màu xám xanh, trạng thái dẻo mềm Lớp này chỉ
bắt gặp tại BH13 và BH14, với bề dày quan sát được là 1.6m (BH13) đến 2.3m (BH14) Thí nghiệm hiện trường cho giá trị N30 từ 5 đến 7 búa
SPT
Độ sâu mặt lớp (m)
Bề dày
4 Lớp 3: (SC-SM)/SC Cát bụi – cát sét/ cát sét, màu nâu vàng – nâu, kết cấu chặt
vừa Lớp này chỉ bắt gặp tại BH15 và BH17, với bề dày quan sát được là 1.2m (BH17) đến 7.4m (BH15) Thí nghiệm hiện trường cho giá trị N30 từ 11 đến 25 búa
SPT
Độ sâu mặt lớp (m)
Bề dày
Trang 32Gói thầu CT-CS-4.15C: Khảo sát, thiết kế kỹ thuật chi tiết, lập hồ sơ mời thầu và đánh giá hồ sơ dự thầu cho các hạng mục xây lắp của giai đoạn 2 và phần việc còn lại của giai đoạn 1
Báo cáo khảo sát địa chất khu vực Rạch Ngỗng Trang 11
5 Lớp 4: (CL) Sét ít dẻo, màu nâu – nâu đỏ - nâu vàng, trạng thái dẻo cứng Lớp này
với bề dày quan sát được là 2.4m (BH13) đến 4.0m (BH17) và chưa kết thúc tại đáy hố khoan Thí nghiệm hiện trường cho giá trị N30 từ 10 đến 33 búa
SPT
Độ sâu mặt lớp (m)
6 Lớp 5: S(CL) Sét ít dẻo pha cát, màu nâu vàng – nâu đỏ, trạng thái dẻo cứng Lớp
này chỉ bắt gặp tại BH13 và BH17, bề dày quan sát được là 3.0m (BH13) 3.0m (BH17) và chưa kết thúc tại đáy hố khoan Thí nghiệm hiện trường cho giá trị N30 từ 11 đến 18 búa
SPT
Độ sâu mặt lớp
Trang 33Gói thầu CT-CS-4.15C: Khảo sát, thiết kế kỹ thuật chi tiết, lập hồ sơ mời thầu và đánh giá hồ sơ dự thầu cho các hạng mục xây lắp của giai đoạn 2 và phần việc còn lại của giai đoạn 1
Báo cáo khảo sát địa chất khu vực Rạch Ngỗng Trang 12
4.5.4 Chỉ tiêu cơ lý các lớp đất
Bảng2
Tên lớp
Tên lớp
Tên lớp
Tên lớp
Tên lớp Lớp Lớp Lớp Lớp Lớp
- Giới hạn chảy % 56.0 45.3 27.7 41.4 35.3
- Giới hạn dẻo % 29.5 24.5 18.4 20.4 20.1
- Chỉ số dẻo 26.6 20.8 9.3 21.1 15.2
- Độ sệt B 1.10 0.67 0.40 0.28 0.38 + Lực dính kết Ctc kg/cm2 0.082 0.166 0.105 0.354 0.271 + Góc ma sát trong ϕtc Độ 3026’ 7053’ 22052’ 13010’ 16025’ + Chỉ số nén a1-2 kg/cm2 0.159 0.064 0.024 0.022 0.022
4.5.5 Kết luận và kiến nghị
- Căn cứ vào kết quả khảo sát hiện trường và thí nghiệm trong phòng, chúng tôi có kết luận và kiến nghị như sau: Lớp đất số 1, 2 là lớp đất yếu không thuận lợi đặt móng công trình
- Tuy nhiên, tùy theo hạng mục công trình mà có sự lựa chọn các giải pháp móng cũng như chọn biện pháp xử lý nền thích hợp đảm bảo tính ổn định và đem lại hiệu quả kinh
tế cao nhất
Trang 34Gói thầu CT-CS-4.15C: Khảo sát, thiết kế kỹ thuật chi tiết, lập hồ sơ mời thầu và đánh giá hồ sơ dự thầu cho các hạng mục xây lắp của giai đoạn 2 và phần việc còn lại của giai đoạn 1
Báo cáo khảo sát địa chất khu vực Rạch Ngỗng Trang 13
- Bảng thống kê chỉ tiêu cơ lý các lớp đất
- Kết quả thí nghiệm nén ba trục UU
- Kết quả thí nghiệm nén cố kết
- Kết quả thí nghiệm cắt cánh
- Kết quả thí nghiệm 9 chỉ tiêu cơ lý
- Kết quả thí nghiệm mẫu nước ăn mòn bê tông
- Kết quả thí nghiệm thành phần hóa học của mẫu đất