so sánh controlling and monitoring trong học phần quản lý dự án 2 của các bạn kinh tế chuyên ngành kinh tế đầu tư. Điều này giúp các bạn hiểu rõ hơn về 2 cách so sánh này,fgsauygegjdsbhvjdsbjvbdjvbsjdbvbvjbjvbjhbvhbxhbchzbb svsbdh sbsbs svbsjbvjhsbvjhbvhdjbsjbvjsbvjdbshbskbak sjhdgvjdsbvbjzbj vvbsbjsdbhdsb sbvsjhbfhdjbv

Trang 1

III Comparing between monitoring and control

The similarities:

1. Implementation time: regular, continuous

2. Scope of review: emphasize the internal area of the project

3. Review content: mainly related to activities, test the deployment process

4. Using data: daily details, not aggregated

Definition Project monitoring is

the process of monitoring the project's progress on time, cost and implementation process to regularly evaluate the

completion level and propose the measures and actions needed to implement it public project

Project control is

a three-step process:

- Collect information: progress, cost, technical requirements

- Compare this information with the plan and requirements set out

- Implement corrective measures to achieve the objectives set out

limit markers

- Limit check method

- The S curves

- Performance control - Value chart obtained

- progress reports

- Project meetings

- take a practical look

- Control the cost

of the project

- project of check time

- control of quality requirements

- control other issues

+ document control project + change control the following - Collecting - Comparing the

Trang 2

activities information

about the project performance

- Providing forecasts for future work

- Tracking and analyzing risks

- Communicating the status of the project

information with the project

management plan

- Compiling and analyzing the information

- Developing preventive action plans to keep the project within the variance

thresholds

- Developing corrective action plans to bring the project back within the variance thresholds

- Recommending defect repairs for processes that allow poor performance

- Submitting change requests

to implement the preventive and corrective actions, defect repairs, or other necessary

changes Goals Three Dimensions of

Project Controlling:

- Target Control

- Time Control

- Cost Control

- Specific

- Measurable

- Achievable

- Relevant

- Time-bound